S
MDC
K
D
TO
TC
PC
HP
R
J
RA
F
FS
D
TS
S
TS
MH
S
M
T
M
T
M
V
S
SYSTEMS
DISTRIBUTION AND RACEWAY
FIRE ALARM
LIGHTING FIXTURES
WIRING DEVICES
ABBREVIATIONS AND SYMBOLS
FACP
FA-RPS
FAA
C
A a
J
J
SR
x x x x x x
A AMPERE(S)
AC ABOVE COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERES INTERRUPTING CAPACITY
ATS AUTOMATIC TRANSFER SWITCH
BFF BELOW FINISHED FLOOR
C CONDUIT
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CT CURRENT TRANSFORMER
DISC DISCONNECT
DW DISHWASHER
DWG(S) DRAWING(S)
(E) EXISTING TO REMAIN
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
(ER) EXISTING TO BE RELOCATED
EM EMERGENCY
EPO EMERGENCY POWER OFF
EWC ELECTRIC WATER COOLER
(R) EXISTING TO BE REMOVED
F FUSE
FLA FULL LOAD AMPS
GD GARBAGE DISPOSAL
G GROUND
GC GENERAL CONTRACTOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
HP HORSEPOWER
IDF INTERMEDIATE DISTRIBUTION FACILITY
IG ISOLATED GROUND
ISC SHORT CIRCUIT CURRENT
KVA KILOVOLT AMPERE(S)
KW KILOWATT(S)
LTG LIGHTING
MCA MINIMUM CIRCUIT AMPERE(S)
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION CENTER
MDF MAIN DISTRIBUTION FACILITY
MLO MAIN LUGS ONLY
MTS MANUAL TRANSFER SWITCH
MW MICROWAVE
NC NORMALLY CLOSED
NL NIGHT LIGHT - SEE GENERAL NOTES
NO NORMALLY OPEN
OAE OR APPROVED EQUAL
OH OVERHEAD
P POLE
PART PARTIAL CIRCUIT
PH PHASE
PNL PANEL
RCPT RECEPTACLE
REF REFRIGERATOR
(RL) RELOCATED
SPD SURGE PROTECTION DEVICE
UC UNDER COUNTER/CABINET
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
V VOLT(S)
W WATT(S) OR WIRE
WG WIRE GUARD
WP WEATHERPROOF
XFMR TRANSFORMER
KITCHEN EQUIPMENT SCHEDULE NOTATION
MECHANICAL EQUIPMENT SCHEDULE NOTATION
DETAIL NOTE
DELTA REVISION NOTE
ELECTRICAL WIRE SIZE
MAIN DISTRIBUTION CENTER (MDC)
SURFACE MTD PANELBOARD
RECESSED PANELBOARD
TRANSFORMER
BRANCH CIRCUIT HOMERUN
CONDUIT CONCEALED IN FLOOR OR UNDERGROUND
CONDUIT EXPOSED OR CONCEALED IN WALL OR
CEILING
RACEWAY UP
RACEWAY DOWN
CAPPED CONDUIT
CURRENT TRANSFORMER
CIRCUIT BREAKER SWITCH
FUSED SWITCH
GROUNDING ELECTRODE CONDUCTOR
METER
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR/GRAPHIC MAP
FIRE ALARM REMOTE POWER SUPPLY
CONTROL MODULE
MONITOR MODULE
MANUAL PULLDOWN STATION
WALL MOUNTED ADA STROBE
ADA HORN OR SPEAKER WITH STROBE
MINI HORN / STROBE
ELECTROMAGNETIC DOOR HOLD OPEN
SPRINKLER FLOW SWITCH
SPRINKLER TAMPER SWITCH
THERMAL DETECTOR
PHOTOELECTRIC SMOKE DETECTOR
DUCT SMOKE DETECTOR, SUPPLY OR RETURN
REMOTE INDICATING LIGHT (TEST SWITCH)
120V. MOTORIZED SMOKE DAMPER
RESCUE ASSISTANCE PHONE
FIRE FIGHTERS PHONE JACK
TTB, MDF OR IDF SYSTEM BACKBOARD
TELECOMMUNICATION OUTLET
FLOOR MOUNTED TELECOMMUNICATION OUTLET
TELEVISION OUTLET
SPEAKER - PAGING AND OR SOUND SYSTEM -
INDICATES SPEAKER ZONE
MICROPHONE OUTLET
VOLUME CONTROL
PUSH BUTTON
CLOSED CIRCUIT TELEVISION CAMERA
CABLE TRAY (LENGTH AS INDICATED ON DRAWINGS)
LUMINAIRE TYPE, REFERENCING LUMINAIRE
SCHEDULE, TYPICAL ALL FIXTURES. SUBSCRIPT,
IF SHOWN, REFERENCES WALL SWITCH.
WALL MOUNTED LUMINAIRE
SURFACE MOUNTED LUMINAIRE
RECESSED LUMINAIRE
DOWNLIGHT LUMINAIRE
SURFACE CEILING LUMINAIRE
PENDANT LUMINAIRE
WALLWASH LUMINAIRE
STRIP LUMINAIRE
SURFACE OR PENDANT TRACK LUMINAIRE
LINEAR PENDANT LUMINAIRE (LENGTH AS
INDICATED ON DRAWINGS/SCHEDULE)
EXIT LUMINAIRE - SHADED INDICATES FACE/
DIRECTIONAL ARROWS AS SHOWN.
