1 - SABER SOW 25 Sep 25.pdf

PDF 2 MB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a Statement of Work (SOW) for the Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for Nellis Air Force Base, Creech Air Force Base, Range 63, Point Bravo, and the Nevada Test and Training Range. The contract will support design and construction projects with a maximum ceiling of $185 million over five years, with individual task orders ranging from $15,000 to $4,000,000. Projects will encompass a broad range of construction and maintenance activities including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, fire protection, concrete work, and other infrastructure improvements.

The solicitation (FA486125R0003) is a competitive HUBZone procurement limited to qualified small businesses, with a proposal due date of 11 November 2025. The contract requires contractors to have in-house design capabilities or ready access to design services for infrastructure alterations and repairs. The 99th Contracting Squadron will manage the contract, with task orders issued individually to execute specific projects. Contractors must provide comprehensive services including design, construction, quality control, environmental compliance, safety management, and documentation such as as-built drawings, warranties, and operation manuals.

View the file

Other files

File Type Posted
Solicitation Amendment FA486125R00030017 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030017.pdf PDF
Solicitation Amendment - FA486125R00030013.pdf PDF
Attach 79 RFI Log SABER Seed 29 Jan 2026_.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030011 SF 30 .pdf PDF
2 - Price Schedule _13 Jan 2026.xlsx XLSX spreadsheet
3 - Self Scoring Matrix 7_Jan 26.xlsx XLSX spreadsheet
44 -Statement of Objectives (SOO) for RKMF 240010 20 Nov 25.pdf PDF
Solicitation Amendment - FA486125R00030009.pdf PDF
Solicitation Amendment FA486125R00030009_SF 30.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
(Attachment 70) SABER Seed SOO Honor Guard Building 10250 Attachment 17 - Double Check Valve Assembly.pdf PDF
(Attachment 56) SABER Seed SOO Honor Guard Building 10250 Attachment 2- HAZMAT Results 10250 Restrooms part 2.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment FA486125R00030003 SF 30 .pdf PDF
Attachment 53 Gordian SABER Technical Specifications.pdf PDF
Solicitation Amendment FA486125R00030002 SF 30.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
Solicitation Amendment - FA486125R00030001.pdf PDF
Atch 42 NV20250058 19Sep25 Hwy Clark.pdf PDF
Atch 50_RFI Log_General Solicitation.xlsx XLSX spreadsheet
Atch 51_RFI Log_ SABER Seed.xlsx XLSX spreadsheet
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
34 - Schedule of Values Template.xlsx XLSX spreadsheet
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Solicitation FA486125R0003

Attachment # 01

STATEMENT OF WORK

FOR

SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER)

NELLIS AIR FORCE BASE, NEVADA

OFFICE OF THE BASE CIVIL ENGINEER

(25 Sep 2025)

