Atlas Park Pond Dredging

Closed State & local contract opportunity Posted

Solicitation number
PE-65100-NONST-2025-000000027
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Douglas County, Georgia is seeking a contractor for the Atlas Park Pond Dredging project, a comprehensive environmental remediation and site improvement initiative. The procurement involves permanently capping a contaminated soil area with clean fill and asphalt, including constructing a parking lot with a precast concrete boat ramp. The primary scope of work includes dredging approximately 1,126 cubic yards of impacted sediment from two designated zones, removing the top 1-foot of sediment, and utilizing appropriate dredging techniques such as suction or pump and hose methods. Contractors must install and maintain a containment boom to prevent sediment migration and adhere to strict environmental protocols, including securing a wetland permit before commencing work. The project is currently under the Georgia Voluntary Remediation Program, with erosion control plans pending review by the Georgia Soil and Water Conservation Commission (GSWCC). The solicitation was posted on February 24, 2025, with proposals due by April 7, 2025, and the total project timeline specified at 270 days (approximately 9 months).

While no specific set-aside designations were explicitly mentioned in the documentation, contractors will need significant environmental remediation expertise and HAZWOPER training for workers handling contaminated materials. The project requires specialized capabilities in sediment removal, environmental containment, site grading, and proper disposal of contaminated materials at approved landfills. Bidders must demonstrate technical proficiency in handling complex environmental remediation tasks, including confirmatory testing and detailed documentation of material disposal. Although a specific budget range was not provided, the comprehensive technical specifications and multi-phase nature of the project suggest a substantial capital investment. The project involves extensive site preparation, including clearing, grubbing, grading, drainage installation, signage, striping, and erosion control activities, indicating a complex and technically demanding procurement opportunity that will likely require significant technical and financial resources from potential contractors.

Opportunity text

The project includes permanently ¿capping' an area of contaminated soil with clean fill and asphalt. The ¿cap¿ consists of the construction of a parking lot with a precast concrete boat ramp. This project aims to remediate a currently unusable contaminated area and construct a public park in a future phase. Work involves dredging material from existing ponds, drying and property disposing of the material, clearing and grubbing, grading, drainage, signage, striping and related erosion control activities. Grading work for the cap will involve hauling material from off-site as well as using on-site material. This project consists of dredging approximately 1,126 cubic yards of impacted sediment located in two sediment removal zones. The top 1-foot of sediment should be removed from the entire footprint. The Contractor will be responsible for selecting the appropriate dredging technique and placement of the dredge spoils in the sediment placement area which may include a suction dredging method and a pump and hose method to transport the sediment to the Sediment Placement Area. In order to prevent the migration of suspended sediments outside of the sediment removal areas, Contractor shall provide and install a containment boom with a floating surface device, skirt, and longitudinal support prior to dredging activities. The containment boom will be located immediately outside the limits of each sediment removal zone and will be anchored to the shoreline. The skirt will extend to the bottom of the pond. The containment boom will remain in place during all dredging activities and be routinely inspected by the Contractor to ensure it is functioning properly. NOTE: No work shall take place in the areas with wetlands present until a wetland permit is secured by the County. NOTE: Erosion Control Plans are currently under review with GSWCC at the time of this bid. EC Plans may be adjusted based on comments received from GSWCC.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity