Jemez_ElecDwgs_Amendment_5.pdf

PDF 1 MB Posted

Attached to
Jemez RD Office Construction Project Federal contract opportunity
Solicitation number
12837919R0002
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Amended Electrical Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Jemez RD Office Construction Project, newest first.
File Type Posted
SF-30_Amendment_6_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
JMEC_Jemez_Mountain_Electric_COOP_Requirements.docx DOCX document
SF-30_Amendment_5_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Windstream_Requirements.docx DOCX document
011000_Summary_of_work-revised_2019-07-25_JEMEZ.docx DOCX document
323113_-_Rev2_-_CHAIN_LINK_FENCES_AND_GATES.DOC DOC document
SF-30_Amendment_4_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Questions_&_Answers_-_07-26-19.xlsx XLSX spreadsheet
Pricing_Spreadsheet_Template.xlsx XLSX spreadsheet
Jemez_RD_Construction_Project_-_Pre-Bid_Meeting_Attendee_List_07-17-2019.pdf PDF
Contract_Time_-_Period_of_Performance.pdf PDF
SF-30_Amendment_3_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
SF-30_Amendment_2_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
SF-30_Amendment_1_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Revised-Jemez_RD_Complex_Solicitation_12837919R0002_-_07-10-19.pdf PDF
List_Revised_Specs_-_Project_Manuals_1-2-3_2019-07-10.pdf PDF
Project_Manuals_1-2-3_-_Full_Rev1_Specifications_2019_07_09.pdf PDF
Solicitation_Body_-_12837919R0002_-_Jemez_RD_Construction_Project.pdf PDF
Drawings_-_1_of_3.pdf PDF
Drawings_-_2_of_3.pdf PDF
Drawings_-_3_of_3.pdf PDF
Project_Manual_-_Volume_2_of_3.pdf PDF
Project_Manual_-_Volume_1_of_3.pdf PDF
Appendix_E_-_Wage_Determinations.pdf PDF
Appendix_G_-_Question_Template.xlsx XLSX spreadsheet
Past_Performance_Questionnaire_Appendix_F.pdf PDF
Appendix_C_-_2010_Geotechnical_Report.pdf PDF
Project_Manual_-_Volume_3_of_3.pdf PDF
Appendix_A_-_1992_Asbestos_Report.pdf PDF
Appendix_D_-_2019_Geotechnical_Report.pdf PDF
Appendix_B_-_2019_Asbestos_Report.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

MDC

K

D

TO

TC

PC

HP

R

J

RA

F

FS

D

TS

S

TS

MH

S

M

T

M

T

M

V

S

SYSTEMS

DISTRIBUTION AND RACEWAY

FIRE ALARM

LIGHTING FIXTURES

WIRING DEVICES

ABBREVIATIONS AND SYMBOLS

FACP

FA-RPS

FAA

C

A a

J

J

SR

x x x x x x

A AMPERE(S)

AC ABOVE COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERES INTERRUPTING CAPACITY

ATS AUTOMATIC TRANSFER SWITCH

BFF BELOW FINISHED FLOOR

C CONDUIT

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CT CURRENT TRANSFORMER

DISC DISCONNECT

DW DISHWASHER

DWG(S) DRAWING(S)

(E) EXISTING TO REMAIN

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

(ER) EXISTING TO BE RELOCATED

EM EMERGENCY

EPO EMERGENCY POWER OFF

EWC ELECTRIC WATER COOLER

(R) EXISTING TO BE REMOVED

F FUSE

FLA FULL LOAD AMPS

GD GARBAGE DISPOSAL

G GROUND

GC GENERAL CONTRACTOR

GFI GROUND FAULT CIRCUIT INTERRUPTER

HP HORSEPOWER

IDF INTERMEDIATE DISTRIBUTION FACILITY

IG ISOLATED GROUND

ISC SHORT CIRCUIT CURRENT

KVA KILOVOLT AMPERE(S)

KW KILOWATT(S)

LTG LIGHTING

MCA MINIMUM CIRCUIT AMPERE(S)

MCB MAIN CIRCUIT BREAKER

MDP MAIN DISTRIBUTION CENTER

MDF MAIN DISTRIBUTION FACILITY

MLO MAIN LUGS ONLY

MTS MANUAL TRANSFER SWITCH

MW MICROWAVE

NC NORMALLY CLOSED

NL NIGHT LIGHT - SEE GENERAL NOTES

NO NORMALLY OPEN

OAE OR APPROVED EQUAL

OH OVERHEAD

P POLE

PART PARTIAL CIRCUIT

PH PHASE

PNL PANEL

RCPT RECEPTACLE

REF REFRIGERATOR

(RL) RELOCATED

SPD SURGE PROTECTION DEVICE

UC UNDER COUNTER/CABINET

UG UNDERGROUND

UON UNLESS OTHERWISE NOTED

V VOLT(S)

W WATT(S) OR WIRE

WG WIRE GUARD

WP WEATHERPROOF

XFMR TRANSFORMER

KITCHEN EQUIPMENT SCHEDULE NOTATION

MECHANICAL EQUIPMENT SCHEDULE NOTATION

DETAIL NOTE

DELTA REVISION NOTE

ELECTRICAL WIRE SIZE

MAIN DISTRIBUTION CENTER (MDC)

SURFACE MTD PANELBOARD

RECESSED PANELBOARD

TRANSFORMER

BRANCH CIRCUIT HOMERUN

CONDUIT CONCEALED IN FLOOR OR UNDERGROUND

CONDUIT EXPOSED OR CONCEALED IN WALL OR

CEILING

RACEWAY UP

RACEWAY DOWN

CAPPED CONDUIT

CURRENT TRANSFORMER

CIRCUIT BREAKER SWITCH

FUSED SWITCH

GROUNDING ELECTRODE CONDUCTOR

METER

FIRE ALARM CONTROL PANEL

FIRE ALARM ANNUNCIATOR/GRAPHIC MAP

FIRE ALARM REMOTE POWER SUPPLY

CONTROL MODULE

MONITOR MODULE

MANUAL PULLDOWN STATION

WALL MOUNTED ADA STROBE

ADA HORN OR SPEAKER WITH STROBE

MINI HORN / STROBE

ELECTROMAGNETIC DOOR HOLD OPEN

SPRINKLER FLOW SWITCH

SPRINKLER TAMPER SWITCH

THERMAL DETECTOR

PHOTOELECTRIC SMOKE DETECTOR

DUCT SMOKE DETECTOR, SUPPLY OR RETURN

REMOTE INDICATING LIGHT (TEST SWITCH)

120V. MOTORIZED SMOKE DAMPER

RESCUE ASSISTANCE PHONE

FIRE FIGHTERS PHONE JACK

TTB, MDF OR IDF SYSTEM BACKBOARD

TELECOMMUNICATION OUTLET

FLOOR MOUNTED TELECOMMUNICATION OUTLET

TELEVISION OUTLET

SPEAKER - PAGING AND OR SOUND SYSTEM -

INDICATES SPEAKER ZONE

MICROPHONE OUTLET

VOLUME CONTROL

PUSH BUTTON

CLOSED CIRCUIT TELEVISION CAMERA

CABLE TRAY (LENGTH AS INDICATED ON DRAWINGS)

LUMINAIRE TYPE, REFERENCING LUMINAIRE

SCHEDULE, TYPICAL ALL FIXTURES. SUBSCRIPT,

IF SHOWN, REFERENCES WALL SWITCH.

WALL MOUNTED LUMINAIRE

SURFACE MOUNTED LUMINAIRE

RECESSED LUMINAIRE

DOWNLIGHT LUMINAIRE

SURFACE CEILING LUMINAIRE

PENDANT LUMINAIRE

WALLWASH LUMINAIRE

STRIP LUMINAIRE

SURFACE OR PENDANT TRACK LUMINAIRE

LINEAR PENDANT LUMINAIRE (LENGTH AS

INDICATED ON DRAWINGS/SCHEDULE)

EXIT LUMINAIRE - SHADED INDICATES FACE/

DIRECTIONAL ARROWS AS SHOWN.

