This file is a Metropolitan Airports Commission (MAC) Uninterruptible Power Supply (UPS) inventory spreadsheet documenting the agency's comprehensive UPS systems and maintenance requirements across the Minneapolis-St. Paul International Airport (MSP) campus as of September 8, 2026. The Metropolitan Airports Commission is soliciting an RFP for UPS services that includes personnel, labor, transportation, trucks, tools, and equipment necessary to provide maintenance on MAC's UPS systems. The spreadsheet identifies approximately 150+ individual UPS units and related backup power systems located throughout various airport facilities, including terminal buildings, concourses, fire stations, field maintenance buildings, parking structures, and runway facilities. A mandatory pre-proposal meeting and facility tour is scheduled for August 31, 2026, from 9:00 a.m. to 11:00 a.m. CST, with the tour portion beginning at 10:00 a.m. The inventory includes detailed specifications for each unit, including asset identification, building location, equipment make and model, serial numbers, power ratings in KVA, voltage configurations, battery types and quantities, installation dates, warranty end dates, battery replacement due dates, and unit replacement schedules.
The spreadsheet reveals significant ongoing maintenance and replacement requirements, with numerous units scheduled for battery replacement throughout 2024-2026 and many units approaching end-of-life replacement dates between 2026 and 2047. Equipment manufacturers represented include Eaton, APC, Schneider Electric, Toshiba, GE, Liebert, and others, with power capacities ranging from 3 KVA to 300 KVA. Multiple units are noted as part of capital improvement projects such as the 2024 Terminal 2 North Gate Expansion (106-3-627), Concourse G Rehabilitation (106-2-1013), and Safety & Security Center Phase 2 (106-3-664), with several new installations anticipated in Q4 2026. The inventory indicates that battery replacement has already occurred on some units, while others have replacement due dates spanning the next several years, suggesting a significant service and maintenance demand for the selected vendor. The current environment shows MAC actively managing aging infrastructure with planned replacements integrated into broader capital improvement initiatives across the airport campus.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Workforce Certificate Form.pdf | ||
| 9-SUBCONTRACTOR INFORMATION FORM.docx | DOCX document | |
| 3-MAC UPS SPREADSHEET for RFP 2026.08.13 .pdf | ||
| 5-PROPOSAL FORM.docx | DOCX document | |
| 1-08 20 2026 UPS RFP Solicitation Document.pdf | ||
| 6-RESPONSE FORM.docx | DOCX document | |
| 8-PRICE FORMS.docx | DOCX document | |
| 11-VENDOR QUALIFICATIONS FORM.docx | DOCX document | |
| 14-09 17 2026 Addendum 2 for UPS.pdf | ||
| 4-AFFIDAVIT OF NON COLLUSION.docx | DOCX document | |
| 12-09 11 2026 2026 Addendum for UPS.pdf | ||
| 7-REFERENCES.docx | DOCX document | |
| 2-MAC UPS Location Plans 2026-08-13.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
METROPOLITAN AIRPORTS COMMISSION TOTAL UPS SERVICE/MAINT/REPAIRS/INVENTORY 09/08/2026
ASSET BLDG DOOR # AREA MAKE MODEL SERIAL # KVA
INPUT / OUTPUT
VOLTAGE
SINGLE OR
DUAL
SOURCE
Y or N ext.
Maint.
Bypass
BATTERY TYPE/QUANTITY
DATE
INSTALLED
WARRANTY END
DATE
BATTERY
REPLACEMENT DUE
BATTERY
REPLACED
UNIT
REPLACEMENT DUE
NOTES
14UT-1540-1 Fire Foam Buiding 14UT-1540-M FIRE FOAM BLDG Eaton PW9130N3000T GJ361A0101 3.00 120/120 ? Yes CSB-HR1234W 4/1/2016 NA 8/15/2029 8/15/2024 NA
UPS-1416-1 QTA 18AB-1416-C QTA Toshiba 1000 SERIES UT1A1A030C6 13031000202 3.00 208/120 ? Yes
UT1-DC-0320
12V/9AH
8/1/2014 8/1/2016 10/1/2029 10/1/2024 NA
1AF-1710-C Air Freight Facility 1AF-1710-CX TR Eaton 9PX3000RT PA20M03RCM 3.00 120/120 ? No Model 744-A3122 battery pack 5/1/2019 NA 10/2/2029 10/2/2024 NA
172 ALEC North 1AL 1050.01 Office Toshiba 1600EP 100300888
10.00 or
20.00
120/240 ? Yes
Maintenance Free Sealed (4) 72v Hot Swap Lead
Acid battery. Enclosed unit.
