Drawings 3 of 3
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANGLE
CHANNEL
DIAMETER
CENTER LINE
0 or °
PLATEP
L
AT@
BYX
AND&
POUND OR NUMBER#
PLUS OR MINUS+/-
FEET'
INCHES"
REFER TO CONSTRUCTION SPECIFICATION INSTITUTE,
UNIFORM DRAWING SYSTEM AND TO PROJECT
SPECIFICATIONS FOR REFERENCE STANDARDS &
ADDITIONAL ABBREVIATIONS
QUANTITY( )
AB ANCHOR BOLT
AC AIR CONDITIONING
ACC ACCESSIBLE OR
ACCESSIBILITY
ACCT ACCENT
ACOUST ACOUSTICAL
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
ADJT ADJACENT
AFF ABOVE FINISH FLOOR
ALUM ALUMINUM
ALT ALTERNATE
APC ACRYLIC PLASTER
CEILING SYSTEM
APPROX APPROXIMATE
ARCH ARCHITECT/ARCHITECTURAL
ASPH ASPHALT
AUTO AUTOMATIC
AWI AMERICAN WOODWORKING
INST.
BBF STANDARD (2X) SMALL
DRAWERS OVER FILE DRAWER
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BENCH MARK
BM BEAM
B.O. BOTTOM OF
BRG BEARING
BSMT BASEMENT
CAB CABINET
CBB CEMENTITIOUS BACKER
BOARD
CFA COMPUTER FLOOR AREA
CHNLS CHANNELS
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMT CERAMIC MOSAIC TILE
CMT-B CERAMIC MOSAIC TILE BASE
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONSTR CONSTRUCTION
COORD COORDINATE
CPT CARPET
CSWK CASEWORK
CSI CONSTRUCTION
SPECIFICATIONS INSTITUTE
CTP CERAMIC TILE PAVERS
CUH CABINET UNIT HEATER
CWT CERAMIC WALL TILE
D DRYER (IN PLAN)
DBL DOUBLE
DEMO DEMOLISH, DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM. DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWN SPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
(E) EXISTING
EA EACH
EIFS EXTERIOR INSULATION &
FINISH SYSTEM
EJ EXPANSION JOINT
ELEV/EL ELEVATION
ELEV ELEVATOR
ELEC ELECTRICAL
ENCL ENCLOSURE
ENGR ENGINEERED
EPF EPOXY POURED FLOOR
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EX EXPOSED
EXH EXHAUST
EXP EXPANSION
EXP-JT EXPANSION JOINT
EXT EXTERIOR
EW EACH WAY
EWC ELECTRIC WATER COOLER
FBGL FIBERGLASS
FD FLOOR DRAIN
FDN FOUNDATION
OPG OPENING
OPP OPPOSITE
OV OVER
OFCI OWNER FURNISHED
CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
PEMB PRE-ENGINEERED METAL
BUILDING
PC PRECAST CONCRETE
PCV POLYVINYL CHLORIDE
PL PROPERTY LINE
PL PLATE
PLG PLUMBING
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PREFAB PREFABRICATED
POR PORCELAIN TILE
PT PRESSURE TREATED
PTN PARTITION
QT QUARRY TILE
R RISER
RAD RADIUS
RB RACQUETBALL
RB RUBBER BASE
RCP REFLECTED CEILING
PLAN
RD ROOF DRAIN
RE: REFER/REFERENCE
REF REFRIGERATOR
REINF REINFORCED
REQ REQUIRED
RESIL RESILIENT
REV REVISION
RFG ROOFING
RM ROOM
R-NOSING RUBBER STAIR NOSING
RO ROUGH OPENING
ROW RIGHT OF WAY
RTFS RUN TRACK FLR SYSTEM
RTU ROOF TOP UNIT
SAT SUSPENDED
ACOUSTICAL TILE
SC SOLID CORE
SCHED SCHEDULE
S-CONC SEALED CONCRETE
SEAL SEALER
SECT SECTION
SF SQUARE FOOT/FEET
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SMACNA SHEET METAL AND AIR
CONDITIONING
CONTRACTOR
NATIONAL ASSOCIATION
SPEC SPECIFICATIONS
SPRL SPANDREL
SQ SQUARE
SS SOLID SURFACE
S-STL STAINLESS STEEL
ST STAIN
STA STATION
STC SOUND TRANSMISSION
CLASS
STD STANDARD
STHG SHEATHING
STL STEEL
SUPPL SUPPLIED
SUSP SUSPENDED
STOR STORAGE
STR STRINGER
STRL STRUCTURAL
STRUCT STRUCTURE,
STRUCTURAL
SYM SYMMETRICAL
SYST SYSTEM
T TREAD (IN PLAN)
T TEMPERED (ON
WINDOW)
TB TACK BOARD
TBB TILE BACKER BOARD
TBD TO BE DETERMINED
T&B TOP & BOTTOM
TC TOP OF CURB
T&G TONGUE & GROOVE
TEL TELEPHONE
TEMP TEMPERED
THK THICKNESS
THLD THRESHOLD
T.O. TOP OF
T.O. B TOP OF BEAM
T.O. C TOP OF CONCRETE
ABBREVIATIONS
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FLOOR
FF&E FURNITURE, FIXTURES &
EQUIPMENT FG FINISH
GRADE
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIN-FLR FINISH FLOOR
FIXT FIXTURE
FLD FIELD
FLR FLOOR
FLRG FLOORING
FO FACE OF
FOS FACE OF STUD
FR FIRE RESISTIVE
FR FRAME
FRMG FRAMING
FRP FIBER REINFORCED PANEL
FT FOOT/FEET
FTG FOOTING
FURN FURNITURE
FUT FUTURE
GA GAUGE
GAL GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GHM GALVANIZED HOLLOW
METAL
GL GLASS
GLU LAM GLUE LAMINATED WOOD
GMGU GLASS MESH GYPSUM UNIT
GR GRADE
GYP BD/GWB GYPSUM BOARD
HB HOSE BIB
HC HOLLOW CORE
HDBD HARDBOARD
HDR HEADER
HDWR HARDWARE
HM HOLLOW METAL
HORZ/H HORIZONTAL
HPC HIGH PERFORMANCE
COATING
HRU HEATING ROOFTOP UNIT
HT/H HEIGHT
HTR HEATER
HVAC HEATING, VENTING & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
INDIC INDICATOR
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
JST JOIST
KD KNOCK DOWN
KIT KITCHEN
LAM LAMINATE
LAV LAVATORY
LF LINEAR FOOT
LIN LINOLEUM
LRF LIGHT REDIRECTING FILM
LT LIGHT
MAT. MATERIAL
MANUF MANUFACTURE
MAX MAXIMUM
MB MARKER BOARD
MD METAL DECK
MDF MEDIUM DENSITY
FIBERBOARD
MECH MECHANICAL
MH MANHOLE
MISC MISCELLANEOUS
MIN MINIMUM
MIR MIRROR
MO MASONRY OPENING
MTD MOUNTED
MTG MEETING
MTL METAL
(N) NEW
N NORTH
NA NOT APPLICABLE
NAT NATATORIUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO. NUMBER
NOM NOMINAL
NON-COM NON-COMBUSTIBLE
OC ON CENTER
OD OUTSIDE DIAMETER
OFC/OFF OFFICE
OH OVER HEAD
T.O. F TOP OF FLR/FOOTING
T.O. M TOP OF MASONRY
T.O. S TOP OF SLAB
T.O. STL TOP OF STEEL
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
TYPE 'X' FIRE RATED GYPSUM BOARD
UBC UNIFORM BUILDING CODE
UL UNDERWRITER'S LABORATORY
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
VAR VARIES
VNR VENEER
VER/V VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VOC VOLATILE ORGANIC COMPOUND
W WASHER (IN PLAN)
W WIRE GLASS (ON WINDOW)
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WH WATER HEATER
WI WROUGHT IRON
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-1
ABBREVIATIONS,
SYMBOLS, AND NOTES
JS
BRS
KH
0 2' 4' 8'
SCALE A
0 2' 4' 6'
SCALE C
0 1' 2' 4'
SCALE B
0 1' 2'
SCALE D
0 1'
SCALE E
01/2' 1' 2'
SCALE F
WOOD GLULAM
CARPET
RIGID INSULATION
BATT/LOOSE FILL INSULATION
GLASS
GYPSUM BOARD
PARTICLE BOARD
PLYWOOD
WOOD FINISH
NON-CONTINUOUS WOOD BLOCKING
CONTINUOUS WOOD BLOCKING
ALUMINUM
STEEL
CONCRETE BLOCK
SAND/MORTAR/PLASTER/GROUT
CONCRETE (PRECAST OR CAST IN PLACE)
GRAVEL/POROUS FILL
EARTH/COMPACT FILL
BRICK/STONE VENEER
TB MB
ELEVATION INDICATOR
WINDOW INDICATOR
ROOM DESIGNATION
WALL TYPE INDICATOR
DOOR INDICATOR
EXTERIOR ELEVATION
INDICATOR
DETAIL REFERENCE
PAINT FINISH INDICATOR
FLOOR FINISH INDICATOR
FINISH INDICATOR
FLOOR MATERIAL
TRANSITION INDIC.