BATTERY PACK EMERGENCY LUMINAIRE

EMERGENCY LUMINAIRE - SHADED PROVIDE WITH

INTEGRAL BATTERY BACKUP

GROUND MOUNTED DIRECTIONAL LUMINAIRE

STEP LIGHT TYPE LUMINAIRE

BOLLARD OR POST TOP LUMINAIRE

EXTERIOR AREA LIGHT

DUPLEX RECEPTACLE

FOUR PLEX RECEPTACLE

SINGLE RECEPTACLE

COMBO RECEPTACLE/SWITCH

SWITCHED DUPLEX RECEPTACLE

SPECIAL PURPOSE RECEPTACLE

FLOOR MOUNTED SPECIAL PURPOSE RECEPTACLE

FLOOR MOUNTED RECEPTACLE DUPLEX/QUAD

SURFACE RACEWAY

CLOCK RECEPTACLE

JUNCTION BOX

WALL MOUNTED J-BOX

FLOOR MOUNTED JUNCTION BOX

MOLDED CASE CIRCUIT BREAKER IN ENCLOSURE

NON-FUSED DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

MAGNETIC CONTROLLER (STARTER)

COMBINATION STARTER/DISCONNECT SWITCH

MOTOR

RELAY

TIME CLOCK

PHOTOCELL

THERMAL OVERLOAD SWITCH

SINGLE POLE SWITCH, LINE VOLTAGE

3-WAY SWITCH, LINE VOLTAGE

4-WAY SWITCH, LINE VOLTAGE

KEY OPERATED SWITCH

DIMMER SWITCH, LINE VOLTAGE

S

S

S

S

S

S x LIGHTING CONTROL DEVICE x LIGHTING CONTROL DEVICE, REFER

TO DETAILS FOR CONTROL INTENT

EMERGENCY POWERED DUPLEX RECEPTACLE

WAP WIRELESS ACCESS POINT

CEILING MOUNTED RECEPTACLE DUPLEX/QUAD

CLGCLG

CR ACCESS CONTROL - CARD READER

E

ELEVATOR PHONE JACK

DED DEDICATED

P PANIC/DURESS ALARM - WIRED PANIC BUTTON

GB INTRUSION ALARM - GLASS BREAK DETECTOR

DC INTRUSION ALARM - DOOR CONTACT

MD INTRUSION ALARM - DIRECTIONAL MOTION DETECTOR

1. WHERE MULTIPLE LINE VOLTAGE DEVICES ARE SHOWN

ADJACENT TO EACH OTHER, THEY ARE ALL TO SHARE THE

SAME JUNCTION BOX, UP TO FOUR GANGS.

2. WHERE MORE THAN FOUR DEVICES ARE SHOWN ADJACENT TO

EACH OTHER, DEVICES ARE TO STACK VERTICALLY ABOVE ONE

ANOTHER IN TWO ROWS IN AS SMALL OF GANG BOXES AS

POSSIBLE. I.E. SIX DEVICES WILL USE TWO THREE GANG

BOXES, FIVE DEVICES WILL USE ONE THREE GANG AND ONE

TWO GANG BOX.

3. SEPARATELY GANGED DEVICES ARE NOT ALLOWED TO BE

INSTALLED ADJACENT TO ONE ANOTHER HORIZONTALLY

WITHIN THE SAME STUD BAY.

4. AUDIBLE/VISUAL FIRE ALARM DEVICES SHOWN ARE TO BE

MOUNTED AT 90" OR 6" BELOW CEILING, WHICHEVER IS LOWER.

ADA STROBES TO BE MOUNTED AT 80" AFF OR 6" BELOW

CEILING, WHICHEVER IS LOWER.

5. THE E.C. SHALL REFER TO ARCHITECTURAL ELEVATIONS TO

COORDINATE ALL COUNTER HEIGHTS. ALL "AC" DEVICES SHALL

HAVE BOTTOM OF BACK-BOX MOUNTED 4" ABOVE THE

BACK/SIDE SPLASH.

NOTES:

S

S

FAA

S

V

M

6'-8"

5'-4"

6'-0"

TO CENTER

(SEE

NOTE 6)

1'-6"

3'-8"

TO BOTTOM OF DEVICE (SEE NOTE 4)

TOP OF CABINET

CENTER OF CABINET

TYPICAL 9'-0" CEILING

TYPICAL 8'-0" CEILING

8'-0"

7'-4"

TO CENTER

TO BOTTOM

5'-0"

TO CENTER

AC AC AC AC

POWER PANEL,

FIRE ALARM PANEL, OR

MASTER CLOCK

x

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

E0-0

ELECTRICAL LEGEND

MJH/SCK

MJH/SCK

ESN

NTSE0-0

DEVICE MOUNTING HEIGHT3

LIGHTNING PROTECTION SYSTEM NOTES

PROVIDE AND INSTALL A LIGHTNING PROTECTION

SYSTEM WITH AN UNDERWRITER'S

LABORATORIES LISTED MASTER C LABEL. REFER

TO PERFORMACE SPECIFICATION SECTION 26.4113

FOR SYSTEM REQUIREMENTS. COORDINATE ALL

GROUND ROD LOCATIONS ON ROOF WITH CO

WHILE DEVELOPING SUBMITTALS. COORDINATE

ALL DOWN CONDUCTOR LOCATIONS WITH CO AND

MANUFACTURER DURING SUBMITTALS.

SUBMITTALS REQUIRE FULL ROOF PLANS WITH

ALL GROUND ROD (AND ALL OTHER EQUIPMENT)

TO BE INDICATED FOR REVIEW PRIOR TO

SUBMITTAL APPROVAL.

lcarroll Text Box revisions in Red made by AE Design lcarroll Text Box Revisions in blue made by Lexie Carroll, USFS lcarroll Text Box Electrical and Communication Addendume Changes - Addendum #4

B

ATTACH TO REBAR

WITH BONDING

CLAMPI

ANCHOR BOLT

ANCHOR BOLT DATA

4-#4 BARS

VERTICAL

ELEVATION

H

EA1

KEY

POLE

HEIGHT

OVERALL

A

F G

HB SIZE C D E F G

TOP VIEW

I

BASE PLATE

1" CHAMFER

BASE COVER

ATTACH TO BONDING

LUG ON POLE

D

A

C

HAND HOLE

E

H

BELOW TOP 5" OF

FOUNDATION #3 HORIZ.

TIES @ 12" O.C.

PVC RIGID

CONDUIT TYP.

FINISH GRADE

VARIES3-#3 HORIZ. TIES WITHIN

TOP 5" OF FOUNDATION

EA2 24'0" 4" 24"PER MANUFACTURER 1'0" 6'0" 6'0" 36"

24'0" 4" 24"PER MANUFACTURER 1'0" 6'0" 6'0" 36"

ES0-2

ES0-3

ES0-4

ES0-5

T

OFFICE

FIRE

W A

R E

H O

U S

E

S1

S2 S4

S8

S5

S6S6

S5

S7

S9

S4

S15

S3 S17

S16

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

ES0-1

ELECTRICAL SITE PLAN

MJH/SCK

MJH/SCK

ESN

SITE GENERAL NOTES

A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH A MINIMUM

OF 2#8, 1#10, 1"C, UON.

REFER TO SCALE

POLE BASE DETAIL

REFER TO SCALE

ELECTRICAL SITE PLAN

20'0 40' 80'

NORTH

KEY

VALUE KEYNOTE TEXT

S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ

MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS

DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW

PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH

AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL

CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION

BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS

LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL

(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).

JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE

OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION

BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND

BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR

TO PROJECT INITIATION.

S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.

CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.

PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90

DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND

INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND

THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE

CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING

ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.

JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE

TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE

CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE

SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY

METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN

SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE

METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND

SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS

FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL

BE BILLED TO THE NEW PROJECT METER NUMBER.

S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS

BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV

WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT

QUANTITIES AND SIZES.

S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL

SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND

BUILDING UTILITY TRANSFORMER.

S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE

INFORMATION.

S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.

REFER TO OFFICE PLANS EO1-1.

S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR

REFERENCE ONLY.

S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION

010250.

S11 BASE: SITE LIGHTING.

S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING

OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).

S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE

APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM

SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"

SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT

MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT

EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY

FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE

INSTALLATION. COORDINATE TIMING OF PROJECT WITH

WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL

INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO

INSTALLATION.

S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM

HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW

UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB

UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE

OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND

INSTALLED BY WINDSTREAM.

B REFER TO SPECIFICATION SECTION 010250 FOR MORE DETAIL AND

PACKAGING OF OPTIONAL ITEMS. DETAIL NOTES PROVIDED FOR

DISTINCTION BETWEEN BASE AND OPTIONAL ITEMS.

C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS INDICATED ON

THIS SHEET SHALL REFER TO CIRCUIT ORIGINATING IN

PANELBOARDS BASED UPON THE FOLLOWING CONVENTION:

PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'

PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'

PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'

lcarroll Text Box Changed in BLUE made by Lexie Carroll, USFS lcarroll Text Box changed in RED made by AE Design, the Electrical AE firm of Record

EA1

PO1- 57

ZS1

EA1

PO1- 57

ZS1

EA2

PO1- 57

ZS1

S10

S10

S10

S1

S3

S16

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

ES0-2

ELECTRICAL ENLARGED

SITE PLAN - NORTH

PARKING AREA

MJH/SCK

MJH/SCK

ESN

REFER TO SCALE

ENLARGED ELECTRICAL SITE PLAN

5'0 10' 20'

NORTH

SITE GENERAL NOTES

A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH

A MINIMUM OF 2#8, 1#10, 1"C, UON.

KEY

VALUE KEYNOTE TEXT

S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ

MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS

DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW

PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH

AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL

CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION

BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS

LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL

(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).

JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE

OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION

BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND

BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR

TO PROJECT INITIATION.

S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.

CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.

PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90

DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND

INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND

THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE

CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING

ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.

JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE

TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE

CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE

SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY

METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN

SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE

METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND

SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS

FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL

BE BILLED TO THE NEW PROJECT METER NUMBER.

S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS

BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV

WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT

QUANTITIES AND SIZES.

S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL

SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND

BUILDING UTILITY TRANSFORMER.

S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE

INFORMATION.

S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.

REFER TO OFFICE PLANS EO1-1.

S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR

REFERENCE ONLY.

S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION

010250.

S11 BASE: SITE LIGHTING.

S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING

OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).

S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE

APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM

SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"

SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT

MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT

EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY

FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE

INSTALLATION. COORDINATE TIMING OF PROJECT WITH

WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL

INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO

INSTALLATION.

S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM

HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW

UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB

UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE

OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND

INSTALLED BY WINDSTREAM.

B REFER TO SPECIFICATION SECTION 010250 FOR MORE

DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL

NOTES PROVIDED FOR DISTINCTION BETWEEN BASE

AND OPTIONAL ITEMS.

C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS

INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT

ORIGINATING IN PANELBOARDS BASED UPON THE

FOLLOWING CONVENTION:

PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'

PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'

PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'

J

J

J

EA1

PO1- 57

ZS1

EA2

PO1- 57

ZS1

EA2

PO1- 57

ZS1

EG1

PO1- 57

ZS2

EG1

PO1- 57

ZS2

EG1

PO1- 57

ZS2

EG1

PO1- 57

ZS2

EG2

PO1- 57

ZS3

EG2

PO1- 57

ZS3

T

S10

PANEL PO1

S8

S7

S5

S6S6

S2

S4

S6S6 S5

OFFICE BUILDING

FLAG POLE

S11

S11

S11

S11

S11

S11 S11

S13

S13

S13

S13

PO1-81,83

PO1-74,76

PO1-77,79

PO1-73,75

S17

S3

UTILITY

JUNCTION

BOX

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

ES0-3

ELECTRICAL ENLARGED

SITE PLAN - OFFICE AREA

MJH/SCK

MJH/SCK

ESN

REFER TO SCALE

ENLARGED ELECTRICAL SITE PLAN

5'0 10' 20'

NORTH

SITE GENERAL NOTES

A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH

A MINIMUM OF 2#8, 1#10, 1"C, UON.

KEY

VALUE KEYNOTE TEXT

S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ

MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS

DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW

PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH

AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL

CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION

BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS

LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL

(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).

JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE

OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION

BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND

BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR

TO PROJECT INITIATION.

S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.

CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.

PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90

DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND

INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND

THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE

CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING

ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.

JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE

TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE

CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE

SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY

METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN

SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE

METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND

SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS

FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL

BE BILLED TO THE NEW PROJECT METER NUMBER.

S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS

BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV

WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT

QUANTITIES AND SIZES.

S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL

SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND

BUILDING UTILITY TRANSFORMER.

S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE

INFORMATION.

S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.

REFER TO OFFICE PLANS EO1-1.

S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR

REFERENCE ONLY.

S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION

010250.

S11 BASE: SITE LIGHTING.

S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING

OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).

S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE

APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM

SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"

SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT

MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT

EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY

FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE

INSTALLATION. COORDINATE TIMING OF PROJECT WITH

WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL

INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO

INSTALLATION.

S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM

HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW

UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB

UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE

OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND

INSTALLED BY WINDSTREAM.

B REFER TO SPECIFICATION SECTION 010250 FOR MORE

DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL

NOTES PROVIDED FOR DISTINCTION BETWEEN BASE

AND OPTIONAL ITEMS.

C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS

INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT

ORIGINATING IN PANELBOARDS BASED UPON THE

FOLLOWING CONVENTION:

PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'

PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'

PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'

EA1

PO1- 57

ZS1

EA1

PO1- 57

ZS1

EA1

PO1- 57

ZS1

EA1

PO1- 57

ZS1

FIRE BUILDING

W A

R E

H O

U S

E

S10

S10

S10

S10

S6S6

S5

S5

S14

S14

PW1-43,45

PW1-47,49

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

ES0-4

ELECTRICAL ENLARGED

SITE PLAN - FIRE

BLDG/WAREHOUSE AREA

MJH/SCK

MJH/SCK

ESN

REFER TO SCALE

ENLARGED ELECTRICAL SITE PLAN

10'0 20' 40'

NORTH

SITE GENERAL NOTES

A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH

A MINIMUM OF 2#8, 1#10, 1"C, UON.

KEY

VALUE KEYNOTE TEXT

S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ

MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS

DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW

PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH

AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL

CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION

BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS

LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL

(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).

JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE

OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION

BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND

BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR

TO PROJECT INITIATION.

S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.

CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.

PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90

DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND

INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND

THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE

CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING

ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.

JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE

TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE

CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE

SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY

METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN

SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE

METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND

SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS

FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL

BE BILLED TO THE NEW PROJECT METER NUMBER.

S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS

BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV

WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT

QUANTITIES AND SIZES.

S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL

SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND

BUILDING UTILITY TRANSFORMER.

S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE

INFORMATION.

S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.

REFER TO OFFICE PLANS EO1-1.

S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR

REFERENCE ONLY.

S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION

010250.

S11 BASE: SITE LIGHTING.

