05 12 00.pdf

PDF 53 KB Posted

Attached to
TINKER AFB MAC BOA WWYK200323 REPAIR HVAC DIFFUSER AND DUCTWORK B3001
Solicitation number
WWYK200323-P
Issued by

About this file

This document appears to be a solicitation for a federal contract opportunity related to the repair of HVAC diffuser and ductwork at Tinker Air Force Base. The key details are:

The opportunity is a Tinker AFB MAC BOA (Multiple Award Construction Contract) set-aside, available only to current MAC BOA holders. A mandatory site visit is required to be considered responsive, with an RSVP deadline of 2:00pm CST on 11/8/2024. An Entry Authorization List for site visit attendees must be provided by 2:00pm CST on 11/12/2024. The estimated price range is between $1,000,000 and $5,000,000. This is a small business set-aside opportunity.

View the file

Other files

File Type Posted
Attachment 1 EAL List - BLANK to Contractor_WWYK200323 .xlsx XLSX spreadsheet
32 13 11.pdf PDF
23 82 01.pdf PDF
07 72 20.pdf PDF
08 11 13.pdf PDF
23 08 01.00 20.pdf PDF
08 33 23.pdf PDF
23 05 48.00 40.pdf PDF
10 44 16.pdf PDF
26 05 48.00 10.pdf PDF
01 33 16.00 10.pdf PDF
06 61 16.pdf PDF
23 25 00.pdf PDF
Tinker General Req Specs Nov22ChLog.pdf PDF
23 64 26.pdf PDF
07 41 13.pdf PDF
03 30 00.pdf PDF
26 28 01.00 10.pdf PDF
40 17 26.00 20.pdf PDF
06 20 00.pdf PDF
07 31 13.pdf PDF
23 05 15.pdf PDF
09 29 00.pdf PDF
21 13 13.pdf PDF
07 52 00.pdf PDF
07 62 13.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
200323_Submittal Register.pdf PDF
23 82 43.00 40.pdf PDF
00 70 00.pdf PDF
32 01 17.pdf PDF
03 11 13.00 10.pdf PDF
03 20 00.00 10.pdf PDF
31 23 06.pdf PDF
09 72 00.pdf PDF
13 48 00.pdf PDF
04 20 00.pdf PDF
23 31 13.00 40.pdf PDF
08 52 00.pdf PDF
08 51 13.pdf PDF
32 92 23.pdf PDF
26 08 00.pdf PDF
10 28 13.pdf PDF
23 81 23.pdf PDF
32 11 23.pdf PDF
01 45 00.00 10.pdf PDF
05 40 00.pdf PDF
07 53 23.pdf PDF
10 26 00.pdf PDF
23 11 25.pdf PDF
Show 40 more

Latest 50 of 183 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 05 12 00

STRUCTURAL STEEL

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN ASSOCI ATI ON OF STATE HI GHWAY AND TRANSPORTATI ON OFFI CI ALS

(AASHTO)

AASHTO HB- 17 ( 2002; Er r at a 2003; Er r at a 2005, 17t h Edi t i on) St andar d Speci f i cat i ons f or Hi ghway Br i dges

AMERI CAN I NSTI TUTE OF STEEL CONSTRUCTI ON ( AI SC)

AI SC 303 ( 2010) Code of St andar d Pr act i ce f or St eel Bui l di ngs and Br i dges

AI SC 325 ( 2011) St eel Const r uct i on Manual

AI SC 326 ( 2009) Det ai l i ng f or St eel Const r uct i on

AI SC 341 ( 2010) Sei smi c Pr ovi s i ons f or St r uct ur al St eel Bui l di ngs

AI SC 360 ( 2010) Speci f i cat i on f or St r uct ur al St eel Buildings

AI SC DESI GN GUI DE 10 ( 1997) Er ect i on Br aci ng of Low- Ri se St r uct ur al St eel Bui l di ngs

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS A2. 4 ( 2012) St andar d Symbol s f or Wel di ng, Br azi ng and Nondest r uct i ve Exami nat i on

AWS D1. 1/ D1. 1M ( 2015; Er r at a 2015) St r uct ur al Wel di ng Code - St eel

AWS D1. 8/ D1. 8M ( 2009) St r uct ur al Wel di ng Code—Sei smi c Supplement

ASME I NTERNATI ONAL ( ASME)

ASME B46. 1 ( 2009) Sur f ace Text ur e, Sur f ace Roughness, Wavi ness and Lay

ASTM I NTERNATI ONAL ( ASTM)

ASTM A108 ( 2013) St andar d Speci f i cat i on f or St eel Bar , Car bon and Al l oy, Col d- Fi ni shed

Apr i l 2019 Page 1 SECTI ON 05 12 00

ASTM A123/ A123M ( 2013) St andar d Speci f i cat i on f or Zi nc ( Hot - Di p Gal vani zed) Coat i ngs on I r on and St eel Pr oduct s