REVISION
INDICATOR
ACCESSORY INDICATOR
CUBBIES;
RE: INT ELEVS
CORNER GUARD
WALL MOUNTED
FIRE EXTINGUISHER
BRACKET
SEMI-RECESSED
FIRE EXTINGUISHER
CABINET
SURFACE MOUNTED
FIRE EXTINGUISHER
CABINET
INTERIOR ELEVATION
INDICATOR
GYM EQUIPMENT:
WALL PADS
MARKER OR
TACKBOARD
RECESSED FLOOR
SLAB
1 1/2" = 1'-0"
A200
PLAN
A200
AXXX
VCT CPT
F.E.
BRACKET
F.E.C.
SURFACE
F.E.C.
SEMI-R
xxxx
DRAWING SCALE
SHEET WHERE
LOCATED
DETAIL NUMBER
ON SHEET
DRAWING TITLE
LEVEL CHANGE
INDICATORW5
VESTIBULE
A101
SIM
SHEET
WHERE LOCATED
DETAIL NUMBER ON
SHEET
SHEET
WHERE LOCATED
DETAIL NUMBER
ON SHEET
1i
A101
SIM
ASI
a
1i
T TEMPERED GLAZING
1i1i
GLAZING TYPE
S SPANDREL GLAZING
0"
GLAZING LOCATION
SHEET WHERE
LOCATED
DETAIL NUMBER
ON SHEET
DRAWING TITLE
SECTION INDICATOR
R12 ROOF TYPE INDICATOR
AUTOMATIC DOOR
OPENER ACTUATOR
ADO
SYMBOLS LEGEND MATERIALS LEGEND
SOLID SURFACEX
X
X
X
X
X
FLOOR TYPE INDICATORF1
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-2
ABBREVIATIONS,
SYMBOLS, AND NOTES
JS
BRS
KH
GENERAL NOTES
GENERAL REQUIREMENTS DRAWINGS AND DIMENSIONS CONSTRUCTION NOTESPARTITION NOTES
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL
CONTRACTORS, SUB-CONTRACTORS, MANUFACTURERS, SUPPLIERS:
CAREFULLY AND THOROUGHLY REVIEW THESE GENERAL NOTES. IT IS
YOUR RESPONSIBILITY TO KNOW AND ADHERE TO THESE
REQUIREMENTS.
2. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO
DISCIPLINES FOR THE CONVENIENCE OF THE GOVERNMENT. THE
SEPARATIONS USED HEREIN ARE USED ONLY FOR THE PURPOSES OF
CONVENIENCE AND REFERENCE, AND IN NO WAY DO THEY DEFINE OR
LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF
THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE
DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS
NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED
WHOLE.
3. EVERY EFFORT HAS BEEN MADE TO MAKE THESE DOCUMENTS
CONCISE AND COORDINATED, TO DEFINE WORK IN THE MOST LOGICAL
PLACE AND TO ELIMINATE REDUNDANCY. DO NOT PRESUME THAT YOUR
SCOPE OF WORK IS SINGULARLY DEFINED. YOUR SCOPE OF WORK IS
DEFINED THROUGHOUT THE ENTIRE SET OF DRAWINGS AND
SPECIFICATIONS AND IS NOT CONTAINED IN JUST ONE SERIES OF
DRAWINGS OR DIVISION OF SPECIFICATIONS. YOU MUST REVIEW THE
ENTIRE SET OF CONTRACT DOCUMENTS TO DETERMINE YOUR SCOPE
OF WORK.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS
PREPARED BY SPECIFIC ENGINEERING DISCIPLINES (SUCH AS CIVIL,
STRUCTURAL, MECHANICAL, ELECTRICAL, ETC.) ARE COMPLEMENTARY;
ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE
CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR
CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE
DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE
CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM
THE ARCHITECT PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT
CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR
INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL
PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. MECHANICAL AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A
DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL M.E.
EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL
DETAILING OF SHAFTS, CHASES, AND SUCH.
6. THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL VISIT THE
SITE AND BECOME FAMILIAR WITH SITE CONDITIONS AS THEY MAY
AFFECT CARRYING OUT THE WORK AS DESCRIBED IN THESE CONTRACT
DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE, VERIFY, AND BE
RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT, AND NOTIFY THE
CO OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE
PROCEEDING WITH THE WORK.
7. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING
AND PROTECTING ALL UTILITY LINES. LOCATIONS SHOWN ARE
APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY LINES CAUSED BY
CONSTRUCTION OPERATIONS AT NO COST TO THE GOVERNMENT.
8 ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE
PROJECT SHALL BE FAMILIAR WITH THE RULES AND REGULATIONS OF
THE OCCUPATIONAL SAFETY AND HEALTH ACT, AND IMPLEMENT THOSE
RULES AS THEY APPLY TO THIS PROJECT.
9. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT,
LABOR, AND SERVICES NECESSARY TO COMPLETE THE WORK.
10. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE
INTERNATIONAL BUILDING CODE. REFER TO CODE ANALYSIS AND CODE
PLANS.
11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COORDINATION OF ALL TRADES AND THE PREVENTION OF CONFLICT
BETWEEN ALL TRADES.
12. PRIOR TO BEGINNING ANY WORK, THE CONTRACTOR SHALL
CONDUCT A WALK THROUGH INSPECTION WITH THE CO TO DETERMINE
IN WRITING THE CONDITION OF THE WORK ALREADY IN PLACE. THE
CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING
EQUIPMENT PRESENTLY IN PLACE THAT IS DAMAGED DURING
CONSTRUCTION.
13. CONTRACTOR SHALL SUBMIT CONFIRMATION OF ORDERED
MATERIALS OR ITEMS NECESSARY TO COMPLETE THE PROJECT WITH
PROJECTED DELIVERY DATE GREATER THAN FOUR WEEKS.
14. ALL SUB-CONTRACTORS SHALL SUBMIT SHOP DRAWINGS AS
REQUIRED FOR ARCHITECTS APPROVAL PRIOR TO COMMENCING ANY
WORK.
15. SEAL AROUND ALL PENETRATIONS THROUGH EXISTING AND
PROPOSED FIRE RATED PARTITIONS. PROVIDE UL APPROVED
FIRESTOP SYSTEM TO MEET REQUIRED RATING.
1. PROVIDE AND INSTALL ALL BLOCKING STIFFENERS, BRACING, BACK-
UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE
INSTALLATION OF ALL CASEWORK AND OF ALL FLOOR MOUNTED OR
SUSPENDED MECHANICAL AND ELECTRICAL EQUIPMENT.
2. COORDINATE METAL STUD GAUGE WITH PRE-APPROVED EQUIPMENT
ANCHORAGE. WHERE A DISCREPANCY OCCURS, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN.
3. THERE SHALL BE NO BACK-TO-BACK ELECTRICAL TELEPHONE, OR
OTHER OUTLETS, EXCEPT WHERE SPECIFICALLY SHOWN.
4. PROVIDE ACOUSTIC (SOUND) SEALANT AT NON-RATED WALLS AND
FIRE-RATED SEALANT AT SMOKE PARTITION AND AS REQUIRED BY TEST
NUMBER.
1. DO NOT SCALE THE DRAWINGS.
2. ALL DIMENSIONS ON PLANS ARE TO FACE OF BLOCK OR TO FACE
OF STUD UNLESS NOTED OTHERWISE.
3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
NOTIFYING THE CO IMMEDIATELY SHOULD ANY DISCREPANCIES BE
FOUND IN THE DRAWINGS AND SPECIFICATIONS.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL
FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS
PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK
INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE CO PRIOR TO
PROCEEDING WITH THE WORK.
5. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY THE
CONTRACTOR AND APPROVED BY THE OWNER BEFORE ACTUAL
CONSTRUCTION WORK BEGINS. ANY INDICATION OF PROJECT LIMITS
OR LINES OF DEMARCATION ARE SHOWN FOR THE CONVENIENCE OF
THE CONTRACTOR, AND ARE NOT TO BE TAKEN LITERALLY.
6. SEE GENERAL NOTES ON ALL 'A' SERIES DRAWINGS FOR
INFORMATION RELATED TO PLANS AND DETAILS ON THOSE SHEETS.
7. THE TERM "ALIGN" REFERS TO LOCATING DIFFERENT COMPONENTS
OF CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
8. CONTRACTORS AND ALL SUB-CONTRACTORS SHALL FIELD VERIFY
ALL DIMENSIONS PRIOR TO FABRICATION AND/OR ORDERING OF
MATERIALS.
9. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST
BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK,
FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE
CO OF ANY DISCREPANCY.
10. REFER TO THE COURAL REFLECTED CEILING PLAN FOR EXACT
LOCATIONS OF ALL CEILING FIXTURES. REFER TO MECHANICAL AND
ELECTRICAL DRAWINGS FOR COMPLETE CONSTRUCTION
REQUIREMENTS.
11. ARCH, MECHANICAL, AND ELECTRICAL DRAWINGS SHOW WHERE
EXPOSED DUCTWORK IS TO BE INSTALLED AT A SPECIFIC ELEVATION
IN A CONTROLLED PATTERN. THE CONTRACTOR MUST RELY ON ALL
OF THESE DISCIPLINES TO COMPLETE THE WORK AND SHOULD
NOTIFY THE CO OF ANY DISCREPANCIES.