BATTERY PACK EMERGENCY LUMINAIRE
EMERGENCY LUMINAIRE - SHADED PROVIDE WITH
INTEGRAL BATTERY BACKUP
GROUND MOUNTED DIRECTIONAL LUMINAIRE
STEP LIGHT TYPE LUMINAIRE
BOLLARD OR POST TOP LUMINAIRE
EXTERIOR AREA LIGHT
DUPLEX RECEPTACLE
FOUR PLEX RECEPTACLE
SINGLE RECEPTACLE
COMBO RECEPTACLE/SWITCH
SWITCHED DUPLEX RECEPTACLE
SPECIAL PURPOSE RECEPTACLE
FLOOR MOUNTED SPECIAL PURPOSE RECEPTACLE
FLOOR MOUNTED RECEPTACLE DUPLEX/QUAD
SURFACE RACEWAY
CLOCK RECEPTACLE
JUNCTION BOX
WALL MOUNTED J-BOX
FLOOR MOUNTED JUNCTION BOX
MOLDED CASE CIRCUIT BREAKER IN ENCLOSURE
NON-FUSED DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
MAGNETIC CONTROLLER (STARTER)
COMBINATION STARTER/DISCONNECT SWITCH
MOTOR
RELAY
TIME CLOCK
PHOTOCELL
THERMAL OVERLOAD SWITCH
SINGLE POLE SWITCH, LINE VOLTAGE
3-WAY SWITCH, LINE VOLTAGE
4-WAY SWITCH, LINE VOLTAGE
KEY OPERATED SWITCH
DIMMER SWITCH, LINE VOLTAGE
S
S
S
S
S
S x LIGHTING CONTROL DEVICE x LIGHTING CONTROL DEVICE, REFER
TO DETAILS FOR CONTROL INTENT
EMERGENCY POWERED DUPLEX RECEPTACLE
WAP WIRELESS ACCESS POINT
CEILING MOUNTED RECEPTACLE DUPLEX/QUAD
CLGCLG
CR ACCESS CONTROL - CARD READER
E
ELEVATOR PHONE JACK
DED DEDICATED
P PANIC/DURESS ALARM - WIRED PANIC BUTTON
GB INTRUSION ALARM - GLASS BREAK DETECTOR
DC INTRUSION ALARM - DOOR CONTACT
MD INTRUSION ALARM - DIRECTIONAL MOTION DETECTOR
1. WHERE MULTIPLE LINE VOLTAGE DEVICES ARE SHOWN
ADJACENT TO EACH OTHER, THEY ARE ALL TO SHARE THE
SAME JUNCTION BOX, UP TO FOUR GANGS.
2. WHERE MORE THAN FOUR DEVICES ARE SHOWN ADJACENT TO
EACH OTHER, DEVICES ARE TO STACK VERTICALLY ABOVE ONE
ANOTHER IN TWO ROWS IN AS SMALL OF GANG BOXES AS
POSSIBLE. I.E. SIX DEVICES WILL USE TWO THREE GANG
BOXES, FIVE DEVICES WILL USE ONE THREE GANG AND ONE
TWO GANG BOX.
3. SEPARATELY GANGED DEVICES ARE NOT ALLOWED TO BE
INSTALLED ADJACENT TO ONE ANOTHER HORIZONTALLY
WITHIN THE SAME STUD BAY.
4. AUDIBLE/VISUAL FIRE ALARM DEVICES SHOWN ARE TO BE
MOUNTED AT 90" OR 6" BELOW CEILING, WHICHEVER IS LOWER.
ADA STROBES TO BE MOUNTED AT 80" AFF OR 6" BELOW
CEILING, WHICHEVER IS LOWER.
5. THE E.C. SHALL REFER TO ARCHITECTURAL ELEVATIONS TO
COORDINATE ALL COUNTER HEIGHTS. ALL "AC" DEVICES SHALL
HAVE BOTTOM OF BACK-BOX MOUNTED 4" ABOVE THE
BACK/SIDE SPLASH.
NOTES:
S
S
FAA
S
V
M
6'-8"
5'-4"
6'-0"
TO CENTER
(SEE
NOTE 6)
1'-6"
3'-8"
TO BOTTOM OF DEVICE (SEE NOTE 4)
TOP OF CABINET
CENTER OF CABINET
TYPICAL 9'-0" CEILING
TYPICAL 8'-0" CEILING
8'-0"
7'-4"
TO CENTER
TO BOTTOM
5'-0"
TO CENTER
AC AC AC AC
POWER PANEL,
FIRE ALARM PANEL, OR
MASTER CLOCK
x
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
E0-0
ELECTRICAL LEGEND
MJH/SCK
MJH/SCK
ESN
NTSE0-0
DEVICE MOUNTING HEIGHT3
LIGHTNING PROTECTION SYSTEM NOTES
PROVIDE AND INSTALL A LIGHTNING PROTECTION
SYSTEM WITH AN UNDERWRITER'S
LABORATORIES LISTED MASTER C LABEL. REFER
TO PERFORMACE SPECIFICATION SECTION 26.4113
FOR SYSTEM REQUIREMENTS. COORDINATE ALL
GROUND ROD LOCATIONS ON ROOF WITH CO
WHILE DEVELOPING SUBMITTALS. COORDINATE
ALL DOWN CONDUCTOR LOCATIONS WITH CO AND
MANUFACTURER DURING SUBMITTALS.
SUBMITTALS REQUIRE FULL ROOF PLANS WITH
ALL GROUND ROD (AND ALL OTHER EQUIPMENT)
TO BE INDICATED FOR REVIEW PRIOR TO
SUBMITTAL APPROVAL.
lcarroll Text Box revisions in Red made by AE Design lcarroll Text Box Revisions in blue made by Lexie Carroll, USFS lcarroll Text Box Electrical and Communication Addendume Changes - Addendum #4
B
ATTACH TO REBAR
WITH BONDING
CLAMPI
ANCHOR BOLT
ANCHOR BOLT DATA
4-#4 BARS
VERTICAL
ELEVATION
H
EA1
KEY
POLE
HEIGHT
OVERALL
A
F G
HB SIZE C D E F G
TOP VIEW
I
BASE PLATE
1" CHAMFER
BASE COVER
ATTACH TO BONDING
LUG ON POLE
D
A
C
HAND HOLE
E
H
BELOW TOP 5" OF
FOUNDATION #3 HORIZ.
TIES @ 12" O.C.
PVC RIGID
CONDUIT TYP.
FINISH GRADE
VARIES3-#3 HORIZ. TIES WITHIN
TOP 5" OF FOUNDATION
EA2 24'0" 4" 24"PER MANUFACTURER 1'0" 6'0" 6'0" 36"
24'0" 4" 24"PER MANUFACTURER 1'0" 6'0" 6'0" 36"
ES0-2
ES0-3
ES0-4
ES0-5
T
OFFICE
FIRE
W A
R E
H O
U S
E
S1
S2 S4
S8
S5
S6S6
S5
S7
S9
S4
S15
S3 S17
S16
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
ES0-1
ELECTRICAL SITE PLAN
MJH/SCK
MJH/SCK
ESN
SITE GENERAL NOTES
A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH A MINIMUM
OF 2#8, 1#10, 1"C, UON.
REFER TO SCALE
POLE BASE DETAIL
REFER TO SCALE
ELECTRICAL SITE PLAN
20'0 40' 80'
NORTH
KEY
VALUE KEYNOTE TEXT
S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ
MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS
DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW
PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH
AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL
CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION
BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS
LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL
(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).
JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE
OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION
BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND
BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR
TO PROJECT INITIATION.
S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.
CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.
PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90
DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND
INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND
THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE
CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING
ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.
JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE
TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE
CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE
SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY
METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN
SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE
METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND
SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS
FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL
BE BILLED TO THE NEW PROJECT METER NUMBER.
S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS
BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV
WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT
QUANTITIES AND SIZES.