S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING

OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).

S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE

APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM

SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"

SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT

MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT

EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY

FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE

INSTALLATION. COORDINATE TIMING OF PROJECT WITH

WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL

INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO

INSTALLATION.

S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM

HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW

UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB

UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE

OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND

INSTALLED BY WINDSTREAM.

B REFER TO SPECIFICATION SECTION 010250 FOR MORE

DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL

NOTES PROVIDED FOR DISTINCTION BETWEEN BASE

AND OPTIONAL ITEMS.

C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS

INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT

ORIGINATING IN PANELBOARDS BASED UPON THE

FOLLOWING CONVENTION:

PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'

PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'

PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'

EA2

PO1- 57

ZS1

EA1

PO1- 57

ZS1

S11

S11

S15

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

ES0-5

ELECTRICAL ENLARGED

SITE PLAN - SOUTH

PARKING AREA

MJH/SCK

MJH/SCK

ESN

REFER TO SCALE

ENLARGED ELECTRICAL SITE PLAN

10'0 20' 40'

NORTH

KEY

VALUE KEYNOTE TEXT

S1 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD ELECTRICAL TO NEW UNDERGROUND AT JEMEZ

MOUNTAIN ELECTRIC COOPERATIVE (JMEC) "RISER" POLE (AS

DESIGNATED BY JMEC). THE APPROXIMATE LENGTH OF THE NEW

PRIMARY UNDERGROUND CONDUIT IS 800 FT. JMEC SHALL FURNISH

AND INSTALL JUNCTION BOX ALONG THIS PATH. ELECTRICAL

CONTRACTOR SHALL CONFIRM DESIRED LOCATION FOR JUNCTION

BOX WITH JMEC IN ORDER TO PROVIDE CONDUIT STUB UPS AT THIS

LOCATION. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL

(1) 6" SCHEDULE 40 PVC (ALL 90 DEGREE FITTINGS SHALL BE RIGID).

JMEC SHALL FURNISH AND INSTALL ALL CABLING BETWEEN THE

OVERHEAD/UNDERGROUND TRANSITION LOCATIONS AND JUNCTION

BOX. THE CONTRACTOR SHALL PERFORM ALL TRENCHING AND

BACKFILLING. COORDINATE TIMING OF PROJECT WITH JMEC PRIOR

TO PROJECT INITIATION.

S2 BASE: LOCATION OF BUILDING TRANSFORMER AND CONCRETE PAD.

CONTRACTOR SHALL FURNISH AND INSTALL ALL PRIMARY CONDUIT.

PRIMARY CONDUIT SHALL BE (1) 6" SCHEDULE 40 PVC (ALL 90

DEGREE FITTINGS SHALL BE RIGID). JMEC SHALL FURNISH AND

INSTALL ALL PRIMARY CABLING BETWEEN THE JUNCTION BOX AND

THE PRIMARY CONNECTION POINT AT THE TRANSFORMER. THE

CONTRACTOR SHALL PERFORM ALL TRENCHING AND BACKFILLING

ON THE PRIMARY AND SECONDARY SIDE OF THE TRANSFORMER.

JMEC SHALL FURNISH AND INSTALL THE TRANSFORMER. THE

TRANSFORMER CONCRETE PAD SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR PER JMEC SPECIFICATIONS. THE

CONTRACTOR SHALL FURNISH AND INSTALL THE CONDUIT ON THE

SECONDARY SIDE OF THE TRANSFORMER TO BUILDING UTILITY

METER LOCATION. JMEC SHALL PROVIDE ALL CABLING BETWEEN

SECONDARY CONNECTION POINT AT THE TRANSFORMER AND THE

METER. JMEC SHALL MAKE ALL CONNECTIONS OF THE PRIMARY AND

SECONDARY CABLING AT THE TRANSFORMER LANDINGS. ALL COSTS

FOR WORK DESCRIBED ABOVE TO BE PERFORMED BY JMEC SHALL

BE BILLED TO THE NEW PROJECT METER NUMBER.

S3 BASE: APPROXIMATE ROUTING OF LOW VOLTAGE CONDUIT SYSTEMS

BETWEEN MDF LOCATION AND SITE TELEPHONE AND CATV

WINDSTREAM PEDESTAL LOCATIONS. REFER TO ES3-0 FOR CONDUIT

QUANTITIES AND SIZES.

S4 BASE: APPROXIMATE ROUTING OF BUILDING PRIMARY ELECTRICAL

SERVICE BETWEEN NEAREST JMEC EXISTING CONNECTION AND

BUILDING UTILITY TRANSFORMER.

S5 BASE: NEW UNDERGROUND ELECTRICAL PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S6 BASE: NEW UNDERGROUND TELE/COMM PATHWAY. REFER TO ES3-0

FOR CONDUIT QUANTITIES AND SIZES.

S7 BASE: NEW TELE/COMM VAULT. REFER TO ES3-0 FOR MORE

INFORMATION.

S8 BASE: NEW SITE DEMARCATION ROOM WITHIN OFFICE BUILDING.

REFER TO OFFICE PLANS EO1-1.

S9 RADIO TOWER NOT IN CONTRACT, LOCATION SHOWN FOR

REFERENCE ONLY.

S10 OPTIONAL: OVERHEAD LIGHT POLE, REFER TO SPECIFICATION

010250.

S11 BASE: SITE LIGHTING.

S13 BASE: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S14 OPTIONAL: PROVIDE CONNECTION TO ELECTRIC VEHICLE CHARGING

STATION. PROVIDE 40A, 208V, 1-PHASE CIRCUIT WITH 2#8, 1#10G, 1"C.

CIRCUIT AS SHOWN. COORDINATE EXACT LOCATION AND

CONNECTION REQUIREMENTS WITH APPROVED SHOP DRAWINGS

PRIOR TO ROUGH IN.

S15 BASE: TRANSITION FROM NEW UNDERGROUND TO EXISTING

OVERHEAD AT JMEC "RISER" POLE (AS DESIGNATED BY JMEC).

S16 BASE: APPROXIMATE LOCATION OF TRANSITION FROM EXISTING

OVERHEAD WINDSTREAM SERVICE TO NEW UNDERGROUND. THE

APPROXIMATE LENGTH OF THE NEW UNDERGROUND WINDSTREAM

SERVICE IS 800'. ELECTRICAL CONTRACTOR SHALL PROVIDE (2) 3"

SCHEDULE 80 PVC CONDUITS WITH 80LBS. PULL STRINGS AT

MINIMUM 30" BURIAL DEPTH, STUBBED UP 6" ABOVE GROUND AT

EACH END WITH TAPE COVER THE OPENINGS, AT LEAST 5' AWAY

FROM ANY POWER POLES. PROVIDE WARNING TAPE 1' ABOVE

INSTALLATION. COORDINATE TIMING OF PROJECT WITH

WINDSTREAM PRIOR TO PROJECT INITIATION. CONFIRM ALL

INSTALLATION REQUIREMENTS WITH WINDSTREAM PRIOR TO

INSTALLATION.

S17 BASE: APPROXIMATE LOCATION FOR NEW WINDSTREAM

HANDLEHOLE/PEDESTAL, TO BE LOCATED AT MIDPOINT OF NEW

UNDERGROUND ROUTING. ELECTRICAL CONTRACTOR SHALL STUB

UP CONDUITS TO 6" ABOVE GROUP WITH TAPE COVERING THE

OPENINGS. HANDLEHOLE/PEDESTAL SHALL BE SUPPLIED AND

INSTALLED BY WINDSTREAM.

SITE GENERAL NOTES

A ALL EXTERIOR LIGHTING CIRCUITS SHALL BE FED WITH

A MINIMUM OF 2#8, 1#10, 1"C, UON.