12. THE GENERAL CONTRACTOR SHALL COORDINATE THE WORK OF
ALL TRADES INSTALLING THEIR RESPECTIVE EQUIPMENT IN THE
CEILING PLENUMS. MECHANICAL, ELECTRICAL, AND STRUCTURAL
SHARE THIS SAME SPACE. EACH SUB CONTRACTOR IS TO REVIEW THE
REQUIREMENTS OF THEIR WORK WITH THE AWARENESS OF THE
OTHER TRADES THAT NEED TO SHARE THESE SPACES AND MUST NOT
ASSUME THAT THEIR INSTALLATION HAS BEEN CONSIDERED IN THE
DESIGN AND SHOP DRAWINGS OF THE OTHER TRADES.
1. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT
CONFIGURATIONS OR DETAILS OF SPECIFIC MANUFACTURERS
(TYPICALLY THE FIRST MANUFACTURER LISTED UNDER "ACCEPTABLE
MANUFACTURERS" IN THE SPECIFICATIONS). DIMENSIONS AND DETAILS
FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY
INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER
MANUFACTURERS MAY ALSO BE ACCEPTABLE. THEREFORE, ACTUAL
INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE
SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS
FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING
PARTITION THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS),
AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING
CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY
BECAUSE OF THESE DIFFERENCES.
2. PROVIDE SOLID BLOCKING WITHIN PARTITIONS AT ALL LOCATIONS
WHERE ITEMS WILL BE MOUNTED ON PARTITIONS INCLUDING, BUT NOT
LIMITED TO: ACCESSORIES, CASEWORK TRIM, FLASHING, WALL
MOUNTED EQUIPMENT, TACK/BULLETIN/MARKER BOARDS, ETC.
3. ALL WOOD BLOCKING SHALL BE FIRE-RETARDANT WOOD.
4. MAINTAIN RATING AT ALL BLOCKOUTS FOR ALL FIRE EXTINGUISHERS
AND TOILET ACCESSORIES THAT ARE TO BE INSTALLED IN RATED
WALLS.
5. PROVIDE 24" X 24" ACCESS PANELS IN PARTITIONS WHERE REQUIRED
FOR MECHANICAL EQUIPMENT EXCEPT WHERE SIZES ARE OTHERWISE
NOTED.
6. PROVIDE GYPSUM BOARD CONTROL JOINTS IN PARTITIONS AND
CEILINGS AT 30'-0" MAX SPACING. COORDINATE TO MEET FIRE
RESISTIVE RATINGS OF THE ASSEMBLY, FIRESTOP JOINTS AT RATED
PARTITIONS. SUB-CONTRACTOR MUST PROVIDE A SUBMITTAL FOR JOINT
MATERIAL.
7. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR
MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER AND WHERE
THE INTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED
OTHERWISE ON THE DRAWINGS.
8. FIREBLOCK ALL CONCEALED SPACES, SOFFITS, SHAFTS, CHASES AND
CEILING AREAS PER REQUIREMENTS OF THE IBC AND THE LOCAL
JURISDICTION'S AMENDMENTS.
9. PROVIDE CONTINUOUS PERIMETER BUILDING INSULATION AT ALL
EXTERIOR WALLS FROM SLAB TO ROOF DECK.
10. PROVIDE SLIP JOINT CONNECTIONS AT PARTITIONS THAT EXTEND TO
STRUCTURE ABOVE. PROVIDE BRACING ABOVE AS REQUIRED. REFER
TO STRUCTURAL DRAWINGS AND TO SLIP JOINT DETAILS.
11. ASSUME LEVEL 4 FINISH FOR ALL GYPSUM BOARD PARTITIONS,
UNLESS NOTED OTHERWISE.
12. ALL VERTICAL AND HORIZONTAL PIPES, CONDUITS, DUCTS, ETC. IN
FINISHED ROOMS OR AREAS THROUGHOUT THE BUILDING SHALL BE
FURRED IN TO MATCH THE ROOM FINISH, UNLESS OTHERWISE NOTED.
13. WHERE MECHANICAL WORK PENETRATES ANY COMPONENT OF A
FIRE-RATED ASSEMBLY, PROVIDE THE APPROPRIATE FIRE AND/OR
SMOKE DAMPERS. IF IT IS NOT CLEAR WHETHER DUCTWORK
PENETRATES A PORTION OF THE RATED ASSEMBLY, OBTAIN
CLARIFICATION FROM THE ARCHITECT PRIOR TO BIDDING. SEAL AROUND
ALL PENETRATIONS THROUGH PROPOSED FIRE RATED PARTITIONS.
PROVIDE UL APPROVED FIRESTOP SYSTEM TO MEET REQUIRED RATING.
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-3
ABBREVIATIONS,
SYMBOLS, AND NOTES
JS
BRS
KH
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-4
CODE ANALYSIS
JS
BRS
KH
CHAPTER 29 - Plumbing Systems
2902.1 Minimum Number of Fixtures
Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 2902.1 Refer table of the project plumbing fixtures counts
Fire Partitions – 708 NA (1020.1, Exception 4: A fire resistance rating is not required for corridors in an occupancy in Group B that is a space requiring only a single means of egress complying with section 1006.2)
Shaft Enclosures – 713 Main stair does not require shaft enclosure per 1019.3, exception 1: Exit access stairways and ramps that serve or atmospherically communicate between only two stories.
Ducts & Air Transfer Openings – 717 717.6.3: A shaft enclosure in accordance with 713 shall be provided at duct openings.
Concealed Spaces - 718 Fireblocking in accordance with 718.2 between floor levels
Thermal and Sound Insulating Materials - 720 Insulating materials, where concealed or exposed as installed in buildings of any type of construction, shall have flame spread index of not more than 25 and a smoke-developed index of not more than 450.
CHAPTER 3 - USE AND OCCUPANCY CLASSIFICATION
B Business (primary) S-1 Storage (incidental, non-separated)
CHAPTER 5 - GENERAL BUILDING HEIGHTS AND AREAS
Allowable Building Height: 40’ (B-occupancy, non-sprinklered, Type VB)
Allowable Number of Stories: 2 (B-occupancy, non-sprinklered, Type VB)
Allowable Building Area (At): B-Occupancy (SM): 9,000 GSF per floor
**Sprinkler increase not required **Frontage increase not required
CHAPTER 6 - TYPES OF CONSTRUCTION
Table 601 - Type VB Primary structural frame: 0 hr Bearing Walls -Exterior: 0 hr Bearing walls - Interior: 0 hr Exterior Nonbearing Walls: see Table 602 values below.
Interior Nonbearing Walls: 0 hr Floor Construction: 0 hr Roof Construction: 0 hr
Table 602 - Type VB Fire Separation Distance:
X ≥ 30 = 0 hr 10 ≤ X < 30 = 1 hr 5 ≤ X < 10 = 1 hr X < 5 = 1 hr
CHAPTER 7 – FIRE AND SMOKE PROTECTION FEATURES
Fire Resistance Rating of Structural Members - 704
NA
Exterior Wall Projections – Table 705.2 Not permitted where FSD is 2' or less.
FSD of 30' or greater = projections allowed up to 20'
Allowable Area of Openings (per story) – Table 705.8 X < 3 = Not Permitted 5 < X < 3 = 15% 10 < X < 5 = 25% 15 < X < 10 = 45% 20 < X < 15 = 75% 25 < X < 20 = No Limit 30 < X < 25 = No Limit X > 30 = No Limit
Fire Walls – Table 706.4 – 3 hr (B-occupancy, Type VB)
NA
JEMEZ RANGER DISTRICT OFFICE
Project Location: Jemez Springs, NM 87025 Santa Fe National Forest Date: 3/08/2019 By: John Simon, BRS Architecture
CODES OF JURISDICTION:
· 2018 International Building Code
· 2018 International Structural Code
· 2017 National Electric Code
· 2018 International Plumbing Code
· 2018 International Mechanical Code
· 2018 International Fire/Life Safety Code
· 2018 International Energy Conservation Code
· 2018 International Fuel & Gas Code
· NFPA Fire Codes (Vol. 1-16), 101
· ICC/ANSI A117.1-2009 Accessibility Standards
· ADAAG
· 2013 ASHRAE 90.1
PROJECT DATA SUMMARY
Construction Type: VB - Office (non-separated) Number of Stories: 2 Occupancy Types: B (Primary), S-1 Building Square Feet:
Main Level - 4,534 GSF Second Level - 3,786 GSF Total - 8,320 SF
IECC Compliance Method: Prescriptive Automatic Sprinkler Systems: No Fire Alarm & Detection: Yes - Manual Occupancy Load: Based on net square feet, calculated per requirements of NFPA - See Code Plans
Load Factor: 150 (NFPA 101 Table 7.3.1.2) Occ Load: 72 (2 exits required, 3 exits provided)
1st Floor: 44 Occupants (1 exit required) 2nd Floor: 28 Occupants (1 exit required)
CHAPTER 8 - Interior Finishes
Section 803 Wall & Ceiling Finishes All interior finish materials meet the minimum required fire performance and smoke development rating per section 803.