6 Batteries per Pack/ 4 Packs
3/31/2010 NA 12/31/2031 12/3/2024 3/31/2030
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
1024-1B MAC Data Center 1DC-1024-E MAC Data Center GE
TLE
SBB500-3BR-47-N
AS1500-4913-B032A 500.00 480/277 Dual Yes (120) 3 strings of 40 Data Safe 12HX505-FR NA TBD 1/4/2028 1/4/2023 NA
1024-1Y MAC Data Center 1DC-1024-E MAC Data Center GE
TLE
SBB500-3BR-47-N
AS1500-4913-B033A 500.00 480/277 Dual Yes (120) 3 strings of 40 datasafe 12HX505-FR NA TBD 1/4/2028 1/4/2023 NA
LUPS-1DI-2050.01 1DI 1DI-2050 De-Icing Schneider Elec
- Galaxy VS GVSUPS10K0B4FS TBD 10.00 208/120 - 208/120 Dual Yes VRLA 2026 TBD 7/31/2031 NA 2046
New unit - Installed by North Field Maintenance
Runway Deicing Storage Facility
1EG-1130-1
T1 Generator
Building
1EG-1130 -E
T1 Generator
Room Eaton 9390-80 EE253CAB07 60.00 480/480 ? Yes (36) DEKA HIGH RATE HR3000 6/15/2011 NA 2/20/2030 2/20/2025 6/15/2031
RSB-1EG1130-1
T1 Generator
Building
1EG-1130 -E
T1 Generator
Controls Rm
Cummins /
Saft AT10-048-012-0113000 327414/294540 NA 120Vac 48Vdc Single No (38) Saft SPH 130, Ni-Cd 5/31/2021 5/31/2022 5/31/2031 NA TBD
Station Battery
NiCd
UPS 1028-1B
(268) Fire Station #1 1FD-1028A-E AARF Schneider GALAXY 3500 PS1442132445 20.00 208/120 NO Yes 16 SYBTU 1/4 SYBT4 10/30/2022 10/30/2023 10/30/2027 N/A 10/30/2042
UPS 2023-1Y Fire Station #1 1FD-2023.01-E AARF Eaton 9390 SERIES 570 EE345CBB10 50.00 208/120 208/120 ? Yes
(32) Deka Unigy 45HR2000
32 Cells
1/1/2012 NA 11/7/2028 11/7/2023 1/1/2032
UPS 2107-2 Fire Station #1 1FD-2107-E Second Level APC Galaxy 3500 PS1237131523 30.00 208/120 ? Yes 16 SYBTU1-PLP/4 SYBT4 6/1/2013 6/1/2015 4/9/2029 4/9/2024 6/1/2033
UPS 2107-1 Fire Station #1 1FD-2107-E 2nd Level APC Galaxy 3500 PS1413130647 15.00 208/120 ? Yes 8 SYBTU1-PLP/2 SYBT4 6/1/2013 6/1/2015 8/15/2029 8/15/2024 6/1/2033
UPS 2184-1 Field Maintenance 1FM-2184 FM upper level APC Galaxy 3500 PS1547331284 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
1/1/2016 NA 6/11/2030 6/11/2025 1/1/2036
275 MSP Landside 1SB-1250-C Taxi Starter Booth
Post Rd
APC
Smart-UPS RT
SURTD5000XLT
NS0632006381 5.00 240/120 ? No (32) 12v/9.2AH
SURTRK2
9/26/2024 NA 9/26/2029 9/26/2024 TBD Need to confirm unit replacement date
173 ALEC South 2AL-1032-C Office APC SRT3000R MXLA AS2338292684 3.00 120/120 ? No Maintenance Free Sealed (4) 12v 33AH Lead Acid battery. Enclosed unit.
12/14/2023 7/17/2005 12/14/2028 12/14/2023 12/14/2029
2AL-1054-C ALEC South 2AL-1054-C ground level MGE Galaxy 3500 PS1214130612 15.00 208/120 ? Yes 16 SYBTU1/4 SYBT4 6/1/2013 6/1/2015 8/15/2029 8/15/2024 6/1/2033
UPS 2301-1 (221) Field Maint Bldg #9 2FM-2301-C South Field Maint
Mezzanine Eaton 9355-15 EX314AXX02 15.00 208/120 Single Yes
High Rate HSL 1079
12V/9AH 36W per Cell
11/1/2005 NA 12/31/2031 11/17/2023 11/1/2025
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
LUPS-3GH2500.01-1 GATE 269 3GH2500.01-1 LANDSIDE Schneider GALAXY VS QD2223180803 10.00 208/208 Dual Yes CS3 HR 1234W F2FR (320) 4/5/2023 4/5/2025 4/5/2028 4/5/2023 4/5/2043
4CF-1035-1 Drivers Training 4CF-1035-C Drivers Training GE LP33 Q1020-1414-B555B 20.00 208/120 ? Yes
(24) data safe 12HX150R-FR
(23F1Y150-C2881B08000A01SW05)
7/1/2017 NA 7/20/2027 7/20/2022 7/1/2034
UPS-A2359-1 T1 A-2359-E A Concourse Eaton 93PM MODEL 50 EJ511UXX06 40.00 480/480 ? Yes (180) PWHR1234W2FR 4/1/2016 NA 7/18/2027 7/18/2022 4/1/2036
UPS-B0208-1 T1 B-0208-E B Concourse Eaton 93PM-50-1 EM176UXX02 40.00 480/480 ? Yes (180) PWHR1234W2FR NA NA 11/13/2028 11/13/2023 1/1/2038
180 MSP Landside Between Red/Blue Parking
Ramp
Spline Road meets Hub Core Eaton 9SX700 PC21M30HFK 3.00 120/120 Single No Eaton RBC2 744-A4310 3/1/2023 NA 3/1/2028 NA 3/1/2029 http://www.apc.com/
INPUT / OUTPUT
VOLTAGE
SINGLE OR
DUAL
SOURCE
Y or N ext.
Maint.