Index

1. Contents

SECTION 01 11 00 SUMMARY OF WORK

1. PART 1 – GENERAL

1.1 SUMMARY

1.1.1 Description:

1.1.2 Definitions

1.2 LOCATION

1.1.3 Nellis Air Force Base (NAFB)

1.1.4 Creech AFB (CAFB)

1.1.5 NTTR

1.2 SCOPE OF WORK

1.2.1 Scope Description

1.2.2 SABER Execution

1.3 PROGRAM OVERVIEW

1.3.1 Minimum/Maximum Contract Amounts

1.3.2 Commencement Of Work

1.3.3 Task Order Performance Period

1.3.4 Performance Evaluations

1.3.5 Gordian's SABER System License

1.3.6 Task Order Issuance Procedures

1.3.7 Phase-In Period

1.4 PROJECT ESTIMATING/DESIGN ORDERING PROCEDURE

1.4.1 Intent of Design/Estimating

1.4.2 Notice of Requirement

1.4.3 Revised Design Task Orders and Government-Requested Redesign

1.4.4 Magnitude of Project

1.4.5 Performance Time

1.4.6 Site Visit/Scope Validation Meetings

1.4.7 Request for Information

1.4.8 Environmental Survey

1.4.9 Construction Cost proposal

1.4.10 Format of the Proposal

1.4.11 Design Levels and Requirements

1.4.12 Government Review

1.4.13 Government Acceptance and Payment

1.5 CONSTRUCTION ORDER

1.5.1 Proposal

1.6 NOTICE TO PROCEED

1.6.1 Phases

1.7 WORKING HOURS:

1.7.1 Standard Work Hours

1.7.2 Non-Standard Working Hours

1.7.3 Standard Work Hour Change Request

1.8 ENVIRONMENTAL PROTECTION:

1.8.1 Regulations and Permits

1.8.2 Hazardous Materials

1.8.3 Contaminated Soils

1.8.4 Asbestos and Lead Based Paint

1.8.5 Air Quality

1.8.6 Authority to Construct Permit

1.8.7 Storm Water Construction Permit (Soil Erosion):

1.8.8 Protection of Water Resources

1.8.9 Waste and Disposal

1.8.10 Spills

1.8.11 Historical/Archaeological Artifacts/Paleontological Remains

1.8.12 Protection of Flora and Fauna

1.8.13 Environmental Management System

1.8.14 Fuel Storage Requirements

1.9 EXISTING FACILITIES/JOB SITE VERIFICATION

1.9.1 Job Site Verification

1.9.2 Demolition

1.9.3 Responsibility

1.9.4 New Work

1.9.5 Damage to Utilities

1.10 AF FORM 103 WORK CLEARANCE PERMIT:

1.10.1 Projects on Nellis AFB

1.10.2 Projects on Creech AFB

1.10.3 AF 103 Permit Application

1.10.4 Digging Permit

1.10.5 Road Closures/Lane Restrictions

1.10.6 Outages

1.10.7 Liability

1.10.8 Hydro-Excavation

1.11 GOVERNMENT-FURNISHED PROPERTY

1.11.1 Government-Furnished Equipment and Materials

1.11.2 Inventory

1.11.3 Contractor Transporting

1.11.4 Risk and Responsibility

1.11.5 Transportation Cost

1.11.6 Location

1.12 CONTRACTOR-FURNISHED EQUIPMENT/SUPPLIES

1.12.1 SABER Software/Hard Copy Requirements

1.12.2 Price Determination

1.12.3 Cost proposal Organization

1.13 GENERAL REQUIREMENTS

1.13.1 Sequence Of Work

1.13.2 Progress Meetings

1.13.3 Coordinating and Scheduling

1.13.4 Haul Route

1.13.5 Material Storage

1.14 UTILITY SERVICES NELLIS AFB AND NTTR

1.14.1 Water and Electricity

1.14.2 Telecommunications

1.14.3 Temporary Utility Connections

1.15 UTILITIES SERVICES CREECH, RANGE 63, AND POINT BRAVO

1.15.1 Water and Electricity

1.15.2 Telephone

1.15.3 Temporary Water Connections

1.16 PRIVATIZED ELECTRICAL UTILITY SYSTEM

1.16.1 Infrastructure

1.16.2 Connection Charge Agreement

1.16.3 Temporary Electrical Connections and Disconnections

1.16.4 VEA uses USDA

1.16.5 Contact Information

1.17 EMERGENCY MEDICAL TREATMENT

1.18 CODES AND SPECIFICATIONS:

1.18.1 Design

1.18.2 Compliance

1.18.3 Communications Specifications

1.18.4 Registered Communications Distribution

1.19 BASE ENTRY

1.19.1 Conformance with Regulations/Directives

1.19.2 Information Required

1.19.3 Unauthorized Activity

1.19.4 Delivery Tickets

1.19.5 Subject to Search

1.19.6 Increased Security Postures

1.19.7 Secure Compartmentalized Information Facility (SCIF) Renovation

1.19.8 Access to Point Bravo and Range 63

1.19.9 Minimum Badge Requirements

1.20 BASE REGULATIONS

1.20.1 Smoking

1.20.2 Seatbelts

1.20.3 Firearms/Illegal Drugs

1.20.4 Speed Limit

1.20.5 Parking

1.20.6 Cell Phone Use

1.21 SECURITY

1.21.1 Physical Security

1.21.2 Security Personnel

1.21.3 Communications

1.22 SAFETY AND ACCIDENT PREVENTION

1.22.1 General

1.22.2 Personnel Safety

1.22.3 Temporary Barriers

1.22.4 Safety Briefings

1.22.5 Security Police

1.22.6 Equipment and Tools

1.22.7 Explosive Operated Hand Tools

1.22.8 Electromagnetic Emission Devices

1.22.9 Use of Radioactive Devices on Government Property

1.22.10 Laser Systems

1.23 FIRE PREVENTION AND PROTECTION

1.23.1 Fire Regulations

1.23.2 Welding Permit

1.23.3 Clean-Up

1.23.4 Fire Extinguishers

1.24 WEATHER CONDITIONS

1.24.1 Weather Hazards

1.24.2 High Winds

1.24.3 Performance Period

1.25 QUALITY CONTROL

1.25.1 Contractor Responsibilities

1.25.2 Quality Control Program

1.25.3 Quality Control Records

1.25.4 Notice of Non-Conforming Work

1.26 LAYING OUT WORK

1.26.1 Layout

1.26.2 Field Dimensions

1.27 DRAWING STANDARDS, EXPECTATIONS, AND FORMAT

1.27.1 General

1.27.2 Expectations

1.27.3 Graphic Format

1.27.4 As-Built Standards

1.27.5 General Areas of Focus

1.27.6 Mark-up Guidelines

Final As-built Drawings

1.27.7 As-Built Delivery Specifications

1.27.8 As-Built Specifications

1.27.9 Government Furnished Data

1.27.10 Survey Data

1.27.11 Ownership

1.28 CONTROLLED AREA RESTRICTIONS

1.28.1 Definition

1.28.2 Controlled Area Escorts

1.28.3 Airfield Restrictions

1.29 SECURITY REQUIREMENTS FOR RESTRICTED AREAS

1.29.1 Restricted Areas

1.29.2 Citizenship

1.29.3 Delays

1.29.4 Escorts

1.29.5 Access Criteria

1.29.6 Visitor Access Procedures

1.29.7 Badges

1.29.8 Property Removal Authorization

1.29.9 Vehicles

1.29.10 Travel

1.29.11 Sensitive Equipment

1.29.12 Prohibited Items

1.30 PROTECTION AND CLEANUP

1.30.1 Clean-Up

1.30.2 Protection

1.31 FINAL INSPECTION

1.31.1 Pre-Final Inspection Notification

1.31.2 Final Inspection Notification

1.31.3 Declination to Inspect

1.31.4 Acceptance

1.32 PROJECT COMPLETION AND CLOSE-OUT

1.32.1 Warranties

1.32.2 Final Material Submittals

1.32.3 Final As-Builts

1.32.4 Operation & Maintenance Manuals

1.32.5 DD Form 1354

1.32.6 BUILDER Data

1. PART 2 – PRODUCTS

2.1. GREEN PROCUREMENT:

2.1.1 Description:

2.1.2 Material Submittals and Guidelines

2.1.3 Exemptions

SECTION 01 33 00 SUBMITTAL PROCEDURES

1. PART 1 - GENERAL

1.1 DESCRIPTION

1.1.1 Work included

1.1.2 Related work

1.2 QUALITY ASSURANCE

1.2.1 Coordination of submittals

1.2.2 Substitutions

1.2.3 Unacceptable Substitutions

1.2.4 "Or equal":

