COVER SHEET
C-001
A. BONNO
A. BONNO
J. BACH
L.OUBRE
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-C O
VE
R
, G
EN
ER
AL
N O
TE
S
PL
O
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
NOT TO SCALE NORTHNORTH
PROJECT SITE MAP
24-HOUR EROSION CONTROL CONTACT:
NAME:
COMPANY:
ADDRESS:
PHONE #:
GWSCC #
EXPIRATION:
NOTE: THE PRIMARY PERMITTEE IS NOT KNOWN AT THIS TIME
AND IS TO BE DESIGNATED AS THE EMERGENCY CONTACT
AFTER CONTRACT IS AWARDED.
GPS COORDINATES OF CONSTRUCTION EXIT:
LAT: N32.192827
LONG: W81.399114
TOTAL PARCEL ACREAGE: 314.32
TOTAL DISTURBED AREA: 8.67 ACRES
TOTAL IMPERVIOUS AREA: 4.16 ACRES
PARCEL NO.: 03010027
LANDLOT: N/A
DISTRICT: 01
*SCHEDULE FOR PERMITTING PURPOSES ONLY. REFER TO OFFICIAL PROJECT
SCHEDULE (AS APPROVED BY OWNER) FOR OFFICIAL DATES AND DURATIONS.
TITLE: REPRESENTATIVE FOR PRIMARY PERMITTEE
(AWARDED CONTRACTOR TO PROVIDE LEVEL I
CERTIFICATION AND FILL OUT 24-HOUR EROSION
CONTROL CONTACT.
PROJECT DESCRIPTION
THE SCOPE OF THIS PROJECT IS 'CAPPING' AN AREA OF CONTAMINATED SOIL WITH CLEAN
FILL AND ASPHALT. THE CAP CONSISTS OF THE CONSTRUCTION OF A PARKING LOT WITH
AN ADA ACCESSIBLE BOAT RAMP. THIS PROJECT AIMS TO REMEDIATE A CURRENTLY
UNUSABLE CONTAMINATED AREA AND CONSTRUCT A PUBLIC PARK IN A FUTURE PHASE.
24 HOUR GA CONTACT
TRE WILKINS, P.E.
(912) 667 0621
OWNER/ CONTACT
TRE WILKINS, P.E.
PROJECT MANAGER
EFFINGHAM COUNTY BOC
804 S LAUREL ST
SPRINGFIELD, GA, 31329
OFFICE PHONE: 912-754-2123
CELL PHONE: 912-667-0621
GENERAL CONTRACTOR
TBD
DESIGN PROFESSIONAL
POND & COMPANY
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
P: (404) 395-3305 E: JONESB@PONDCO.COM
CONTACT: BRAD JONES, PLA
GSWCC# 0000031792
EXPIRES 01/12/2025
DESIGN PROFESSIONAL:
BRAD JONES, PLA
LEVEL II CERTIFICATION
No.: 000031792
EXPIRES: 01/12/2028
ATLAS SITE
CIVIL CONSTRUCTION DOCUMENTS FOR:
216 SHADY OAKS ROAD
GUYTON, GA 31312
EFFINGHAM COUNTY
POND PROJECT NUMBER: 1220238
DATE: 2/14/2025
CASE NUMBER: TBD
EFFINGHAM COUNTY, GA 31312
VICINITY MAP
SCALE: NTS
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
PROJECT
SITE
TBD
ACTIVITY SCHEDULE (FOR PERMITTING REFERENCE ONLY)
ACTIVITY
TIME / WEEKS
5-63-41-2
REMOVAL OF TEMPORARY EROSION
DEMOLITION OF SURFACE PAVEMENT, WALLS,
INSTALL SILT FENCE, CONSTRUCTION EXIT,
MAINTENANCE OF TEMPORARY EROSION
PERMANENT SEEDING
AND SEDIMENT CONTROL MEASURES
INSTALL REMAINDER OF INITIAL PERIMTER
BASINS, CHECK DAMS, ROCK DAMS, DIVERSION
BERMS, ROCK FILTER, DOWN DRAINS, INLET
SEDIMENT TRAPS, AND FILTER RINGS,
7-8 9-10 11-12
CONTROLS INCLUDING SEDIMENT
FENCES, AND UTILITY POLES
CLEARING AND GRUBBING
ROUGH GRADING OPERATIONS
FINAL PAVING
AND SEDIMENT CONTROL MEASURES
13-14 15-16
TREE PROTECTION INSTALLATION
MAINTAIN TREE PROTECTION INSTALLATION
AND TREE PROTECTION MEASURES
Sheet List Table Sheet Number Sheet Title
C-001 COVER
C-002 GENERAL NOTES
V-001 SURVEY
CS100 OVERALL SITE PLAN
CS101 SITE PLAN
CG100 ENVIRONMENTAL SOIL GRADING PLAN