Bypass
BATTERY TYPE/QUANTITY
DATE
INSTALLED
WARRANTY END
DATE
BATTERY
REPLACEMENT DUE
BATTERY
REPLACED
UNIT
REPLACEMENT DUE
NOTES
UPS1016-1 T1 C-1016-E C Concourse APS MGE Galaxy 3500 PS1515131919 10.00 208/120 ? Yes 8 SYBTU1/2 SYBT4 10/1/2015 10/1/2015 3/19/2030 3/19/2025 10/1/2035
UPS 1273-1 T1 C-1273-E C Concourse APS MGE Galaxy 3500 PS1519130057 10.00 208/120 ? Yes 8 SYBTU1-PLP 10/1/2015 10/1/2015 2/21/2030 2/21/2025 10/1/2035
LUPS-1480-1 T1 C-1480-C C Concourse Schneider GALAXY VS QD2204181002 20.00 208/120 Dual Yes (320) CSB HR 1234W F2FR 6/21/2022 6/21/2024 6/21/2027 6/21/2022 6/21/2042
LUPS-C1621-1 T1 C-1621-E
C Concourse lower level APS MGE Galaxy 3500 PS1237131519 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
6/1/2013 6/1/2015 1/28/2030 1/28/2025 6/1/2033
UPS-1623-1
(217) T1 C-1623-E
EMC
1st Floor Area B POWERVAR ACDEF20.0-20Y PS14421132448 20.00 208/208 Single Yes HR1290WF2FR CSB 5/6/2022 NA 2/23/2029 2/23/2024 5/6/2042
C-1903-1 T1 C-1903-E C Concourse APC MGE 5000 Galaxy
72-174001-00 3AER12006001 40.00 480/277 ? Yes (36) DATA SAFE 12HX300-FR 10/1/2015 TBD 3/27/2030 3/27/2025 10/1/2035
UPS-3050-1B T1 C-3050.06-E
Penthouse above
C2 Eaton 93PM MODEL 50 EM031UXX06 40.00 480/480 Dual Yes (20 Trays) Eaton PWHR1234W2FR TBD 9/18 TBD 4/4/2029 4/4/2024 1/1/2037
UPS-3050-1Y T1 C-3050.06-E
Penthouse above
C2 Eaton 93PM MODEL 50 EM031UXX07 40.00 480/480 Dual Yes (20 Trays) Eaton PWHR1234W2FR TBD 9/18 TBD 5/14/2029 5/14/2024 1/12037
UPS 3415-1 T1 C-3415-E C Concourse APS MGE Galaxy 3500 PS1525334496 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
4/29/2016 NA 3/26/2030 3/26/2025 4/29/2036
LUPS-CX4112-1 T1 CX-4112-C Hub Core APS MGE Galaxy 3500 PS1428232048 30.00 208/120 ? Yes 16 SYBTU1-PLP/4 SYBT4 6/1/2015 TBD 3/26/2030 3/26/2025 6/1/2035
LUPS-D3068-1 T1 D-3068-M D Concourse APC GVSUPS50KB4D QD2348180282 20.00 120/120 Dual Yes (4) GVSBTHU / (40) HRL1234WF2FR 8/19/2024 8/19/2026 8/19/2029 NA 8/19/2044
UPS-1317-1 T1 E-1317C E Concourse APC MGE Galaxy 5000 3AEQ18012001 60.00 480/277 ? Yes
(36) DEKA UNIGY HR3000
72-174021-14, J14-21392
6/29/2015 TBD 2/21/2030 2/21/2025 6/29/2035
LUPS-F-1231-1 T1 F-1231-E
F Concourse lower level APC MGE Galaxy 3500 PS1214130608 15.00 208/120 ? Yes (320) CS3 HR 1234W F2FR 6/1/2013 6/1/2015 1/31/2030 1/30/2025 6/1/2033
UPS-F2435-1 T1 F-2435-E
F Concourse Main
Level Eaton
9PX3000RT W/
9PXEBM72RT
PA20J49EG7 3.00 120/120 ? No
(18) Maintenance Free Sealed 12v 9AH Lead Acid battery. Enclosed unit.
6/23/2020 6/23/2022 6/23/2030 5/1/2025 NA
UPS 1045-1 T1 G-1045-E
G Concourse
South Baggage
EDS
Eaton 9395-550 EE102BAA01 300.00 480/277 Dual Yes
DATA SAFE 12HX540
2 VYCON VDC XE UA3NLETBJ017000
6/1/2021 2/14/2022 12/31/2031 6/1/2021 NA
Unit replacment in 2024 Concourse G Rehab - 106-
2-1013 - expected install Q4 2026.
Battery replacement date is for new unit.
UPS 1250-1 T1 G-1250-E G concourse FIS APS MGE Galaxy 3500 PS1547331288 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
6/25/2015 NA 3/21/2030 3/21/2025 6/25/2035
UPS-G1257-1 T1 G-1257-E G Concourse Eaton 93PM-50-1 EN2014UXX04 40.00 480/480 ? Yes (36) PWHR124W2FR 8/20/2019 8/20/2021 1/27/2030 1/27/2025 8/20/2039
UPS-1424.02-1 T1 G-1424.02-C G Concourse APC
SMART UPS RT 3000
SURTA3000XL
AS2503291375 3.00 120/120 ? No CP1290FR 5/12/2025 NA 5/12/2030 5/12/2025 NA
HUPS-G1714-1 T1 G-1714-E G Concourse APC MGE Galaxy 5000 C11722190005 130.00 480/480 ? Yes
(72) C&D UPS12-300MR
(2) External Battery Cabinets 4/23/2018 4/23/2020 4/23/2028 5/16/2024 4/23/2038
219 T1 G-3208-E G Concourse FIS -
G-3208 MGE Galaxy 3500 QS1815251633 30.00 208/3 208/120 ? Yes 16 SYBTU1/4 SYBT4 10/12/2018 TBD 6/30/2031 8/13/2024 NA
Unit replacment in 2024 Concourse G Rehab - 106-
2-1013 - expected install Q2 2026.
