View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL – VOLUME I
100% CONSTRUCTION DOCUMENTS
JEMEZ RANGER DISTRICT OFFICE COMPLEX
FOR
USDA FOREST SERVICE, SOUTHWESTERN REGION
SANTA FE NATIONAL FOREST
JEMEZ SPRINGS RANGER DISTRICT
JULY 1, 2019
PROJECT MANUAL – VOLUME I
100% CONSTRUCTION DOCUMENTS
JEMEZ RANGER DISTRICT OFFICE COMPLEX
FOR
USDA FOREST SERVICE, SOUTHWESTERN REGION
SANTA FE NATIONAL FOREST
JEMEZ SPRINGS RANGER DISTRICT
JVA, Inc.
1319 Spruce Street Boulder, CO 80302 phone: 303-444-1951
JVA Project No. 2339.15.1c
JULY 1, 2019
JEMEZ DISTRICT OFFICE i
TABLE OF CONTENTS
PROJECT MANUAL
100% CONSTRUCTION DOCUMENTS
TABLE OF CONTENTS
JEMEZ RANGER DISTRICT OFFICE COMPLEX
USDA FOREST SERVICE SOUTHWESTERN REGION
JEMEZ SPRINGS RANGER DISTRICT
DIVISION 0 – PROCUREMENT AND CONTRACTING REQUIREMENTS
000107 Seals Page
000115 List of Drawing Sheets
003126 Existing Hazardous Material Information
003132 Geotechnical Data
DIVISION 1 – GENERAL REQUIREMENTS
010250 Definition of Items and Measurement and Payment
011000 Summary of Work
011400 Work Restrictions
011500 Hazardous Materials Requirements
011700 Accident Prevention
012500 Utility Company Coordination
013100 Project Management and Coordination
013300 Submittal Procedures
014000 Quality Requirements
014130 Contractor’s Quality Control
014200 References and Standards
014500 Construction Indoor Air Quality Management
015000 Temporary Facilities and Control
015639 Temporary Tree and Plant Protection
016000 Product Requirements
JEMEZ DISTRICT OFFICE ii
017300 Execution Requirements
017419 Construction Waste Management and Disposal
017700 Closeout Procedures
017823 Operation and Maintenance Data
017900 Demonstration and Training
018109 Testing For Indoor Air Quality Testing
018113 Sustainable Design Requirements – Green Globes
019113 General Commissioning Requirements
DIVISION 2 – EXISTING CONDITIONS
024100 Demolition
028213 Asbestos Abatement
DIVISION 3 – CONCRETE
032000 Concrete Reinforcement
033000 Cast-In-Place Concrete
033511 Concrete Floor Finishes
DIVISION 4 – MASONRY
042200 Concrete Unit Masonry
DIVISION 5 – METALS
051200 Structural Steel Framing
054300 Slotted Channel Framing
055000 Metal Fabrications
055100 Metal Stairs
057300 Decorative Metal Railings
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry
JEMEZ DISTRICT OFFICE iii
062000 Finish Carpentry
064100 Architectural Wood Casework
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
071113 Bituminous Dampproofing
071300 Sheet Water Proofing
071400 Fluid Applied Waterproofing
071900 Water Repellant & Graffiti Coatings
072100 Thermal Insulation
072116 Insulated Sheathing
072500 Weather Barriers
074113 Metal Roof Panels
074213 Metal Wall Panels
075423 Thermoplastic-Polyolefin Roofing (TPO)
076200 Sheet Metal Flashing and Trim
077200 Roof Accessories
078400 Firestopping
079200 Joint Sealants
DIVISION 8 – OPENINGS
081113 Hollow Metal Doors and Frames
081416 Flush Wood Doors
083100 Access Doors and Panels
083613 Overhead Sectional Doors
084313 Aluminum Framed Storefronts and Curtainwall
087100 Door Hardware
088000 Glazing
DIVISION 9 – FINISHES
090561 Flooring Preparation
JEMEZ DISTRICT OFFICE iv
092116 Gypsum Board Assemblies
092236 Metal Lath
092400 Cement Plastering
093000 Tiling
095100 Suspended Acoustic Ceilings
096500 Resilient Flooring
096813 Tile Carpeting
097200 Wall Coverings
097733 Fiber Glass Reinforced Plastic (FRP) Panels
099113 Exterior Painting
099123 Interior Painting
DIVISION 10 – SPECIALTIES
101101 Visual Display Boards
101400 Signage
101470 Environmental Graphics
102113 Metal Toilet Compartments
102226 Folding Panel Partitions
102601 Manufactured Wall and Corner Guards
102800 Toilet, Bath, and Laundry Accessories
104116 Emergency Key Boxes
104400 Fire Protection Specialties
DIVISION 11 – Equipment
115213 Projection Screens
DIVISION 12 – FURNISHINGS
122400 Window Shades
123600 Countertops
JEMEZ DISTRICT OFFICE v
DIVISION 13 – SPECIAL CONSTRUCTION
133419 Metal Building Systems Structural Criteria
DIVISION 14 – CONVEYING EQUIPMENT
142100 Electric Traction Elevators
DIVISION 22 – PLUMBING
220500 Common Work Results for Plumbing
220513 Common Motor Requirements for Plumbing Equipment
220517 Sleeves and Sleeve Seals for Plumbing Piping
220518 Escutcheons for Plumbing Piping
220523 General-Duty Valves for Plumbing Piping
220529 Hangers and Supports for Plumbing Piping and Equipment
220553 Identification for Plumbing Piping and Equipment
220719 Plumbing Piping Insulation
220800 Commissioning of Plumbing
221116 Domestic Water Piping
