SF-30_Amendment_6_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf
PDF 530 KB Posted
- Attached to
- Jemez RD Office Construction Project Federal contract opportunity
- Solicitation number
- 12837919R0002
About this file
Amendment # 6
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE Jemez Ranger District Office Complex Construction Project – Santa Fe National Forest
STANDARD FORM 30
AMENDMENT OF SOLICITATION/MODIFICATION OF
CONTRACT
1. CONTRACT ID CODE: PAGE 1 OF 1
2. AMENDMENT/MODIFICATION NO.:
3. EFFECTIVE DATE:
08-09-2019
4. REQUISITION/PURCHASE #: 5. PROJECT #:
6. ISSUED BY: CODE:
SANTA FE NATIONAL FOREST
NORTHERN ACQUISITION MANAGEMENT ZONE
11 FOREST LANE
SANTA FE, NEW MEXICO 87508
7. ADMINISTERED BY (if other than Item 6) CODE:
8. NAME AND ADDRESS OF CONTRACTOR: CODE: FACILITY CODE:
9A. AMENDMENT OF SOLICITATION
NO: 12837919R0002
9B. DATED: (See Item 11) 07-10-2019
10A. MODIFICATION OF
CONTRACT/ORDER NO.
10B. DATED: (see Item 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATION
|XX | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers {} is extended, {XX} is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR
AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATE (IF REQUIRED):
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS
DESCRIBED IN ITEM 14,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority). THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A. FAR CLAUSE 52.243-2 CHANGES (FIXED PRICE)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN
ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
IMPORTANT:
Contractor is not x is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION : Described below and attached are: Description of changes, additions, and deletions.
Solicitation 12837919R0002 is hereby amended per the following:
1. The Government will evaluate proposals received as described in the document titled, “Revised-Jemez RD Complex
Solicitation 12837919R0002 07-10-19”, issued through Solicitation Amendment # 1, and reserves the right to make award without discussions (other than discussions conducted for the purpose of minor clarification), unless discussions are determined to be necessary by the Contracting Officer.
2. The following questions and their respective answers are provided here for all potential contractors:
Question Answer
Typically, a fire station has a Risk Category of IV. The structural design loads on sheet SF0-0 states that it has a Risk Category of Type II. Can you please confirm Confirmed. It is Risk Category Type II.
The Building Drift on the structural plans show H/120 under the “Pre-Engineered Metal Building” section on sheet SF0-0.
However, the drift limit in the specs shows H/240 (specs 133419.6.a). Which is correct? H/120
The purlin vertical deflection on the structural plans state L/120 and the specs state L/180 or L/240 (specs 133419.4.a).
Which is correct? L/120
Detail W1000 on sheet AF0-5 shows a ½ siding subgirt between the girt and panel.
Can you find out what this is and why it is needed? Is it a hat channel? Why is this required?
The architect was consulted and has recommended that this item can be removed from the project.
3. The due date/time for the solicitation response remains on or before 12:00 NOON – MDT, Tuesday, August 13, 2019.
4. All other Terms and Conditions of the solicitation remain in full force and effect.
5. End of Amendment.
15A. NAME AND TITLE OF SIGNER (TYPE/PRINT) 16A. NAME AND TITLE OF CONTRACTING OFFICER (TYPE/PRINT)
Joseph Varoz
15B. CONTRACTOR/OFFEROR
(Person authorized to sign)
15C. DATE
SIGNED
16B. UNITED STATES OF
AMERICA
BY: _Joseph Varoz__ (Admin. Contracting Officer)
16C. DATE SIGNED
08-09-2019