Section 803.1.1 Interior Wall and Ceiling Finish Materials Interior wall and ceiling finish materials shall be classified in accordance with ASTM E 84 or UL 723. Such interior finish materials shall be grouped in the following classes in accordance with their flame spread and smoke development indexes.
Class A - Flame Spread Index 0-25: Smoke-Developed index 0-450 Class B - Flame Spread Index 26-75: Smoke-Developed index 0-450 Class C - Flame Spread Index 76-200: Smoke-Developed index 0-450
Refer to Code Plans for locations. Refer to drawing interior elevations and finish schedule for materials being used.
Project Requirements:
Interior exit stairways and ramps and exit passageways: Class A Corridors and enclosure for exit access stairways and ramps: Class B Rooms and Enclosed Spaces: Class C
CHAPTER 9 - Fire Protection
Section 903.2 Sprinkler Systems Where Required Automatic Sprinkler System
NA
Section 904 Alternative Automatic Fire-Extinguishing System
NA
Section 905 Standpipe Systems
NA
Section 906 Portable Fire Extinguishers Where Required.
Re: Code Plans for locations. Fire extinguishers shall be located within 75' of any portion of the building. Drawings indicate proposed locations, and shall be field approved by fire department prior to install.
CHAPTER 10 - Means of Egress
Section 1005.1 Means of Egress Sizing B Occupancy (non-sprinklered) Stairways - .3" / Occupant Other Egress Components - .2" / Occupant
Section 1007 Exit Arrangement Where two exits are required, they shall be placed a distance apart equal to not less than one half of the length of the diagonal dimension of the building or area served.
Section 1016 Exit Access Travel Distance B Occupancy (non-sprinklered)
Maximum Exit Access Travel Distance 200' Maximum Common Path of Travel 75'
NFPA SPECIFIC CODE CONSIDERATIONS
7.5.1.3.2 Separation of Exits
Where two exits are required, they shall be located at a distance not less than one half the length of the maximum overall diagonal.
7.5.1.3.5: Exits shall be exempt from diagonal requirements where they are located in accordance with 7.5.1.3.1 7.5.1.3.1: Where more than one exit is required, such exits shall be remotely located from each other and shall be arranged to minimize the possibility that more than one has the potential of being blocked by any one fire or other emergency condition.
7.5.4.4 Area of Refuge
Where an exit stair is used as an accessible means of egress it shall incorporate an area of refuge within an enlarged story level landing or be accessed from an area of refuge.
8.6.5 Required Fire Resistance Rating
Minimum fire resistance rating for the enclosure of floor openings enclosures in new construction is 1 hr.
38.2.5.3.2 Common Path of Travel
Common path of travel shall not exceed 100' within a single tenant space having an occupant load not exceeding 30.
38.2.6.2 Maximum Travel Distance
Travel distance shall not exceed 200'
IECC - 2018
IECC Prescriptive Insulation Requirements:
Roof - R30 (Insulation above deck) Wall - R13 + R3.8 CI Glazing
East/South/West Orientations = SHGC .425, .38 U Value = 1" IGU w/ Low-E Coating (SN 68) on #2 Surface North Orientation = SHGC .57, .51 U Value = 1" IGU w/ Low E Coating (SN 68) Coating on #2 Surface
FE
92'
UP
FE
12'
EXIT DOOR
35" 9"
EXIT DOOR
35" 4"
EXIT DOOR
30" 14"
BUSINESS OCCUPANCY - 150/SF GROSS (IBC/NFPA)
3360 TOTAL SQUARE FEET = 24 OCCUPANTS
-INDICATED BY DIAGONAL LINES-
BUSINESS OCCUPANCY
CONF - 30/SF GROSS
(NFPA)
576 TOTAL SQUARE
FEET = 20 OCCUPANTS
-INDICATED BY
VERTICAL LINES-
TOTAL OCCUPANTS ON FIRST LEVEL = 44
1 EXIT REQUIRED PER OCCUPANT LOAD,
COMMON PATH OF TRAVEL LIMITATIONS NECESSITATE TWO EXITS
MAXIMUM EXIT
PATH OF TRAVEL
DISTANCE = 114'
MAXIMUM
ALLOWED = 200'
LONGEST COMMON PATH OF TRAVEL = 31'
MAXIMUM = 75' (PER IBC)
1 HR RATED CEILING ASSEMBLY AT
UNDERSIDE OF STAIR AND LANDING:
4" WOOD STUDS AT MAX 16" OC
SPACING, W/ 5/8" TYPE X GYP BD
PER IBC 722.6
FIRE RATED DOORS ON
MAGENTIC HOLD OPENS
1 HR RATED ELEVATOR ENCLOSURE
RATED
CONSTRUCTION
IN THIS ROOM
PER USFS
REQUIREMENTS,
NOT CODE
CODE LEGEND
1 HOUR RATED _________
EXITING LOAD AND
DIRECTION OF TRAVEL
PANIC HARDWARE
ALARMED PANIC
HARDWARE
SUBTOTAL EXITING LOAD &
DIRECTION OF TRAVEL
FIRE EXTINGUISHER
EXIT LIGHT (SHADED
QUADRANT INDICATES
FACE(S) OF FIXTURE)
EXIT DOOR
A B
C
A - EGRESS WIDTH
B - REQUIRED EGRESS WIDTH
(.2" PER OCCUPANT - 1005.3.2)
C - OCCUPANT LOAD SERVED
EXIT ARRANGEMENT
SEPARATION
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-5
FIRST FLOOR CODE PLAN
JS
BRS
KH
SCALE AAO0-5
FIRST FLOOR CODE PLAN1 0 2' 4' 8'
SCALE A
91'
51'
UP
FE
12'
AO7-2
BUSINESS OCCUPANCY - 150/SF GROSS (IBC/NFPA)
3082 TOTAL SQUARE FEET = 21 OCCUPANTS
-INDICATED BY DIAGONAL LINES-
BUSINESS OCCUPANCY
CONF - 30/SF GROSS
(NFPA)
193 TOTAL SQUARE
FEET = 7 OCCUPANTS
-INDICATED BY
VERITCAL LINES-
TOTAL OCCUPANTS ON SECOND LEVEL = 28
1 EXIT REQUIRED PER OCCUPANT LOAD,
COMMON PATH OF TRAVEL LIMITATIONS NECESSITATE TWO EXITS
LONGEST COMMON PATH OF TRAVEL = 41'
MAXIMUM = 75' (PER IBC)
MAXIMUM TRAVEL DISTANCE = 85'
MAXIMUM ALLOWED = 200'
1 HR RATED WALLS STAIR ENCLOSURE
30" X 48" AREA OF REFUGE PER IBC 1009.3.3
1 HR RATED
SHAFT
ENCLOSURE PER
IBC 713.4
FIREBLOCKING IN ACCORDANCE W/ IBC 718.2.1
FIREBLOCKING IN ACCORDANCE W/ IBC 718.2.1
FIREBLOCKING IN
ACCORDANCE W/ IBC 718.2.1
1 HR RATED CEILING ASSEMBLY AT
UNDERSIDE OF STAIR: 4" WOOD
STUDS AT MAX 16" OC SPACING, W/
5/8" TYPE X GYP BD PER IBC 722.6
FIRE RATED DOORS ON
MAGENTIC HOLD OPENS
RATED ASSEMBLY
AER-09038 (1 HOUR)
ABOVE STAIR
ENCLOSURE
CODE LEGEND
1 HOUR RATED _________
EXITING LOAD AND
DIRECTION OF TRAVEL
PANIC HARDWARE
ALARMED PANIC
HARDWARE
SUBTOTAL EXITING LOAD &
DIRECTION OF TRAVEL
FIRE EXTINGUISHER
EXIT LIGHT (SHADED
QUADRANT INDICATES
FACE(S) OF FIXTURE)
EXIT DOOR
A B
C
A - EGRESS WIDTH
B - REQUIRED EGRESS WIDTH
(.2" PER OCCUPANT - 1005.3.2)
C - OCCUPANT LOAD SERVED
EXIT ARRANGEMENT
SEPARATION
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-6
SECOND FLOOR CODE
PLAN
JS
BRS
KH
SCALE AAO0-6
SECOND FLOOR CODE PLAN1
0 2' 4' 8'
UP
R E
F
UP
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-7
SPACE UTLIZATION PLAN
JS
BRS
KH
OFFICE SPACE (LIGHT GRAY TONE): 1947 SF
SUPPORT SPACE (VERTICAL LINES): 3311 SF
NET AREA: 5258 SF
CIRCULATION SPACE (DIAGONAL LINES):2533 SF
RENTABLE AREA: 7791 SF
CIRCULATION / RENTABLE SF = CIRCULATION FACTOR
2533 / 7791 = .33
51 EMPLOYEES X 150 SF/PERSON = 7650 SF
+ SPECIAL SPACES:
ARCHAEOLOGY STORAGE 55 SF
SECURE STORAGE 90 SF
CONFERENCE STORAGE 80 SF
LEO STORAGE 20 SF
MECH/ELEC 225 SF
VESTIBULE 60 SF
VISTOR AREA 470 SF
COUNTING ROOM 95 SF
PLOTTER/GIS 100 SF
SERVER ROOM 95 SF
TOTAL ALLOWABLE AREA: 8940 SF
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-8
3D VIEWS - FOR
REFERENCE ONLY
JS
BRS
KH
PERSPECTIVE VIEWS ARE FOR REFERENCE ONLY - NOT TO SCALE
PERSPECTIVE OF SOUTH FACADE PERSPECTIVE OF NORTH FACADE
PERSPECTIVE OF MAIN ENTRY
PERSPECTIVE OF SOUTH WEST CORNER OF BUILDING
W1040
W1041 W1043
4" WOOD STUD WALL (STC 32)
4" WOOD STUD WALL w/ INSULATION (STC 34)
6" WOOD STUD WALL (STC 32)
4" WOOD STUD CHASE WALL
5/8" GYP. BD.