221119 Domestic Water Piping Specialties
221123 Inline, Domestic-Water Pumps
221316 Sanitary Waste and Vent Piping
221319 Sanitary Waste Piping Specialties
223300 Electric, Domestic-Water Heaters
223400 Fuel-Fired, Domestic-Water Heaters
224100 Plumbing Fixtures
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230500 Common Work Results for HVAC
230513 Common Motor Requirements for HVAC Equipment
230517 Sleeves and Sleeve Seals for HVAC Piping
JEMEZ DISTRICT OFFICE vi
230519 Meters and Gages for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment
230553 Identification for HVAC Piping and Equipment
230593 Testing, Adjusting, And Balancing for HVAC
230713 Duct Insulation
230719 HVAC Piping Insulation
230800 Commissioning of HVAC
230923 Direct Digital Control (DDC) System for HVAC
230923.11 Control Valves
230923.12 Control Dampers
230923.14 Flow Instruments
230923.18 Leak Detection Instruments
230923.23 Pressure Instruments
230923.27 Temperature Instruments
231126 Facility Liquefied-Petroleum Gas Piping
232113 Hydronic Piping
232116 Hydronic Piping Specialties
232123 Hydronic Pumps
232300 Refrigerant Piping
232513 Water Treatment for Closed-Loop Hydronic Systems
233113 Metal Ducts
233300 Air Duct Accessories
233346 Flexible Ducts
233423 HVAC Power Ventilators
233600 Air Terminal Units
233713 Diffusers, Registers, and Grilles
235123 Gas Vents
235216 Condensing Boilers
235416.13 Gas-Fired Furnaces
JEMEZ DISTRICT OFFICE vii
235523.13 Low-Intensity, Gas-Fired, Radiant Heaters
237416.13 Packaged, Large-Capacity, Rooftop Air-Conditioning Units
238126 Split-System Air-Conditioners
DIVISION 26 – ELECTRICAL
260500 Common Work Results for Electrical
260519 Low-Voltage Electrical Power Conductors and Cables
260526 Grounding and Bonding for Electrical Systems
260529 Hangers and Supports for Electrical Systems
260533 Raceway and Boxes for Electrical Systems
260553 Identification for Electrical Systems
260800 Electrical Commissioning
260923 Lighting Control Devices
260943 Network Lighting Controls
262416 Panelboards
262726 Wiring Devices
262813 Fuses
264113 Lightning Protection for Structures
265100 Lighting Fixtures
270000 Telecommunications
281300 Access Control
281500 Intrusion Detection System
282300 Video Surveillance
283111 Digital, Addressable Fire-Alarm System
DIVISION 31 – EARTHWORK
312000 Earthwork
312500 Erosion and Sedimentation Control
313250 Watering
JEMEZ DISTRICT OFFICE viii
DIVISION 32 – EXTERIOR IMPROVEMENTS
321200 Flexible Paving
321300 Rigid Paving
321540 Crushed Stone Surfacing
323113 Chain Link Fences and Gates
323300 Site Furnishings
329113 Soil Preparation
329119.13 Topsoil Placement
329219 Seeding
329300 Plants
DIVISION 33 – UTILITIES
331000 Water Utilities
331300 Disinfection of Water Systems
333300 Sanitary Sewerage System
334000 Storm Drainage Systems
LIST OF APPENDICES
Appendix A – Asbestos Inspection Report, 1992, M&E Engineering, Inc.
Appendix B – Investigation of Suspect Asbestos Containing Materials, 2019, ACME
Appendix C – Preliminary Geotechnical Evaluation, 2010, Ninyo and Moore
Appendix D – Geotechnical Engineering Study, 2019, Kumar and Associates
JEMEZ DISTRICT OFFICE 000107-1
SEALS PAGE
SECTION 000107
SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. CIVIL ENGINEER:
Professional Certification. I hereby certify that these documents were prepared or approved by me and that I am a duly registered Professional Engineer.
License No.___________________
Expiration Date: _______________
JVA, Inc.
17769
12/31/2019
JEMEZ DISTRICT OFFICE 000107-2
B. LANDSCAPE ARCHITECT:
Professional Certification. I hereby certify that these documents were prepared or approved by me and that I am a duly registered Landscape Architect.
License No.___________________
Expiration Date: _______________
DHM Design
06/30/2020
JEMEZ DISTRICT OFFICE 000107-3
C. STRUCTURAL ENGINEER:
JVA, Inc.
17769
JEMEZ DISTRICT OFFICE 000107-5
E. MECHANICAL ENGINEER:
360 Engineering, Inc.
19486
12/31/2020
JEMEZ DISTRICT OFFICE 000107-6
F. PLUMBING ENGINEER:
360 Engineering, Inc.
19486
12/31/2020
JEMEZ DISTRICT OFFICE 000107-7
G. ELECTRICAL ENGINEER:
AE Design
END OF SECTION 000107
07/01/2019
18655
JEMEZ DISTRICT OFFICE 000107-8
THIS PAGE INTENTIONALLY LEFT BLANK
JEMEZ DISTRICT OFFICE 000115-1
LIST OF DRAWING SHEETS
SECTION 000115
LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
A. Drawings consist of the Contract Drawings, dated 07/01/2019, within the separately bound drawing set titled Jemez Ranger District Office Complex Phase Two.
B. List of Drawings:
G0-0 Cover G0-1 Sheet Index G0-2 G0-3
Sheet Index Sheet IndexG0-3 Sheet Index
G0-4
Company Contact Information C0-1
C C
General Notes C0-2 Legends C0-3
CC0-5
Abbreviations
C0-4 Demolition Notes and Legend C0-5 Overall Demolition Plan C0-6 Demolition Plan C0-7 Demolition Plan C0-8 Demolition Plan C0-9 Demolition Plan C0-10 Demolition Plan C0-11 Demolition Plan CE1-0 Overall Erosion Control Plan CE1-1 Detailed Erosion Control Plan CE1-2 Detailed Erosion Control Plan CE1-3 Detailed Erosion Control Plan CE1-4 Detailed Erosion Control Plan CE1-5 Detailed Erosion Control Plan CE1-6 Detailed Erosion Control Plan C1-0 Overall Grading and Drainage Plan C1-1 Detailed Grading and Drainage Plan C1-2 Detailed Grading and Drainage Plan C1-3 Detailed Grading and Drainage Plan C1-4 Detailed Grading and Drainage Plan C1-5 Detailed Grading and Drainage Plan C1-6 Detailed Grading and Drainage Plan C1-7 Drive Centerline Plan C1-8 Drive Centerline Profile C1-9 Drive Centerline Profile
JEMEZ DISTRICT OFFICE 000115-2
C1-10 Drive Centerline Profile CD1-0 Grading and Drainage Details CD1-1 Grading and Drainage Details CD1-2 Grading and Drainage Details CD1-3 Grading and Drainage Details CD1-4 Grading and Drainage Details CD1-5 Grading and Drainage Details CD1-6 Grading and Drainage Details CD1-7 Grading and Drainage Details CD1-8 Grading and Drainage Details CD1-9 Grading and Drainage Details CD1-10 Grading and Drainage Details CD1-11 Grading and Drainage Details CD1-12 Grading and Drainage Details CD1-13 Grading and Drainage Details CD1-14 Grading and Drainage Details CD1-15 Grading and Drainage Details CD1-16 Grading and Drainage Details
U2-0 Overall Utility Plan U2-1 Water Plan and Profile U2-2 Water Plan and Profile U2-3 Sanitary Plan and Profile U2-4 Sanitary Plan and Profile
UD2-0 Utility Details UD2-1 Utility Details UD2-2 Utility Details UD2-3 Utility Details C3-0 Overall Horizontal Control Plan C3-1 Detailed Horizontal Control Plan C3-2 Detailed Horizontal Control Plan C3-3 Detailed Horizontal Control Plan C3-4 Detailed Horizontal Control Plan C3-5 Detailed Horizontal Control Plan C3-6 Detailed Horizontal Control Plan C3-7 Line and Curve Tables C3-8 Line and Curve Tables C3-9 Line and Curve Tables C3-10 Line and Curve Tables CD3-0 Site Details CD3-1 Site Details CD3-2 Site Details LS-01 Site Layout Key Map LS-02 Site Layout Plan LS-03 Site Layout Plan LS-04 Site Layout Plan
JEMEZ DISTRICT OFFICE 000115-3
LS-05 Site Layout Plan LS-06 Site Details LS-07 Site Details LS-08 Site Details LS-09 Site Details LP-01 Planting Plan LP-02 Planting Plan Enlargement LP-03 Planting Details LP-04 Planting Details SO0-0 General Notes SO0-1 General Notes/Abbreviations SO1-0 Plan Box Notes and Schedules SO1-1 Foundation Plan SO1-2 Second Floor Framing Plan SO1-5 Roof Framing Plan SO5-1 Concrete Typical Details – Office SO5-2 Concrete Sections – Office SO5-3 Concrete Sections – Office SO5-4 Wood Typical Details – Office SO5-5 Wood Typical Details – Office SO5-6 Wood Sections – Office SO5-7 Wood Sections – Office SF0-0 General Notes – Fire Bldg SF0-1 General Notes Abbreviations – Fire Bldg SF1-0 Foundation Plan – Fire Bldg SF2-0 Roof Framing Plan – Fire Bldg SF3-0 Foundation Details – Fire Bldg SF3-1 Foundation Details – Fire Bldg SW0-0 General Notes – Warehouse SW0-1 General Notes/Abbreviations – Warehouse SW1-0 Foundation Plan – Warehouse SW2-0 Roof Plan – Warehouse SW3-0 Foundation Details - Warehouse SW3-1 Foundation Details - Warehouse AO0-1 Abbreviations, Symbols, And Notes AO0-2 Abbreviations, Symbols, And Notes AO0-3 Abbreviations, Symbols, And Notes AO0-4 Code Analysis AO0-5 First Floor Code Plan AO0-6 Second Floor Code Plan AO0-7 Space Utilization Plan AO0-8 3D Views - For Reference Only AO0-9 Wall Types AO0-11 Floor & Roof Types AO1-1 First Floor Plan
JEMEZ DISTRICT OFFICE 000115-4
AO1-2 Second Floor Plan AO1-3 First Floor Dimension Plan AO1-4 Second Floor Dimension Plan AO1-5 Roof Plan AO2-1 First Floor Reflected Ceiling Plan AO2-2 Second Floor Reflected Ceiling Plan AO3-1 Exterior Elevations AO3-2 Exterior Elevations AO3-3 Exterior Elevations AO3-4 Exterior Elevations AO3-10 Building Sections AO3-11 Building Sections AO3-12 Building Sections AO4-1 Wall Sections AO4-2 Wall Sections AO4-3 Wall Sections AO5-1 Stair 1 Plans and Sections AO5-2 Stair 2 Plans and Sections AO5-3 Stair 1 Details AO5-4 Stair 2 Details AO5-5 Elevator Plans and Details AO5-6 Cane Detection Details AO6-0 Accessory Schedules and Elevations AO6-1 Interior Elevations & Enlarged Plans - Restrooms AO6-2 Interior Elevations & Enlarged Plans AO6-3 Interior Elevations & Enlarged Plans - Front Desk AO6-4 Interior Elevations - First Floor AO6-5 Interior Elevations - Second Floor AO6-6 Interior Elevations - Second Floor AO6-9 General Casework Details AO6-10 General Casework Details AO7-1 Window Types AO7-2 Window Details AO7-3 Door Schedules and Types AO7-5 Plan Details AO7-7 Section Details - Foundation AO7-8 Section Details AO7-9 Section Details - Roof AO7-10 Section Details - Ceiling AO9-0 Interior Finish Notes AO9-1 Interior Finish Legend AO9-2 First Floor Finish Plan AO9-3 Second Floor Finish Plan AO9-4 Interior Details AO9-5 First Floor Carpet Patterns
JEMEZ DISTRICT OFFICE 000115-5
AO9-6 Second Floor Carpet Patterns AF0-1 Abbreviations, Symbols, And Notes AF0-2 Abbreviations, Symbols, And Notes AF0-3 Abbreviations, Symbols, And Notes AF0-4 Code Analysis AF0-5 Wall Types, Roof Types, Floor Types AF1-1 Floor Plan AF1-2 Reflected Ceiling Plan AF1-3 Roof Plan AF3-1 Overall Building Elevations AF3-2 Overall Building Elevations AF3-3 Overall Building Sections AF4-1 Wall Sections AF6-1 Interior Elevations AF7-1 Details AF9-0 Interior Finish Notes AF9-1 First Floor Finish Plan AW0-1 Abbreviations, Symbols, And Notes AW0-2 Abbreviations, Symbols, And Notes AW0-3 Abbreviations, Symbols, And Notes AW0-4 Code Analysis AW0-5 Wall Types, Roof Types, Floor Types AW1-1 Floor Plan AW1-2 Reflected Ceiling Plan AW1-3 Roof Plan AW3-1 Overall Building Elevations AW3-2 Overall Building Elevations AW3-3 Overall Building Sections AW4-1 Wall Sections AW6-1 Interior Elevations AW7-1 Details M0-0 Mechanical Cover Sheet
MO0-1 Mechanical Equipment Schedules MO0-2 Mechanical Equipment Schedules MO0-3 Mechanical Details MO0-4 Mechanical Details MO0-5 Mechanical Details MO0-6 Mechanical Details MO0-7 Mechanical Calculations MO0-8 Mechanical Control Sequences MO0-9 Mechanical Control Sequences MO0-10 Mechanical Control Sequences MO0-11 Controls Points Lists MO0-12 Controls Points Lists MO0-13 Controls Schematic Diagrams
JEMEZ DISTRICT OFFICE 000115-6
MO0-14 Controls Schematic Diagrams MO0-15 Controls Schematic Diagrams MO1-1 Office First Floor Mechanical Plan MO1-2 Office Second Floor Mechanical Plan MO1-3 Office Roof Mechanical Plan MO2-1 Office First Floor Mechanical Piping Plan MO2-2 Office Second Floor Mechanical Piping Plan MF0-1 Mechanical Equipment Schedules MF0-2 Mechanical Details MF0-3 Mechanical Details MF1-1 Fire Building First Floor Mechanical Plan MF1-2 Fire Building Roof Mechanical Plan MW0-1 Mechanical Equipment Schedules MW0-2 Mechanical Details MW1-1 Warehouse Mechanical Plan
P0-0 Plumbing Cover Sheet PO0-1 Plumbing Schedules PO0-2 Plumbing Details PO0-3 Plumbing Details PO0-4 Waste & Vent Isometrics PO1-1 Office First Floor Domestic Water Plan PO1-2 Office Second Floor Domestic Water Plan PO1-3 Office Roof Domestic Water Plan PO2-1 Office First Floor Waste & Vent Plan PO2-2 Office Second Floor Waste & Vent Plan PO2-3 Office Roof Waste & Vent Plan PO3-1 Office First Floor Gas Piping Plan PO3-2 Office Second Floor Gas Piping Plan PO3-3 Office Roof Gas Piping Plan PF0-1 Plumbing Schedules PF0-2 Plumbing Details PF0-3 Plumbing Details PF0-4 Plumbing Isometrics PF1-1 Fire Building Domestic Water Plan PF2-1 Fire Building Waste & Vent Plan PF3-1 Fire Building Gas Piping Plan PW0-1 Plumbing Schedules PW0-2 Plumbing Details PW0-3 Plumbing Isometrics PW1-1 Warehouse Domestic Water Plan PW2-1 Warehouse Waste & Vent Plan E0-0 Electrical Legend E0-1 Electrical General Notes E0-2 Electrical General Notes E0-5 Electrical/Low Voltage Details
JEMEZ DISTRICT OFFICE 000115-7
E0-6 Electrical/Low Voltage Details ES0-1 Electrical Site Plan ES0-2 Electrical Enlarged Site Plan – North Parking Area ES0-3 Electrical Enlarged Site Plan – Office Area ES0-4 Electrical Enlarged Site Plan – Fire Bldg/Warehouse Area ES0-5 Electrical Enlarged Site Plan – South Parking Area ES3-0 Electrical Site One-Line Diagram ES4-2 Electrical Exterior Lighting Schedules ES6-0 Electrical Site Energy Compliance ES6-1 Electrical Site Energy Compliance ES6-2 Electrical Site Energy Compliance EO1-1 Office First Floor Electrical Power Plan EO1-2 Office Second Floor Electrical Power Plan EO2-1 Office First Floor Electrical Lighting Plan EO2-2 Office Second Floor Electrical Lighting Plan EO3-0 Office Electrical One-Line Diagram EO4-0 Office Electrical Schedules and Details EO4-1 Office Electrical Schedules and Details EO4-2 Office Electrical Schedules and Details EO4-3 Office Electrical Schedules and Details EO6-0 Office Energy Compliance EO6-1 Office Energy Compliance EO6-2 Office Energy Compliance EO6-3 Office Energy Compliance EF1-0 Fire Electrical Power Plan EF2-0 Fire Electrical Lighting Plan EF3-0 Fire Electrical One-Line Diagram EF4-0 Fire Electrical Schedules and Details EF4-1 Fire Electrical Schedules and Details EF6-0 Fire Energy Compliance EF6-1 Fire Energy Compliance EF6-2 Fire Energy Compliance EF6-3 Fire Energy Compliance EW1-0 Warehouse Electrical Power Plan EW2-0 Warehouse Electrical Lighting Plan EW3-0 Warehouse Electrical One-Line Diagram EW4-0 Warehouse Electrical Schedules and Details EW6-0 Warehouse Energy Compliance EW6-1 Warehouse Energy Compliance EW6-2 Warehouse Energy Compliance EW6-3 Warehouse Energy Compliance
JEMEZ DISTRICT OFFICE 000115-8
END OF SECTION 000115
JEMEZ DISTRICT OFFICE 003126-1
EXISTING HAZARDOUS MATERIAL INFORMATION
SECTION 003126
EXISTING HAZARDOUS MATERIAL INFORMATION
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Section with its referenced attachments is part of the Procurement and Contracting Requirements for the Project. They provide government's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. An existing Asbestos Inspection Report for the Project, prepared by M&E Engineering, Inc., dated January 30, 1992, is appended at the end of the specifications as Appendix A.