CG101 GRADING PLAN
CG201 EARTHWORKS
CE001 ESPC NOTES
CE002 ESPC NOTES
CE003 ESPC NOTES
CE004 ESPC NOTES
CE101 ESPC PLAN INITIAL
CE201 ESPC PLANS INTERMEDIATE
CE301 ESPC PLANS FINAL
CE501 ESPC DETAILS
CE502 ESPC DETAILS
CE503 ESPC DETAILS
CE504 ESPC DETAILS
C-501 CONSTRUCTION DETAILS
DPR SEAL
JonesB Date
GENERAL
NOTES
C-001
A. BONNO
A. BONNO
J. BACH
L.OUBRE
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-C O
VE
R
, G
EN
ER
AL
N O
TE
S
PL
O
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
DESIGN PROFESSIONAL:
BRAD JONES, PLA
LEVEL II CERTIFICATION
No.: 000031792
EXPIRES: 01/12/2028
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
CIVIL ABBREVIATIONS
@ AT
& AND
Ø DIAMETER
APPR APPROVED
APPROX APPROXIMATELY
BLDG BUILDING
BM BENCHMARK
BOT BOTTOM
BW BOTTOM OF WALL GRADE ELEVATION
CENTERLINE
CF CUBIC FEET
CONC CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
DI DROP INLET
DIA DIAMETER
DB DUCTBANK
DIP DUCTILE IRON PIPE
DS DOWNSPOUT
E EASTING
EG EXISTING GRADE
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
EX EXISTING
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FT FEET
FL BOTTOM FACE OF CURB
FS FLARE END SECTION
GAB GRADED AGGREGATE BASE
GIS GEOGRAPHIC INFORMATION SYSTEM
HDPE HIGH DENSITY POLYETHYLENE PIPE
HORZ HORIZONTAL
HT HEIGHT
HW HEADWALL
IBW INSIDE BOTTOM OF WALL
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH
INC INCORPORATED
INV INVERT
IPF IRON PIN FOUND
IPS IRON PIN SET
JB JUNCTION BOX
LF LINEAR FEET
LOD LIMITS OF DISTURBANCE
LP LIGHTING PROTECTION
MAX MAXIMUM
M.E. MATCH ELEVATION
MECH MECHANICAL
MES MITERED END SECTION
MIN MINIMUM
MON MONUMENT
N NORTHING
N/F NOW OR FORMERLY
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OWS OIL/WATER SEPARATOR
PIV POST INDICTOR VALVE
POL PETROLEUMS, OILS, AND LUBRICANTS
PROP PROPOSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
QC QUALITY CONTROL
RCP REINFORCED CONCRETE PIPE
R/W RIGHT OF WAY
SD STORM DRAIN
SF SQUARE FEET
SPEC SPECIFICATIONS
SQ SQUARE
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
STD STANDARD
TBM TEMPORARY BENCHMARK
TBD TO BE DETERMINED
TC TOP OF CURB
TYP TYPICAL
VERT VERTICAL
WM WATER METER
WV WATER VALVE
WWF WELDED WIRE FABRIC
W/ WITH
W/C WATER TO CEMENT
YR YEAR
SHEET NAMING CONVENTION
C-001
2 DIGIT SEQUENTIAL # (01-99)
(FIRST DIGIT INDICATES PLAN
TYPE. SECOND DIGIT INDICATES
FLOOR)
1 DIGIT SHEET TYPE DESIGNATOR
0 - GENERAL
2 - PROFILES
3 - SECTIONS
4 - ENLARGED PLANS
6 - SCHEDULES AND DIAGRAMS
9 - 3D VIEWS (ISO, PERSPECTIVES,
PHOTOS)
2 DIGIT DESCIPLINE
DESIGNATOR
(IF ONLY ONE LETTER IS
USED, THE SECOND
LETTER IS REPLACED
WITH A DASH "-" AS A
PLACEHOLDER)**
PROJECT CONTACTS:
LANDSCAPE ARCHITECT FOR THIS PROJECT IS:
POND
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
P: (678) 336.7740
CONTACT: BRAD JONES, PLA
CL
1 - PLANS
5 - DETAILS
7 - USER DEFINED
8 - USER DEFINED
NOTE:
1. NOT ALL ABBREVIATIONS SHOWN WILL BE USED ON THIS
PROJECT.