B REFER TO SPECIFICATION SECTION 010250 FOR MORE

DETAIL AND PACKAGING OF OPTIONAL ITEMS. DETAIL

NOTES PROVIDED FOR DISTINCTION BETWEEN BASE

AND OPTIONAL ITEMS.

C UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS

INDICATED ON THIS SHEET SHALL REFER TO CIRCUIT

ORIGINATING IN PANELBOARDS BASED UPON THE

FOLLOWING CONVENTION:

PO1-# = CIRCUIT TO OFFICE PANEL 'PO1'

PW1-# = CIRCUIT TO WAREHOUSE PANEL 'PW1'

PF1-# = CIRCUIT TO FIRE STATION PANEL 'PF1'

2 [3" CONDUIT]

2" CONDUIT

OFFICE BUILDING FIRE BUILDING WAREHOUSE

2" CONDUIT

T

PRIMARY BY UTILITY

COMPANY REFER

ELECTRICAL SITE PLANS

PAD MOUNTED UTILITY

TRANSFORMER

120/208V, 3PH, 4W

ASSUMED 150KVA

OFFICE

1ST FLOOR

'MDF'

KEYNOTE LEGEND

NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO SITE TELEPHONE SERVICE POINT.

ELECTRICAL CONTRACTOR SHALL CONFIRM ALL REQUIREMENTS, ROUTING, AND LOCATIONS WITH SERVICE

PROVIDER AND CO PRIOR TO INSTALLATION.

NEW (1) 4" PVC CONDUIT WITH 1-1/2" INNER DUCT ROUTED 30" BELOW GRADE FOR CONNECTION TO SITE FIBER OPTIC SERVICE POINT. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT AND DUCT SIZING AND

QUANTITY WITH SERVICE PROVIDER PRIOR TO INSTALLATION.

NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO SITE CATV SERVICE POINT.

ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY WITH SERVICE PROVIDER PRIOR

TO INSTALLATION.

NEW (1) 4" PVC CONDUIT WITH 1-1/2" INNER DUCT ROUTED 30" BELOW GRADE FOR CONNECTION TO FIBER VAULT (FOR FUTURE USE). ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT AND DUCT SIZING AND

QUANTITY WITH CO PRIOR TO INSTALL.

NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO FIRE BUILDING TELECOM ROOM VIA UNDERGROUND VAULT. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY WITH

CO PRIOR TO INSTALLATION.

NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO WAREHOUSE BUILDING TELECOM ROOM VIA UNDERGROUND VAULT. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY

WITH CO PRIOR TO INSTALLATION.

NEW TELECOM UNDERGROUND VAULT, 24"x26"x36"D COMMUNICATIONS IN-GROUND PULL BOX. CONFIRM

FINAL LOCATION WITH CO PRIOR TO EXCAVATION.

GENERAL NOTES

1.

2.

3.

PROVIDE PULLCORD FOR ALL CONDUIT INSTALLED FOR CABLE.

4.

PROVIDE PULLBOXES AS REQUIRED BY CABLE INSTALLER FOR RUNS EXCEEDING MAXIMUM PULL DISTANCE, AS IDENTIFIED BY CABLE INSTALLER.

ALL CONDUIT AND CABLING IN CRAWL SPACE IS TO BE SUPPORTED BY AND TIGHT TO STRUCTURE ABOVE.

WHERE CONDUIT TRANSITIONS FROM BEING SUPPORTED BY STRUCTURE INTO SOIL, ADD LOOP AND/OR

FLEXIBLE CONDUIT FOR FLEXIBILITY AND TO ALLOW FOR ANTICIPATED SOIL MOVEMENT.

REFER TO SPECIFICATIONS FOR FULL CONDUIT REQUIREMENTS. HOWEVER, NOTE THAT ALL UNDERGROUND CONDUIT BENDS ARE TO BE GALVANIZED RIGID CONDUIT. UNDERGROUND CONDUIT EXTENDING ABOVE SLAB

IS ALSO TO BE GALVANIZED RIGID CONDUIT.

1.

2.

3.

4.

5.

6.

7.

TELEPHONE

/LOW

VOLTAGE

UTILITY

4 5

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

07/01/2019

ES3-0

ELECTRICAL SITE

ONE-LINE DIAGRAM

MJH/SCK

MJH/SCK

ESN

REFER TO SCALE

BASE - SITE ELECTRICAL ONE-LINE & UNDERGROUND DIAGRAM

REFER TO SCALE

SITE LOW VOLTAGE RISER & UNDERGROUND DIAGRAM

ELECTRICAL ONE-LINE GENERAL NOTES

A ALL UNDERGROUND PATHWAYS (QUANTITIES

AND SIZES) SHOWN IN THE ONE-LINE DIAGRAM

ARE PART OF THE BASE SCOPE. REFER TO THE

ELECTRICAL SITE PLANS FOR LOCATIONS AND

DISTANCES. REFER TO INDIVIDUAL BUILDING

ONE-LINE DIAGRAMS (EO3-0, EF3-0, EW3-0) AND

SPECIFICATION 010250 FOR FURTHER

CLARIFICATION OF BASE AND OPTIONAL ITEMS.

lcarroll Callout Provide conduit and trenching for Primary Electrical Line: Utility Company to provide and install wiring.

PANEL

PF1M

200N

200NG

SEE DETAIL

BASE: SITE

OFFICET

PRIMARY BY

UTILITY

COMPANY

PAD MOUNTED UTILITY

TRANSFORMER

120/208V, 3PH, 4W

ASSUMED 150KVA

EXTERIOR INTERIOR

N G

BUILDING-MOUNTED

SERVICE-RATED

FUSED DISCONNECT

'PF1', 200A, 3PH, 4W,

NEMA 3R, 22K AIC

IN-LINE UTILITY METER

WAREHOUSE BASE

UNDERGROUND PATHWAY,

REFER TO ELECTRICAL SITE

PLANS

F0

F1

F

GROUNDING ELECTRODE SYSTEMS NOTES

1 METAL UNDERGROUND WATER PIPE - MAKE CONNECTION TO

METAL UNDERGROUND WATER PIPE INDIRECT CONTRACT WITH

THE EARTH FOR 10' OR AND ELECTRICALLY CONTINUOUS TO

THE POINTS OF CONNECTION TO THE GROUNDING ELECTRODE

CONDUCTOR AND BONDING CONDUCTORS. CONNECTION POINT

TO BE AT A MAXIMUM OF 5' OF THE POINT OF ENTRANCE ON THE

INTERIOR OF THE BUILDING.

2 BUILDING STEEL - THE METAL FRAME OF THE BUILDING OR

STRUCTURE, WHERE ANY OF THE FOLLOWING METHODS ARE

USED TO MAKE AN EARTH CONNECTION:

A.AT LEAST ONE STRUCTURAL METAL MEMBER THAT IS IN

DIRECT CONTACT WITH THE EARTH FOR 10' OR MORE, WITH

OR WITHOUT CONCRETE ENCASEMENT.

B.HOLD-DOWN BOLTS SECURING THE STRUCTURAL STEEL

COLUMN THAT ARE CONNECTED TO A CONCRETE ENCASED

ELECTRODE THAT COMPLIES WITH 250.52(A)(3) AND IS

LOCATED IN THE SUPPORT FOOTING OR FOUNDATION. THE

HOLD-DOWN BOLTS SHALL BE CONNECTED TO THE

CONCRETE-ENCASED ELECTRODE BY WELDING,

EXOTHERMIC WELDING, THE USUAL STEEL TIE WIRES, OR

OTHER APPROVED MEANS.