ASTM A143/ A143M ( 2007; R 2014) St andar d Pr act i ce f or Saf eguar di ng Agai nst Embr i t t l ement of Hot - Di p Gal vani zed St r uct ur al St eel Pr oduct s and Pr ocedur e f or Det ect i ng Embrittlement

ASTM A193/ A193M ( 2015a) St andar d Speci f i cat i on f or Al l oy- St eel and St ai nl ess St eel Bol t i ng Mat er i al s f or Hi gh- Temper at ur e Ser vi ce and Ot her Speci al Pur pose Appl i cat i ons

ASTM A276/ A276M ( 2016) St andar d Speci f i cat i on f or St ai nl ess St eel Bar s and Shapes

ASTM A29/ A29M ( 2013) St andar d Speci f i cat i on f or Gener al Requi r ement s f or St eel Bar s, Car bon and Al l oy, Hot - Wr ought

ASTM A307 ( 2014) St andar d Speci f i cat i on f or Car bon St eel Bol t s and St uds, 60 000 PSI Tensi l e Strength

ASTM A325 ( 2014) St andar d Speci f i cat i on f or St r uct ur al Bol t s, St eel , Heat Tr eat ed, 120/ 105 ksi Mi ni mum Tensi l e St r engt h

ASTM A36/ A36M ( 2014) St andar d Speci f i cat i on f or Car bon St r uct ur al St eel

ASTM A490 ( 2014a) St andar d Speci f i cat i on f or St r uct ur al Bol t s, Al l oy St eel , Heat Tr eat ed, 150 ksi Mi ni mum Tensi l e St r engt h

ASTM A500/ A500M ( 2013) St andar d Speci f i cat i on f or Col d- For med Wel ded and Seaml ess Car bon St eel St r uct ur al Tubi ng i n Rounds and Shapes

ASTM A53/ A53M ( 2012) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess

ASTM A563 ( 2015) St andar d Speci f i cat i on f or Car bon and Al l oy St eel Nut s

ASTM A563M ( 2007; R 2013) St andar d Speci f i cat i on f or Car bon and Al l oy St eel Nut s ( Met r i c)

ASTM A6/ A6M ( 2014) St andar d Speci f i cat i on f or Gener al Requi r ement s f or Rol l ed St r uct ur al St eel Bar s, Pl at es, Shapes, and Sheet Pi l i ng

ASTM A668/ A668M ( 2015) St andar d Speci f i cat i on f or St eel For gi ngs, Car bon and Al l oy, f or Gener al

Apr i l 2019 Page 2 SECTI ON 05 12 00

I ndust r i al Use

ASTM A780/ A780M ( 2009; R 2015) St andar d Pr act i ce f or Repai r of Damaged and Uncoat ed Ar eas of Hot - Di p Gal vani zed Coat i ngs

ASTM A992/ A992M ( 2011) St andar d Speci f i cat i on f or St r uct ur al St eel Shapes

ASTM B695 ( 2004; R 2009) St andar d Speci f i cat i on f or Coat i ngs of Zi nc Mechani cal l y Deposi t ed on I r on and St eel

ASTM C1107/ C1107M ( 2014a) St andar d Speci f i cat i on f or Packaged Dr y, Hydr aul i c- Cement Gr out (Nonshrink)

ASTM C827/ C827M ( 2010) Change i n Hei ght at Ear l y Ages of Cyl i ndr i cal Speci mens f r om Cement i t i ous Mixtures

ASTM F1554 ( 2015) St andar d Speci f i cat i on f or Anchor Bol t s, St eel , 36, 55, and 105- ksi Yi el d Strength

ASTM F1852 ( 2014) St andar d Speci f i cat i on f or " Twi st Of f " Type Tensi on Cont r ol St r uct ur al Bol t / Nut / Washer Assembl i es, St eel , Heat Tr eat ed, 120/ 105 ksi Mi ni mum Tensi l e Strength

ASTM F2329 ( 2013) Zi nc Coat i ng, Hot - Di p, Requi r ement s f or Appl i cat i on t o Car bon and Al l oy St eel Bol t s, Scr ews, Washer s, Nut s, and Speci al Thr eaded Fast ener s

ASTM F436 ( 2011) Har dened St eel Washer s

ASTM F844 ( 2007a; R 2013) Washer s, St eel , Pl ai n ( Fl at ) , Unhar dened f or Gener al Use

ASTM F959 ( 2013) Compr essi bl e- Washer - Type Di r ect Tensi on I ndi cat or s f or Use wi t h St r uct ur al Fasteners

SOCI ETY FOR PROTECTI VE COATI NGS ( SSPC)

SSPC PA 1 ( 2000; E 2004) Shop, Fi el d, and Mai nt enance Pai nt i ng of St eel

SSPC Pai nt 20 ( 2002; E 2004) Zi nc- Ri ch Pr i mer s ( Type I , I nor gani c, and Type I I , Or gani c)