Battery replacement date is for new unit.
UPS-3208-1 T1 G-3208-E G Concourse APS MGE Galaxy 3500 QS1815251633 30.00 208/120 Single Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
Q2 2026 TBD 6/30/2031 8/13/2025 TBD
Unit replaement in 2024 Concourse G Rehab - 106-
2-1013 - MAC00498 - expected install Q2 2026.
Battery replacement date is for new unit.
LUPS-G3174-1 T1 G-3714-E G Concourse Schneider GALAXY VS QD2204181000 25.00 208/208 Dual Yes (4) GVSBTHU / (40) HRL1234WF2FR 6/21/2022 6/21/2024 6/30/2031 NA 6/21/2042
Unit replacement in 2024 Concourse G Rehab - 106-
2-1013 - expected removal Q2 2026.
Battery replacement date is for new unit.
GL-1002-C Glycol Building GL-1002-C Glycol Building APC Smart UPS-SRT3000XLA AS2151192057 3.00 120/120 ? Yes APCRBC152 8/4/2022 8/4/2024 8/4/2027 NA 8/4/2028
INPUT / OUTPUT
VOLTAGE
SINGLE OR
DUAL
SOURCE
Y or N ext.
Maint.
Bypass
BATTERY TYPE/QUANTITY
DATE
INSTALLED
WARRANTY END
DATE
BATTERY
REPLACEMENT DUE
BATTERY
REPLACED
UNIT
REPLACEMENT DUE
NOTES
GO-0094-1B General Office GO-0094-E GO Lower Level Powerware 9390 EE345CBB11 50.00 208/120 208/120 ? Yes (32) Deka Unigy 45HR2000 2/10/2012 NA 6/20/2028 6/20/2023 2/10/2032
UPS-0094-1B General Office GO-0094-E GO Lower Level Eaton 9390 series 570 EE345CBB11 50.00 208/120 208/120 ? Yes (32) Deka Unigy 45HR2000 2/10/2012 NA 6/20/2028 6/20/2023 2/10/2032
UPS-0094-1Y General Office GO-0094-E GO Lower Level Eaton 9390 series 570 EE345CBB09 50.00 208/120 208/120 ? Yes (32) Deka Unigy 45HR2000 2/10/2012 NA 6/20/2028 6/20/2023 2/10/2032
UPS GO-1128-1 General Office GO-1128-E GO Main Level Liebert NXb 20 M14J7H0018 20.00 208/120 ? Yes (24) Data Safe 12HX100R-FR 6/1/2017 TBD 10/28/2030 10/28/2025 6/1/2037
LUPS-HC4698-1 T1 HC-4698
4TH Floor Badging
Area Eaton 9355-30 EQ505KXX10 30.00 208/208 Dual Yes (60) Eaton PWHR1234W2FR 5/24/2022 2024 5/24/2027 TBD 5/24/2042
UPS-HLR3661-1 T2 HLR-3661-E Light Rail Platform Eaton
9PX3000RT W/
9PXEBM72RT
GA20J48006 3.00 120/120 ? No
(18) Maintenance Free Sealed 12v 9AH Lead Acid battery. Enclosed unit.
2/1/2021 NA 9/4/2031 9/4/2026 2/1/2027
46, CLUP2082-1 T2 HPC-2081-C 2nd Floor Core Eaton 93PM-50-1 ET201UXX07 15.00 480/3 ? No 12V/9AH 9/30/2024 NA 9/30/2029 NA 9/30/2044
HUPS-HPC2082-1 Purple ramp HPC-2082-E T2 Galaxy VS GVSUPS100KB5D QD2422180258 80.00 480V/480V Dual Yes (44) GVSBTHU 3/6/2026 3/6/2028 3/6/2031 NA 3/6/2046
HPC-2182-1 T2 HPC-2182-C CSB Toshiba UT1A1A030C6 1301000201 3.00 120 ? Yes 12V/9AH 8/1/2014 8/1/2016 NA 12/5/2024 11/25/2031 To be removed in 2024 EIP project. Expected 2026.
UPS-1034-1 (48) T2 HPM-1034.02-E Electric Room MGE Comet UPS-72-160802-42 B02-10679 80.00 480/3 208/120 Single Yes (36) C&D UPS12-400MR 11/1/1999 NA 12/31/2031 1/31/2025 11/1/2019
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
LUPS-HPO2537-1 T2 HPO-2537-C
2nd Floor Orange
Ramp APS MGE Galaxy 3500 PS1515131914 10.00 208/120 ? Yes
SYBTU1- PLP
(320) CS3 HR 1234W F2FR
10/1/2015 TBD 6/2/2030 6/2/2025 10/1/2035
UPS-M591.01 (277) T2 HPO-M591.01
Skyway Core
Comm Rm APS MGE Galaxy 3500 QS2003150254 30.00 208/3 208/120 ? Yes (12) OG-SYBTU1 / (4) SYBTU1-PLP 5/19/2022 5/19/2024 5/18/2027 NA 5/19/2042
LUPS-HPOM617-1 T2 HPO-M617-CX
Mezzanine
Orange Ramp MGE Galaxy 3500 QS1939150766 30.00 208/3 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
5/19/2022 5/19/2024 5/18/2027 5/19/2022 5/19/2042
HUPS 1135-1 T2 HPP-1135-C Ready Return Toshiba 1000 Typeform
UT1A1A030C6
13031000199 3.00 120 ? Yes
UT1-DC-0320
12V/9AH
8/1/2014 8/1/2016 10/1/2029 10/1/2024 NA
CHUPS-HPP1346-1 T2 HPP-1346-C North Helix Schneider Galaxy VS QS2029181820 80.00 480/480 Dual Yes (48) GVSBTHU Moduel / (480) HRL1234WF2FR 5/1/2024 None 5/1/2029 TBD 5/1/2044
UPS 1064-1 T2 HT-1064-E
Ground Level
West APS MGE Galaxy 3500 PS1515131912 10.00 208/120 ? Yes
SYBTU1-PLP
8 SYBTU2/2 SYBT4
10/1/2015 TBD 5/30/2030 5/30/2025 10/1/2035
UPS1171-1Y T2 HT-1171-E
Ground Air Bag
Claim Eaton 9390 EE345CBB13 40.00 208/120 ? Yes
(32) Deka Unigy 45HR2000
FE354DAA01
1/1/2012 NA 2/22/2027 2/22/2022 3/1/2032
UPS1171-1B T2 HT-1171-E
Ground Air Bag
Claim Schneider Symmetra PX2 QD1703140069 50.00 208 3/4 208/120 ? Yes 28 SYBTU1-PLP/7 SYBT4 8/21/2017 NA 2/21/2029 2/21/2024 8/21/2037
HT-1293-1 T2 HT-1293-E Terminal 2 Schneider Galaxy VS 102311008128
100.00 expandable to 150.00
480 Dual Yes (40) Leoch XP12-300FR 4/17/2024 4/17/2026 4/17/2029 NA 4/17/2044
228 T2 HT-1402.03-C OSR Data room GE SGA050-1-02-N P0050-1005-0726N 50.00 480/277 ? No (32) DATASAFE 12HX300-FR 11/1/2006 NA 12/31/2031 11/9/2023 11/1/2026
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
UPS1537-1B T2 HT-1537.05-E Ground Level East Eaton 93PM MODEL-50-1 EM123UXX02 40.00 480/480 ? Yes (20 Trays) Eaton PWHR1234W2FR 6/7/2017 NA 3/1/2029 3/1/2024 6/7/2037
UPS-1537-1Y T2 HT-1537.05-E Ground Level East Schneider
MGE
Galaxy 5000 3AET12005001 40.00 480/480 ? Yes (36) VISION 6FM75D-X 6/7/2017 NA 7/1/2029 7/1/2024 6/7/2037
HUPS-HT1708-1 T2 HT-1708 T2 Schneider Galaxy VM TBD 180.00 480/480 Dual Yes TBD TBD TBD 12/31/2031 NA 1/1/2047
New unit - Installed as part of 2024 Terminal 2
North Gate Expansion - 106-3-627
Estimated startup 12/31/2026
INPUT / OUTPUT
VOLTAGE
SINGLE OR
DUAL
SOURCE
Y or N ext.
Maint.
Bypass
BATTERY TYPE/QUANTITY
DATE
INSTALLED
WARRANTY END
DATE
BATTERY
REPLACEMENT DUE
BATTERY
REPLACED
UNIT
REPLACEMENT DUE
NOTES
HUPS-HT1708-2 T2 HT-1708 T2 Schneider Galaxy VM TBD 180.00 480/480 Dual Yes TBD TBD TBD 12/31/2031 NA 1/1/2047
New unit - Installed as part of 2024 Terminal 2
North Gate Expansion - 106-3-627
Estimated startup 12/31/2026
STB-HT1825-1 T2 HT-1825
T2 Generator
Controls Rm Cummins BAT999999A0284 TBD NA 120 48Vdc Single No (8) Concentric 12AVR150ET 4Q 2026 TBD 10/15/2031 NA TBD
Station Battery
New unit - Installed as part of 2024 T2 North
STB-HT1825-2 T2 HT-1825
T2 Generator
Controls Rm Cummins BAT999999A0284 TBD NA 120 48Vdc Single No (8) Concentric 12AVR150ET 4Q 2026 TBD 10/15/2031 NA TBD
Station Battery
New unit - Installed as part of 2024 T2 North
HUPS-HT3226.01-1 T2 HT-3226.01 Penthouse Schneider GALAXY VS QD2208181241 80.00 480/480 Dual Yes (11) GVSBTH4 / (110) CS3 HR 1234W F2FR 12/9/2022 12/9/2024 12/9/2028 NA 12/9/2042
HUPS 1011-1Y LPM LPM-1011A
T1 parking management
MGE
APC-MGE 5000 Galaxy
72-174001-00 C11710190012 80.00 480/480 ? Yes
(36) UPS12-400MR
IP1700182-1A, 0S38-36D400-432-1-1D250-A
10/1/2017 NA 11/7/2028 10/31/2023 10/1/2037
HUPS 1011-1B LPM LPM-1011A
T1 parking management
MGE
APC-MGE 5000 Galaxy
72-174001-00 C11710190011 80.00 480/480 ? Yes
(36) UPS12-400MR
IP1700182-1A, 0S38-36D400-432-1-1D250-A
10/1/2017 NA 11/7/2028 11/1/2023 10/1/2037
UPS LT-0099-1Y T1 LT-0099-E
M1
Valet West Eaton 9390 EE345CBB12 50.00 208/120 ? Yes (32) Data Safe 12HX205-FR 11/29/2011 NA 7/15/2027 7/15/2022 11/29/2031
UPS LT-0099-1B T1 LT-0099-E
M1
Valet West Eaton 9390 EE345CBB08 50.00 208/120 ? Yes (32) Data Safe 12HX205-FR 11/29/2011 NA 11/29/2027 7/15/2022 11/29/2031
UPS-0302-1 T1 LT-0302-C Valet North APS MGE Galaxy 3500 QS1950150019 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
8/28/2020 8/28/2022 4/30/2030 2/27/2025 8/28/2040
UPS-LT0511-1 T1 LT-0511-C Valet Eaton 9355 BN075KXX05 20.00 208/120 ? Yes (18) PWHR 1234 W2 FR 6/12/2019 6/12/2021 1/24/2030 1/24/2025 6/12/2039
LUPS-LT0685-1 T1 LT-0685 Valet APS MGE Galaxy 3500 QS2003150243 24.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
11/10/2020 11/10/2022 7/10/2030 7/10/2025 11/10/2040
LUPS-LT0810-1 T1 LT-0810 GTC Eaton 9355 BM433KXX06 20.00 208/120 ? Yes (18) PWHR 1234 W2 FR 11/26/2019 11/26/2021 12/17/2029 12/17/2024 11/26/2039
UPS-LT0934-1 T1 LT-0934-C GTC APS MGE Galaxy 3500 QS1637353110 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
10/5/2017 10/5/2019 6/21/2029 6/21/2024 10/5/2037
UPS-1229-1 T1 LT-1229-C
Main Terminal baggage APS MGE Galaxy 3500 QS1912150218 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
4/7/2021 4/7/2023 4/1/2031 4/1/2026 4/7/2041
UPS-LT1378-1 T1 LT-1378 Tug Drive APS MGE Galaxy 3500 QS1838250142 30.00 208/120 ? Yes
(12) SYBTU1-PLP / (96) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
2/21/2019 2/21/2021 9/27/2029 9/27/2024 2/21/2039
UPS-LT-1387-1 T1 LT-1387.01-C
Main Terminal baggage APC MGE Galaxy 3500 QS2136250012 20.00 208/120 Dual Yes (8) SYBTU1-PLP/2 SYBT4 3/1/2015 TBD 4/12/2029 4/12/2024 3/1/2035
UPS-LT1710A-1 T1 LT-1710A
South Swtich
Room Eaton
9PX3000RT W/
9PXEBM72RT
PA20K43BFE 3.00 120/120 ? No
(18) Maintenance Free Sealed 12v 9AH Lead Acid battery. Enclosed unit.
3/10/2020 3/10/2022 8/29/2029 8/29/2024 NA
UPS-1990-1 T1 LT-1990
North Switch
Room
APC
SRT3000RMXLA-NC
W/SRT96RMBP
AS1821L01646 3.00 120/120 ? No
(2) APCRBC152 /
Maintenance Free Sealed (16) 12v 5.5AH Lead Acid battery. Enclosed unit.
3/10/2020 3/10/2022 8/9/2027 8/29/2024 3/10/2040
UPS-LT2140-1 T1 LT-2140-C Ticketing Area APS MGE Galaxy 3500 QS1912150205 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
5/19/2020 TBD 4/30/2030 4/30/2025 5/19/2040
UPS-2254-1 T1 LT-2254.01-C
Main Terminal
Food Court APS MGE Galaxy 3500 PS1232331705 15.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
6/1/2013 6/1/2015 9/3/2029 9/3/2024 6/1/2033
LUPS-LT2279-1 T1 LT-2279 Ticketing Area Schneider GALAXY VS QD2217180856 20.00 208/208 Dual Yes (12) GVSBTHU / (120) HRL1234WF2FR 4/12/2023 4/12/2025 3/10/2029 NA 4/12/2043
UPS 3071-1 T1 LT-3071-C Mezzanine APS MGE Galaxy 3500 PS1237131511 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
6/1/2013 6/1/2015 8/29/2029 8/29/2024 6/1/2033
LUPS-3255-1 T1 LT-3255.04 Center Mezzanine Schneider GALAXY VS QD2201181313 20.00 208/120 Dual Yes (320) CSB HR 1234W F2FR 6/21/2022 6/21/2024 6/21/2027 NA 6/21/2042
INPUT / OUTPUT
VOLTAGE
SINGLE OR
DUAL
SOURCE
Y or N ext.
Maint.
Bypass
BATTERY TYPE/QUANTITY
DATE
INSTALLED
WARRANTY END
DATE
BATTERY
REPLACEMENT DUE
BATTERY
REPLACED
UNIT
REPLACEMENT DUE
NOTES
UPS LT-3401-1 T1 LT-3401-E T1 Training Powerware 9355-30 BD426KXX06 20.00 208/120 ? Yes (24) PWHR1234W2F NA NA 12/31/2031 11/10/2023 NA
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
UPS4010-1 T1 LT-4010 Main Terminal APS MGE Galaxy 3500 QS1645251165 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
2/22/2018 2/22/2020 8/14/2029 8/14/2024 2/22/2038
UPS 4451-1 T1 LT-4451-C Main Terminal APS MGE Galaxy 3500 QS1861150840 30.00 208/120 ? Yes
(16) SYBTU1-PLP / (128) Maintenance Free Sealed
12v 7.5AH Lead Acid battery. Enclosed unit.