USE TYPE 'X' GYP.
BOARD ON
ASSEMBLIES
NOTED IN CODE
PLANS AS FIRE
RATED
WOOD STUDS
5/8" TYPE 'X'
GYP. BOARD
WOOD STUDS
INSULATION
5/8" GYP. BD.
3 1/2" NOMINAL
WOOD STUDS;
RE: STRUCT.
S H
A F
T S
ID
E
O F
W A
L L
PLUMBING CHASE WALL
5/8" GYP. BD.
3 1/2" NOMINAL
WOOD STUDS
INSULATION
W1044
NOTES:
1. AVOID PENETRATING THIS
WALL WITH ELEMENTS THAT
CROSS FROM ONE SPACE TO
ANOTHER; SUCH AS
PIPEWORK, DUCTWORK OR
CONDUIT.
2. MECHANICAL CONNECTION
BETWEEN THE TWO SIDES OF
THE WALL IS NOT ALLOWED.
3. OTHER MATERIAL CAN
REPLACE THE SUGGESTED
GYP BD AS LONG AS THE
OVERALL SURFACE REMAINS
AT 2.1 POUNDS PER SF PER 5/8'
GYP LAYER
4"
EXTEND ALL GYP. BD.
LAYERS & FRAMING TO
UNDERSIDE OF STRUCTURE
ABOVE FOR ACOUSTICS
W1060
W1063 6"" WOOD STUD CHASE WALL
W1061 6" WOOD STUD WALL w/ INSULATION (STC 34)
W2080
7 5/8" NOMINAL CMU
1 1/2" Z-FURRING
5/8" GYP BOARD
5/8" GYP. BD.
3 1/2" WOOD STUDS
3/4" TYPE ACX FIRE
RETARDANT
PLYWOOD
W1040P 4" WOOD STUD WALL W/ PLYWOOD
8" CMU WITH GYP BOARD
UL U305 - 1 HR
6" WOOD STUD WALL - SHEAR
RE: STRUCTURAL
1 HR RATED
5/8" TYPE 'X'
GYP. BOARD
WOOD STUDS
W1060S UL WP-3341 - 1 HR
SHEAR SHEATHING
LAYER, RE:
STRUCTURAL
6" WOOD STUD WALL - 1 HR RATED (STC 32)W1060R
4" WOOD STUD WALL - 1 HR RATED (STC 32)W1040R
W1061R 6" WOOD STUD WALL w/ INSULATION - 1 HR RATED (STC 34)
W1041R 4" WOOD STUD WALL w/ INSULATION - 1 HR RATED (STC 34)
UL U305 - 1 HR
NOTE: AT IT ROOM PROVIDE 3/4" TYPE ACX FIRE
RETARDANT PLYWOOD ON THE IT ROOM SIDE OF THE WALL
INSTEAD OF GYP. BOARD
W1068
EXTERIOR WALL - METAL PANEL &
WOOD STUDS
5/8" GYP. BD.
5 1/2" NOMINAL
WOOD STUDS; RE:
STRUCT.
R-19 BATT
INSULATION
METAL PANEL
SYSTEM - CORTEN
STEEL
W1078 EXTERIOR WALL - STUCCO & WOOD
STUDS
3 COAT STUCCO
SYSTEM
1/2" SHEATHING
3 1/2" NOMINAL
WOOD STUDS
1 1/2" INSULATED
SHEATHING; R-6
5 1/2" NOMINAL
WOOD STUDS; RE:
STRUCT.
5/8" GYP BOARD
W1069
EXTERIOR WALL - STUCCO & WOOD
STUDS
3 COAT STUCCO
SYSTEM
1 1/2" INSULATED
SHEATHING; R-6
(W1069) 6" (W1089) 8"
NOMINAL WOOD
STUDS; RE:
STRUCT.
5/8" GYPSUM
BOARD
R-13 MIN. BATT
INSULATION
W2085B EXTERIOR WALL - CMU & STUCCO
2 " RIGID
INSULATION
8" CMU
R-13 MIN. BATT
INSULATION
1 1/2" INSULATED
SHEATHING; R-6
METAL LATH
WEATHER
BARRIER WEATHER BARRIER
METAL LATH
WEATHER BARRIER
DRAINAGE SCREEN
PER STUCCO MFR
W2085A
2 " RIGID
INSULATION
8" CMU
WEATHER BARRIER
METAL LATH
EXTERIOR WALL - CMU & STUCCO
1' - 0 1/2"
2X2 TREATED FURRING
1/2" PLYWOOD SHEATHING
1' - 0 1/2" 10 1/2"
W1089
METAL LATH
3 COAT STUCCO
SYSTEM
3 COAT STUCCO
SYSTEM
DRAINAGE SCREEN
PER STUCCO MFR
1/2" SUB-GIRT,
RUNNING
HORIZONTALLY
1 1/2"
1/2"
1 1/2" 5 1/2" 5/8"
9 5/8"
1 1/2" 5 1/2" 5/8"
8 1/2"
1/2" 3 1/2" 1 1/2" 6 1/8" 2" 7 5/8"
2" 7 5/8" 1 1/2"1/2"
AIR & MOISTURE
BARRIER PER
STUCCO MFR.
AIR BARRIER PER
STUCCO MFR
AIR BARRIER PER
STUCCO MFR
AIR & MOISTURE
BARRIER PER
STUCCO MFR.
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-9
WALL TYPES
JS
BRS
KH
IN
T
E R
IO
R
P A
R T
IT
IO
N S
E X
T E
R
IO
R P
A R
T
IT
IO
N
S
F2SLAB ON GRADEF1 3/4" SHEATHING W/ GYPCRETE
CONCRETE SLAB,
RE: STRUCTURAL
FOR DEPTH
FINISHED FLOOR,
RE: FINISH PLAN
PLYWOOD
SHEATHING,
GRADE A
GYPCRETE
RE: GEO-TECH FOR
SUBGRADE
REQUIREMENTS
FINISHED FLOOR,
RE: FINISH PLAN
UNDERSLAB
VAPOR RETARDER
R1 R3STANDING SEAM OVER INSULATION W/
PLYWOOD ROOF DECK
(RE: ROOF PLAN FOR SLOPE)
MEMBRANE ROOFING
(RE: ROOF PLAN FOR SLOPE)
STANDING SEAM METAL
ROOF
1/2" NAILER BOARD
SHEATHING
R-30 POLY-
ISOCYANURATE
BOARD INSULATION
3/4" PLYWOOD ROOF
DECK
3/4" PLYWOOD ROOF
DECK
R-30 RIGID
INSULATION
MEMBRANE ROOF
VAPOR RETARDER
MEMBRANE (ICE AND
WATER SHIELD) SEAL
SEAMS TYP. MIDPOINT
STANDING SEAM METAL
ROOF
1/2" NAILER BOARD
SHEATHING
POLY-ISOCYANURATE
BOARD INSULATION-
CUT TO MATCH
THICKNESS FOR
CONSISTANT METAL
ROOF PLANE
2" TONGUE AND
GROOVE ROOF DECK
VAPOR RETARDER
MEMBRANE (ICE AND
WATER SHIELD) SEAL
SEAMS TYP. MIDPOINT
STANDING SEAM OVER INSULATION W/
PLYWOOD ROOF DECK
(RE: ROOF PLAN FOR SLOPE)
R2
1/4" COVER BOARD
VAPOR RETARDER
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO0-11
FLOOR & ROOF TYPES
JS
BRS
KH
R O
O F
T Y
P E
S F
L O
O R
T Y
P E
S
CR
CR CR
CR
CR
CR
C R
C R
UP
AO3-3
AO3-1
AO3-4 1
VISITOR/REC
LARGE CONF B
104b
CONF. STOR
104c
SERVER
116b
MECH/ELEC/
JANITOR
RR 1
ELEV
ARCH STOR
SECURE
STORAGE
CIRC.
101a
AO3-10
AO3-12
AO3-11
VESTIBULE
RANGER
VIS
AO5-1
AO5-2
L.E.O.