1.3 SUBMITTALS

1.3.1 Certification of Compliance

1.3.2 Shop Drawings

1.3.3 Samples

1.3.4 Color Selection

1.3.5 Manufacturers' Recommendations

1.3.6 Manufacturer's Warranty

1.3.7 Catalog Data

1.3.8 As-Built Drawings

2 PART 2 - PRODUCTS: NO PRODUCTS ARE REQUIRED BY THIS PART

3. PART 3 - EXECUTION

3.1 SUBMITTAL REGISTER

3.2 TRANSMITTAL OF SUBMITTALS

3.2.1 AF Form 3000

3.2.2 Submission Number

3.2.3 Resubmittal

3.2.4 Item Number

3.2.5 Submittal Information

3.2.6 Returning Submittals

3.3 GROUPING OF SUBMITTALS

3.4 TIMING OF SUBMITTALS

3.4.1 Submittal Schedule

3.4.2 Timelines

3.5 CONTRACTING OFFICER'S REVIEW

3.5.1 Errors

3.5.2 Approval

3.5.3 Re-submittal

3.5.4 Corrections

3.5.5 Delays

SECTION 01 11 00

SUMMARY OF WORK

1. PART 1 – GENERAL

1.1 SUMMARY

1.1.1 Description: This is a Simplified Acquisition of Base Engineering Requirements (SABER) indefinite-delivery, indefinite-quantity (IDIQ) contract for design and construction efforts at Nellis Air Force Base (NAFB), Creech Air Force Base (CAFB), Range 63, and Point Bravo. Work shall be defined in individual Task Orders (TO) and may consist of multiple disciplines in general construction categories. It may involve design services for all aspects of general construction including construction, modifications, and renovations of existing facilities.

Work may include but is not limited to maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, asbestos remediation, paving and earthen work for industrial/office buildings and/or infrastructure. The Contractor shall furnish all design, labor, equipment, materials, manufactured articles, transportation, supervision, and all else necessary to accomplish the design and/or repair/construction of each TO written under this SABER for all work that is defined for each project. These TOs will be completed in accordance with this SABER Statement of Work, all applicable SABER specifications, referenced documents, and any provided TO specific documents.

1.1.2 Definitions:

1.1.2.1 Addendum Statement of Objectives (SOO) Request: A requested change made by 99 CES to be included and priced by the SABER Contractor for an existing task order prior to receipt of proposal. A contract modification shall be issued by 99 CONS to formally integrate the Addendum into the task order contract.

1.1.2.2 Addendum Statement of Work (SOW) Request: A modification request made by 99 CES to be priced by the SABER Contractor for an existing task order after receipt of proposal.

Once an addendum proposal is finalized and funded by the Government, a contract modification may be issued by 99 CONS to formally integrate the change into the task order contract.

1.1.2.3 As-Built Drawings: Drawings prepared by the Contractor that are in sufficient detail, in accordance with this SOW, and accurately reflect the project as it was constructed. Drawings shall be complete with all changes, modifications, and deletions from the original awarded drawings. The final as-built drawings include modifications during construction, field requested changes, shop drawing modifications, and contractor designs. (See Section 1.28).

1.1.2.4 As-Constructed Drawings: These are As-Built Drawings for Civil Works Projects.

The term As-Built used in this document is synonymous.

1.1.2.5 Calendar Day (CD): Each day of the calendar year including workdays (WD), Holidays, and Weekends (including Saturdays and Sundays). Unless otherwise specified, all references to “days” will be considered as calendar days.

1.1.2.6 Coefficient: A Coefficient is the Contractor’s pricing factor which is multiplied against the standard unit prices in calculating proposed task order (TO) prices. It is proposed by the Contractor as a percentage increase (e.g., 1.10) to the current edition of the Construction Task Catalog® (CTC). See Section 1.5.9.1.

1.1.2.7 Congested Area: any area with less than 3' vertical or horizontal clearance and includes areas such as crawl spaces, ceiling plenums where the ceiling grid is not removed, narrow piping tunnels, and equipment rooms where the space to install the new work is congested as a result of equipment and piping placement that meet these dimensional restrictions.

1.1.2.8 Contract Clauses: Terms and conditions that clearly define and outline a specific part of the contract. Particularly, privileges, rights and duties relevant to the contract.

1.1.2.9 Contractor: The term Contractor refers to the general contractor. The general contractor is responsible for all subcontractors, suppliers, and consultants under their employ.

1.1.2.10 Contractor Mark-ups (Redlines): Drawings that are marked with changes and revisions and accurately annotated to show the project as-built by the contractor. They are part of the working as-built set.

1.1.2.11 Contracting Officer: The Contracting Officer refers to a person with the authority to enter into, administer, change and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the contracting officer.

1.1.2.12 Controlled Area: Area of performance on Government property with heightened security requirements within which the Contractor is not allowed free access to the work site, cannot enter and exit freely, and will be required to be under escort at all times during performance of the project. This may include all the areas on and adjacent to airfield features, within a flightline perimeter fence, the flightline side of facilities, or as otherwise defined in specific project documents.

1.1.2.13 Cost Proposal: A computerized, “detailed report” of the cost proposal using eGordian, organized into the SABER Construction Task Catalog CSI format listing quantities, CSI number, unit price, total price, and a description of all items required by a Statement of Work as well as drawings for which a price exists in the SABER Construction Task Catalog® (CTC).

1.1.2.14 Designer of Record (DOR): The individual accountable for specific portions of the design documents. Where professional certification is required for the design, the DOR would be the individual providing certification for that portion of the design. Where professional certification is not required, the DOR would typically be the individual who provided the design or specifications for a particular aspect of the project (i.e.: architectural, civil, structural, mechanical, fire, telecommunications or electrical).

1.1.2.15 Drawings: Graphical representations in accordance with this SOW documenting the work required for each Government project. (See Section 1.28)

1.1.2.16 Facility: A separate building or structure.

1.1.2.17 Final Inspection: The final examination/inspection held by the Government to verify that all work requirements (including clean-up) have been satisfactorily accomplished by the Contractor.

1.1.2.18 Government-Furnished Property: Items (e.g., equipment, facilities, materials, services, etc.) provided by the Government to the Contractor for use in performance of this contract, including issued task orders.

1.1.2.19 Match Existing: A term used to describe the exactness to which the Government requires a new and old product to match. “Match existing” requires that a thorough and/or an exhaustive effort be made, on the part of the Contractor, to match as close as possible an existing finish, product, color, texture, sheen, etc. This may mean the use of custom matching of colors or providing manufacturers “non-standard” material selections during the submittal process.