1/30/2019 1/30/2021 1/29/2030 1/29/2025 1/30/2039
UPS-MC2601-1 T1 MC-2601AX East Switch Room APC
SRT3000RMXLA-NC
W/SRT96RMBP
AS1827193855 3.00 120/120 ? No
(2) APCRBC152 /
Maintenance Free Sealed (16) 12v 5.5AH Lead Acid battery. Enclosed unit.
2/1/2021 NA 5/1/2029 5/1/2024 2/1/2027
188 MSP Airside ME1-1000B-EX
ME1 Building -
Runway 17/35
West
Chloride EDP EDP70/30/15 4x4 B214273 20.00 480/3 480/3 ? Yes (24) DATA SAFEHX540-FR 12/12/2001 NA 12/31/2031 7/15/2022 12/12/2021
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
187 MSP Airside ME2-1000B-E
ME2 Building -
Runway 17/35
East
Chloride EDP EDP70/20/15 4x4 B214274 15.00 480/3 208/120 ? ? (24) C and D UPS 12-490MR 1/22/2003 NA 12/31/2031 11/26/2024 1/22/2023
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
UPS 189 MSP Airside ME3-1000B-EX ME3 Building -
Runway W-Y Y-3 Chloride ETL EDP70/20/154X4 B220267 24.00 480/3 208/120 ? Yes DEKA UNIGY HR3000 11/1/2020 USED 12/31/2031 3/10/2020 NA
Unit replacement included in 2026 EI/EPU - 106-2-
1118 - MAC03038 - expected install Q4 2026.
Battery replacement date is for new unit.
HUPS-ME41000-1 MSP Airside ME4-1000B-EX Runway 4-22
West APC GVUPS20KB4G QD2425182572 20.00 480/277 Dual Yes
(3) Galaxy VS Smart Modular Battery String High
Capacity 9Ah
5/5/2025 5/5/2027 5/5/2030 TBD 1/1/2045
272 MSP Airside ME4-1000B-EX Runway 4-22
West Chloride EDP EDP 70+ B260918 18.00 480/3 480/277 ? Yes (24) DATA SAFE 12HX150R FR 11/1/2006 NA NA 11/8/2023 NA
Unit removed in 2024 Tunnel Fan Replacement project - 106-1-347 - MAC04835
Replacement unit is HUPS-ME41000-1
HUPS-ME51000-1 MSP Airside ME5-1000B-X Runway 4-22 East APC GVUPS20KB4G QD2425182571 20.00 480/277 Dual Yes
(3) Galaxy VS Smart Modular Battery String High
Capacity 9Ah
5/6/2025 5/6/2027 5/6/2030 TBD 1/1/2045
271 MSP Airside ME5-1000B-X Runway 4-22 East Chloride EDP EDP 70+ B260921 18.00 480/3 480/277 ? Yes
(24) DEKA UNIGY U1HR1500
ACAB-24K
11/1/2006 NA NA 2/25/2021 NA
Unit removed in 2024 Tunnel Fan Replacement project - 106-1-347 - MAC04835
Replacement unit is HUPS-ME51000-1
HUPS-PB6107-1 T1 PB-6107 Blue 6th Floor Eaton 93PM-50-1 EN354UXX08 40.00 480/480 Dual Yes Eaton PWHR1234W2FR Sealed (5 Strings) 4/1/2020 2/14/2022 6/2/2030 6/2/2025 4/1/2040
HUPS-PB6107-2 T1 PB-6107 Blue 6th Floor Schneider Galaxy VS QS2032181136 40.00 480/480 ? Yes (320) CS3 HR 1234W F2FR 11/1/2021 Pending CX 3/20/2031 3/20/2026 11/1/2041
HUPS-PGN1980-1 T1 PGN-1980
Green Ramp
Ground Eaton 93PM-50-1 EN354UXX09 40.00 480/480 Dual Yes (180) PWHR1234W2FR 2020 2/14/2022 4/28/2030 4/28/2025 1/1/2040
PM-1001-01-C MSP Landside PM-1001-01C Maroon Ramp Eaton 9355 BF404JBA04 10.00 208/120 ? Yes
(64) Eaton PWHR123W2FR
12V/9AH 16ea 1/15/2013 1/15/2015 9/5/2029 9/5/2024 1/15/2033
HUPS-PR3105-1 T1 PR-3105
Red Ramp 3rd
Floor Schneider GALAXY VS Q2029181826 40.00 480/480 ? Yes (320) CS3 HR 1234W F2FR 10/6/2021 10/6/2023 3/24/2031 3/24/2026 10/6/2041
EHUPS-PS1092-1 T1 PS-1092-E Silver Ramp Schneider Galaxy VM ID1840011426 180.00 480/480 ? Yes (10) OG-GVMBTU VRLA 9/16/2019 9/16/2021 NA 3/16/2026 NA This is a Lighting Inverter UPS. Planned removal in
2027 EI/EPU - MAC03040
EHUPS-PS1092-2 T1 PS-1092-E Silver Ramp Schneider Galaxy VM ID1816002650 180.00 480/480 ? Yes (10) OG-GVMBTU VRLA 9/16/2019 9/16/2021 NA 3/16/2026 NA This is a Lighting Inverter UPS. Planned removal in