SSPC Pai nt 29 ( 2002; E 2004) Zi nc Dust Sacr i f i c i al Pr i mer , Per f or mance- Based

SSPC SP 3 ( 1982; E 2004) Power Tool Cl eani ng

SSPC SP 6/ NACE No. 3 ( 2007) Commer ci al Bl ast Cl eani ng

Apr i l 2019 Page 3 SECTI ON 05 12 00

U. S. DEPARTMENT OF DEFENSE ( DOD)

UFC 3- 301- 01 ( 2013; wi t h Change 1) St r uct ur al Engineering

UFC 3- 310- 04 ( 2013) Sei smi c Desi gn f or Bui l di ngs

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Er ect i on Dr awi ngs; G

SD- 02 Shop Dr awi ngs

Fabr i cat i on Dr awi ngs I ncl udi ng Descr i pt i on of Connect i ons; G

SD- 03 Pr oduct Dat a

Shop Pr i mer

Wel di ng El ect r odes and Rods

Di r ect Tensi on I ndi cat or Washer s

Non- Shr i nk Gr out

Tensi on Cont r ol Bol t s

SD- 06 Test Repor t s

Cl ass B Coat i ng

Bol t s, Nut s, and Washer s

Wel d I nspect i on Repor t s

Di r ect Tensi on I ndi cat or Washer I nspect i on Repor t s

Bol t Test i ng Repor t s

Embr i t t l ement Test Repor t s

SD- 07 Cer t i f i cat es

Steel

Bol t s, Nut s, and Washer s

Galvanizing

Pi ns and Rol l er s

Apr i l 2019 Page 4 SECTI ON 05 12 00

AI SC Fabr i cat i on Pl ant Qual i t y Cer t i f i cat i on

AI SC Er ect or Qual i t y Cer t i f i cat i on

Wel di ng Pr ocedur es and Qual i f i cat i ons

Wel di ng El ect r odes and Rods

1. 3 AI SC QUALI TY CERTI FI CATI ON

Wor k must be f abr i cat ed i n an AI SC Cer t i f i ed Fabr i cat i on Pl ant , Cat egor y St d. Submi t AI SC f abr i cat i on pl ant qual i t y cer t i f i cat i on.

Wor k must be er ect ed by an AI SC Cer t i f i ed Er ect or , Cat egor y CSE. Submi t AI SC er ect or qual i t y cer t i f i cat i on.

1. 4 SEI SMI C PROVI SI ONS

The st r uct ur al st eel syst em must be pr ovi ded i n accor dance wi t h AI SC 341, Chapt er J as amended by UFC 3- 310- 04.

1. 5 QUALI TY ASSURANCE

1. 5. 1 Pr econst r uct i on Submi t t al s

1. 5. 1. 1 Er ect i on Dr awi ngs

Submi t f or r ecor d pur poses. I ndi cat e t he sequence of er ect i on, t empor ar y shor i ng and br aci ng. The er ect i on dr awi ngs must conf or m t o AI SC 303.

Er ect i on dr awi ngs must be r evi ewed, st amped and seal ed by a r egi st er ed pr of essi onal engi neer .

1. 5. 2 Fabr i cat i on Dr awi ng Requi r ement s

Submi t f abr i cat i on dr awi ngs f or appr oval pr i or t o f abr i cat i on. Pr epar e i n accor dance wi t h AI SC 326 and AI SC 325. Fabr i cat i on dr awi ngs must not be r epr oduct i ons of cont r act dr awi ngs. I ncl ude compl et e i nf or mat i on f or t he f abr i cat i on and er ect i on of t he st r uct ur e' s component s, i ncl udi ng t he l ocat i on, t ype, and si ze of bol t s, wel ds, member s i zes and l engt hs, connect i on det ai l s, bl ocks, copes, and cut s. Use AWS A2. 4 st andar d wel di ng symbol s. Shor i ng and t empor ar y br aci ng must be desi gned and seal ed by a r egi st er ed pr of essi onal engi neer and submi t t ed f or r ecor d pur poses, wi t h cal cul at i ons, as par t of t he dr awi ngs. Any devi at i ons f r om t he det ai l s shown on t he cont r act dr awi ngs must be cl ear l y hi ghl i ght ed on t he f abr i cat i on dr awi ngs. Expl ai n t he r easons f or any devi at i ons f r om t he cont r act dr awi ngs.

1. 5. 3 Certifications

1. 5. 3. 1 Wel di ng Pr ocedur es and Qual i f i cat i ons

Pr i or t o wel di ng, submi t cer t i f i cat i on f or each wel der st at i ng t he t ype of wel di ng and posi t i ons qual i f i ed f or , t he code and pr ocedur e qual i f i ed under , dat e qual i f i ed, and t he f i r m and i ndi v i dual cer t i f y i ng t he qual i f i cat i on t est s. I f t he qual i f i cat i on dat e of t he wel di ng oper at or i s mor e t han one- year ol d, t he wel di ng oper at or ' s qual i f i cat i on cer t i f i cat e must be accompani ed by a cur r ent cer t i f i cat e by t he wel der at t est i ng t o t he f act t hat he has been engaged i n wel di ng si nce t he dat e of cer t i f i cat i on, wi t h no br eak i n wel di ng ser vi ce gr eat er t han 6 mont hs.