S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL
SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND
BUILDING UTILITY TRANSFORMER.
S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE
INFORMATION.
S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.
REFER TO OFFICE PLANS EO1-1.
S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR
REFERENCE ONLY.
S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION
010250.
S11 BASE: SITE LIGHTING.
S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING
OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).
S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE
APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM
SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"
SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT
MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT
EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY
FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE
INSTALLATION. COORDINATE TIMING OF PROJECT WITH
WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL
INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO
INSTALLATION.
S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM
HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW
UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB
UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE
OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND
INSTALLED BY WINDSTREAM.
B REFER TO SPECIFICATION SECTION 010250 FOR MORE DETAIL AND
PACKAGING OF OPTIONAL ITEMS. DETAIL NOTES PROVIDED FOR
DISTINCTION BETWEEN BASE AND OPTIONAL ITEMS.
C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS INDICATED ON
THIS SHEET SHALL REFER TO CIRCUIT ORIGINATING IN
PANELBOARDS BASED UPON THE FOLLOWING CONVENTION:
PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'
PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'
PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'
lcarroll Text Box Changed in BLUE made by Lexie Carroll, USFS lcarroll Text Box changed in RED made by AE Design, the Electrical AE firm of Record
EA1
PO1- 57
ZS1
EA1
PO1- 57
ZS1
EA2
PO1- 57
ZS1
S10
S10
S10
S1
S3
S16
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
ES0-2
ELECTRICAL ENLARGED
SITE PLAN - NORTH
PARKING AREA
MJH/SCK
MJH/SCK
ESN
REFER TO SCALE
ENLARGED ELECTRICAL SITE PLAN
5'0 10' 20'
NORTH
SITE GENERAL NOTES
A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH
A MINIMUM OF 2#8, 1#10, 1"C, UON.
KEY
VALUE KEYNOTE TEXT
S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ
MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS
DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW
PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH
AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL
CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION
BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS
LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL
(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).
JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE
OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION
BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND
BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR
TO PROJECT INITIATION.
S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.
CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.
PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90
DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND
INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND
THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE
CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING
ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.
JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE
TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE
CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE
SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY
METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN
SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE
METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND
SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS
FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL
BE BILLED TO THE NEW PROJECT METER NUMBER.
S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS
BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV
WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT
QUANTITIES AND SIZES.
S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL
SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND
BUILDING UTILITY TRANSFORMER.
S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE
INFORMATION.
S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.
REFER TO OFFICE PLANS EO1-1.
S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR
REFERENCE ONLY.
S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION
010250.
S11 BASE: SITE LIGHTING.
S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING
OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).
S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE
APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM
SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"
SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT
MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT
EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY
FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE
INSTALLATION. COORDINATE TIMING OF PROJECT WITH
WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL
INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO
INSTALLATION.
S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM
HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW
UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB
UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE
OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND
INSTALLED BY WINDSTREAM.
B REFER TO SPECIFICATION SECTION 010250 FOR MORE
DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL
NOTES PROVIDED FOR DISTINCTION BETWEEN BASE
AND OPTIONAL ITEMS.
C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS
INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT
ORIGINATING IN PANELBOARDS BASED UPON THE
FOLLOWING CONVENTION:
PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'
PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'
PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'
J
J
J
EA1
PO1- 57
ZS1
EA2
PO1- 57
ZS1
EA2
PO1- 57
ZS1
EG1
PO1- 57
ZS2
EG1
PO1- 57
ZS2
EG1
PO1- 57
ZS2
EG1
PO1- 57
ZS2
EG2
PO1- 57
ZS3
EG2
PO1- 57
ZS3
T
S10
PANEL PO1
S8
S7
S5
S6S6
S2
S4
S6S6 S5
OFFICE BUILDING
FLAG POLE
S11
S11
S11
S11
S11
S11 S11
S13
S13
S13
S13
PO1-81,83
PO1-74,76
PO1-77,79
PO1-73,75
S17
S3
UTILITY
JUNCTION
BOX
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
ES0-3
ELECTRICAL ENLARGED
SITE PLAN - OFFICE AREA
MJH/SCK
MJH/SCK
ESN
REFER TO SCALE
ENLARGED ELECTRICAL SITE PLAN
5'0 10' 20'
NORTH
SITE GENERAL NOTES
A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH
A MINIMUM OF 2#8, 1#10, 1"C, UON.
KEY
VALUE KEYNOTE TEXT
S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ
MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS
DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW
PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH
AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL
CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION
BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS
LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL
(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).
JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE
OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION
BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND
BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR
TO PROJECT INITIATION.
S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.
CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.
PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90
DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND
INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND
THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE
CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING
ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.
JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE
TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE
CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE
SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY
METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN
SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE
METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND
SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS
FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL
BE BILLED TO THE NEW PROJECT METER NUMBER.
S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS
BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV
WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT
QUANTITIES AND SIZES.
S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL
SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND
BUILDING UTILITY TRANSFORMER.
S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE
INFORMATION.
S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.
REFER TO OFFICE PLANS EO1-1.
S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR
REFERENCE ONLY.
S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION
010250.
S11 BASE: SITE LIGHTING.
S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING
OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).
S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE
APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM
SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"
SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT
MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT
EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY
FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE
INSTALLATION. COORDINATE TIMING OF PROJECT WITH
WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL
INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO
INSTALLATION.
S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM
HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW
UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB
UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE
OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND
INSTALLED BY WINDSTREAM.
B REFER TO SPECIFICATION SECTION 010250 FOR MORE
DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL
NOTES PROVIDED FOR DISTINCTION BETWEEN BASE
AND OPTIONAL ITEMS.
C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS
INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT
ORIGINATING IN PANELBOARDS BASED UPON THE
FOLLOWING CONVENTION:
PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'
PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'
PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'
EA1
PO1- 57
ZS1
EA1
PO1- 57
ZS1
EA1
PO1- 57
ZS1
EA1
PO1- 57
ZS1
FIRE BUILDING
W A
R E
H O
U S
E
S10
S10
S10
S10
S6S6
S5
S5
S14
S14
PW1-43,45
PW1-47,49
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
ES0-4
ELECTRICAL ENLARGED
SITE PLAN - FIRE
BLDG/WAREHOUSE AREA
MJH/SCK
MJH/SCK
ESN
REFER TO SCALE
ENLARGED ELECTRICAL SITE PLAN
10'0 20' 40'
NORTH
SITE GENERAL NOTES
A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH
A MINIMUM OF 2#8, 1#10, 1"C, UON.