FOCUS/ COUNT
RR 2
COPY/ MAIL
OPEN WORK
AREA
COLLABORATE
101a
104b
116b 115
104c
109B
LARGE CONF A
104a
AO3-21
AO5-5
AO6-1
AO6-2
AO6-23 2
100A
654.543
E
D
C
B
A.1
1.1
I-A
A
A
A
A
A A
D
C
C
BI-B
I-D
K
AAAA
AO4-1
AO6-4
W1069
W1078
W1069
W1069 W1069
W1078
W1078
W1078 W2085B
W2085B
W1078
W1060R
W1040
W1060S
W1040P
W1040P
W1040
W1040
W1060S
W1040
W1040P
W1040
W1060S
W1060S
W1060S
AO7-5
4' - 6 13/32"
104a
AO6-3
AO7-5
AO7-5
AO7-5
AO7-5
B.5
AO7-2
AO7-2
AO7-2
AO6-4
AO6-4
AO6-4 54
113A 113B
109B
W1060S
W1069
W1060
W1040
W1040
W1040
W1060S
F1F1
W1040
W1040R
W1040
W2080
W1060S
W1044
W1040
W1060S
W1060S
W1040
W1060S
I-C
IA
100' - 0"
W1060S W1060
W1078
DRINKING
FOUNTAINS
MOP SINK
OPERABLE
PARTITION
100' - 0" 103' - 3"
CARD
READER, TYP
SECURITY
CAMERA, TYP
W1060S
E Q
E Q
MARKER BOARD
SOLID BLOCKING TO FULL
HEIGHT AT OPERABLE
PARTITION TERMINATION
POINT
WALL MOUNTED
TELEVISION, PROVIDE
BLOCKING AS NEEDED.
WALL MOUNTED
TELEVISION, PROVIDE
BLOCKING AS NEEDED.
10' - 11 1/2"
E Q
E Q
UP
PANEL, RE:
ELECTRICAL
AC, RE: MECH.
RECYCLING
BINS, NIC
WORK COUNTER
SEE MEP DRAWINGS
FOR EQUIPMENT
INFORMATION
AO7-8
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO1-1
FIRST FLOOR PLAN
MM/JS
BRS
KH
0 2' 4' 8'
SCALE ASCALE AAO1-1
FIRST FLOOR PLAN1
E
F
FE
DN
AO3-3
AO3-1
AO3-4 1
ELEV
BREAK
MEN'S RR
WOMEN'S RR
AO3-10
AO3-12
AO3-11
FOCUS
HUDDLE
WELLNESS
202a
PLOTTER / GIS /
SUPPLY
G R
O U
P S
T O
R A
G E
CIRCULATION
STAIR 2
AO3-21
OPEN WORK
AREA
AO5-2
AO5-1
AO5-5
AO6-1
AO6-5
654.543
E
D
C
B
A.1
1.1
ROOF ACCESS
LADDER
I-E
I-F
E
E
E
E E
F
H G
D
F2
J
AO6-5 3
AO4-1
AO6-5 5
AO6-2
AO6-2 5
AO6-3
AO7-5
AO7-5
AO7-5
B.5
AO7-10
AO6-6
AO6-5 2
AO6-6
AO7-8
200A
200B
W1068
W1068
W1068
W1068
W2085B
W2080
W2085B
W1078
W1069
W1060S
W1068
W1060
W1060
W1060R
W1060S
W1040
W1040W1040
W1060
113' - 0"
113' - 0"
W1060R
W1040
202a
W1040
W1040
W1043 W1043
ROOF AND
CANOPY BELOW
W1040
W1040
W1040
W1040
W1040W1040
W1040
W1043
W1040R
E Q
E Q
"MARKER BOARD
SHEET WATERPROOFING
UNDER TILE AT MEN'S AND
WOMEN'S RESTROOMS
NOTCH CANOPY METAL
ROOFING AND ROOF
DECK AT DOWNSPOUT
PENETRATION
W1040R
AO7-8
PRINTER, NIC
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO1-2
SECOND FLOOR PLAN
MM/JS
BRS
KH
1/4" = 1'-0"AO1-2
SECOND FLOOR PLAN1 0 2' 4' 8'
CR
CR CR
CR
CR
CR
C R
C R
UP
VISITOR/REC
LARGE CONF B
104b
CONF. STOR
104c
SERVER
116b
MECH/ELEC/
JANITOR
RR 1
ELEV
ARCH STOR
SECURE
STORAGE
CIRC.
101a
VESTIBULE
RANGER
VIS
2' - 2 7/8"
3' - 5 1/2" 4' - 0" 4' - 0" 4' - 0"
2' - 0 1/2"
3' - 1 1/2" 4' - 0" 4' - 0" 4' - 0" 2' - 4 1/2"
1' - 8"
LARGE CONF A
104a
OPEN WORK
AREA
COPY/ MAIL
FOCUS/ COUNT
L.E.O.
COLLABORATE
/4
/4
/2
/2
/2
2' - 5 3/4" 4' - 0" 3' - 11 7/8" 4' - 0"
3' - 0 3/8" 1' - 2 5/8" 11' - 9" 4' - 6 3/8"
10 7/8"
3' - 4"
1' - 0 5/8"
7' - 6 5/8" 8 7/8" 8' - 2" 9' - 8 1/2" 12' - 0 1/2" 5"
/2
1' - 7 1/2"
27' - 0"
1' - 7 1/2"
0"
654.543
E
D
C
B
A.1
1.1
/4
/2
/4
/2
/2
/2
/8
/8
/8
/2
/8
B.5
78' - 6 1/8"
RR 2
3' - 5" 5' - 2" 3' - 5 5/8"
/2
1' - 6" 4' - 0" 3' - 5 7/8"
/2
15' - 11 1/2"
1' - 6 1/2"
4' - 7 1/8" 3' - 0" 10 3/8"
3' - 4 3/4"
1' - 6 1/2"
1' - 2"
3' - 5 1/2"
2' - 2 1/2"
10' - 8" 1' - 2 5/8"
1' - 6 1/2" 5' - 1" 3' - 3 1/2" 9' - 1 1/2"
1' - 2 5/8"
5' - 0 3/4"
7' - 3 5/8" 3' - 3" 4' - 11" 5' - 1 3/4" 4' - 6 3/4" 3' - 9 1/8"
2' - 2 3/8"
6' - 1 1/8"
2' - 2 1/2"
9 7/8"7' - 4 1/4" 3' - 0" 2' - 11 3/4"
/2
3' - 0 3/4" 4' - 3 3/4"6 3/4"
/4
26' - 3 5/8" 3' - 4"
1' - 0 1/4"
3' - 6 1/8" 5' - 3 7/8"
/8
/8
8' - 5 5/8"
/2
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO1-3
FIRST FLOOR DIMENSION
PLAN
MM/JS
BRS
KH
SCALE AAO1-3
FIRST FLOOR DIMENSION PLAN1
0 2' 4' 8'
DN
17' - 6" 22' - 9 7/8" 7' - 6 1/4" 30' - 8"
5 1/2" 77' - 7" 5 5/8"
14' - 2 3/4" 1' - 8 3/4"
6 1/8"
10' - 9 1/2" 2 1/2"
8' - 9 1/8" 5' - 1 3/8"
11 1/2"
15' - 3 7/8"
2' - 8 3/4"
5' - 0 3/4"
1' - 6 1/2"
3' - 2" 8' - 4 7/8"
/4
/4
2' - 6" 12' - 0" 3' - 0"
/8
/4
/8
3' - 5 1/2" 12' - 0" 5' - 2" 12' - 0" 4' - 4" 12' - 0" 5' - 2" 12' - 0" 3' - 9" 5' - 2" 3' - 5 1/2"
13' - 1 7/8" 7' - 11" 5' - 3" 3' - 4"
1' - 0 1/8"
OPEN WORK
AREA
ELEV
BREAK
PLOTTER / GIS /
SUPPLY
MEN'S RR
WOMEN'S RR
FOCUS
HUDDLE
WELLNESS
202a
GROUP STORAGE
CIRCULATION
STAIR 2
654.543
E
D
C
B
A.1
1.1
B.5
/2
78' - 6 1/8"
ROOF AND
CANOPY BELOW
2' - 0" 3' - 3"
1' - 11 1/4"
8' - 9 1/8"
/4
/2
/2
/2
/2
2' - 2 1/4"
5' - 11 1/8"
ALIGN FINISH FACE ALIGN FINISH
FACE
/2
/4
5' - 6 1/2"
2' - 2" 14' - 2" 2' - 8"
1' - 2 5/8" 11' - 9" 5' - 5 1/4" 3' - 4" 8' - 7 1/8"
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO1-4
SECOND FLOOR
DIMENSION PLAN
JS/MM/JH
BRS
KH
1/4" = 1'-0"AO1-4
SECOND FLOOR DIMENSION PLAN1
0 2' 4' 8'
AO3-10
AO3-12
AO3-11
/2
/2
/4
R3
R1
654.543
E
D
C
B
A.1
1.1
30"X36" ROOF
HATCH
4" 17' - 3 1/2"
6"
29' - 11 1/8" 3 7/8"
AO7-9
ALUM SUNSHADE
SYSTEM, TYP
W1078 W2085A
W2085B
W1089
W1089
W1069
AO7-9
AO7-9
AO7-9
B.5
AO7-9
R2
R2
ROOF HYDRANT,
RE: PLUMBING
VENT, RE: MECHANICAL
GAS LINE,
PAINTED
MECHANICAL EQUIP,
RE: MECHANICAL
WASTE/VENT LINE, RE:
PLUMBING
/4
1' - 2 3/4"
THROUGH WALL
SCUPPER AND
DOWNSPOUT
OVERFLOW SCUPPER
OVERFLOW
SCUPPER
THROUGH WALL
SCUPPER AND
DOWNSPOUT
RTU CRICKET,
TYP.