Apr i l 2019 Page 5 SECTI ON 05 12 00

Conf or m t o al l r equi r ement s speci f i ed i n AWS D1. 1/ D1. 1M and AWS D1. 8/ D1. 8M.

PART 2 PRODUCTS

2. 1 SYSTEM DESCRI PTI ON

Pr ovi de t he st r uct ur al st eel syst em, i ncl udi ng shop pr i mer or gal vani z i ng, compl et e and r eady f or use. St r uct ur al st eel syst ems i ncl udi ng desi gn, mat er i al s, i nst al l at i on, wor kmanshi p, f abr i cat i on, assembl y, er ect i on, i nspect i on, qual i t y cont r ol , and t est i ng must be pr ovi ded i n accor dance with AI SC 360, AI SC 341, UFC 3- 301- 01 and UFC 3- 310- 04 except as modi f i ed i n t hi s cont r act .

2. 2 STEEL

2. 2. 1 St r uct ur al St eel

Wi de f l ange and WT shapes, ASTM A992/ A992M. Angl es, Channel s and Pl at es, ASTM A36/ A36M.

2. 2. 2 St r uct ur al St eel Tubi ng

ASTM A500/ A500M, Gr ade C.

2. 2. 3 St eel Pi pe

ASTM A53/ A53M, Type E or S, Gr ade B, wei ght c l ass STD ( St andar d) .

2. 3 BOLTS, NUTS, AND WASHERS

Submi t t he cer t i f i ed manuf act ur er ' s mi l l r epor t s whi ch c l ear l y show t he appl i cabl e ASTM mechani cal and chemi cal r equi r ement s t oget her wi t h t he act ual t est r esul t s f or t he suppl i ed f ast ener s.

2. 3. 1 Common Gr ade Bol t s

2. 3. 1. 1 Bolts

ASTM A307, Gr ade A. The bol t heads and t he nut s of t he suppl i ed f ast ener s must be mar ked wi t h t he manuf act ur er ' s i dent i f i cat i on mar k, t he st r engt h gr ade and t ype speci f i ed by ASTM speci f i cat i ons.

2. 3. 1. 2 Nuts

ASTM A563M, Gr ade A, heavy hex st y l e.

2. 3. 1. 3 Sel f - Locki ng Nut s

Pr ovi de nut s wi t h a l ocki ng pi n set i n t he nut . The l ocki ng pi n must s l i de al ong t he bol t t hr eads, and by r ever si ng t he di r ect i on of t he l ocki ng pi n, t he nut must be r emoved wi t hout damagi ng t he nut or bol t .

Pr ovi de st ai nl ess st eel l ocki ng pi ns.

2. 3. 1. 4 Washers

ASTM F844.

Apr i l 2019 Page 6 SECTI ON 05 12 00

2. 3. 2 Hi gh- St r engt h Bol t s

2. 3. 2. 1 Bolts

ASTM A325, Type 1 ASTM A490, Type 1 or 2.

2. 3. 2. 2 Nuts

ASTM A563, Gr ade and St yl e as speci f i ed i n t he appl i cabl e ASTM bol t standard.

2. 3. 2. 3 Di r ect Tensi on I ndi cat or Washer s

ASTM F959.

2. 3. 2. 4 Washers

ASTM F436, pl ai n car bon st eel .

2. 3. 3 Tensi on Cont r ol Bol t s

ASTM F1852, Type 1, heavy- hex head assembl i es consi st i ng of st eel st r uct ur al bol t s wi t h spl i ned ends, heavy- hex car bon st eel nut s, and har dened car bon st eel washer s. Assembl y f i ni sh must be pl ai n.

2. 3. 4 Foundat i on Anchor age

2. 3. 4. 1 Anchor Rods

ASTM F1554 Gr 36 , Cl ass 1A .

2. 3. 4. 2 Anchor Nut s

ASTM A563, Gr ade A, hex st y l e.

2. 3. 4. 3 Anchor Washer s

ASTM F844.

2. 3. 4. 4 Anchor Pl at e Washer s

ASTM A36/ A36M

2. 4 STRUCTURAL STEEL ACCESSORI ES

2. 4. 1 Wel di ng El ect r odes and Rods

AWS D1. 1/ D1. 1M and AWS D1. 8/ D1. 8M.

2. 4. 2 Non- Shr i nk Gr out

ASTM C1107/ C1107M, wi t h no ASTM C827/ C827M shr i nkage.