2027 EI/EPU - MAC03040
HUPS-PS1092-1 T1 PS-1092-EX Silver Ramp Schneider Galaxy VM ID1840009339 180.00 480/480 ? Yes (10) OG-GVMBTU VRLA 9/16/2019 9/16/2021 3/16/2031 3/16/2026 9/16/2039
HUPS-PS6046-1 T1 PS-6046-E Silver Ramp Schneider Galaxy VM ID1847005969 80.00 480/480 ? Yes (10) 0G-GVMBTU VRLA 9/16/2019 9/16/2021 3/27/2031 3/27/2026 9/16/2039
EHINV-PSCC1059-1 PSCC PSCC-1059-E
Safety and
Security Center /
ARFF 2
Myers Power
Products
2-G-26-S-R120-BD2006-
BF1601-BF2501-BIP-
SPAREF
148955L1-1 16.70 480/480 Single No (40) BAT-CG12150C 1/18/2024 1/18/2026 1/18/2029 NA 1/18/2044
CHUPS-PSCC1129-1 PSCC PSCC-1129
Safety and
Security Center Eaton 93PM TBD 180.00 480/480 Dual Yes TBD TBD TBD 11/30/2031 NA 1/1/2047
New unit - Installed as part of 2024 Safety &
Security Center Phase 2 - 106-3-664
Estimated startup 11/30/2026
CHUPS-PSCC1130-1B PSCC PSCC-1130
Safety and
Security Center Eaton 93PM TBD 180.00 480/480 Dual Yes TBD TBD TBD 11/30/2031 NA 1/1/2047
New unit - Installed as part of 2024 Safety &
Security Center Phase 2 - 106-3-664
Estimated startup 11/30/2026
INPUT / OUTPUT
VOLTAGE
SINGLE OR
DUAL
SOURCE
Y or N ext.
Maint.
Bypass
BATTERY TYPE/QUANTITY
DATE
INSTALLED
WARRANTY END
DATE
BATTERY
REPLACEMENT DUE
BATTERY
REPLACED
UNIT
REPLACEMENT DUE
NOTES
CHUPS-PSCC1130-1Y PSCC PSCC-1130
Safety and
Security Center Eaton 93PM TBD 180.00 480/480 Dual Yes TBD TBD TBD 11/30/2031 NA 1/1/2047
New unit - Installed as part of 2024 Safety &
Security Center Phase 2 - 106-3-664
Estimated startup 11/30/2026
STB-PSCC1146-1L PSCC PSCC-1146
PSSC Generator
Controls Rm Cummins BAT999999A0278 TBD NA 120Vac 24Vdc Single No (8) East Penn 12AVR150ET 4Q 2026 TBD 11/15/2031 NA TBD
Station Battery
New unit - Installed as part of 2024 PSSC P2
STB-PSCC1146-1R PSCC PSCC-1146
PSSC Generator
Controls Rm Cummins BAT999999A0278 TBD NA 120Vac 24Vdc Single No (8) East Penn 12AVR150ET 4Q 2026 TBD 11/15/2031 NA TBD
Station Battery
New unit - Installed as part of 2024 PSSC P2
CHUPS-PSCC2522.02-1 PSCC PSCC-2522.02-E
Safety and
Security Center -
ARFF 2
Schneider GALAXY VS QD2224181219 80.00 480/480 Dual Yes CS3 HR 1234W F2FR 1/18/2024 1/18/2026 1/18/2029 3/1/2023 1/18/2044
UPS-1044-1 RDC RDC-1044-C RDC APC
SMART-UPS SRT3000XLA
W/SRT96RMBP
AS1837197110 3.00 120/120 ? No
(2) APCRBC152 /
Maintenance Free Sealed (16) 12v 5.5AH Lead Acid battery. Enclosed unit.
8/16/2019 8/16/2021 10/2/2029 10/2/2024 8/16/2027
UPS-RDC1044-1 RDC RDC-1044-C RDC APC
SMART-UPS SRT3000XLA
W/SRT96RMBP
AS183719110 3.00 120/120 ? No
(2) APCRBC152 /
Maintenance Free Sealed (16) 12v 5.5AH Lead Acid battery. Enclosed unit.
8/16/2019 8/16/2021 10/2/2029 10/2/2024 8/16/2027
UPS 327 Anoka Airport Tower Server/Radio Room Main Floor Server
Room APS MGE Galaxy 3500 PS1250330233 10.00 208/120 ? Yes
SYBTU1-PLP
8 SYBTU1/2 SYBT4
9/1/2013 NA 11/25/2029 11/25/2024 NA Need to confirm unit install date.
UPS-TC-1290-1 Trades TC-1290-C Between Paint and
Plumbing Shop APS MGE Galaxy 3500 PS1539132374 15.00 208/120 Single Yes
(8) SYBTU1-PLP / (64) Maintenance Free Sealed 12v
7.5AH Lead Acid battery. Enclosed unit.
TBD NA 7/9/2030 7/9/2025 1/1/2026
CLUPS-TC1520-1 Trades TC-1520-E Trades Storage APC GVSUPS50KB4D QD2415288364 30.00 208/120 Dual Yes
(3) Galaxy VS Smart Modular Battery String High
Capacity 9Ah
2/2/2026 2/2/2028 2/2/2031 NA 2/2/2046