3 UFER GROUND (CONCRETE-ENCASED ELECTRODE) - AN

ELECTRODE ENCASED BY AT LEAST 2" OF CONCRETE, LOCATED

WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION

OR FOOTING THAT IS IN DIRECT CONTACT WITH EARTH,

CONSISTING OF AT LEAST 20' OF ONE OR MORE BARE OR ZINC

GALVANIZED OR OTHER ELECTRICALLY CONDUCTIVE COATED

STEEL REINFORCING BARS OR RODS OF NOT LESS THAN 1/2" IN

DIAMETER, OR CONSISTING OF AT LEAST 20' OF BARE COPPER

CONDUCTOR NOT SMALLER THAN NO. 4 AWG. REINFORCING

BARS SHALL BE PERMITTED TO BE BONDED TOGETHER BY THE

USUAL STEEL TIE WIRES OR OTHER EFFECTIVE MEANS.

4 GROUND ROD - ROD IS TO BE 8FT IN LENGTH AND SHALL BE

MADE OF IRON OR STEEL AT LEAST 5/8" DIAMETER.

INSTALLATION METHODS FOR GROUND ROD SHALL BE IN

COMPLIANCE WITH THE NEC SUCH THAT AT LEAST 8' OF LENGTH

IS IN CONTACT WITH THE EARTH.

GENERAL GROUNDING NOTES

1 ALL CABLES TO BE TERMINATED ONTO BUS BAR WITH TWO

HOLE COMPRESSION LUGS AND ATTACHED TO BUS BAR

WITH TAB COMPRESSION BELLEVILLE WASHERS AND TORX

BOLT ASSEMBLY.

2 ALL GROUND CONNECTORS SHALL BE STRANDED.

3 ALL BUS BARS SHALL BE ATTACHED TO SURFACE WITH

NON-CONDUCTIVE STAND-OFFS.

4 GROUND BUS BAR AND GROUNDING SYSTEM SHALL BE UL

LISTED AND COMPLY WITH MANUFACTURERS

INSTALLATION INSTRUCTIONS.

PRINCIPAL GROUND

POINT (PGP) CU

GROUND BAR

INTERNAL TO

DISCONNECT SWITCH

(DF-1) OR (DW-1)

TELECOMMUNICATIONS

GROUND BAR

('TMGB-1')

INTERSYSTEM'S

BONDING

BRIDGE PER NEC

250.94

ADJACENT TO

DISCONNECT SWITCH

(DF-1) OR (DW-1)

G4

G4

G4G4

CWP

UFER

G6

GND

ROD

O3

FEEDER SCHEDULE

KEY/

AMPS

SERVICE ENTRANCE FEEDERS

400N 600N 800N

1000N 1200N 1600N 2000N 2500N 3000N 3500N 4000N

EQUIPMENT FEEDERS

20NG

30NG

40NG

50NG

60NG

70NG

80NG

90NG

100NG

110NG

125NG

150NG

175NG

200NG

225NG

250NG

300NG

350NG

400NG

450NG

500NG

600NG

700NG

800NG

1000NG

1200NG

1600NG

2000NG

GROUNDING CONDUCTORS

G8 G6 G4 G2 G10 G20 G30

NOTES:

1.

2.

3.

FEEDER CONDUIT

AND CONDUCTORS

2[4#3/0, 2"C] 2[4#350, 3"C]

2[4#500, 3-1/2"C] 3[4#400, 3-1/2"C]

4[4#350, 3"C] 5[4#400, 3-1/2"C] 6[4#400, 3-1/2"C] 7[4#500, 3-1/2"C] 8[4#500, 3-1/2"C]

10[4#500, 3-1/2"C] 11[4#500, 3-1/2"C]

4#12, #12G, 3/4"C 4#10, 1#10G, 3/4"C

4#8, 1#10G, 1"C 4#6, 1#10G, 1-1/4"C 4#4, 1#10G, 1-1/4"C 4#4, 1#8G, 1-1/4"C 4#3, 1#8G, 1-1/4"C 4#2, 1#8G, 1-1/2"C 4#1, 1#8G, 1-1/2"C

4#1, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#2/0, 1#6G, 2"C

4#3/0, 1#6G, 2-1/2"C 4#4/0, 1#4G, 2-1/2"C

4#250, 1#4G, 3"C 4#350, 1#4G, 3"C

4#500, 1#3G, 3-1/2"C 2[4#3/0, 1#3G, 2-1/2"C] 2[4#4/0, 1#2G, 2-1/2"C]

2[4#250, 1#2G, 3"C] 2[4#350, 1#1G, 3"C]

2[4#500, 1#1/0G, 3-1/2"C] 2[4#500, 1#1/0G, 3-1/2"C] 3[4#400, 1#2/0G, 3-1/2"C]

4[4#350, 1#3/0G, 3"C] 5[4#400, 1#4/0G, 3-1/2"C] 6[4#400, 1#250G, 3-1/2"C]

1#8, 3/4" C 1#6, 3/4" C 1#4, 3/4" C 1#2, 3/4" C

1-1/0, 3/4" C 1-2/0, 3/4" C 1-3/0, 3/4" C

FEEDER FOR SECONDARY OF SEPARATELY DERIVED

SYSTEM (SDS). GROUND SIZE PER NEC 250.66.

ALL CONDUCTORS ARE SINGLE CONDUCTOR COPPER

THWN UNLESS NOTED OTHERWISE. AMPACITY BASED

ON NEC TABLE 310.16.

ALL CONDUITS ARE EMT UNLESS NOTED OTHERWISE,

FILL RATIOS BASED ON NEC ANNEX C TABLE C1.

KEY/

AMPS

SDS XFMR FEEDERS (NOTE 1)

30S 50S 100S 150S 250S 400S 500S 800S 1000S 1600S 2500S

20G 30G 40G 50G 60G 70G 80G 90G

100G 110G 125G 150G 175G 200G 225G 250G 300G 350G 400G 450G 500G 600G 700G 800G 1000G 1200G 1600G 2000G

ABBREVIATIONS

MECH

XFMR

FEEDER CONDUIT

AND CONDUCTORS

4#10, 1#8G, 3/4"C 4#6, 1#8G, 1-1/4"C 4#1, 1#6G, 1-1/2"C 4#1/0, 1#6G, 2"C 4#250, 1#2G, 3"C

2[4#3/0, 1#2G, 2"C] 2[4#250, 1#1/0G, 3"C]

2[4#500, 1#2/0G, 3-1/2"C] 3[4#400, 1#4/0G, 3-1/2"C] 5[4#400, 1#350G, 3-1/2"C] 7[4#500, 1#500G, 3-1/2"C]

3#12, #12G, 3/4"C 3#10, 1#10G, 3/4"C

3#8, 1#10G, 1"C 3#6, 1#10G, 1"C 3#4, 1#10G, 1"C

3#4, 1#8G, 1-1/4"C 3#3, 1#8G, 1-1/4"C 3#2, 1#8G, 1-1/4"C 3#1, 1#8G, 1-1/2"C 3#1, 1#6G, 1-1/2"C

3#1/0, 1#6G, 1-1/2"C 3#1/0, 1#6G, 1-1/2"C

3#2/0, 1#6G, 2"C 3#3/0, 1#6G, 2"C 3#4/0, 1#4G, 2"C

3#250, 1#4G, 2-1/2"C 3#350, 1#4G, 2-1/2"C

3#500, 1#3G, 3"C 2[3#3/0, 1#3G, 2"C] 2[3#4/0, 1#2G, 2"C]

2[3#250, 1#2G, 2-1/2"C] 2[3#350, 1#1G, 2-1/2"C] 2[3#500, 1#1/0G, 3"C] 2[3#500, 1#1/0G, 3"C] 3[3#400, 1#2/0G, 3"C] 4[3#350, 1#3/0G, 3"C] 5[3#400, 1#4/0G, 3"C] 6[3#400, 1#250G, 3"C]

SEE MECH SCHEDULE

SEE XFMR SCHEDULE

200N 4#3/0, 2-1/2"C] -- --

DRAWING TITLE

PROJECT NAME

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

SUBSHEET NO.

/2

/1

:3

C

W K

J

9.

5.

C \D

R A

W

IN

G S

\R E

C E

IV

E

D \U

S F

S \2

T

IT

L E

B L

O C

K \R

-B

O R

D E

R .D

W G

(R3)

SOUTHWESTERN REGION

JEMEZ RANGER

DISTRICT OFFICE DESIGN

PHASE TWO

SANTA FE

NATIONAL FOREST

JEMEZ RANGER DISTRICT

07/01/2019

2339.15.1c

DRAWN

LOGOS / STAMPS

DWG SHEET NO.

FIRE STATION - OPTIONAL

07/01/2019

EF3-0

FIRE ELECTRICAL

ONE-LINE DIAGRAM

MJH/SCK

MJH/SCK

ESN

NO SCALE

ELEC DISTRIBUTION GROUNDING ONE-LINE DIAGRAM & NOTES

NO SCALE

1 ONE-LINE DIAGRAM

BY THE ELECTRICAL CONTRACTOR FOR BIDDING PURPOSES. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ESTIMATING AND MEASURING ACTUAL FIELD CONDITION LENGTHS AS PART OF THE BID PROCESS.

4. CONDUCTOR LENGTHS INDICATED IN THIS SCHEDULE ARE FOR THE PUROPOSES OF FAULT CURRENT CALCULATIONS ONLY. THESE LENGTHS ASSUME WORST CASE SHORTEST DISTANCE CONDITIONS AND SHOULD NOT BE UTILIZED

3. TRANSFORMER IMPEDANCES USED IN THE CALCULATIONS WERE TAKEN FROM EATON'S PUBLISHED IMPEDANCES FOR DOE 2016 DRY-TYPE TRANSFORMERS.

2. REFER TO PLANS FOR ASSUMED UTILITY TRANSFORMER SIZE UTILIZED FOR CALCULATIONS.

1. ALL CALCULATIONS WERE DONE USING BUSSMAN "POINT-TO-POINT" METHOD.

NOTES:

F2 PANEL 'PF1' 20 208 120 3 3X COPPER THREE SINGLE CONDUCTORS STEEL 600V 12843 2 16,060 14,545 ---- F2

F1 'DF1' 130 208 120 3 350 COPPER THREE SINGLE CONDUCTORS NONMAGNETIC 600V 22736 2 26,000 16,060 ---- F1

F0 -- 26,000 -- F0

(I3ph) OR (IL-L) (LT)

DESCRIPTION (ft) (EL-L) (EL-N) SIZE MATERIAL TYPE MATERIAL CLASS VALUE RUNS UPSTREAM AT EQUIP LET THRU

POINT LOCATION LENGTH (L) VOLTAGE VOLTAGE PHASE WIRE CONDUCTOR CONDUCTOR CONDUIT VOLTAGE C # OF PARALLEL Isc AVAILABLE Isc POINT

FAULT CURRENT CALCULATION SCHEDULE

lcarroll

Provide conduit and trenching for Primary Electrical Line: Utility Company to provide and install wiring.

PANEL200NG

SEE DETAIL

BASE: SITE

OFFICE

200N

FIRE BUILDING

BASE: SITE

PW1M

T

PRIMARY BY

UTILITY

COMPANY

PAD MOUNTED UTILITY

TRANSFORMER

120/208V, 3PH, 4W

ASSUMED 150KVA

EXTERIOR INTERIOR

N G

BUILDING-MOUNTED

SERVICE-RATED

FUSED DISCONNECT

'DW1', 200A, 3PH, 4W,

NEMA 3R, 22K AIC

IN-LINE UTILITY METER

F0

F1

F

O4

SECURTY

1ST FLOOR

'ELEC'

KEYNOTE LEGEND

2.

3.

4. MAIN TELEPHONE TERMINAL BOARD 'MTTB' SHALL CONSIST OF 3/4 INCH, FIRE-RETARDANT TREATED

PLYWOOD INSTALLED FLOOR TO CEILING IN ROOM,FOR LENGTHS AS INDICATED ON THE PLAN

DRAWINGS. ALL RECEPTACLE DEVICES SHOWN INBACKBOARD ON PLANS SHALL BE FLUSH MOUNT, UON.

5. NEW TYPICAL WORK AREA COMMUNICATIONS OUTLET FOR STRUCTURED CABLE TERMINATIONS.

PROVIDE 2-INCH DEEP, 2-GANG BOX WITH 1-GANG PLASTER RING. PROVIDE 1" CONDUIT TO ACCESSIBLE CEILING AND BUSH END. RECEPTACLE FACEPLATE, JACK, CABLING, AND TERMINATIONS BY OTHERS.

6. NEW TYPICAL WORK AREA OUTLET FOR CABLE TV TERMINATION. PROVIDE 2-INCH DEEP, 2-GANG BOX WITH 1-GANG PLASTER RING. PROVIDE 1-1/4" CONDUIT TO ACCESSIBLE CEILING AND BUSH END.

CATV RECEPTACLE FACEPLATE, JACK, CABLING, AND TERMINATIONS BY OTHERS.

7. PROVIDE #6AWG GREEN COPPER GROUNDING CONDUCTOR (TYPICAL) BETWEEN GROUNDING BUSSES

AS INDICATED.

8. ROUTE (1) 1/2" CONDUIT FOR SECURITY CONTROL PANEL COMMUNICATIONS CABLING RACEWAY.

PRINCIPAL GROUND POINT NEAR ELECTRICAL SERVICE EQUIPMENT.

TELECOMMUNICATIONS MAIN GROUNDING BAR 'TMGB' FUNCTIONING AS INTERSYSTEM BONDING

TERMINATION DEVICE, COMPLYING WITH NEC 250.94.

GENERAL NOTES

1.PROVIDE EMT FOR ALL CABLING ROUTED THROUGH AREAS WITH EXPOSED STRUCTURAL CEILINGS AND THROUGH INACCESSIBLE CEILINGS. COORDINATE CONDUIT SIZE REQUIREMENTS WITH CABLE INSTALLER.

2.ALL EXPOSED CONDUIT SHALL BE CONCEALED TO THE EXTENT POSSIBLE, AND SHALL BE INSTALLED PARALLEL

AND CLOSE TO STRUCTURAL MEMBERS. PAINT CONDUIT TO MATCH ADJACENT FINISHES.

3.PROVIDE PULLCORD FOR ALL CONDUIT INSTALLED FOR CABLE.

4.PROVIDE PULLBOXES AS REQUIRED BY CABLE INSTALLER FOR RUNS EXCEEDING MAXIMUM PULL DISTANCE, AS IDENTIFIED BY CABLE INSTALLER.

5.PROVIDE SLEEVES AND CONDUIT BETWEEN FLOORS FOR ROUTING OF CABLE. COORDINATE CONDUIT SIZE WITH CABLE INSTALLER. COORDINATE LOCATION OF RACEWAY WITH CO AND CABLE INSTALLER.

6.ALL CONDUIT AND CABLING IN CRAWL SPACE IS TO BE SUPPORTED BY AND TIGHT TO STRUCTURE ABOVE.WHERE CONDUIT TRANSITIONS FROM BEING SUPPORTED BY STRUCTURE INTO SOIL, ADD LOOP AND/OR FLEXIBLE CONDUIT FOR FLEXIBILITY AND TO ALLOW FOR ANTICIPATED SOIL MOVEMENT.

7.REFER TO SPECIFICATIONS FOR FULL CONDUIT REQUIREMENTS. HOWEVER, NOTE THAT ALL UNDERGROUND CONDUIT BENDS ARE TO BE GALVANIZED RIGID CONDUIT. UNDERGROUND CONDUIT EXTENDING ABOVE SLAB

IS ALSO TO BE GALVANIZED RIGID CONDUIT.