2. 4. 3 Wel ded Shear St ud Connect or s

ASTM A29/ A29M, Type B. AWS D1. 1/ D1. 1M.

Apr i l 2019 Page 7 SECTI ON 05 12 00

2. 4. 4 Pi ns and Rol l er s

ASTM A668/ A668M, Cl ass C, D, F, or G; ASTM A108, Gr ades 1016 t o 1030.

Pr ovi de as speci f i ed i n AASHTO HB- 17, Di v i s i on I I , Sect i ons 10. 26 and

10. 27, except pr ovi de pi ns i n l engt hs t o ext end a mi ni mum of 0. 25 i nch beyond t he out si de f aces of t he connect ed par t s.

2. 5 GALVANIZING

ASTM F2329 f or t hr eaded par t s or ASTM A123/ A123M f or st r uct ur al st eel member s, as appl i cabl e, unl ess speci f i ed ot her wi se gal vani ze af t er f abr i cat i on wher e pr act i cabl e.

2. 6 FABRICATION

Fabr i cat i on must be i n accor dance wi t h t he appl i cabl e pr ovi s i ons of AI SC 325. Fabr i cat i on and assembl y must be done i n t he shop t o t he gr eat est ext ent possi bl e. Punch, subpunch and r eam, or dr i l l bol t and pi n hol es per pendi cul ar t o t he sur f ace of t he member .

Compr essi on j oi nt s dependi ng on cont act bear i ng must have a sur f ace r oughness not i n excess of 500 mi cr o i nch as det er mi ned by ASME B46. 1, and ends must be squar e wi t hi n t he t ol er ances f or mi l l ed ends speci f i ed i n

ASTM A6/ A6M.

Shop spl i ces of member s bet ween f i el d spl i ces wi l l be per mi t t ed onl y wher e i ndi cat ed on t he Cont r act Dr awi ngs. Spl i ces not i ndi cat ed r equi r e t he appr oval of t he Cont r act i ng Of f i cer .

Do not spl i ce t r uss t op and bot t om chor ds except as appr oved by t he Cont r act i ng Of f i cer . Chor d spl i ces must occur at panel j oi nt s at appr oxi mat el y t he t hi r d poi nt of t he span. The cent er of gr avi t y l i nes of t r uss member s must i nt er sect at panel poi nt s unl ess ot her wi se appr oved by t he Cont r act i ng Of f i cer . When t he cent er of gr avi t y l i nes do not i nt er sect at a panel poi nt , pr ovi s i ons must be made f or t he st r esses due t o eccent r i c i t y. Camber of t r usses must be 1/ 8 i nch i n 10 f eet unl ess ot her wi se i ndi cat ed.

2. 6. 1 Markings

Pr i or t o er ect i on, member s must be i dent i f i ed by a pai nt ed er ect i on mar k.

Connect i ng par t s assembl ed i n t he shop f or r eami ng hol es i n f i el d connect i ons must be mat ch mar ked wi t h scr at ch and not ch mar ks. Do not l ocat e er ect i on mar ki ngs on ar eas t o be wel ded. Do not l ocat e mat ch mar ki ngs i n ar eas t hat wi l l decr ease member st r engt h or cause st r ess concent r at i ons. Af f i x embossed t ags t o hot - di pped gal vani zed member s.

2. 6. 2 Shop Pr i mer

SSPC Pai nt 20 or SSPC Pai nt 29, ( z i nc r i ch pr i mer ) . Shop pr i me st r uct ur al st eel , except as modi f i ed her ei n, i n accor dance wi t h SSPC PA 1. Do not pr i me st eel sur f aces embedded i n concr et e, gal vani zed sur f aces, sur f aces t o r ecei ve spr ayed- on f i r epr oof i ng, sur f aces t o r ecei ve epoxy coat i ngs, sur f aces desi gned as par t of a composi t e st eel concr et e sect i on, or sur f aces wi t hi n 0. 5 i nch of t he t oe of t he wel ds pr i or t o wel di ng ( except sur f aces on whi ch met al decki ng i s t o be wel ded) . I f f l ash r ust i ng occur s, r e- c l ean t he sur f ace pr i or t o appl i cat i on of pr i mer . Appl y pr i mer t o a mi ni mum dr y f i l m t hi ckness of 2. 0 mi l .

Apr i l 2019 Page 8 SECTI ON 05 12 00

Sl i p cr i t i cal sur f aces must be pr i med wi t h a Cl ass B coat i ng i n accor dance with AI SC 325. Submi t t est r epor t f or Cl ass B coat i ng.

Pr i or t o assembl y, pr i me sur f aces whi ch wi l l be conceal ed or i naccessi bl e af t er assembl y. Do not appl y pr i mer i n f oggy or r ai ny weat her ; when t he ambi ent t emper at ur e i s bel ow 45 degr ees F or over 95 degr ees F; or when t he pr i mer may be exposed t o t emper at ur es bel ow 40 degr ees F wi t hi n 48 hour s af t er appl i cat i on, unl ess appr oved ot her wi se by t he Cont r act i ng Of f i cer . Repai r damaged pr i med sur f aces wi t h an addi t i onal coat of pr i mer .