1.1.2.20 Negotiations: Communications between the Government and the Contractor aimed at reaching an agreement on all aspects, including pricing, technical requirements, and the performance time required for each identified construction project.

1.1.2.21 Non-Pre-Priced Line Items (NPI): Items of work not contained in the SABER CTC.

See Section 1.13.2.

1.1.2.22 Notice to Proceed (NTP): A contract document issued by the Contracting Officer, after receipt of bonding, which gives the Contractor written notice to commence work and/or order materials.

1.1.2.23 Phase-in Period: A time period made available to the contractor to mobilize, acquire equipment, manpower, and all else necessary to become fully operational and begin executing work as ordered. See paragraph 1.3.7.

1.1.2.24 Phase-out Period: The period of time available to the contractor, after the completion of the final Task Order, to demobilize from the installation, and return any utilized utilities and property to its original configuration.

1.1.2.25 Pre-Construction Conference: A meeting attended by designated representatives of the Government and the Contractor after project award but before the start of work to discuss all aspects of the required work for a specific project.

1.1.2.26 Pre-Final Inspection: The quality control examination held by the Contractor to identify all work and discrepancies to be corrected prior to requesting a final inspection by the Government. It is encouraged to have Government representation on-site during the Pre-Final Inspection.

1.1.2.27 Pre-Priced Line Items (PI): Items of work contained in the SABER CTC. See Section 1.13.2.

1.1.2.28 Professional Certification: The process of affixing a seal or statement to a drawing or design document to indicate that the work to which it is affixed has been performed by a person licensed as a professional, in that area of expertise, in the state of Nevada.

1.1.2.29 Progress Meeting: A meeting attended by designated representatives of the Government and the Contractor to discuss the progress on existing SABER projects as well as the basic contract performance.

1.1.2.30 Restricted Work Area: Area of performance on Government property with increased security requirements within which the Contractor is not allowed free access to the work site.

The Contractor shall be escorted to and from the work site by a Government representative.

Contractor provided escorts are not allowed. Restricted Work Areas are marked by warning signs, contain priority resources and all personnel must obtain specific written permission to enter. Personnel and equipment entry may be subject to delays due to security processing.

1.1.2.31 SABER: Simplified Acquisition of Base Engineering Requirements generally means a fixed-price, indefinite-delivery/indefinite-quantity (ID/IQ) contract which orders are placed.

Each order includes detailed task specifications which encompass most types of real property maintenance, repair, and construction work.

1.1.2.32 SABER Construction Task Catalog® (CTC): A comprehensive listing of construction related tasks together with a specific unit of measure and a published Unit Price.

1.1.2.33 Scoping Meetings: Meetings attended by designated representatives of the Government and the Contractor to discuss and define the work requirements of potential projects in sufficient detail to allow the Contractor to prepare a Statement of Work (SOW), required drawings, material submittal forms, and all else necessary to successfully complete the project.

Meetings may be requested/held before the design task order is issued.

1.1.2.34 Site Visit: An investigative visit to a location at which work has been proposed by the Government to be done by the Contractor. The purpose of the visit is for the Contractor along with their subcontractors as necessary to gather enough information to prepare the Statement of Work, drawings, and project estimate.

1.1.2.35 Statement of Objectives (SOO): The initial document, with drawings where applicable, provided to the Contractor stating the Government’s overall objectives of the work to be completed. It is used when the Government intends to provide maximum flexibility to the Contractor to propose an innovative approach.

1.1.2.36 Statement of Work (SOW): Written descriptions (in the quality, detail, and professionalism identified in the Contractor’s technical proposal) documenting work required by each Government task order, prepared by the Contractor from the Statement of Objectives provided by the Government.

1.1.2.37 Task Order (TO): An order placed against an established contract, which may contain the general requirements and parameters of a proposed project. Included with the TO may be a Statement of Work or Statement of Objectives that define specific technical requirements for the project. May also include information such as budget limitations, design certifications and drawings required to be prepared by the contractor.

1.1.2.38 Technical Specifications – The written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

1.1.2.39

1.1.2.40 True Ceiling: The location/point where the wall and the solid ceiling or roof deck adjoins/touches. This is in reference to “wall and true ceiling”. This is not the point where the wall and grid/drop ceiling adjoins/touch.

1.1.2.41 True Floor: The location/point where the wall and the solid floor or finish floor adjoins/touches. This is in reference to “wall and true floor”. This is not the point where the wall and a raise/false floor adjoins/touch.

1.1.2.42 Unrestricted Work Areas: Areas of performance on Government property with limited security requirements within which the Contractor is normally allowed full, free access to the work site.

1.1.2.43 User: Term used to describe the Government’s customer or using agency that the contract work is being performed for.

1.1.2.44 Workday (WD): Monday through Friday, excluding Saturdays, Sundays, Federal Holidays and the day after Thanksgiving.

1.1.2.45 Working As-Built: The Contractor shall maintain a set of paper drawings (Construction Set) and specifications to track changes, additions or deletions from the original design during construction. Working as-built drawings shall be marked up and kept current on a weekly basis and shall always be available at the jobsite. These marked-up drawings shall be submitted to the government along with the final as-built drawings at project closeout.

1.2 LOCATION: The project sites are located at Nellis AFB, Creech AFB, or at other locations within the southern portions of the Nevada Test and Training Range (NTTR) such as Range 63, and Point Bravo or at Tolicha Peak within the western portions of the NTTR.

1.1.3 Nellis Air Force Base (NAFB) is located approximately nine (9) miles north of downtown Las Vegas at the intersection of Las Vegas Blvd and Craig Road. NAFB consists of three main areas: the Main Base, Area II, and Area III. The specific project location will be indicated in the individual TOs.

1.1.4 Creech AFB (CAFB) is located approximately 45 miles north of Las Vegas, Nevada on Highway US-95. The specific project location will be indicated in the individual TOs.

1.1.5 NTTR: Southern NTTR is approximately 35 miles north of Las Vegas and Tolicha Peak is approximately 145 miles north of Las Vegas. The specific project location will be indicated in the individual TOs.

1.2 SCOPE OF WORK

1.2.1 Scope Description: The scope of work for each project shall include all the requirements defined herein as well as all work identified in the subject TOs.

1.2.2 SABER Execution: The SABER will be utilized to execute a broad range of maintenance, repair and minor construction projects on real property at sites noted in section 1.2 “Location”. These projects may include tasks in a variety of trades such as demolition, site work, excavation, cast-in-place concrete, masonry, structural steel, electrical, mechanical (including HVAC), painting, millwork, and other specialty and general contracting work.

Projects may also include design work of varying levels of complexity.

1.3 PROGRAM OVERVIEW

1.3.1 Minimum/Maximum Contract Amounts: The only work authorized under the SABER is as described in individual Task Orders (TOs). A minimum of $50,000.00 is guaranteed for the IDIQ contract awarded. Individual TOs shall have an estimated magnitude of $15,000.00 to $4,000,000.00. The Government makes no representation as to the number of TOs or actual amount of work to be ordered in excess of the minimum guarantee specified herein. The aggregate amount of the SABER program shall not exceed $185,000,000.00.

1.3.2 Commencement Of Work: No construction work under this contract shall commence until such a time as the Contracting Officer issues a written TO and a Notice to Proceed (NTP) under the TO as described in section 1.7 “Notice to Proceed.” The Contracting Officer reserves the right to determine the issue date of any NTP.

1.3.3 Task Order Performance Period: FAR 52.211-10, Commencement, Prosecution, and Completion of Work shall be incorporated into each TO identifying the construction schedule.

The Government reserves the right to negotiate a performance period or impose a performance period for each TO.

1.3.4 Performance Evaluations: At the conclusion of each ordering period, the Contractor will be evaluated in the Contractor Performance Assessment Reporting System (CPARS). The evaluations will take into account all aspects of the contractor’s performance on all issued TOs.

Furthermore, performance evaluations may be completed at any time the Contractor’s performance is considered less than satisfactory. Contractors will be provided with an opportunity to provide input into the evaluation. The performance evaluations may have an impact on the award of future TOs.

1.3.5 Gordian's SABER System License: Nellis AFB selected The Gordian Group’s (Gordian) Task Order Contracting Solution for their SABER program. The Gordian SABER Solution™ includes Gordian’s proprietary SABER Information Management System SABER Applications, construction cost data, and Construction Task Catalog® which shall be used by the Contractor solely for the purpose of fulfilling its obligations under this Contract, including the preparation and submission of Task Order Proposals, Cost proposals, subcontractor lists, and other requirements specified by the Government. The Contractor shall be required to execute Gordian’s SaaS Terms of Use and pay a SABER System License Fee to obtain access to the Gordian SABER Solution™. Gordian’s SABER System License purchased by the contractor shall include user licenses for access to eGordian, CTC, Technical Specifications, and annual training for Nellis AFB and contractor staff. The SABER System License Fee applies to all Task Orders issued to the Contractor under the terms of the Contract.

1.3.6 Task Order Issuance Procedures

1.3.6.1 Work under the SABER will be ordered by written TO issued on a DD Form 1155 (Order for Supplies or Services) to the contractor by the Contracting Officer.

1.3.6.2 The individual TOs will be placed in a progressive numbering system, which relate back to the contractor’s basic SABER.

1.3.6.3 The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by a duly executed TOs.

1.3.6.4 TOs will be firm fixed price and clearly define the specific services to be performed or the performance desired. Each TO will be subject to the terms and conditions of the SABER IDIQ. In the event of a conflict between the TO and the SABER IDIQ, the TO shall take precedence.

1.3.7 Phase-In Period: The Contractor shall be allowed an initial 30 calendar day “start-up” period following SABER IDIQ contract award. However, limited performance may be required during the “start -up” period (see Table 1 below). The Contractor shall have all equipment and personnel in place and available to fully execute all requirements of this contract following the 30-calendar day “start-up” period. The Contractor may be notified of potential projects within the phase-in period and, if capable of performing, may begin work earlier than shown in Table 1 below.

Table 1: Phase-In Period

LIMITED PERFORMANCE PERIOD REQUIRED CAPABILITY

(Cumulative Value of Work Awarded)

Award date up to 30 days: $400,000

1.4 PROJECT ESTIMATING/DESIGN ORDERING PROCEDURE

1.4.1 Intent of Design/Estimating: It is not the Government’s intent to have the Contractor provide an estimating service for projects that have no SABER construction consideration.

However, the Government is not obligated to issue a task order for the construction work described in the completed project estimate.

1.4.2 Notice of Requirement: As the need exists for design and/or project estimating under the terms of this contract, the CO will notify the Contractor of the requirement by issuing a task order for the work.

1.4.2.1 When ordering design and or cost proposal services, such notification will include a project number, project title, statement of objectives, general scope of work, magnitude of project, any statutory limitations, special instructions, and conditions that may exist with respect to the work. The Contractor shall be responsible for preparing a detailed proposal by identifying tasks required, conducting an asbestos/lead-based paint (LBP) survey as necessary, preparing drawings, developing performance times, and furnishing the finalized design to the CO for approval. The Contractor shall prepare a detailed cost proposal in the specified format by listing quantities of individual work elements needed, specify non-priced line items, and submit to the CO for evaluation/negotiation. The applicable design/estimating CLIN fee shall cover the costs for this effort.

1.4.3 Revised Design Task Orders and Government-Requested Redesign

1.4.3.1 If within the initial three task periods (Tasks and their respective performance periods are depicted in Table 3, Period Performance Time), the Government may inform the contractor of the intent to provide a revised SOO without incurring a redesign fee. The task order shall be suspended until the Government provides the revised SOO package, at which time Task 4 will begin.