C. An existing Investigation of Suspect Asbestos Containing Materials for the Project, prepared by ACME Environmental, dated February 14, 2019, is appended at the end of the specifications as Appendix B.
END OF SECTION 003126
JEMEZ DISTRICT OFFICE 003126-2
EXISTING HAZARDOUS MATERIAL INFORMATION
JEMEZ DISTRICT OFFICE 003132-1
GEOTECHNICAL DATA
SECTION 003132
GEOTECHNICAL DATA
1.1 GEOTECHNICAL DATA
A. This Section with its referenced attachments is part of the Procurement and Contracting Requirements for the Project. They provide government's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. A Preliminary Geotechnical Evaluation, prepared by Ninyo and Moore, dated February 5, 2010, is appended to the end of the specifications as Appendix C.
C. A Geotechnical Engineer Study for the Project, prepared by Kumar and Associates, dated February 4, 2019, is appended at the end of the specifications as Appendix D.
END OF SECTION 003132
JEMEZ DISTRICT OFFICE 003132-2
GEOTECHNICAL DATA
JEMEZ DISTRICT OFFICE 010125-1
DEFINITION OF ITEMS
& MEASUREMENT AND PAYMENT
SECTION 010250
DEFINITION OF ITEMS AND MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general; what is and what is not included in an item; the limits or cut-off points where one item ends and another begins; and method of measurements and basis of payment for work items listed in the Schedule of Items.
B. Work:
1. Furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project or any portion of it, and carrying out all duties and obligations imposed by the contract on the Contractor.
2. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, as shown on the drawings, and as staked in the field.
3. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.
1.2 DETERMINATION OF QUANTITIES
A. Each pay item listed in the schedule of items will be paid as a lump sum item.
Therefore measurement of individual work items will not be necessary for final payment. The contractor can measure items in order to verify they match what is in the contract, and for verification of percentage of completed work for progress payments.
B. Quantity Measurements:
1. The contractor may compute the quantities for periodic progress payments.
2. All Contractor measurements are subject to verification.
PART 2 - METHOD OF MEASUREMENT
2.1 GENERAL
The method of measurement “Lump Sum Quantities (LSQ) will be used for determining final payment designated on the Schedule of Items for each pay item:
JEMEZ DISTRICT OFFICE 010125-2
& MEASUREMENT AND PAYMENT
A. LUMP SUM QUANTITIES (LSQ)
1. These quantities denote one complete unit of work as required by or described in the contract, including all materials, equipment, labor, & incidentals to complete the job as described in the drawings and specifications. They shall be measured complete and in-place.
PART 3 – DEFINITION OF ITEMS & PAYMENT
3.1 SCHEDULE OF ITEMS
A. The project Schedule of Items includes several sections to organize the items into Base Items and Optional Items. When a pay item is described as a Base Item, the description will be the same when that item or a similar item is included as an Optional Item. Contractor shall provide item pricing for all items listed in the Schedule of Items. Contract award will be made for all Base Items. Those items listed as Optional Items will be awarded based on available project funding. The Optional Items may be awarded in any order and in any combination.
B. BASE ITEMS – The physical limits of the work in each of the base items are as follows: The east limit will be the uphill side of the retaining wall east of the entrance road. The north limit will be gate #1. Exceptions to these limits will be: water, sewer, electrical, propane, and data underground utilities to the fire building and warehouse.
Other exceptions are the 3’X5’ box culvert on the way to the north parking lot, channel improvements, and concrete flatwork and other site work around the new office building. For each item listed, work items include, but are not limited to the items described.
1. Base Item #1: Mobilization, Site & Building Demolition, Office Construction, Sampling, Testing, Quality Control, Surveying, & Staking, As-Builts.
a. Measurement: This item is measured as a lump sum quantity.
b. Mobilization would include movement of personnel, equipment, supplies and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site; Also includes all Contractor sampling, testing, quality control, construction surveying, staking, and as-builts for all Base Items.
c. Site & Building Demolition would include clearing and grubbing brush, landscaping, trees; excavation and placement; grading; hauling/disposal of excess fill material; removal of concrete sidewalks & stairs; removal of concrete flatwork; removal of asphalt roadways and parking lots; removal of a 2,450 sq. ft. office; removal of a 1,600 ft. office; and removal of other site
JEMEZ DISTRICT OFFICE 010125-3
& MEASUREMENT AND PAYMENT
furnishings. Item also includes preparing and complying with EPA NPDES Stormwater Permit (In New Mexico, EPA is the permitting authority); and installation and maintenance of temporary erosion and sedimentation controls for the duration of the contract.
d. Office Construction includes construction of a new 8,320 sq. ft. stud wall two-story office building beginning with site prep, foundation, utilities, site work, etc. through completion of the building.
e. Pay item also includes commissioning and all work necessary for construction of office building to meet Green Globes requirements as outlined in Division 1 Section “Sustainable Design Requirements for Green Globes”.
2. Base Item #2: Site Improvements, Site Grading, & Underground Utilities
a. Measurement: This item is measured as a lump sum quantity.
b. Site Improvements & Site Grading includes excavation and placement for site work and drainages; excavation, importing, hauling and placement of backfill; hauling & placement of aggregate; hauling/disposal of excess fill material; construction of retaining walls; and concrete flat work in front of and behind office. Aggregate surface roadway and parking lot from site entrance to gate #1. Includes overhead parking lighting for parking area from site entrance to gate #1. Also includes 3’x5’ box culvert near proposed north parking lot, as well as all channel improvements and water retention pond.
The east limit of the site work in the Base Items is the uphill edge of the retaining wall on the east side of the entrance. The north limit is gate #1, with the exception of the box culvert, channel improvements, and grading & concrete flatwork around the office.
c. Installing underground domestic water lines includes but is not limited to installing domestic waterlines and meters and connecting to the Village of Jemez Springs water main. Work includes a corporation stop, meter, remote meter readout, and meter vault. Includes excavation, bedding, backfill, compaction, cleaning, disinfection, backflow prevention, and testing.
Includes water lines servicing the new office, fire building, and warehouse, and tying to the existing water line to the house. Also includes decommissioning of existing water lines.
d. Installing sewer lines includes, but is not limited to installing new lines, cleanouts, and manholes. Also re-locating and re-using an existing manhole and connecting to an existing sewer service. Work also includes excavation, bedding, backfill, compaction, cleaning, testing, removal, hauling, and disposal. Includes sewer lines servicing the new office, fire building, and warehouse, and tying to the existing sewer line to the house. Also includes decommissioning of existing sewer lines.
JEMEZ DISTRICT OFFICE 010125-4
& MEASUREMENT AND PAYMENT
e. Installing electrical service includes, but is not limited to excavation, bedding, backfill, and compaction for electrical service throughout the site.
Electrical work includes underground wiring and conduit from the meter to the office, fire building, and warehouse. Work also includes system grounding. Note: replacement of the transformer and meter, installation of conduit and electrical lines from the transformer to the meter, will be installed under a separate contract and are not part of this contract; however, coordination between the Contractor and the utility company is part of this contract. Also includes decommissioning of existing electrical lines.
f. Installing propane service includes, but is not limited to excavation, bedding, gas line, backfill, and compaction for propane service from the new proposed propane tank location to the office, fire building, and warehouse. Also includes remove of existing propane lines, valves, and tanks.
g. Also includes mobilization, quality control, staking and as-builts for this pay item.
C. OPTIONAL ITEMS – The following are optional items for consideration in a price proposal and included at contract award only if found to be in the Government best interest and if funds are available. Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interest, the Government will evaluate offers for award Purpose by adding the total price for all options to the total price for the Requirements. Evaluation of options will not obligate the Government to exercise the options. Any reference to optional items in the specifications or project plans are a reference to optional items in the Schedule of Items. The physical limits of the work of each of the optional items will be described in each item. Optional items can be awarded at any time during the life of the contract.
1. Optional Item #3: Demolition of Warehouse, South Storage Sheds, and Parking Lot; Site work and Construction of Fire Building.
a. Measurement: This item is measured as a lump sum quantity.
b. Demolition includes clearing and grubbing brush, landscaping, trees;
excavation and placement; grading; hauling/disposal of excess fill material;
removal of concrete sidewalks; removal of concrete flatwork; removal of asphalt roadway north of gate 1 to the warehouse; removal of the parking lot south of the warehouse; removal of a 2,900 sq. ft. warehouse; and removal of other site furnishings. Item also includes preparing and complying with EPA NPDES Stormwater Permit (In New Mexico, EPA is the permitting authority); and installation and maintenance of temporary erosion and sedimentation controls for the duration of the contract.
c. Fire Building Construction and Site Work includes construction of a new 3,475 sq. ft. fire building beginning with site prep, foundation, utilities, site work, etc. through completion of the building. Includes construction of
JEMEZ DISTRICT OFFICE 010125-5
& MEASUREMENT AND PAYMENT
gravel road from gate #1 to just beyond 4 parking spots north of office.
Includes 4 parking spots. Includes concrete trash pad. Includes new parking lot at Fire Building are Warehouse, as well as gates and fencing around parking lot. Includes concrete pan, storm drain, and culvert replacement under road to residence. Includes overhead parking lighting for Fire Building parking lot.
d. Also includes mobilization, quality control, staking and as-builts for this pay item.
2. Optional Item #4: Demolition of 12 Storage Buildings and Construction of Warehouse and Site Work
a. Measurement: This item is measured as a lump sum quantity.
b. Clearing and grubbing brush, landscaping, trees; excavation and placement;
grading; hauling/disposal of excess fill material; removal of concrete sidewalks & stairs; removal of concrete flatwork; removal of 12 approx. 150
sq. ft. storage sheds; and removal of other site furnishings. Item also includes preparing and complying with EPA NPDES Stormwater Permit (In New Mexico, EPA is the permitting authority); and installation and maintenance of temporary erosion and sedimentation controls for the duration of the contract.
c. Construction of a new 2,900 sq. ft. warehouse building beginning from site prep, foundation, utilities, site work, etc. through completion of the building.
Includes retaining wall between warehouse and upper parking lot.
d. Also includes mobilization, quality control, staking and as-builts for this pay item.
3. Optional Item #5: Asphalt Paving for Entry Road, Parking, & Office
a. Measurement: This item is measured as a lump sum quantity.
b. Asphalt paving for roadway from entrance to gate #1. Also includes asphalt paving of parking lots on both sides of entry road and in front of office.
c. Also includes mobilization, quality control, staking and as-builts for this pay item.
4. Optional Item #6: Asphalt Paving for Fire Building & Warehouse
a. Measurement: This item is measured as a lump sum quantity.
b. Asphalt paving for roadway from gate #1 to just north of 4 parking spots north of office. Includes asphalt paving of 4 parking spots and asphalt paving of parking lot for fire building and warehouse.
c. Also includes mobilization, quality control, staking and as-builts for this pay item.
5. Optional Item #7: Construct North Gravel Parking Lot
a. Measurement: This item is measured as a lump sum quantity.
JEMEZ DISTRICT OFFICE 010125-6
& MEASUREMENT AND PAYMENT
b. Construction of north gravel parking lot. Includes a gate to access the acequia. Includes overhead parking lighting.
c. Also includes mobilization, quality control, staking and as-builts for this pay item.
6. Optional Item #8: Upper East Gravel Parking Lot
a. Measurement: This item is measured as a lump sum quantity.
b. Construction of a gravel road from north of the 4 parking spots up to and including the upper east parking lot; Includes gate and fencing around upper east parking lot; Includes demolition of 2 storage sheds in upper parking lot.
Includes overhead parking lighting.
c. Also includes mobilization, quality control, staking and as-builts for this pay item.