KEY
VALUE KEYNOTE TEXT
S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ
MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS
DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW
PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH
AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL
CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION
BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS
LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL
(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).
JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE
OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION
BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND
BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR
TO PROJECT INITIATION.
S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.
CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.
PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90
DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND
INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND
THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE
CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING
ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.
JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE
TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE
CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE
SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY
METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN
SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE
METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND
SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS
FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL
BE BILLED TO THE NEW PROJECT METER NUMBER.
S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS
BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV
WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT
QUANTITIES AND SIZES.
S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL
SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND
BUILDING UTILITY TRANSFORMER.
S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE
INFORMATION.
S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.
REFER TO OFFICE PLANS EO1-1.
S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR
REFERENCE ONLY.
S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION
010250.
S11 BASE: SITE LIGHTING.
S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING
OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).
S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE
APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM
SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"
SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT
MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT
EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY
FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE
INSTALLATION. COORDINATE TIMING OF PROJECT WITH
WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL
INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO
INSTALLATION.
S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM
HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW
UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB
UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE
OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND
INSTALLED BY WINDSTREAM.
B REFER TO SPECIFICATION SECTION 010250 FOR MORE
DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL
NOTES PROVIDED FOR DISTINCTION BETWEEN BASE
AND OPTIONAL ITEMS.
C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS
INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT
ORIGINATING IN PANELBOARDS BASED UPON THE
FOLLOWING CONVENTION:
PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'
PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'
PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'
EA2
PO1- 57
ZS1
EA1
PO1- 57
ZS1
S11
S11
S15
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
ES0-5
ELECTRICAL ENLARGED
SITE PLAN - SOUTH
PARKING AREA
MJH/SCK
MJH/SCK
ESN
REFER TO SCALE
ENLARGED ELECTRICAL SITE PLAN
10'0 20' 40'
NORTH
KEY
VALUE KEYNOTE TEXT
S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ
MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS
DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW
PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH
AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL
CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION
BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS
LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL
(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).
JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE
OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION
BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND
BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR
TO PROJECT INITIATION.
S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.
CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.
PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90
DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND
INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND
THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE
CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING
ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.
JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE
TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE
CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE
SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY
METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN
SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE
METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND
SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS
FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL
BE BILLED TO THE NEW PROJECT METER NUMBER.
S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS
BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV
WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT
QUANTITIES AND SIZES.
S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL
SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND
BUILDING UTILITY TRANSFORMER.
S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0
FOR CONDUIT QUANTITIES AND SIZES.
S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE
INFORMATION.
S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.
REFER TO OFFICE PLANS EO1-1.
S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR
REFERENCE ONLY.
S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION
010250.
S11 BASE: SITE LIGHTING.
S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING
STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.
CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND
CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS
PRIOR TO ROUGH IN.
S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING
OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).
S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING
OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE
APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM
SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"
SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT
MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT
EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY
FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE
INSTALLATION. COORDINATE TIMING OF PROJECT WITH
WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL
INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO
INSTALLATION.
S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM
HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW
UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB
UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE
OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND
INSTALLED BY WINDSTREAM.
SITE GENERAL NOTES
A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH
A MINIMUM OF 2#8, 1#10, 1"C, UON.
B REFER TO SPECIFICATION SECTION 010250 FOR MORE
DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL
NOTES PROVIDED FOR DISTINCTION BETWEEN BASE
AND OPTIONAL ITEMS.
C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS
INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT
ORIGINATING IN PANELBOARDS BASED UPON THE
FOLLOWING CONVENTION:
PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'
PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'
PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'
2 [3" CONDUIT]
2" CONDUIT
OFFICE BUILDING FIRE BUILDING WAREHOUSE
2" CONDUIT
T
PRIMARY BY UTILITY
COMPANY REFER
ELECTRICAL SITE PLANS
PAD MOUNTED UTILITY
TRANSFORMER
120/208V, 3PH, 4W
ASSUMED 150KVA
OFFICE
1ST FLOOR
'MDF'
KEYNOTE LEGEND
NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO SITE TELEPHONE SERVICE POINT.
ELECTRICAL CONTRACTOR SHALL CONFIRM ALL REQUIREMENTS, ROUTING, AND LOCATIONS WITH SERVICE
PROVIDER AND CO PRIOR TO INSTALLATION.
NEW (1) 4" PVC CONDUIT WITH 1-1/2" INNER DUCT ROUTED 30" BELOW GRADE FOR CONNECTION TO SITE FIBER OPTIC SERVICE POINT. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT AND DUCT SIZING AND
QUANTITY WITH SERVICE PROVIDER PRIOR TO INSTALLATION.
NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO SITE CATV SERVICE POINT.
ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY WITH SERVICE PROVIDER PRIOR
TO INSTALLATION.
NEW (1) 4" PVC CONDUIT WITH 1-1/2" INNER DUCT ROUTED 30" BELOW GRADE FOR CONNECTION TO FIBER VAULT (FOR FUTURE USE). ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT AND DUCT SIZING AND
QUANTITY WITH CO PRIOR TO INSTALL.
NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO FIRE BUILDING TELECOM ROOM VIA UNDERGROUND VAULT. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY WITH
CO PRIOR TO INSTALLATION.
NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO WAREHOUSE BUILDING TELECOM ROOM VIA UNDERGROUND VAULT. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY
WITH CO PRIOR TO INSTALLATION.
NEW TELECOM UNDERGROUND VAULT, 24"x26"x36"D COMMUNICATIONS IN-GROUND PULL BOX. CONFIRM
FINAL LOCATION WITH CO PRIOR TO EXCAVATION.
GENERAL NOTES
1.
2.
3.
PROVIDE PULLCORD FOR ALL CONDUIT INSTALLED FOR CABLE.
4.
PROVIDE PULLBOXES AS REQUIRED BY CABLE INSTALLER FOR RUNS EXCEEDING MAXIMUM PULL DISTANCE, AS IDENTIFIED BY CABLE INSTALLER.
ALL CONDUIT AND CABLING IN CRAWL SPACE IS TO BE SUPPORTED BY AND TIGHT TO STRUCTURE ABOVE.
WHERE CONDUIT TRANSITIONS FROM BEING SUPPORTED BY STRUCTURE INTO SOIL, ADD LOOP AND/OR
FLEXIBLE CONDUIT FOR FLEXIBILITY AND TO ALLOW FOR ANTICIPATED SOIL MOVEMENT.