CRICKET TO SCUPPER
AO7-9
AO7-9
1' - 9 7/8" 27' - 0" 1' - 9 7/8"
AO7-8
/4
36' - 0" 11' - 10 1/8"
3 7/8"
78' - 6 1/8"
ALUM SUNSHADE
SYSTEM, TYP
PREFINISHED
MTL. PARAPET
CAP, TYP
CANOPY BELOW
PREFINISHED
MTL. PARAPET
CAP, TYP
R2
INTEGRAL ROOF GUTTERS,
RE: DETAILS
30' - 9 1/4"
DOWNSPOUT
DOWNSPOUT
LAMBS TONGUE /
WATERFALL EDGE
ON END OF THIS
INTEGRAL GUTTER
DOWNSPOUT
INTEGRAL ROOF GUTTER,
RE: DETAILS
PREFINISHED
METAL FLASHING
OVER WALL BELOW
/4
HATCHED AREA INDICATES
ROOF WALKPADS
NOTCH LOWER CANOPY
METAL ROOFING AND ROOF
DECK AT DOWNSPOUT
PENETRATION (RE: SECOND
FLOOR PLAN)
RTU CRICKET,
TYP.
AO7-10
/4
AO7-10
AO7-8
AO7-8
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO1-5
ROOF PLAN
MM/JS
BRS
KH
0 2' 4' 8'
EXTERIOR CANOPY,
RE: ROOF PLAN AND
DETAILS
VISITOR/REC
LARGE CONF B
104b
CONF. STOR
104c
SERVER
116b
MECH/ELEC/
JANITOR
COLLABORATE
RR 1
ELEV
ARCH STOR
SECURE
STORAGE
CIRC.
101a
VIS
VESTIBULE
RANGER
RR 2
L.E.O.
FOCUS/ COUNT
COPY/ MAIL
OPEN WORK
AREA
LARGE CONF A
104a
STRUCTURAL FRAMING, RE: STRUC
ACT CEILING CLOUDS WITH
AXIOM TRIM, TYP.
10' - 0"
C1
9' - 0"
C1
LIGHT FIXTURE, RE:
ELEC. DWGS TYP
9' - 0"
C2
9' - 0"
C2
STRUCTURAL FRAMING, RE: STRUC
/4
/2
AO7-10
1' - 8 3/8" 12' - 0" 1' - 7 3/4"
CENTER LIGHTS
BETWEEN CLOUDS, TYP
CENTER LIGHTS IN HALL,
ADJUST DUCTWORK
NORTH/SOUTH AS NEEDED
FOR LIGHTING
10' - 0"
C2
10' - 0"
C2
10' - 0"
C2
10' - 0"
C2
10' - 0"
C2
10' - 0"
C2
10' - 0"
C2
9' - 0"
C1
9' - 0"
C1
9' - 0"
C1
9' - 0"
C1
EQ. EQ.
HVAC DUCT, RE: MECH
/2
E Q
E
Q
9' - 0"
C2
STRUCTURAL FRAMING,
RE: STRUC
EXTERIOR CANOPY
CEILING TYPE C4 AT 10'-0" AFF
LIGHT FIXTURE, RE: ELEC.
DWGS TYP
AO7-3
1' - 10 7/8" 1' - 10 1/8"
/4
9' - 0"
C2
109' - 0"
CEILING MOUNTED
PROJECTION SCREEN7' - 2 1/8" 6' - 0" 7' - 1 5/8"
110' - 0"
9' - 0"
C1
C4
110' - 0"
C4
OPEN TO STRUCTURE
BREAK GRID AT LIGHTS
AND DIFFUSERS, TYP
OPERABLE PARTITION TRACK
AND SYSTEM
17' - 8"
RCP LEGEND
WALL EXTENDS 9'-0" AFF, OR 6"
ABOVE ANY CEILING
C1 - GYP. BOARD CEILING
C2 - SAT CEILING TYPE 1
EXPOSED STRUCTURE
C3 - TONGUE AND GROOVE
ROOF DECK
C4 - ACOUSTIC METAL
BLADE CEILING - WOOD
FINISH
C3 - SAT CEILING TYPE 2
(VINYL COVERED)
*NOT USED IN OFFICE
C1-R - 1 HR RATED GYP.
BOARD CEILING
1.ALL CEILING ELEVATIONS LISTED AS A.F.F.
DIMENSIONS.
SEE INTERIOR ELEVATIONS FOR
CLARIFICATION IF NECESSARY.
2.REFER TO WALL TYPES LISTED ON A0-9.
THOSE WALLS, DESIGNATED ON PLANS AND
WITHIN DETAILS MAY BE INTENDED TO
CONTAIN SOME SOUND, WATER VAPOR,
SMOKE AND /OR FIRE ATTENUATION.
3. ALL WALLS SHALL TERMINATE AT DECK
UNLESS OTHERWISE NOTED
RCP GENERAL NOTES
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO2-1
FIRST FLOOR REFLECTED
CEILING PLAN
MM/JS
BRS
KH
SCALE AAO2-1
FIRST FLOOR RCP - SD1 0 2' 4' 8'
SCALE A 128 of 299
BREAK
GROUP STORAGE
HUDDLE
FOCUS
OPEN WORK
AREA
MEN'S RR
WOMEN'S RR
PLOTTER / GIS /
SUPPLY
CIRCULATION
200 WELLNESS
202a
EXPOSED BEAMS AT ROOF OVERHANGLIGHT FIXTURE, CENTER B/W CEILING
CLOUDS (TYP), RE: ELEC. DWGS
STRUCTURAL FRAMING, RE: STRUC
ACT CEILING CLOUDS WITH AXIOM
TRIM, TYPICAL
9' - 0"
C2
9' - 0"
C2
9' - 0"
C1
9' - 0"
C1
9' - 0"
C2
9' - 0"
C2
/2
T
Y P
9' - 0"
C2
8' - 0"
C1
/2
/2
/2
1' - 9 1/4" 4' - 0" 2' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 8 1/2"
125' - 10 19/32"
AO7-10
AO7-10
/2
T Y
P
/2
T Y
P
121' - 4"
123' - 6 1/4"
124' - 8 13/32"
LIGHT FIXTURE, RE: ELEC. DWGS TYP
STRUCTURAL FRAMING, RE: STRUC
STRUCTURAL FRAMING, RE: STRUC
LIGHT FIXTURE, RE: ELEC. DWGS
TYP
STAIR 2
ELEV
HVAC DUCT, RE: MECH
ROOF LADDER / ROOF ACCESS -
FRAME WALLS W/ GYP FINISH FROM
SUSPENDED CEILING TO ROOF
DECK ALL SIDES OF ROOF LADDER
8' - 0"
C1
8' - 0"
C1 8' - 0"
C1
8' - 6"
C1
PT
PT
PT
C2
C2
C2
C2
LIGHT FIXTURE, RE: ELEC
10' - 0"
C1-R
AO7-10
(2) LAYERS TYPE X GYP BD AT TOP OF SHAFT
RCP LEGEND
WALL EXTENDS 9'-0" AFF, OR 6"
ABOVE ANY CEILING
C1 - GYP. BOARD CEILING
C2 - SAT CEILING TYPE 1
EXPOSED STRUCTURE
C3 - TONGUE AND GROOVE
ROOF DECK
C4 - ACOUSTIC METAL
BLADE CEILING - WOOD
FINISH
C3 - SAT CEILING TYPE 2
(VINYL COVERED)
*NOT USED IN OFFICE
C1-R - 1 HR RATED GYP.
BOARD CEILING
1.ALL CEILING ELEVATIONS LISTED AS A.F.F.
DIMENSIONS.
SEE INTERIOR ELEVATIONS FOR
CLARIFICATION IF NECESSARY.
2.REFER TO WALL TYPES LISTED ON A0-9.
THOSE WALLS, DESIGNATED ON PLANS AND
WITHIN DETAILS MAY BE INTENDED TO
CONTAIN SOME SOUND, WATER VAPOR,
SMOKE AND /OR FIRE ATTENUATION.