2. 6. 2. 1 Cleaning

SSPC SP 6/ NACE No. 3, except st eel exposed i n spaces above cei l i ngs, at t i c spaces, f ur r ed spaces, and chases t hat wi l l be hi dden t o v i ew i n f i ni shed const r uct i on may be cl eaned t o SSPC SP 3 when r ecommended by t he shop pr i mer manuf act ur er . Mai nt ai n st eel sur f aces f r ee f r om r ust , di r t , oi l , gr ease, and ot her cont ami nant s t hr ough f i nal assembl y.

2. 6. 3 Fi r epr oof i ng and Epoxy Coat ed Sur f aces

Sur f aces t o r ecei ve spr ayed- on f i r epr oof i ng or epoxy coat i ngs must be cl eaned and pr epar ed i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons, and as speci f i ed i n Sect i on 07 81 00 SPRAY- APPLI ED

FIREPROOFING.

2. 6. 4 Sur f ace Fi ni shes

ASME B46. 1 maxi mum sur f ace r oughness of 125 f or pi n, pi nhol es, and sl i di ng bear i ngs, unl ess i ndi cat ed ot her wi se.

2. 7 DRAI NAGE HOLES

Adequat e dr ai nage hol es must be dr i l l ed t o el i mi nat e wat er t r aps. Hol e di amet er must be 1/ 2 i nch and l ocat i on must be i ndi cat ed on t he det ai l dr awi ngs. Hol e s i ze and l ocat i on must not af f ect t he st r uct ur al i nt egr i t y.

PART 3 EXECUTI ON

3. 1 ERECTION

a. Er ect i on of st r uct ur al st eel , except as i ndi cat ed i n i t em b. bel ow, must be i n accor dance wi t h t he appl i cabl e pr ovi s i ons of AI SC 325.

b. For l ow- r i se st r uct ur al st eel bui l di ngs ( 60 f eet t al l or l ess and a maxi mum of 2 st or i es) , t he st r uct ur e must be er ect ed i n accor dance with AI SC DESI GN GUI DE 10.

Af t er f i nal posi t i oni ng of st eel member s, pr ovi de f ul l bear i ng under base pl at es and bear i ng pl at es usi ng nonshr i nk gr out . Pl ace nonshr i nk gr out i n accor dance wi t h t he manuf act ur er ' s i nst r uct i ons.

3. 1. 1 STORAGE

Mat er i al must be st or ed out of cont act wi t h t he gr ound i n such manner and l ocat i on as wi l l mi ni mi ze det er i or at i on.

3. 2 CONNECTIONS

Except as modi f i ed i n t hi s sect i on, connect i ons not det ai l ed must be

Apr i l 2019 Page 9 SECTI ON 05 12 00 desi gned i n accor dance wi t h AI SC 360. Bui l d connect i ons i nt o exi st i ng wor k. Do not t i ght en anchor bol t s set i n concr et e wi t h i mpact t or que wr enches. Hol es must not be cut or enl ar ged by bur ni ng. Bol t s, nut s, and washer s must be cl ean of di r t and r ust , and l ubr i cat ed i mmedi at el y pr i or t o i nst al l at i on.

3. 2. 1 Common Gr ade Bol t s

ASTM A307 bol t s must be t i ght ened t o a " snug t i ght " f i t . " Snug t i ght " i s t he t i ght ness t hat exi st s when pl i es i n a j oi nt ar e i n f i r m cont act . I f f i r m cont act of j oi nt pl i es cannot be obt ai ned wi t h a f ew i mpact s of an i mpact wr ench, or t he f ul l ef f or t of a man usi ng a spud wr ench, cont act t he Cont r act i ng Of f i cer f or f ur t her i nst r uct i ons.

3. 2. 2 Hi gh- St r engt h Bol t s

Pr ovi de di r ect t ensi on i ndi cat or washer s i n al l ASTM A325 and ASTM A490 bol t ed connect i ons. Bol t s must be i nst al l ed i n connect i on hol es and i ni t i al l y br ought t o a snug t i ght f i t . Af t er t he i ni t i al t i ght eni ng pr ocedur e, bol t s must t hen be f ul l y t ensi oned, pr ogr essi ng f r om t he most r i gi d par t of a connect i on t o t he f r ee edges.

3. 2. 2. 1 I nst al l at i on of Di r ect Tensi on I ndi cat or Washer s ( DTI W)

Wher e possi bl e, t he DTI W must be i nst al l ed under t he bol t head and t he nut must be t i ght ened. I f t he DTI W i s i nst al l ed adj acent t o t he t ur ned el ement , pr ovi de a f l at washer bet ween t he DTI W and nut when t he nut i s t ur ned f or t i ght eni ng, and bet ween t he DTI W and bol t head when t he bol t head i s t ur ned f or t i ght eni ng. I n addi t i on t o t he LI W, pr ovi de f l at washer s under bot h t he bol t head and nut when ASTM A490 bol t s ar e used.