1.4.3.2 Once the first three task periods have been completed and Task 4 has commenced (see Table 3: Period Performance Time for the task descriptions) and the Government wishes to revise the SOO, the contractor may request a redesign fee. The task order shall be suspended until the Government provides the revised SOO package, at which time Task 4 and its respective performance period will restart.

1.4.3.3 The redesign fee will only apply to government requested significant scope changes, not for errors in contractor design.

1.4.3.4 The Government's acceptance of the design does not relieve the contractor or their Designers of Record from flaws, deficiencies, or violations within the design. Additionally, any requirement to correct the design, or any related construction, shall be at no cost to the Government.

1.4.4 Magnitude of Project

1.4.4.1 The Contractor shall promptly advise the CO and provide a rationale and Rough Order of Magnitude if the project being designed is or is likely to exceed the specified project magnitude.

1.4.4.2 The project magnitude ranges shall be defined as shown below in Table 2:

Table 2: Project Magnitude Ranges

1 $ 15,000 TO $500,000

2 $500,001 TO $1,500,000

3 $1,500,001 TO $3,000,000

4 $3,000,001 TO $4,000,000

1.4.4.3 Unspecified Minor Military construction projects are subject to the current fiscal year statutory limit in accordance with 10 USC §2805.

1.4.5 Performance Time: Upon receipt of a design Task Order, the Contractor shall respond within the maximum time parameters described in Table 3 below.

Table 3: Performance Time

PROJECT MAGNITUDE

1 2, 3, 4

TASK DESCRIPTION Level 0 Level 1 Level 2 Level 0 Level 1 Level 2

Task 1:

Visit the work site after design award with the CO and Project Manager and/or designated representatives within:

7 Calendar Days from date of award

7 Calendar Days

7 Calendar Days

14 Calendar Days

14 Calendar Days

14 Calendar Days

Task 2:

Contractor to submit RFIs to Government within:

7 Calendar days after site visit

7 Calendar days

7 Calendar days

7 Calendar days

7 Calendar days

7 Calendar days

Task 3: Government provides RFI responses to Contractor within:

7 Calendar days after receipt of contractor

RFIs

7 Calendar days

7 Calendar days

7 Calendar days

7 Calendar days

7 Calendar days

Task 4:

Contractor to submit design/proposal after site visit or receipt of Government RFI responses within:

Calendar

Days

Calendar

Days

Calendar

Days

30 Calendar Days

60 Calendar Days

90 Calendar Days

Task 5:

Provide subsequent revisions of the design/cost proposal within:

Calendar

Days after receipt of

Govt Evaluation

Calendar

Days

Calendar

Days

14 Calendar Days

21 Calendar Days

21 Calendar Days

1.4.6 Site Visit/Scope Validation Meetings: The Government and Contractor personnel shall conduct a site visit and/or scope validation meetings as necessary to refine the Government’s requirements. At a minimum, the following will be discussed:

• Site investigation requirements

• Methods and alternatives for accomplishing work

• Definition and refinement of requirements

• Detailed Statement of Objectives

• Availability of Government As-Built Drawings (See Section 1.28)

1.4.7 Request for Information: The Contractor shall ensure the scope of work is fully defined and a thorough review of all Government as-builts is accomplished if available. It is the sole responsibility of the Contractor to request in writing to the Contracting Officer specific drawings or technical documents to review. All available as-builts will be provided to the Contractor. The Contractor shall field verify all provided as-builts as well as existing field conditions prior to accomplishing any design work. Contractor shall submit requests for information to utilize proposed alternative means of accomplishing the project. The Contractor has five (5) business days after the site visit to notify the Government of any additional information needed for the submission of proposals.

1.4.8 Environmental Survey: The Contractor shall accomplish an exhaustive asbestos/LBP survey, as necessary based on project scope, through a certified environmental consultant. The Contractor shall accomplish all work in compliance with all applicable Federal, State, and local regulations. All environmental survey tests shall be included in the Contractor’s design fee based on each individual task order. No additional compensation shall be paid to the Contractor for asbestos or lead based paint testing; this will be covered under the appropriate design/estimating CLIN.

1.4.9 Construction Cost Proposal: Upon completion of the refined scope of the individual requirement, including the finalized drawings and Statement of Work, whether Contractor or Government generated, the Contractor shall prepare a detailed cost proposal by identifying tasks, preparing drawings, refining quantities of both pre-priced and non-pre-priced items (NPI), pricing NPIs, developing performance times, and preparing a completed proposal document for submission to the Contracting Officer.

1.4.9.1 Contractor’s Coefficient: The purpose of the Contractor’s coefficient is to capture most common, recurring project costs within a single figure in order to simplify and reduce repetitiveness in cost proposals. All cost proposals submitted will reflect the coefficient factor in effect at the time of submission. The Contractor’s Coefficient includes common, recurring project costs as outlined below.

1.4.9.1.1 COEFFICIENT: A numerical factor that represents costs (generally indirect costs) not considered to be included in Construction Task Catalog (CTC) unit prices, e.g. general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, sales tax and compliance with tax laws and contractor’s and subcontractor’s profit. Contingent costs, such as labor rate changes and inflation in future years are also covered in the coefficient. Coefficients proposed by offerors are multiplied by the Government-established unit prices in the Construction Task Catalog (Commonly referred to as a Unit Price Book) to price a job or project on individual task orders. The Coefficient(s) proposed by the offeror and accepted by the Government are incorporated in SABER. The contractor’s price coefficient must include the following:

• Contractor’s overhead and profit

• Subcontractors’ overhead and profit

• Insurance

• All costs associated with bonding (specifically including bond premiums)

• Employee payroll taxes, insurance, and fringe benefits

• All taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)

• Sales tax on material and equipment costs

• All waste and excess material

• Daily clean up

• Mobilization and close out for the total contract and each task order

• Compliance with environmental laws (overhead [indirect] costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.)