NEW (1) 4" PVC CONDUIT ROUTED 30" BELOW GRADE FOR CONNECTION TO WAREHOUSE BUILDING TELECOM

ROOM. ELECTRICAL CONTRACTOR SHALL VERIFY CONDUIT SIZING AND QUANTITY WITH CO

PRIOR TO INSTALLATION.

1.

TO

UNDERGROUND

VAULT (REFER

TO ELECTRICAL

SITE PLANS)

BASE

OPTIONAL

FEEDER SCHEDULE

KEY/

AMPS

SERVICE ENTRANCE FEEDERS

400N 600N 800N 1000N 1200N 1600N 2000N 2500N 3000N 3500N 4000N

EQUIPMENT FEEDERS

20NG

30NG

40NG

50NG

60NG

70NG

80NG

90NG

100NG

110NG

125NG

150NG

175NG

200NG

225NG

250NG

300NG

350NG

400NG

450NG

500NG

600NG

700NG

800NG

1000NG

1200NG

1600NG

2000NG

GROUNDING CONDUCTORS

G8 G6 G4 G2

G10 G20 G30

NOTES:

1.

2.

3.

FEEDER CONDUIT

AND CONDUCTORS

2[4#3/0, 2"C] 2[4#350, 3"C]

2[4#500, 3-1/2"C] 3[4#400, 3-1/2"C]

4[4#350, 3"C] 5[4#400, 3-1/2"C] 6[4#400, 3-1/2"C] 7[4#500, 3-1/2"C] 8[4#500, 3-1/2"C] 10[4#500, 3-1/2"C] 11[4#500, 3-1/2"C]

4#12, #12G, 3/4"C 4#10, 1#10G, 3/4"C

4#8, 1#10G, 1"C 4#6, 1#10G, 1-1/4"C 4#4, 1#10G, 1-1/4"C 4#4, 1#8G, 1-1/4"C 4#3, 1#8G, 1-1/4"C 4#2, 1#8G, 1-1/2"C 4#1, 1#8G, 1-1/2"C

4#1, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#1/0, 1#6G, 2"C 4#2/0, 1#6G, 2"C

4#3/0, 1#6G, 2-1/2"C 4#4/0, 1#4G, 2-1/2"C

4#250, 1#4G, 3"C 4#350, 1#4G, 3"C

4#500, 1#3G, 3-1/2"C 2[4#3/0, 1#3G, 2-1/2"C] 2[4#4/0, 1#2G, 2-1/2"C]

2[4#250, 1#2G, 3"C] 2[4#350, 1#1G, 3"C]

2[4#500, 1#1/0G, 3-1/2"C] 2[4#500, 1#1/0G, 3-1/2"C] 3[4#400, 1#2/0G, 3-1/2"C]

4[4#350, 1#3/0G, 3"C] 5[4#400, 1#4/0G, 3-1/2"C] 6[4#400, 1#250G, 3-1/2"C]

1#8, 3/4" C 1#6, 3/4" C 1#4, 3/4" C 1#2, 3/4" C

1-1/0, 3/4" C 1-2/0, 3/4" C 1-3/0, 3/4" C

FEEDER FOR SECONDARY OF SEPARATELY DERIVED

SYSTEM (SDS). GROUND SIZE PER NEC 250.66.

ALL CONDUCTORS ARE SINGLE CONDUCTOR COPPER

THWN UNLESS NOTED OTHERWISE. AMPACITY BASED

ON NEC TABLE 310.16.

ALL CONDUITS ARE EMT UNLESS NOTED OTHERWISE,

FILL RATIOS BASED ON NEC ANNEX C TABLE C1.

KEY/

AMPS

SDS XFMR FEEDERS (NOTE 1)

30S 50S

100S 150S 250S 400S 500S 800S 1000S 1600S 2500S

20G 30G 40G 50G 60G 70G 80G 90G

100G 110G 125G 150G 175G 200G 225G 250G 300G 350G 400G 450G 500G 600G 700G 800G 1000G 1200G 1600G 2000G

ABBREVIATIONS

MECH

XFMR

FEEDER CONDUIT

AND CONDUCTORS

4#10, 1#8G, 3/4"C 4#6, 1#8G, 1-1/4"C 4#1, 1#6G, 1-1/2"C 4#1/0, 1#6G, 2"C 4#250, 1#2G, 3"C

2[4#3/0, 1#2G, 2"C] 2[4#250, 1#1/0G, 3"C]

2[4#500, 1#2/0G, 3-1/2"C] 3[4#400, 1#4/0G, 3-1/2"C] 5[4#400, 1#350G, 3-1/2"C] 7[4#500, 1#500G, 3-1/2"C]

3#12, #12G, 3/4"C 3#10, 1#10G, 3/4"C

3#8, 1#10G, 1"C 3#6, 1#10G, 1"C 3#4, 1#10G, 1"C

3#4, 1#8G, 1-1/4"C 3#3, 1#8G, 1-1/4"C 3#2, 1#8G, 1-1/4"C 3#1, 1#8G, 1-1/2"C 3#1, 1#6G, 1-1/2"C

3#1/0, 1#6G, 1-1/2"C 3#1/0, 1#6G, 1-1/2"C

3#2/0, 1#6G, 2"C 3#3/0, 1#6G, 2"C 3#4/0, 1#4G, 2"C

3#250, 1#4G, 2-1/2"C 3#350, 1#4G, 2-1/2"C

3#500, 1#3G, 3"C 2[3#3/0, 1#3G, 2"C] 2[3#4/0, 1#2G, 2"C]

2[3#250, 1#2G, 2-1/2"C] 2[3#350, 1#1G, 2-1/2"C] 2[3#500, 1#1/0G, 3"C] 2[3#500, 1#1/0G, 3"C] 3[3#400, 1#2/0G, 3"C] 4[3#350, 1#3/0G, 3"C] 5[3#400, 1#4/0G, 3"C] 6[3#400, 1#250G, 3"C]

SEE MECH SCHEDULE

SEE XFMR SCHEDULE

GROUNDING ELECTRODE SYSTEMS NOTES

1 METAL UNDERGROUND WATER PIPE - MAKE CONNECTION TO

METAL UNDERGROUND WATER PIPE INDIRECT CONTRACT WITH

THE EARTH FOR 10' OR AND ELECTRICALLY CONTINUOUS TO

THE POINTS OF CONNECTION TO THE GROUNDING ELECTRODE

CONDUCTOR AND BONDING CONDUCTORS. CONNECTION POINT

TO BE AT A MAXIMUM OF 5' OF THE POINT OF ENTRANCE ON THE

INTERIOR OF THE BUILDING.

2 BUILDING STEEL - THE METAL FRAME OF THE BUILDING OR

STRUCTURE, WHERE ANY OF THE FOLLOWING METHODS ARE

USED TO MAKE AN EARTH CONNECTION:

A.AT LEAST ONE STRUCTURAL METAL MEMBER THAT IS IN

DIRECT CONTACT WITH THE EARTH FOR 10' OR MORE, WITH

OR WITHOUT CONCRETE ENCASEMENT.

B.HOLD-DOWN BOLTS SECURING THE STRUCTURAL STEEL

COLUMN THAT ARE CONNECTED TO A CONCRETE ENCASED

ELECTRODE THAT COMPLIES WITH 250.52(A)(3) AND IS

LOCATED IN THE SUPPORT FOOTING OR FOUNDATION. THE

HOLD-DOWN BOLTS SHALL BE CONNECTED TO THE

CONCRETE-ENCASED ELECTRODE BY WELDING,

EXOTHERMIC WELDING, THE USUAL STEEL TIE WIRES, OR

OTHER APPROVED MEANS.

3 UFER GROUND (CONCRETE-ENCASED ELECTRODE) - AN

ELECTRODE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.