3. 2. 3 Tensi on Cont r ol Bol t s

Bol t s must be i nst al l ed i n connect i on hol es and i ni t i al l y br ought t o a snug t i ght f i t . Af t er t he i ni t i al t i ght eni ng pr ocedur e, bol t s must t hen be f ul l y t ensi oned, pr ogr essi ng f r om t he most r i gi d par t of a connect i on t o t he f r ee edges.

3. 3 GAS CUTTI NG

Use of gas- cut t i ng t or ch i n t he f i el d f or cor r ect i ng f abr i cat i on er r or s wi l l not be per mi t t ed on any maj or member i n t he st r uct ur al f r ami ng. Use of a gas cut t i ng t or ch wi l l be per mi t t ed on mi nor member s not under st r ess onl y af t er appr oval has been obt ai ned f r om t he Cont r act i ng Of f i cer .

3. 4 WELDING

Wel di ng must be i n accor dance wi t h AWS D1. 1/ D1. 1M. Gr i nd exposed wel ds smoot h as i ndi cat ed. Pr ovi de AWS D1. 1/ D1. 1M qual i f i ed wel der s, wel di ng oper at or s, and t acker s.

Devel op and submi t t he Wel di ng Pr ocedur e Speci f i cat i ons ( WPS) f or al l wel di ng, i ncl udi ng wel di ng done usi ng pr equal i f i ed pr ocedur es.

Pr equal i f i ed pr ocedur es may be submi t t ed f or i nf or mat i on onl y; however , pr ocedur es t hat ar e not pr equal i f i ed must be submi t t ed f or appr oval .

3. 4. 1 Removal of Tempor ar y Wel ds, Run- Of f Pl at es, and Backi ng St r i ps

Remove onl y f r om f i ni shed ar eas. Remove backi ng st r i ps f r om bot t om f l ange

Apr i l 2019 Page 10 SECTI ON 05 12 00 of moment connect i ons, backgouge t he r oot pass t o sound wel d met al and r ei nf or ce wi t h a 5/ 16 i nch f i l l et wel d mi ni mum.

3. 5 SHOP PRI MER REPAI R

Repai r shop pr i mer i n accor dance wi t h t he pai nt manuf act ur er ' s r ecommendat i on f or sur f aces damaged by handl i ng, t r anspor t i ng, cut t i ng, wel di ng, or bol t i ng.

3. 5. 1 Fi el d Pr i mi ng

St eel exposed t o t he weat her , or l ocat ed i n bui l di ng ar eas wi t hout HVAC f or cont r ol of r el at i ve humi di t y must be f i el d pr i med. Af t er er ect i on, t he f i el d bol t heads and nut s, f i el d wel ds, and any abr asi ons i n t he shop coat must be cl eaned and pr i med wi t h pai nt of t he same qual i t y as t hat used f or t he shop coat .

3. 6 GALVANI ZI NG REPAI R

Repai r damage t o gal vani zed coat i ngs usi ng ASTM A780/ A780M zi nc r i ch pai nt f or gal vani z i ng damaged by handl i ng, t r anspor t i ng, cut t i ng, wel di ng, or bol t i ng. Do not heat sur f aces t o whi ch r epai r pai nt has been appl i ed.

3. 7 FI ELD QUALI TY CONTROL

Per f or m f i el d t est s, and pr ovi de l abor , equi pment , and i nci dent al s r equi r ed f or t est i ng. The Cont r act i ng Of f i cer must be not i f i ed i n wr i t i ng of def ect i ve wel ds, bol t s, nut s, and washer s wi t hi n 7 wor ki ng days of t he dat e of t he i nspect i on.

3. 7. 1 Welds

3. 7. 1. 1 Vi sual I nspect i on

AWS D1. 1/ D1. 1M. Fur ni sh t he ser vi ces of AWS- cer t i f i ed wel di ng i nspect or s f or f abr i cat i on and er ect i on i nspect i on and t est i ng and ver i f i cat i on inspections.

I nspect pr oper pr epar at i on, s i ze, gagi ng l ocat i on, and accept abi l i t y of wel ds; i dent i f i cat i on mar ki ng; oper at i on and cur r ent char act er i st i cs of wel di ng set s i n use.

3. 7. 1. 2 Nondest r uct i ve Test i ng

Nondest r uct i ve t est i ng must be i n accor dance wi t h AWS D1. 1/ D1. 1M. Test l ocat i ons must be as i ndi cat ed. I f mor e t han 20 per cent of wel ds made by a wel der cont ai n def ect s i dent i f i ed by t est i ng, t hen al l wel ds made by t hat wel der must be t est ed by ul t r asoni c t est i ng, as appr oved by t he Cont r act i ng Of f i cer . When al l wel ds made by an i ndi v i dual wel der ar e r equi r ed t o be t est ed, magnet i c par t i c l e t est i ng must be used onl y i n ar eas i naccessi bl e t o ul t r asoni c t est i ng. Ret est def ect i ve ar eas af t er r epai r . Submi t wel d i nspect i on r epor t s.