• Quality control

• Office management and equipment

• Office and management personnel

• Office space

• Office supplies

• Employee transportation

• Project trailer

• Project Equipment & Supplies

• Portable toilets for Contractor’s Use

• Construction vehicles

• Personnel safety equipment

• Depreciation of mobile office(s)

• Interest associated with funding of equipment and payroll

• Cost of financing the work

• Preparation and modification of sketches, drawings, submittals, as-built drawings, and other project records.

• Permits, licenses, and fees, including Services required to obtain any filings and permits.

• Include testing, calibration, balancing and the like required to ensure proper installation, construction and performance.

1.4.9.1.2 “The Big Note” of the CTC shall be construed as guidance for the proper use and applications of Unit Price line items used for the Cost proposal.

1.4.9.1.3 Material costs in the CTC include an allowance for waste. Quantities used on individual task order proposals shall be taken from field measurements or design plans, as appropriate, without allowance for any waste.

1.4.9.1.4 Large vehicular construction equipment associated costs are excluded from the contractor’s coefficient.

1.4.9.1.5 Traffic control measures such as flaggers, steel plates, etc. are excluded from the contractor’s coefficient.

1.4.9.1.6 Security fencing and related expenses for secure construction sites are excluded from the contractor's coefficient.

1.4.9.1.7 Cost differences due to location: Due to the remote locations of Creech AFB, Range 63, and Point Bravo, an increase in labor, transportation and other costs is expected. In order to account for these price differences, the Contractor shall use location-specific design fees and coefficients. One set of design fees and coefficients shall be used exclusively for projects at Nellis AFB, and another set of design fees and coefficients shall be used exclusively for projects at Creech AFB, Range 63, and Point Bravo.

1.4.9.1.8 Non-Standard Working Hours: Defined as the period outside of Standard Work Hours and Government holidays. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient. See Section 1.8 for more information.

1.4.9.2 Project Price Adjustment: At the beginning of each Ordering Period all previously negotiated, unawarded project pricing shall be adjusted by the Contractor based on the newly revised CTC, to include the Contractor’s coefficient. The adjusted project pricing will be forwarded for each such project to the Contracting Officer not later than the first day Ordering Period. The adjusted price will be held until the next update or until award of that Task Order, whichever comes first.

1.4.10 Format of the Proposal: The Contractor’s design proposal shall be submitted electronically via e-mail in the requested Project Estimating Software format described in Section 1.13 (with any applicable Word or Excel documents), to include an Adobe (.pdf) version for the Contracting Office and the technical review electronic version from the Project Estimating Software for 99 CES/CEN. Any associated files or AutoCAD drawings too large to transmit via email shall be submitted using DoD SAFE. The Contractor shall make a DoD SAFE drop-off request for file transfer from the Contracting Office when proposals are ready to submit. In addition, up to two 11” x 17” paper copies of drawings per submission may be requested on specific Task Orders and shall be sent to the Contracting Officer concurrently with electronic submission. Each proposal shall include, at a minimum, the following:

1.4.10.1 Statement of Work (SOW): Written descriptions (in the quality, detail, and professionalism identified in the Contractor’s technical proposal) documenting work required by each Government task order, prepared by the Contractor from the Statement of Objectives provided by the Government. In conjunction with the drawings, the SOW must provide at a minimum:

• A listing of the applicable technical codes and regulations to be followed for the project

• Identification of the method of work and materials to be used to include sizes if not shown on drawings

• A listing of the required material submittals (Schedule of Material Submittals, AF66, Attachment #35)

• A total performance period expressed in calendar days, it shall be broken down into design and construction if additional design efforts are required prior to construction.

The SOW must be thorough and detailed enough to allow:

• The Government and the Contractor to estimate the number and type of pre-priced and non-pre-priced items required to successfully perform all work

• Government personnel to monitor and validate work compliance

• The Government to easily follow the work processes involved

1.4.10.2 Cost proposal: A detailed Cost proposal segregated by CSI Division (see paragraph

1.5.9 Cost proposal). Notes and calculations shall be added to cost proposal by the Contractor to help validate quantities and what the line item will be utilized for if not clearly defined by SOW.

1.4.10.3 Design Drawings: A detailed design submittal (See paragraph 1.5.11 Design Levels and Requirements).

1.4.10.4 Asbestos Containing Material (ACM)/Lead Based Paint (LBP) survey report: If applicable, costs for ACM/LBP testing are part of the Contractor’s price for the design/cost proposal CLINs and will not be paid separately by the Government. Report shall clearly depict all areas tested as well as results. Proposal shall define how any positive results will be handled.

1.4.10.5 All necessary support documentation, as required, to indicate that adequate engineering and planning to accomplish the requirement has been accomplished, shall also be submitted as a part of the proposal. Examples of documentation that might be expected would include sketches, drawings, calculations (to include but not limited to any electrical, HVAC, and utility load calculations requiring upgrade), catalog cuts, specifications, verbal description of the work, etc. Costs for documentation are in the Contractor’s price for the design/estimating CLINs and will not be paid separately by the Government. All such design submittals must be approved by the Contracting Officer prior to the start of any negotiation.

1.4.11 Design Levels and Requirements: The Contractor shall complete the design submittal for each task order and deliver the submittals to the Contracting Officer in accordance with the following design schedule as required per scope of the task order. The drawings developed by the contractor shall conform to industry standards relating to good design and drafting practices.

Note that all drawings shall depict the project accurately and shall show sufficient detail to convey the intended appearance and work scope of the project to include but not limited to existing electrical, structural, communications, HVAC/mechanical, security, fire system components, sprinkler, utilities, and plumbing systems. Detail references, notes, and material indications shall be sufficient to thoroughly describe and index the work. All cut sections and details shall also be shown on the drawings. The submittal of hand sketches, PowerPoint presentations, and other such drawings are not acceptable. Not all drawings will be required for each task order.

1.4.11.1 Level 0 Cost proposal: At any time within the contract period, the Government may provide a SOW and, if applicable, a partial or complete design for the Contractor to cost proposal. No additional design effort would be requested.