REFER TO SPECIFICATIONS FOR FULL CONDUIT REQUIREMENTS. HOWEVER, NOTE THAT ALL UNDERGROUND CONDUIT BENDS ARE TO BE GALVANIZED RIGID CONDUIT. UNDERGROUND CONDUIT EXTENDING ABOVE SLAB
IS ALSO TO BE GALVANIZED RIGID CONDUIT.
1.
2.
3.
4.
5.
6.
7.
TELEPHONE
/LOW
VOLTAGE
UTILITY
4 5
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
07/01/2019
ES3-0
ELECTRICAL SITE
ONE-LINE DIAGRAM
MJH/SCK
MJH/SCK
ESN
REFER TO SCALE
BASE - SITE ELECTRICAL ONE-LINE & UNDERGROUND DIAGRAM
REFER TO SCALE
SITE LOW VOLTAGE RISER & UNDERGROUND DIAGRAM
ELECTRICAL ONE-LINE GENERAL NOTES
A ALL UNDERGROUND PATHWAYS (QUANTITIES
AND SIZES) SHOWN IN THE ONE-LINE DIAGRAM
ARE PART OF THE BASE SCOPE. REFER TO THE
ELECTRICAL SITE PLANS FOR LOCATIONS AND
DISTANCES. REFER TO INDIVIDUAL BUILDING
ONE-LINE DIAGRAMS (EO3-0, EF3-0, EW3-0) AND
SPECIFICATION 010250 FOR FURTHER
CLARIFICATION OF BASE AND OPTIONAL ITEMS.
lcarroll Callout Provide conduit and trenching for Primary Electrical Line: Utility Company to provide and install wiring.
PANEL
PF1M
200N
200NG
SEE DETAIL
BASE: SITE
OFFICET
PRIMARY BY
UTILITY
COMPANY
PAD MOUNTED UTILITY
TRANSFORMER
120/208V, 3PH, 4W
ASSUMED 150KVA
EXTERIOR INTERIOR
N G
BUILDING-MOUNTED
SERVICE-RATED
FUSED DISCONNECT
'PF1', 200A, 3PH, 4W,
NEMA 3R, 22K AIC
IN-LINE UTILITY METER
WAREHOUSE BASE
UNDERGROUND PATHWAY,
REFER TO ELECTRICAL SITE
PLANS
F0
F1
F
GROUNDING ELECTRODE SYSTEMS NOTES
1 METAL UNDERGROUND WATER PIPE - MAKE CONNECTION TO
METAL UNDERGROUND WATER PIPE INDIRECT CONTRACT WITH
THE EARTH FOR 10' OR AND ELECTRICALLY CONTINUOUS TO
THE POINTS OF CONNECTION TO THE GROUNDING ELECTRODE
CONDUCTOR AND BONDING CONDUCTORS. CONNECTION POINT
TO BE AT A MAXIMUM OF 5' OF THE POINT OF ENTRANCE ON THE
INTERIOR OF THE BUILDING.
2 BUILDING STEEL - THE METAL FRAME OF THE BUILDING OR
STRUCTURE, WHERE ANY OF THE FOLLOWING METHODS ARE
USED TO MAKE AN EARTH CONNECTION:
A.AT LEAST ONE STRUCTURAL METAL MEMBER THAT IS IN
DIRECT CONTACT WITH THE EARTH FOR 10' OR MORE, WITH
OR WITHOUT CONCRETE ENCASEMENT.
B.HOLD-DOWN BOLTS SECURING THE STRUCTURAL STEEL
COLUMN THAT ARE CONNECTED TO A CONCRETE ENCASED
ELECTRODE THAT COMPLIES WITH 250.52(A)(3) AND IS
LOCATED IN THE SUPPORT FOOTING OR FOUNDATION. THE
HOLD-DOWN BOLTS SHALL BE CONNECTED TO THE
CONCRETE-ENCASED ELECTRODE BY WELDING,
EXOTHERMIC WELDING, THE USUAL STEEL TIE WIRES, OR
OTHER APPROVED MEANS.
3 UFER GROUND (CONCRETE-ENCASED ELECTRODE) - AN
ELECTRODE ENCASED BY AT LEAST 2" OF CONCRETE, LOCATED
WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION
OR FOOTING THAT IS IN DIRECT CONTACT WITH EARTH,
CONSISTING OF AT LEAST 20' OF ONE OR MORE BARE OR ZINC
GALVANIZED OR OTHER ELECTRICALLY CONDUCTIVE COATED
STEEL REINFORCING BARS OR RODS OF NOT LESS THAN 1/2" IN
DIAMETER, OR CONSISTING OF AT LEAST 20' OF BARE COPPER
CONDUCTOR NOT SMALLER THAN NO. 4 AWG. REINFORCING
BARS SHALL BE PERMITTED TO BE BONDED TOGETHER BY THE
USUAL STEEL TIE WIRES OR OTHER EFFECTIVE MEANS.
4 GROUND ROD - ROD IS TO BE 8FT IN LENGTH AND SHALL BE
MADE OF IRON OR STEEL AT LEAST 5/8" DIAMETER.
INSTALLATION METHODS FOR GROUND ROD SHALL BE IN
COMPLIANCE WITH THE NEC SUCH THAT AT LEAST 8' OF LENGTH
IS IN CONTACT WITH THE EARTH.
GENERAL GROUNDING NOTES
1 ALL CABLES TO BE TERMINATED ONTO BUS BAR WITH TWO
HOLE COMPRESSION LUGS AND ATTACHED TO BUS BAR
WITH TAB COMPRESSION BELLEVILLE WASHERS AND TORX
BOLT ASSEMBLY.
2 ALL GROUND CONNECTORS SHALL BE STRANDED.
3 ALL BUS BARS SHALL BE ATTACHED TO SURFACE WITH
NON-CONDUCTIVE STAND-OFFS.
4 GROUND BUS BAR AND GROUNDING SYSTEM SHALL BE UL
LISTED AND COMPLY WITH MANUFACTURERS
INSTALLATION INSTRUCTIONS.
PRINCIPAL GROUND
POINT (PGP) CU
GROUND BAR
INTERNAL TO
DISCONNECT SWITCH
(DF-1) OR (DW-1)
TELECOMMUNICATIONS
GROUND BAR
('TMGB-1')
INTERSYSTEM'S
BONDING
BRIDGE PER NEC
250.94
ADJACENT TO
DISCONNECT SWITCH
(DF-1) OR (DW-1)
G4
G4
G4G4
CWP
UFER
G6
GND
ROD
O3
FEEDER SCHEDULE
KEY/
AMPS
SERVICE ENTRANCE FEEDERS
400N 600N 800N
1000N 1200N 1600N 2000N 2500N 3000N 3500N 4000N
EQUIPMENT FEEDERS
20NG
30NG
40NG
50NG
60NG
70NG
80NG
90NG
100NG
110NG
125NG
150NG
175NG
200NG
225NG
250NG
300NG
350NG
400NG
450NG
500NG
600NG
700NG
800NG
1000NG
1200NG
1600NG
2000NG
GROUNDING CONDUCTORS
G8 G6 G4 G2 G10 G20 G30
NOTES:
1.