Test i ng f r equency: Pr ovi de t he f ol l owi ng t ypes and number of t est s:

Apr i l 2019 Page 11 SECTI ON 05 12 00

Test Type Number of Test s

Ultrasonic

Magnet i c Par t i c l e 4

Dye Penet r ant

3. 7. 2 Di r ect Tensi on I ndi cat or Washer s

3. 7. 2. 1 Di r ect Tensi on I ndi cat or Washer Compr essi on

Di r ect t ensi on i ndi cat or washer s must be t est ed i n pl ace t o ver i f y t hat t hey have been compr essed suf f i c i ent l y t o pr ovi de t he 0. 015 i nch gap when t he di r ect t ensi on i ndi cat or washer i s pl aced under t he bol t head and t he nut i s t i ght ened, and t o pr ovi de t he 0. 005 i nch gap when t he di r ect t ensi on i ndi cat or washer i s pl aced under t he t ur ned el ement , as r equi r ed by ASTM F959. Submi t di r ect t ensi on i ndi cat or washer i nspect i on r epor t s.

3. 7. 3 Hi gh- St r engt h Bol t s

3. 7. 3. 1 Test i ng Bol t , Nut , and Washer Assembl i es

Test a mi ni mum of 3 bol t , nut , and washer assembl i es f r om each mi l l cer t i f i cat e bat ch i n a t ensi on measur i ng devi ce at t he j ob s i t e pr i or t o t he begi nni ng of bol t i ng st ar t - up. Demonst r at e t hat t he bol t s and nut s, when used t oget her , can devel op t ensi on not l ess t han t he pr ovi s i ons speci f i ed i n AI SC 360, dependi ng on bol t s i ze and gr ade. The bol t t ensi on must be devel oped by t i ght eni ng t he nut . A r epr esent at i ve of t he manuf act ur er or suppl i er must be pr esent t o ensur e t hat t he f ast ener s ar e pr oper l y used, and t o demonst r at e t hat t he f ast ener assembl i es suppl i ed sat i sf y t he speci f i ed r equi r ement s. Submi t bol t t est i ng r epor t s.

3. 7. 3. 2 Inspection

I nspect i on pr ocedur es must be i n accor dance wi t h AI SC 360. Conf i r m and r epor t t o t he Cont r act i ng Of f i cer t hat t he mat er i al s meet t he pr oj ect speci f i cat i on and t hat t hey ar e pr oper l y st or ed. Conf i r m t hat t he f ayi ng sur f aces have been pr oper l y pr epar ed bef or e t he connect i ons ar e assembl ed. Obser ve t he speci f i ed j ob s i t e t est i ng and cal i br at i on, and conf i r m t hat t he pr ocedur e t o be used pr ovi des t he r equi r ed t ensi on.

Moni t or t he wor k t o ensur e t he t est i ng pr ocedur es ar e r out i nel y f ol l owed on j oi nt s t hat ar e speci f i ed t o be f ul l y t ensi oned.

I nspect cal i br at i on of t or que wr enches f or hi gh- st r engt h bol t s.

3. 7. 3. 3 Testing

The Gover nment has t he opt i on t o per f or m nondest r uct i ve t est s on 5 per cent of t he i nst al l ed bol t s t o ver i f y compl i ance wi t h pr e- l oad bol t t ensi on r equi r ement s. Pr ovi de t he r equi r ed access f or t he Gover nment t o per f or m t he t est s. The nondest r uct i ve t est i ng wi l l be done i n- pl ace usi ng an ul t r asoni c measur i ng devi ce or any ot her devi ce capabl e of det er mi ni ng i n- pl ace pr e- l oad bol t t ensi on. The t est l ocat i ons must be sel ect ed by t he Cont r act i ng Of f i cer . I f mor e t han 10 per cent of t he bol t s t est ed cont ai n def ect s i dent i f i ed by t est i ng, t hen al l bol t s used f r om t he bat ch f r om whi ch t he t est ed bol t s wer e t aken, must be t est ed at t he Cont r act or ' s

Apr i l 2019 Page 12 SECTI ON 05 12 00 expense. Ret est new bol t s af t er i nst al l at i on at t he Cont r act or ' s expense.

3. 7. 4 Test i ng f or Embr i t t l ement

ASTM A143/ A143M f or st eel pr oduct s hot - di p gal vani zed af t er f abr i cat i on.

Submi t embr i t t l ement t est r epor t s.

- - End of Sect i on - -

Apr i l 2019 Page 13 SECTI ON 05 12 00

File details come from the government source that posted it. Updated .