3. ALL WALLS SHALL TERMINATE AT DECK
UNLESS OTHERWISE NOTED
RCP GENERAL NOTES
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO2-2
SECOND FLOOR
REFLECTED CEILING PLAN
MM/JS
BRS
KH
SCALE AAO2-2
SECOND FLOOR RCP - SD1 0 2' 4' 8'
FIRST FLOOR
100' - 0"
SECOND FLOOR
113' - 0"
AO3-12
AO3-11
STEANDING SEAM
ROOF
STUCCO WITH ANTI
GRAFFITI COATING
METAL PANEL
SYSTEM - CORTEN
STEEL
STUCCO
CONCRETE STEM WALL
WITH PREFINISHED
SHEET METAL COVER
ALUMINUM STOREFRONT
SYSTEM, RE: WINDOW
TYPES
654.5431.1
A A A A
EE E E
F
B K
STUCCO CONTROL JOINTS, TYP
AO7-8
116'-0"
T.O. FRAMING
116'-0"
T.O. FRAMING
PREFINISHED METAL PARAPET CAP
ALUMINUM STOREFRONT
SUNSHADE SYSTEM BEYOND
PREFINISHED
METAL PARAPET
CAP TO MATCH
STUCCO, TYP
PREFINISHED METAL
PARAPET CAP
DIAGONAL HATCH REPRESENTS
THE LIGHT REDIRECTING FILM (LRF)
WOOD BEAMS, RE: STRUCTURAL
PREFINISHED METAL FASCIA
INTEGRAL ROOF GUTTER, RE:
DETAILS
RE: CIVIL FOR GRADING AND
PAVING INFO, TYP
CANOPY ROOF AND WOOD BEAMS STUCCO WITH
ANTI GRAFFITI
COATING
SLOPE
133'-6"
T.O. FRAMING
T.O. LOW EAVE FRAMING
124' - 7"
T.O HIGH EAVE FRAMING
130' - 9"
OPERABLE
WINDOW
KNOX BOX, LOCATION TO
BE VERIFIED WITH C.O.
AO7-8
AO7-10
AO7-8
AO7-8
REPEAT PATTERN1' - 6"1' - 0"1' - 4"1' - 4"1' - 0"1' - 0"1' - 6"1' - 0"1' - 4"
CONCEALED FASTENER METAL PANELS IN VERTICAL APPLICATION USING VARYING
WIDTHS - 12" WIDTH, 16" WIDTH, & 18" WIDTH PANELS IN PATTERN ABOVE.
CORTEN STEEL FINISH ON PANELS. ALL TRIM PIECES AT CORTEN PANELS SHOULD ALSO
BE CORTEN STEEL.
11' - 0"11' - 0"
T.O. LOW EAVE FRAMING
124' - 7"
CEMENT PLASTERING
(3 COAT STUCCO)
METAL WALL PANELS
METAL ROOF PANELS
STOREFRONT WINDOWS
(IN STUCCO)
STOREFRONT WINDOWS
(IN METAL PANEL)
SHERWIN WILLIAMS
MORIN
STO CORP
MORIN
31436 PAVESTONE
A606 STEEL (CORTEN)
SILVERSMITH (MICA) 439RZ1541M
SW 9045
BORA BORA SHORE
KAWNEER DARK BRONZE ANODIZED ALUMINUM
BASIS OF DESIGN
COMPANY COLORMATERIAL
ELEVATION MATERIALS LEGEND
STOREFRONT SUNSHADES KAWNEER DARK BRONZE ANODIZED ALUMINUM
METAL ROOF FASCIA/TRIM MORIN CHAMPAGNE BRONZE (MICA
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO3-1
EXTERIOR ELEVATIONS
MM/JS
BRS
KH
SCALE AAO3-1
SOUTH BUILDING ELEVATION3
0 2' 4' 8'
SCALE A
SCALE BAO3-1
REPEATING VERTICAL METAL PANEL PATTERN1
0 1' 2' 4'
SCALE B 130 of 299
SECOND FLOOR
113' - 0"
AO3-10
STUCCO WITH ANTI-GRAFFITI
COATING
METAL PANEL SYSTEM -
CORTEN STEEL
STUCCO WITH ANTI
GRAFFITI COATING
STAIR 2 EXIT
103' - 3"
EDCBA.1
CC
1 1/2" / 12"
CANOPY BEYOND
STUCCO CONTROL JOINTS, TYP
B.5
PREFINISHED METAL PARAPET
CAP
RE: CIVIL FOR GRADING AND
PAVING INFO, TYP
PREFINISHED METAL FASCIA
OVER ROOF BEYOND
PREFINISHED METAL
PARAPET CAP
INTEGRAL ROOF GUTTER
BEYOND, RE: DETAILS
PREFINISHED METAL FASCIA
WOOD BEAMS, RE: STRUCTURAL
WOOD BEAMS, RE: STRUCTURAL
SLOPE
SLOPE
CONCRETE STEM WALL WITH
PREFINISHED SHEET METAL
COVER
133'-6"
T.O. FRAMING
116'-0"
T.O. FRAMING
T.O. LOW EAVE FRAMING
124' - 7"
T.O HIGH EAVE FRAMING
130' - 9"
PREFINISHED METAL
DOWNSPOUT, RE: ROOF
PLAN
CEMENT PLASTERING
(3 COAT STUCCO)
METAL WALL PANELS
METAL ROOF PANELS
STOREFRONT WINDOWS
(IN STUCCO)
STOREFRONT WINDOWS
(IN METAL PANEL)
SHERWIN WILLIAMS
MORIN
STO CORP
MORIN
31436 PAVESTONE
A606 STEEL (CORTEN)
SILVERSMITH (MICA) 439RZ1541M
SW 9045
BORA BORA SHORE
KAWNEER DARK BRONZE ANODIZED ALUMINUM
BASIS OF DESIGN
COMPANY COLORMATERIAL
ELEVATION MATERIALS LEGEND
STOREFRONT SUNSHADES KAWNEER DARK BRONZE ANODIZED ALUMINUM
METAL ROOF FASCIA/TRIM MORIN CHAMPAGNE BRONZE (MICA
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO3-2
EXTERIOR ELEVATIONS
MM/JS
BRS
KH
1/4" = 1'-0"AO3-2
EAST BUILDING ELEVATION1
0 2' 4' 8'
SECOND FLOOR
113' - 0"
AO3-12
AO3-11
STUCCO WITH ANTI GRAFFITI
COATING
METAL PANEL SYSTEM -
CORTEN STEEL
ALUMINUM STOREFRONT
SYSTEM, RE: WINDOW
TYPES
STAIR 2 EXIT
103' - 3"
ENTRY CANOPY
6 5 4.5 4 3 1.1
D
J
E
A A
HG
PREFINISHED METAL
PARAPET CAP, MATCH
STUCCO
STUCCO WITH ANTI
GRAFFITI COATING
STUCCO CONTROL JOINTS,
TYP
PREFINISHED METAL FASCIA
ALUMINUM STOREFRONT
SUNSHADE SYSTEM
BEYOND
SLOPE
STUCCO FINISH ON
WALL BEYOND
PREFINISHED METAL
PARAPET CAP ON WALL
BEYOND
116'-0"
T.O. FRAMING
RE: CIVIL FOR GRADING AND
PAVING INFO, TYP
133'-6"
T.O. FRAMING
T.O. LOW EAVE FRAMING
124' - 7"
T.O HIGH EAVE FRAMING
130' - 9"
PREFINISHED
OVERFLOW SCUPPER,
RE: ROOF PLAN, MATCH
STUCCO
AO7-8
108' - 0"
AO7-10
AO7-8
PREFINISHED
SCUPPER AND
DOWNSPOUT, MATCH
STUCCO
PREFINISHED SCUPPER
AND DOWNSPOUT,
MATCH STUCCO
AO7-8
CEMENT PLASTERING
(3 COAT STUCCO)
METAL WALL PANELS
METAL ROOF PANELS
STOREFRONT WINDOWS
(IN STUCCO)
STOREFRONT WINDOWS
(IN METAL PANEL)
SHERWIN WILLIAMS
MORIN
STO CORP
MORIN
31436 PAVESTONE
A606 STEEL (CORTEN)
SILVERSMITH (MICA) 439RZ1541M
SW 9045
BORA BORA SHORE
KAWNEER DARK BRONZE ANODIZED ALUMINUM
BASIS OF DESIGN
COMPANY COLORMATERIAL
ELEVATION MATERIALS LEGEND
STOREFRONT SUNSHADES KAWNEER DARK BRONZE ANODIZED ALUMINUM
METAL ROOF FASCIA/TRIM MORIN CHAMPAGNE BRONZE (MICA
DRAWING TITLE
PROJECT NAME
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
SUBSHEET NO.
/2
/1
:3
C
W K
J
9.
5.
C \D
R A
W
IN
G S
\R E
C E
IV
E
D \U
S F
S \2
T
IT
L E
B L
O C
K \R
-B
O R
D E
R .D
W G
(R3)
SOUTHWESTERN REGION
JEMEZ RANGER
DISTRICT OFFICE DESIGN
PHASE TWO
SANTA FE
NATIONAL FOREST
JEMEZ RANGER DISTRICT
07/01/2019
2339.15.1c
DRAWN
LOGOS / STAMPS
DWG SHEET NO.
OFFICE BUILDING
AO3-3
EXTERIOR ELEVATIONS
MM/JS
BRS
KH
SCALE AAO3-3
NORTH BUILDING ELEVATION1
0 2' 4' 8'
SECOND FLOOR
113' - 0"
AO3-10
METAL PANEL SYSTEM -
CORTEN STEEL
ALUMINUM STOREFRONT
SUNSHADE SYSTEM
STUCCO WITH ANTI-GRAFFITI
COATING
E D C B A.1
CANOPY BEYOND
PREFINISHED METAL FASCIA
AT CANOPY BEYOND
WOOD BEAMS, RE: STRUCTURAL
E E
AA…