2.
3.
FEEDER CONDUIT
AND CONDUCTORS
2[4#3/0, 2"C] 2[4#350, 3"C]
2[4#500, 3-1/2"C] 3[4#400, 3-1/2"C]
4[4#350, 3"C] 5[4#400, 3-1/2"C] 6[4#400, 3-1/2"C] 7[4#500, 3-1/2"C] 8[4#500, 3-1/2"C]
10[4#500, 3-1/2"C] 11[4#500, 3-1/2"C]
4#12, #12G, 3/4"C 4#10, 1#10G, 3/4"C
4#8, 1#10G, 1"C 4#6, 1#10G, 1-1/4"C 4#4, 1#10G, 1-1/4"C 4#4, 1#8G, 1-1/4"C 4#3, 1#8G, 1-1/4"C 4#2, 1#8G, 1-1/2"C 4#1, 1#8G, 1-1/2"C
4#1, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#2/0, 1#6G, 2"C
4#3/0, 1#6G, 2-1/2"C 4#4/0, 1#4G, 2-1/2"C
4#250, 1#4G, 3"C 4#350, 1#4G, 3"C
4#500, 1#3G, 3-1/2"C 2[4#3/0, 1#3G, 2-1/2"C] 2[4#4/0, 1#2G, 2-1/2"C]
2[4#250, 1#2G, 3"C] 2[4#350, 1#1G, 3"C]
2[4#500, 1#1/0G, 3-1/2"C] 2[4#500, 1#1/0G, 3-1/2"C] 3[4#400, 1#2/0G, 3-1/2"C]
4[4#350, 1#3/0G, 3"C] 5[4#400, 1#4/0G, 3-1/2"C] 6[4#400, 1#250G, 3-1/2"C]
1#8, 3/4" C 1#6, 3/4" C 1#4, 3/4" C 1#2, 3/4" C
1-1/0, 3/4" C 1-2/0, 3/4" C 1-3/0, 3/4" C
FEEDER FOR SECONDARY OF SEPARATELY DERIVED
SYSTEM (SDS). GROUND SIZE PER NEC 250.66.
ALL CONDUCTORS ARE SINGLE CONDUCTOR COPPER
THWN UNLESS NOTED OTHERWISE. AMPACITY BASED
ON NEC TABLE 310.16.
ALL CONDUITS ARE EMT UNLESS NOTED OTHERWISE,
FILL RATIOS BASED ON NEC ANNEX C TABLE C1.
KEY/
AMPS
SDS XFMR FEEDERS (NOTE 1)
30S 50S 100S 150S 250S 400S 500S 800S 1000S 1600S 2500S
20G 30G 40G 50G 60G 70G 80G 90G
100G 110G 125G 150G 175G 200G 225G 250G 300G 350G 400G 450G 500G 600G 700G 800G 1000G 1200G 1600G 2000G
ABBREVIATIONS
MECH
XFMR
FEEDER CONDUIT
AND CONDUCTORS
4#10, 1#8G, 3/4"C 4#6, 1#8G, 1-1/4"C 4#1, 1#6G, 1-1/2"C 4#1/0, 1#6G, 2"C 4#250, 1#2G, 3"C
2[4#3/0, 1#2G, 2"C] 2[4#250, 1#1/0G, 3"C]
2[4#500, 1#2/0G, 3-1/2"C] 3[4#400, 1#4/0G, 3-1/2"C] 5[4#400, 1#350G, 3-1/2"C] 7[4#500, 1#500G, 3-1/2"C]
3#12, #12G, 3/4"C 3#10, 1#10G, 3/4"C
3#8, 1#10G, 1"C 3#6, 1#10G, 1"C 3#4, 1#10G, 1"C
3#4, 1#8G, 1-1/4"C 3#3, 1#8G, 1-1/4"C 3#2, 1#8G, 1-1/4"C 3#1, 1#8G, 1-1/2"C 3#1, 1#6G, 1-1/2"C
3#1/0, 1#6G, 1-1/2"C 3#1/0, 1#6G, 1-1/2"C
3#2/0, 1#6G, 2"C 3#3/0, 1#6G, 2"C 3#4/0, 1#4G, 2"C
3#250, 1#4G, 2-1/2"C 3#350, 1#4G, 2-1/2"C
3#500, 1#3G, 3"C 2[3#3/0, 1#3G, 2"C] 2[3#4/0, 1#2G, 2"C]
2[3#250, 1#2G, 2-1/2"C] 2[3#350, 1#1G, 2-1/2"C] 2[3#500, 1#1/0G, 3"C] 2[3#500, 1#1/0G, 3"C] 3[3#400, 1#2/0G, 3"C] 4[3#350, 1#3/0G, 3"C] 5[3#400, 1#4/0G, 3"C] 6[3#400, 1#250G, 3"C]
SEE MECH SCHEDULE
SEE XFMR SCHEDULE
200N 4#3/0, 2-1/2"C] -- --
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
FIRE STATION - OPTIONAL
07/01/2019
EF3-0
FIRE ELECTRICAL
ONE-LINE DIAGRAM
MJH/SCK
MJH/SCK
ESN
NO SCALE
ELEC DISTRIBUTION GROUNDING ONE-LINE DIAGRAM & NOTES
NO SCALE
1 ONE-LINE DIAGRAM
BY THE ELECTRICAL CONTRACTOR FOR BIDDING PURPOSES. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ESTIMATING AND MEASURING ACTUAL FIELD CONDITION LENGTHS AS PART OF THE BID PROCESS.
4. CONDUCTOR LENGTHS INDICATED IN THIS SCHEDULE ARE FOR THE PUROPOSES OF FAULT CURRENT CALCULATIONS ONLY. THESE LENGTHS ASSUME WORST CASE SHORTEST DISTANCE CONDITIONS AND SHOULD NOT BE UTILIZED
3. TRANSFORMER IMPEDANCES USED IN THE CALCULATIONS WERE TAKEN FROM EATON'S PUBLISHED IMPEDANCES FOR DOE 2016 DRY-TYPE TRANSFORMERS.