7. Optional Item #9: Landscaping
a. Measurement: This item is measured as a lump sum quantity.
b. Installing soil prep, topsoil placement, and landscaping, including seeding and planting.
c. Also includes mobilization, quality control, staking and as-builts for this pay item.
8. Optional Item #10: Lightning Protection System for Office
a. Measurement: This item is measured as a lump sum quantity.
b. Design & Installation of a lightning protection system for the office building.
c. Also includes mobilization, quality control, staking and as-builts for this pay item.
9. Optional Item #11: Install Polished Concrete Floor In Lieu of Finished Concrete in VIS Area
a. Measurement: This item is measured as a lump sum quantity.
b. Installation of a polished concrete floor rather than the regular stained and sealed concrete floor as shown in the base. This item also includes the deletion of the stained and sealed floor.
D. METHOD OF PAYMENT
1. Monthly payment shall be made on the Contractor’s estimate of work completed by their submission of an original letter invoice containing the signature of a person authorized to sign on behalf of the company. The following information will be presented on each invoice:
a. Name and address of the Contractor
JEMEZ DISTRICT OFFICE 010125-7
& MEASUREMENT AND PAYMENT
b. Invoice date and invoice number (Contractors should be encouraged to use unique invoice numbers to facilitate processing in IAS) Use the same invoice in the IPP System
c. Contract/order number
d. Pay Item, percentage of completion, and extended price
e. Name and address of contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment)
f. Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice
g. Taxpayer Identification Number (TIN) or D-U-N-S+4 (optional but highly recommended)
2. Along with the invoice, the contractor shall submit contractor and subcontractor payrolls.
3. In accordance with Prompt Payment clauses, once the invoice is reviewed and approved by the Contracting Officer, the contractor will submit the invoice through the Federal Invoice Processing Platform (IPP). If the invoice does not contain the information required, the invoice will be rejected back to the Contractor within five
(5) days after receipt, with the reasons why it is not a proper invoice. The Contractor must correct and resubmit the invoice through IPP where it will be processed.
4. A final payment will be made only after receipt of a fully executed Release of Claims and all deliverables.
END OF SECTION 010250
JEMEZ DISTRICT OFFICE 010125-8
& MEASUREMENT AND PAYMENT
THIS PAGE IS INTENTIONALLY LEFT BLANK
JEMEZ DISTRICT OFFICE 011000-1
SUMMARY OF WORK
SECTION 011000
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, freight and delivery, and all necessary valid licenses and permits required to demolish two existing offices, a warehouse, and a dozen storage buildings, and construct an office, fire building, and warehouse, along with associated utilities, site work, driveways, parking, fencing, landscaping, and miscellaneous items.
B. Work to construct the new facilities includes the following:
1. Demolition and removal of exterior improvements including buildings, landscaping, asphalt, concrete, trees, buildings, utilities, fences, and miscellaneous site features. The 3 larger buildings to be demolished include a 2,450 sq. ft. office, a 1,600 sq. ft. office, and a 2,900 sq. ft. office/warehouse. The 12 smaller storage buildings average about 150 sq. ft. each.
2. Excavation and earthmoving including trenching and backfilling for utilities.
3. Aggregate base for foundations, roads, and parking lots.
4. Asphalt roads and parking lots.
5. Concrete for foundations, flatwork and other miscellaneous concrete items.
6. Surface and subsurface drainage systems.
7. Water, sewer, and propane lines and service.
8. Electrical, telephone, and fiber optic service.
9. Coordination with utility companies.
10. Site improvements including grading, erosion control, and aggregate surfaces.
11. Construction of a 8,320 square foot office (Main Level: 4,534, 2nd Level: 3,786).
12. Construction of a 3,475 square foot fire building.
13. Construction of a 2,900 square foot warehouse.
14. Building systems including plumbing, electrical, HVAC, security, and IT infrastructure.
1.2 SUSTAINABILITY
A. The project has been designed to achieve 2 Green Globes and to meet Federal Guiding Principles. Refer to other Division 1 specification section for more information.
1.3 SEQUENCE OF WORK
A. Work shall be performed in order determined by the Contractor.
1.4 LOCATION
JEMEZ DISTRICT OFFICE 011000-2
A. This project is located at the Jemez Ranger District Office of the Santa Fe National Forest. The address is 51 Woodsy Lane, Jemez Springs, NM 87025. (575-829- 3535).
1.5 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of the site is 6,300 ft. In the winter, the site can experience some snowfall, although it is usually fairly dry in the winter and spring. Winter low temperatures are usually in the teens, and can get as low as 0°F, but rarely below that.
In the summer, average high temperatures are in the 80’s with occasional 90’s, and feature frequent afternoon thunderstorms during the monsoon season of July through September.
B. Soil testing has been performed and the geotechnical report and is included an an Appendix. Rocks and debris at the ground surface are evident throughout the area.
The Contractor should expect to encounter such rock and debris during excavation and grubbing operations. Blasting of rocks will not be permitted without special permission. Disposal of debris shall be in the nearest sanitary landfill.
C. In-depth water table surveys have not been performed; however, if water is encountered during excavation, the Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property.
1.6 USE OF PREMISES
A. General: Contractor shall have full use of premises for construction operations as indicated on drawings by “Limits of Construction”, with the exception of the acequia, which must remain open and available at all times for the access for the East/West Sandoval Acequia Commissioner. The Commissioner must be able to access the acequia through the site at all times during the duration of the contract. There may be times when the Commissioner and/or his workers will need to bring in heavy equipment in order to make repairs or improvements to the acequia. The current Commissioner is Gilbert Sandoval, ph: 575.829.3882. Provide a set of keys to the Comissioner in order for him to access the site.
B. Use of Site: Limit use of premises to areas within the Limits of construction indicated.
Do not disturb portions of Project site beyond areas in which the Work is indicated.
