JMEC_Jemez_Mountain_Electric_COOP_Requirements.docx

DOCX document 13 KB Posted

Attached to
Jemez RD Office Construction Project Federal contract opportunity
Solicitation number
12837919R0002
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

JMEC Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Jemez RD Office Construction Project, newest first.
File Type Posted
SF-30_Amendment_6_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Jemez_ElecDwgs_Amendment_5.pdf PDF
SF-30_Amendment_5_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Windstream_Requirements.docx DOCX document
011000_Summary_of_work-revised_2019-07-25_JEMEZ.docx DOCX document
323113_-_Rev2_-_CHAIN_LINK_FENCES_AND_GATES.DOC DOC document
SF-30_Amendment_4_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Questions_&_Answers_-_07-26-19.xlsx XLSX spreadsheet
Pricing_Spreadsheet_Template.xlsx XLSX spreadsheet
Jemez_RD_Construction_Project_-_Pre-Bid_Meeting_Attendee_List_07-17-2019.pdf PDF
Contract_Time_-_Period_of_Performance.pdf PDF
SF-30_Amendment_3_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
SF-30_Amendment_2_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
SF-30_Amendment_1_-_Jemez_RD_Office_Complex_-_12837919R0002.pdf PDF
Revised-Jemez_RD_Complex_Solicitation_12837919R0002_-_07-10-19.pdf PDF
List_Revised_Specs_-_Project_Manuals_1-2-3_2019-07-10.pdf PDF
Project_Manuals_1-2-3_-_Full_Rev1_Specifications_2019_07_09.pdf PDF
Solicitation_Body_-_12837919R0002_-_Jemez_RD_Construction_Project.pdf PDF
Drawings_-_1_of_3.pdf PDF
Drawings_-_2_of_3.pdf PDF
Drawings_-_3_of_3.pdf PDF
Project_Manual_-_Volume_2_of_3.pdf PDF
Project_Manual_-_Volume_1_of_3.pdf PDF
Appendix_E_-_Wage_Determinations.pdf PDF
Appendix_G_-_Question_Template.xlsx XLSX spreadsheet
Past_Performance_Questionnaire_Appendix_F.pdf PDF
Appendix_C_-_2010_Geotechnical_Report.pdf PDF
Project_Manual_-_Volume_3_of_3.pdf PDF
Appendix_A_-_1992_Asbestos_Report.pdf PDF
Appendix_D_-_2019_Geotechnical_Report.pdf PDF
Appendix_B_-_2019_Asbestos_Report.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jemez Mtn. Electric COOP Requirements

1. JMEC will designate an existing pole as a “Riser” pole to allow the distribution line to go underground.

1. JMEC will designate a second existing pole as a “Riser” pole to allow the distribution line to return to its existing Overhead route.

1. The distance between these two poles will be approximately 1,000 800 feet. At some point along this 1,000 800 foot underground route (location undetermined at this time) there will be a junction box installed.

1. The contractor will need to provide and install the conduit and stub ups from the first riser pole to the junction box, and from the junction box to the second riser pole. The conduit should be 6” schedule 40 PVC. The 90’s should be rigid.

1. The contractor will need to provide and install another conduit and stub ups from the junction box to the new service transformer. The requirements for the conduit and stub ups are the same as above.

1. The contractor will need to provide and install the transformer pad. JMEC will provide to the contractor the specification for this pad.

1. The contractor will need to provide and install the conduit from the transformer secondary to the meter location as designated by the Forest Service’s Engineer.

1. JMEC will provide the cable, junction box, service transformer, meter, miscellaneous materials and connectors, as well as all labor to install this material.