2. REFER TO PLANS FOR ASSUMED UTILITY TRANSFORMER SIZE UTILIZED FOR CALCULATIONS.
1. ALL CALCULATIONS WERE DONE USING BUSSMAN "POINT-TO-POINT" METHOD.
NOTES:
F2 PANEL 'PF1' 20 208 120 3 3X COPPER THREE SINGLE CONDUCTORS STEEL 600V 12843 2 16,060 14,545 ---- F2
F1 'DF1' 130 208 120 3 350 COPPER THREE SINGLE CONDUCTORS NONMAGNETIC 600V 22736 2 26,000 16,060 ---- F1
F0 -- 26,000 -- F0
(I3ph) OR (IL-L) (LT)
DESCRIPTION (ft) (EL-L) (EL-N) SIZE MATERIAL TYPE MATERIAL CLASS VALUE RUNS UPSTREAM AT EQUIP LET THRU
POINT LOCATION LENGTH (L) VOLTAGE VOLTAGE PHASE WIRE CONDUCTOR CONDUCTOR CONDUIT VOLTAGE C # OF PARALLEL Isc AVAILABLE Isc POINT
FAULT CURRENT CALCULATION SCHEDULE
lcarroll
Provide conduit and trenching for Primary Electrical Line: Utility Company to provide and install wiring.
PANEL200NG
SEE DETAIL
BASE: SITE
OFFICE
200N
FIRE BUILDING
BASE: SITE
PW1M
T
PRIMARY BY
UTILITY
COMPANY
PAD MOUNTED UTILITY
TRANSFORMER
120/208V, 3PH, 4W
ASSUMED 150KVA
EXTERIOR INTERIOR
N G
BUILDING-MOUNTED
SERVICE-RATED
FUSED DISCONNECT
'DW1', 200A, 3PH, 4W,
NEMA 3R, 22K AIC
IN-LINE UTILITY METER
F0
F1
F
O4
SECURTY
1ST FLOOR
'ELEC'
KEYNOTE LEGEND
2.
3.
4. MAIN TELEPHONE TERMINAL BOARD 'MTTB' SHALL CONSIST OF 3/4 INCH, FIRE-RETARDANT TREATED
PLYWOOD INSTALLED FLOOR TO CEILING IN ROOM,FOR LENGTHS AS INDICATED ON THE PLAN
DRAWINGS. ALL RECEPTACLE DEVICES SHOWN INBACKBOARD ON PLANS SHALL BE FLUSH MOUNT, UON.
5. NEW TYPICAL WORK AREA COMMUNICATIONS OUTLET FOR STRUCTURED CABLE TERMINATIONS.
PROVIDE 2-INCH DEEP, 2-GANG BOX WITH 1-GANG PLASTER RING. PROVIDE 1" CONDUIT TO ACCESSIBLE CEILING AND BUSH END. RECEPTACLE FACEPLATE, JACK, CABLING, AND TERMINATIONS BY OTHERS.
6. NEW TYPICAL WORK AREA OUTLET FOR CABLE TV TERMINATION. PROVIDE 2-INCH DEEP, 2-GANG BOX WITH 1-GANG PLASTER RING. PROVIDE 1-1/4" CONDUIT TO ACCESSIBLE CEILING AND BUSH END.
CATV RECEPTACLE FACEPLATE, JACK, CABLING, AND TERMINATIONS BY OTHERS.
7. PROVIDE #6AWG GREEN COPPER GROUNDING CONDUCTOR (TYPICAL) BETWEEN GROUNDING BUSSES
AS INDICATED.
8. ROUTE (1) 1/2" CONDUIT FOR SECURITY CONTROL PANEL COMMUNICATIONS CABLING RACEWAY.
PRINCIPAL GROUND POINT NEAR ELECTRICAL SERVICE EQUIPMENT.
TELECOMMUNICATIONS MAIN GROUNDING BAR 'TMGB' FUNCTIONING AS INTERSYSTEM BONDING
TERMINATION DEVICE, COMPLYING WITH NEC 250.94.
GENERAL NOTES
1.PROVIDE EMT FOR ALL CABLING ROUTED THROUGH AREAS WITH EXPOSED STRUCTURAL CEILINGS AND THROUGH INACCESSIBLE CEILINGS. COORDINATE CONDUIT SIZE REQUIREMENTS WITH CABLE INSTALLER.
2.ALL EXPOSED CONDUIT SHALL BE CONCEALED TO THE EXTENT POSSIBLE, AND SHALL BE INSTALLED PARALLEL
AND CLOSE TO STRUCTURAL MEMBERS. PAINT CONDUIT TO MATCH ADJACENT FINISHES.
3.PROVIDE PULLCORD FOR ALL CONDUIT INSTALLED FOR CABLE.
4.PROVIDE PULLBOXES AS REQUIRED BY CABLE INSTALLER FOR RUNS EXCEEDING MAXIMUM PULL DISTANCE, AS IDENTIFIED BY CABLE INSTALLER.
5.PROVIDE SLEEVES AND CONDUIT BETWEEN FLOORS FOR ROUTING OF CABLE. COORDINATE CONDUIT SIZE WITH CABLE INSTALLER. COORDINATE LOCATION OF RACEWAY WITH CO AND CABLE INSTALLER.
6.ALL CONDUIT AND CABLING IN CRAWL SPACE IS TO BE SUPPORTED BY AND TIGHT TO STRUCTURE ABOVE.WHERE CONDUIT TRANSITIONS FROM BEING SUPPORTED BY STRUCTURE INTO SOIL, ADD LOOP AND/OR FLEXIBLE CONDUIT FOR FLEXIBILITY AND TO ALLOW FOR ANTICIPATED SOIL MOVEMENT.
7.REFER TO SPECIFICATIONS FOR FULL CONDUIT REQUIREMENTS. HOWEVER, NOTE THAT ALL UNDERGROUND CONDUIT BENDS ARE TO BE GALVANIZED RIGID CONDUIT. UNDERGROUND CONDUIT EXTENDING ABOVE SLAB
IS ALSO TO BE GALVANIZED RIGID CONDUIT.
NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO WAREHOUSE BUILDING TELECOM
ROOM. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY WITH CO
PRIOR TO INSTALLATION.
1.
TO
UNDERGROUND
VAULT (REFER
TO ELECTRICAL
SITE PLANS)
BASE
OPTIONAL
FEEDER SCHEDULE
KEY/
AMPS
SERVICE ENTRANCE FEEDERS
400N 600N 800N 1000N 1200N 1600N 2000N 2500N 3000N 3500N 4000N
EQUIPMENT FEEDERS
20NG
30NG
40NG
50NG
60NG
70NG
80NG
90NG
100NG
110NG
125NG
150NG
175NG
200NG
225NG
250NG
300NG
350NG
400NG
450NG
500NG
600NG
700NG
800NG
1000NG
1200NG
1600NG
2000NG
GROUNDING CONDUCTORS
G8 G6 G4 G2
G10 G20 G30
NOTES:
1.