1.4.11.2 Level 1 Design: An acceptable level 1 design submission shall reflect the final basic plan with sufficient detail to illustrate (as applicable) the structural, architectural, mechanical, electrical, fire and communications systems as well as the paving/grading/drainage plan, haul route and proposed storage site, designed to level 1 definition. The submitted Statement of Work shall be complete in describing the project scope and provide adequate detail to support the accompanying cost proposal, and to convey to the Contracting Officer that the proposal is technically acceptable and fulfills the intent of the Statement of Objectives. The basic calculations needed to size the components of the project shall be included. If information is not available, the Contractor shall state the assumptions on which the SOW and cost proposal are based.

1.4.11.2.1 Drawings: Drawings shall include detailed schedules and legends appropriate to describe the design. Drawings shall be of sufficient detail to fully communicate the design concept. Drawings for level 1 shall include all applicable drawings from the following list and any additional required to fully illustrate the work.

• Cover Sheet/Project Location Maps

• Index of drawings

• Haul routes & Contractor’s Storage Site

• Project location

• Demolition drawings as required

• Civil Plans:

o New construction and exterior work o Building location and orientation o Airfield runways, taxiways, ramp, streets, roads, walks and parking o Exterior utilities beyond five feet (5') building line o Landscape plan and plant schedule

• Architectural Drawings:

o Overall key floor plan with room legend o Interior finish schedules o Architectural features

• Mechanical-Heating, Ventilation, Air-Conditioning, Refrigeration Drawings:

o Floor plan – system layout, tie-in to supporting utilities

• Plumbing:

• Electrical Drawings:

o Floor plan with fixture location, circuiting, switching, convenience outlets-electrical service to equipment, and existing power panels

• Telecommunication Drawings:

o Overall floor plan o Details of OSP routes o Location of all cable terminations o Notes shall include all equipment being provided by the Contractor

1.4.11.2.1.1 Civil Plan: Utilize scale which shows building site, relation to adjacent structures, existing utilities, additional utilities required, and other major site features. Scales for civil plans shall be sufficiently large to clearly delineate building location, topographical, utilities, streets, roads and parking, vegetation and other pertinent data. Show all site amenities.

1.4.11.2.1.2 Plans and elevations: Shall portray general layout and interfacing features even if such features are not in the contract area. Equipment to be included in the project shall be accurately located and scaled. All areas and equipment shall be identified. Areas shown on the floor plan but not included in the project shall be so designated by shading, outlining, or other clean concise means.

1.4.11.2.1.3 Other drawings: Shall depict the project accurately and shall show sufficient detail to convey the intended appearance of the project. Detail references, notes, and material indications shall be sufficient to thoroughly describe and index the work. Exterior and/or interior elevations shall be submitted when the project involves work on such surfaces. Provide interior and exterior finish schedule and door schedule.

1.4.11.2.1.4 Provide separate lists of all Government-furnished equipment to be installed by the Contractor and equipment furnished and installed by the Government, if applicable.

1.4.11.2.1.5 Scales: Shall be sufficiently large to clearly portray the work. Mechanical and electrical schematics shall be large enough so that relative features are proportionate and easily related to architectural plans and features.

1.4.11.2.1.6 Structural/Mechanical/Electrical: Provide general layout of major systems, utility support, and major design features. Connection points and method of connection to existing utilities shall be shown. Include fixture and equipment schedules and Ampere Interrupting Capacity (AIC) calculations.

1.4.11.2.1.7 Communication Drawings: Telecommunication drawings/sheets, T-1 through T-

(x) must be included. Show required spaces for installation of telecommunication systems. Basic OSP installation and routes and connection points.

1.4.11.3 Level 2 Design: An acceptable level 2 design submission shall automatically incorporate all requirements/levels/aspects of the level 1 design requirements and reflect the final basic plan with sufficient detail to illustrate (as applicable) the structural, architectural, mechanical, electrical, fire and communications systems as well as the paving/grading/drainage plan, haul route and proposed storage site, designed to a level 2 definition. The submitted Statement of Work shall be complete in describing the project scope and provide adequate detail to allow for the accompanying cost proposal, and to convey to the Contracting Officer that the proposal was technically acceptable and fulfills the intent of the Statement of Objectives. All calculations needed to size the components of the project should be included. If information was not available or was not provided by the Government, the Contractor shall state the assumptions on which his SOW and cost proposal is based.

1.4.11.3.1 Drawings: Drawings shall include detailed schedules and legends appropriate to describe the design. Drawings shall be of sufficient detail to fully communicate the design concept. Major mechanical and electrical equipment items shall be shown on the drawings with single line diagrams. All utilities and structures shall be shown, as well as the paving/grading/drainage plan, haul route, and Contractor’s storage site. Drawings for a level 2 Design shall include all applicable drawings from the following list and any additional required to fully illustrate the work. Items marked with an * may be required when additional design work is needed in accordance with Sections 1.5.11.4 1.5.11.5 and 1.5.11.6. Drawings falling under this category shall be provided by the Contractor after construction task order has been awarded and shall be stamped as required and approved by the Contracting Officer prior to construction.

Cost associated with these additional drawings will be paid as part of the construction task order.

• Cover Sheet/Project Location Maps

• Index of drawings

• Haul routes & Contractor’s Storage Site

• Project location

• Demolition drawings as required

• Civil Plans:

o New construction and exterior work o Building location and orientation o Airfield runways, taxiways, ramp, streets, roads, walks and parking including subsurface o Exterior utilities beyond five feet (5') building line. Details of connection into existing utilities.

o Landscape plan and plant schedule o Detailed water design for all items requiring NDEP approval per paragraph 1.5.11.5*

• Structural Drawings:

o Foundation plan with column locations o Roof and floor framing plan*

• Architectural Drawings:

o Overall key floor plan with room legend o Roof plan with slopes o Reflected ceiling plan o Interior/exterior elevations o Interior/exterior details* o Architectural sections and details* o Interior finish schedules o Door and window schedules o Hardware schedule o Exterior building…

This is the start of the file's text. The full file is on GovTribe.