1.7 CONTRACTOR’S RESPONSIBILITIES
A. Confine storage of materials to areas as approved by the CO.
B. Contractor shall provie adequate barricades and warnings to protect the public from entering the site. Contractor shall provide a sign, mounted on the barricades, that includes the following:
1. Name of Project.
JEMEZ DISTRICT OFFICE 011000-3
2. Name of Contractor.
3. Point of contact name and phone number for Contractor in case of an emergency.
4. Name of Government (Jemez Ranger District, Santa Fe NF).
5. Point of contact name and phone number for Government in case of an emergency.
6. Address of Government’s temporary location during construction.
C. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect employees and Government inspectors during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
D. Preservation of Natural Features: Confines all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval.
Consult with CO and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
E. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.
1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.
3. See Division 01 Section, “Utility Company Coordination” for coordinating work with the utility companies.
4. Contractor shall call NM811 before any excavation activities (1-800-321-2537).
1.8 MEALS AND LODGING
A. Meals and lodging are limited in Jemez Springs, with less than half dozen restaurants, and even less choices for lodging. There are no RV parks. The Village of Jemez Springs has a website that gives more information at http://www.jemezsprings.org/.
The town of Bernalillo, 50 miles to the south, is a full service community.
B. Meals or lodging will not be available at Forest Service facilities.
1.9 CAMPING
http://www.jemezsprings.org/
JEMEZ DISTRICT OFFICE 011000-4
A. With approval by the Jemez Ranger District, National Forest Service lands may be used by the Contractor to have one fully contained recreation vehicle which may remain at this site for security.
B. With approval from the District Ranger, the existing residence may be used by the contractor as either storage, a job trailer, or housing.
1.10 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.11 PERMITS
A. Special permits for electrical work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.
B. State Electrical inspection is required for this project. Obtain a permit if it is required to do the inspection.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 011000
JEMEZ DISTRICT OFFICE 011400-1
WORK RESTRICTIONS
SECTION 011400
WORK RESTRICTIONS
PART 1-GENERAL
1.1 USE OF PREMISES
A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to immediate area of work.
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.
1.2 WORK RESTRICTIONS
A. Nonsmoking Building: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
B. Sanitary Facilities: A vault toilet on site will remain throughout and after construction and is available for contractors’ use. Contractor shall keep it clean through regular cleanings.
C. Overnight camping on the Site will be allowed with permission and restrictions spelled out from the District Ranger.
1.3 CONTRACTOR’S RESPONSIBILITIES
A. The Contracting Officer will designate areas on the site for material storage. Confine storage of materials to areas as approved by the CO.
B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.
PART 2- PRODUCTS (NOT USED)
PART 3- EXECUTION (NOT USED)
END OF SECTION 011400
JEMEZ DISTRICT OFFICE 011400-2
WORK RESTRICTIONS
JEMEZ DISTRICT OFFICE 011500-1
HAZARDOUS MATERIALS REQUIREMENTS
SECTION 011500
HAZARDOUS MATERIALS REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the Contractual Documents and other Division 1 – 33 specifications sections, apply to work of this section.
1.2 SUMMARY
A. Section Includes: General administrative requirements and procedures for Hazardous Communication Program, as well as removal requirements for existing known hazardous materials at the site.
B. Related Sections: Division 1 - Section ‘Summary of Work”.
1.3 SUBMITTALS
A. Material Safety Data Sheets (MSDS): Copies of all material safety data sheets for all applicable products, including but not limited to: paints, adhesives, mastics, solvents and finishes, etc. shall be retained on site by the Contractor for all applicable products used during the construction and/or remodeling work. Furnish copies of all MSDS’s to the Government upon request and include in the Project Record Document submittal.
B. Certification: Submit written certification that no asbestos-containing materials have been used or incorporated in the new Work. Submit prior to Final Completion.
1.4 PROJECT/SITE CONDITIONS
A. Hazard Communication Requirements:
1. Contractor is responsible for compliance with mandatory federal rules and regulations concerning Hazardous Communication, specifically for those regulations contained in 29 CFR 1910.1200 Hazard Communication.
2. Contractor working at sites under the control of the Government shall make available to the CO, upon request, copies of the Hazard Communication Program used by their firm. In addition to this requirement, all regulations to Multi-employer workplaces shall be adhered to. These regulations are found in 29 CFR 1910.1200, (e) (2) (i) through (e) (4) specifically:
a. (e) (2) Multi-employer workplaces. Employers who produce, use or store hazardous chemicals at a workplace in such a way that employees of other employer(s) may be exposed (for example, employees of a construction contractor working on a site shall additionally ensure that the hazard communication programs developed and implemented under paragraph (e) include the following:
JEMEZ DISTRICT OFFICE 011500-2
HAZARDOUS MATERIALS REQUIREMENTS
1) (3) (2) (i) The methods the employer will use to provide the other employer(s) with a copy of the material safety data sheet, or to make it available at a central location in the workplace, for each hazardous chemical the other employer(s)’ employees may be exposed to while working;
2) (e) (2) (ii) The methods the employer will use to inform the other employer(s) of any precautionary measures that need to be taken to protect employees during the workplace’s normal operating conditions and in foreseeable emergencies; and,
3) (e) (2) (iii) The methods the employer will use to inform the other employer(s) of the labeling system used in the workplace.
b. (e) (3) the employer may rely on an existing hazard communication program to comply with these requirements, provided that it meets the criteria established in this paragraph (e)
c. (e) (4) The employer shall make written hazard communication program available, upon request, to employees, their designated representatives, the Assistant Secretary and the Director, in accordance with the requirements of 29 CFR 1910.1200 (e).
3. The referenced regulations were excerpted from 29 CFR 1910.1200. This excerpt shall not be relied upon for compliance with mandatory federal, state and local regulations. The Contractor shall comply with all such regulations and shall be solely liable for insuring that all requirements under applicable regulations are met.
PART 2 – PRODUCTS – (NOT APPLICABLE)
PART 3 – EXECUTION
3.1 ASBESTOS & LEAD-BASED PAINT ABATEMENT:
A. The existing at this site contain both asbestos and Lead-Based Paint. An Asbestos & Lead-Based Paint inspection report is available to the contractor. During demolition, the contractor shall remove and dispose of asbestos containing materials & lead-based paint using according to the National Emission Standards for Hazardous Air…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.