2.
3.
FEEDER CONDUIT
AND CONDUCTORS
2[4#3/0, 2"C] 2[4#350, 3"C]
2[4#500, 3-1/2"C] 3[4#400, 3-1/2"C]
4[4#350, 3"C] 5[4#400, 3-1/2"C] 6[4#400, 3-1/2"C] 7[4#500, 3-1/2"C] 8[4#500, 3-1/2"C] 10[4#500, 3-1/2"C] 11[4#500, 3-1/2"C]
4#12, #12G, 3/4"C 4#10, 1#10G, 3/4"C
4#8, 1#10G, 1"C 4#6, 1#10G, 1-1/4"C 4#4, 1#10G, 1-1/4"C 4#4, 1#8G, 1-1/4"C 4#3, 1#8G, 1-1/4"C 4#2, 1#8G, 1-1/2"C 4#1, 1#8G, 1-1/2"C
4#1, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#2/0, 1#6G, 2"C
4#3/0, 1#6G, 2-1/2"C 4#4/0, 1#4G, 2-1/2"C
4#250, 1#4G, 3"C 4#350, 1#4G, 3"C
4#500, 1#3G, 3-1/2"C 2[4#3/0, 1#3G, 2-1/2"C] 2[4#4/0, 1#2G, 2-1/2"C]
2[4#250, 1#2G, 3"C] 2[4#350, 1#1G, 3"C]
2[4#500, 1#1/0G, 3-1/2"C] 2[4#500, 1#1/0G, 3-1/2"C] 3[4#400, 1#2/0G, 3-1/2"C]
4[4#350, 1#3/0G, 3"C] 5[4#400, 1#4/0G, 3-1/2"C] 6[4#400, 1#250G, 3-1/2"C]
1#8, 3/4" C 1#6, 3/4" C 1#4, 3/4" C 1#2, 3/4" C
1-1/0, 3/4" C 1-2/0, 3/4" C 1-3/0, 3/4" C
FEEDER FOR SECONDARY OF SEPARATELY DERIVED
SYSTEM (SDS). GROUND SIZE PER NEC 250.66.
ALL CONDUCTORS ARE SINGLE CONDUCTOR COPPER
THWN UNLESS NOTED OTHERWISE. AMPACITY BASED
ON NEC TABLE 310.16.
ALL CONDUITS ARE EMT UNLESS NOTED OTHERWISE,
FILL RATIOS BASED ON NEC ANNEX C TABLE C1.
KEY/
AMPS
SDS XFMR FEEDERS (NOTE 1)
30S 50S
100S 150S 250S 400S 500S 800S 1000S 1600S 2500S
20G 30G 40G 50G 60G 70G 80G 90G
100G 110G 125G 150G 175G 200G 225G 250G 300G 350G 400G 450G 500G 600G 700G 800G 1000G 1200G 1600G 2000G
ABBREVIATIONS
MECH
XFMR
FEEDER CONDUIT
AND CONDUCTORS
4#10, 1#8G, 3/4"C 4#6, 1#8G, 1-1/4"C 4#1, 1#6G, 1-1/2"C 4#1/0, 1#6G, 2"C 4#250, 1#2G, 3"C
2[4#3/0, 1#2G, 2"C] 2[4#250, 1#1/0G, 3"C]
2[4#500, 1#2/0G, 3-1/2"C] 3[4#400, 1#4/0G, 3-1/2"C] 5[4#400, 1#350G, 3-1/2"C] 7[4#500, 1#500G, 3-1/2"C]
3#12, #12G, 3/4"C 3#10, 1#10G, 3/4"C
3#8, 1#10G, 1"C 3#6, 1#10G, 1"C 3#4, 1#10G, 1"C
3#4, 1#8G, 1-1/4"C 3#3, 1#8G, 1-1/4"C 3#2, 1#8G, 1-1/4"C 3#1, 1#8G, 1-1/2"C 3#1, 1#6G, 1-1/2"C
3#1/0, 1#6G, 1-1/2"C 3#1/0, 1#6G, 1-1/2"C
3#2/0, 1#6G, 2"C 3#3/0, 1#6G, 2"C 3#4/0, 1#4G, 2"C
3#250, 1#4G, 2-1/2"C 3#350, 1#4G, 2-1/2"C
3#500, 1#3G, 3"C 2[3#3/0, 1#3G, 2"C] 2[3#4/0, 1#2G, 2"C]
2[3#250, 1#2G, 2-1/2"C] 2[3#350, 1#1G, 2-1/2"C] 2[3#500, 1#1/0G, 3"C] 2[3#500, 1#1/0G, 3"C] 3[3#400, 1#2/0G, 3"C] 4[3#350, 1#3/0G, 3"C] 5[3#400, 1#4/0G, 3"C] 6[3#400, 1#250G, 3"C]
SEE MECH SCHEDULE
SEE XFMR SCHEDULE
GROUNDING ELECTRODE SYSTEMS NOTES
1 METAL UNDERGROUND WATER PIPE - MAKE CONNECTION TO
METAL UNDERGROUND WATER PIPE INDIRECT CONTRACT WITH
THE EARTH FOR 10' OR AND ELECTRICALLY CONTINUOUS TO
THE POINTS OF CONNECTION TO THE GROUNDING ELECTRODE
CONDUCTOR AND BONDING CONDUCTORS. CONNECTION POINT
TO BE AT A MAXIMUM OF 5' OF THE POINT OF ENTRANCE ON THE
INTERIOR OF THE BUILDING.
2 BUILDING STEEL - THE METAL FRAME OF THE BUILDING OR
STRUCTURE, WHERE ANY OF THE FOLLOWING METHODS ARE
USED TO MAKE AN EARTH CONNECTION:
A.AT LEAST ONE STRUCTURAL METAL MEMBER THAT IS IN
DIRECT CONTACT WITH THE EARTH FOR 10' OR MORE, WITH
OR WITHOUT CONCRETE ENCASEMENT.
B.HOLD-DOWN BOLTS SECURING THE STRUCTURAL STEEL
COLUMN THAT ARE CONNECTED TO A CONCRETE ENCASED
ELECTRODE THAT COMPLIES WITH 250.52(A)(3) AND IS
LOCATED IN THE SUPPORT FOOTING OR FOUNDATION. THE
HOLD-DOWN BOLTS SHALL BE CONNECTED TO THE
CONCRETE-ENCASED ELECTRODE BY WELDING,
EXOTHERMIC WELDING, THE USUAL STEEL TIE WIRES, OR
OTHER APPROVED MEANS.
3 UFER GROUND (CONCRETE-ENCASED ELECTRODE) - AN
ELECTRODE…