CLIENT
GEORGIA DEPARTMENT OF NATURAL RESOURCES
2 MARTIN LUTHER KING JR DR SE,
SUITE 1352 EAST
ATLANTA, GA 30334
P: 404.656.6532
GENERAL CIVIL NOTES:
1. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY,
STATE, AND FEDERAL REGULATIONS APPLICABLE TO
CONSTRUCTION OF THIS SITE.
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION
SHALL BE IN STRICT ACCORDANCE WITH THE MINIMUM
ENGINEERING AND CONSTRUCTION STANDARDS ADOPTED BY
THE APPLICABLE JURISDICTIONS HAVING AUTHORITY. WHERE
CONFLICTS OR OMISSIONS EXIST, THE MOST STRINGENT
STANDARDS SHALL DICTATE. SUBSTITUTIONS AND DEVIATION
FROM PLANS AND SPECIFICATIONS SHALL BE PERMITTED ONLY
WHEN WRITTEN APPROVAL HAS BEEN ISSUED BY THE OWNER.
3. ALL DIMENSIONS ARE TAKEN FROM/TO FENCE LINES,
CENTERLINE OF UTILITY, CENTER OF MANHOLE OR CATCH
BASIN, CENTERLINE OF ROAD, FACE OF BUILDING, FACE OF
CURB, FACE OF WALL, OR CENTERLINE OF STRIPING UNLESS
OTHERWISE NOTED.
4. EXISTING CONDITIONS SHOWN ARE BASED UPON PARTIAL
SURVEY PROVIDED BY TR LONG ENGINEERING, PC ON
12/05/2024.
5. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE PROVIDED, INSTALLED, AND MAINTAINED AS
REQUIRED BY LOCAL, STATE, AND FEDERAL REQUIREMENTS.
6. CONTRACTOR TO MOVE ALL CONSTRUCTION DEBRIS OFF THE
HOMESTEAD AIR RESERVE BASE PROPERTY AND DISPOSE
DEBRIS AT A LEGAL, PERMITTED LANDFILL CONSISTENT WITH
ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
7. NO BURNING IS ALLOWED ON THE SITE PROPERTY.
8. CONTRACTOR TO ENSURE ALL EXISTING TOPS OF MANHOLES
AND VALVE BOXES ARE RAISED OR LOWERED TO BE FLUSH
WITH FINISHED GRADES, UNLESS NOTED OTHERWISE.
9. ALL NEW PAVEMENT AND SIDEWALKS SHALL BE CONSTRUCTED
FLUSH WITH EXISTING, WITH NO PONDING OF STORMWATER,
UNLESS NOTED OTHERWISE.
10. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO
ENSURE POSITIVE DRAINAGE AWAY FROM ALL BUILDINGS AND
TO DRAINAGE STRUCTURES OR DITCHES. NATURAL FLOW OF
SURROUNDING WATERS SHALL NOT BE DISTURBED DURING
CONSTRUCTION, UNLESS SHOWN OTHERWISE.
11. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS,
COORDINATES, AND DIMENSIONAL INFORMATION PRIOR TO
CONSTRUCTION. THE CONTRACTOR SHALL BRING ALL
DISCREPANCIES TO THE ATTENTION OF THE COR PRIOR TO
STARTING CONSTRUCTION.
12. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN
ACCORDANCE WITH THE GEORGIA DEPARTMENT OF
TRANSPORTATION (GDOT) AND "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" (MUTCD), LATEST EDITION.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING INSTALLATION OF ALL NEW UTILITIES WITH
THOSE THAT ARE EXISTING. IF EXISTING UTILITIES ARE IN
CONFLICT WITH NEW UTILITIES, THE SITE CONTRACTOR SHALL
NOTIFY THE OWNER BEFORE PROCEEDING WITH
CONSTRUCTION.
14. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE
STOCKPILED IN AN APPROVED AREA DURING CONSTRUCTION.
EXCESS OR UNUSABLE TOPSOIL SHALL BE DISPOSED OF
OFF-SITE IN A MANNER THAT IS LEGAL AND CONSISTENT WITH
ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
15. THE LOCATION OF ALL EXISTING UTILITIES AND STORM
DRAINAGE SHOWN ON THE PLANS HAVE BEEN DETERMINED
FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR
THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER
ASSUMES NO RESPONSIBILITY FOR INACCURACY. PRIOR TO
THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS
UTILITIES AND TO MAKE THE NECESSARY ARRANGEMENTS FOR
ANY RELOCATION OF THESE UTILITIES WITH THE COR OF THE
UTILITY. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN
CROSSING UNDERGROUND UTILITIES, WHETHER SHOWN ON
THE PLAN OR LOCATED BY THE UTILITY COMPANY. ALL
UTILITIES WHICH INTERFERE WITH THE PROPOSED
CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF
THE OWNER. ANY FEES ASSOCIATED WITH UTILITY
RELOCATIONS SHALL BE BORNE BY THE CONTRACTOR IN
ACCORDANCE WITH RESPECTIVE UTILITY COMPANY
STANDARDS. THE CONTRACTOR SHALL COORDINATE
DISCONNECTION OF EXISTING UTILITIES WITH THE
APPROPRIATE UTILITY PROVIDER.
16. GRADING SHALL BE AS INDICATED, AND SHALL PRODUCE A
FINISHED SURFACE WITH NO PONDING OF WATER, READY TO
RECEIVE PLANTING MATERIALS OR GRASSING.
17. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
ENSURE THAT ALL REQUIRED PERMITS ARE OBTAINED AND IN
HAND BEFORE BEGINNING ANY CONSTRUCTION. NO
CONSTRUCTION OR FABRICATION OF ANY ITEM SHALL BEGIN
UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND ANY
OTHER DOCUMENTATION FROM ALL OF THE PERMITTING AND
ANY OTHER REGULATORY AUTHORITIES. ANY PENALTIES,
STOP WORK ORDERS OR ADDITIONAL WORK RESULTING FROM
THE CONTRACTOR BEING IN VIOLATION OF THE ABOVE
REQUIREMENTS, SHALL BE FULLY BORNE BY THE
CONTRACTOR.
18. ALL CONTRACTORS/SUBCONTRACTORS THAT WILL BE
ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY
WITH ALL EROSION, SEDIMENTATION AND POLLUTION CONTROL
AND STORMWATER POLLUTION PREVENTION REQUIREMENTS
CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS,
AND PERMITS.
19. AREAS DISTURBED BY THE CONTRACTOR, WHICH ARE NOT
PART OF THIS PROJECT, SHALL BE RETURNED TO ORIGINAL OR
BETTER CONDITION PRIOR TO THE COMPLETION OF THE
PROJECT AS DETERMINED BY THE OWNER.
20. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE,
TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS
SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS
ALSO RESPONSIBLE FOR COMPLYING WITH ALL HEALTH AND
SAFETY PRECAUTIONS AS REQUIRED BY THE APPLICABLE
REGULATORY AGENCY.
21. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING,
SHORING AND TEMPORARY SUPPORTS, ETC. ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
22. PROTECT ALL EXISTING FEATURES AND EXISTING
LANDSCAPING THAT WILL REMAIN. ANY ITEM DAMAGED DURING
THE PERFORMANCE OF THE WORK WILL BE RESTORED TO
ORIGINAL CONDITION, OR REPLACED WITH NEW AT THE
CONTRACTOR'S EXPENSE. CONTRACTOR SHALL TAKE
PRECAUTIONS TO AVOID OVERLOADING PAVEMENTS WHICH
WILL REMAIN.
23. EACH SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
24. SHEET KEYNOTES ON THE PLANS ARE SPECIFIC TO THAT
SHEET ONLY. MISSING SEQUENTIAL NUMBERS DO NOT APPLY
TO THAT SHEET.
CIVIL DEMOLITION NOTES
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS
ENTIRETY. RESTORE GRADES AND SURFACE IMPROVEMENTS
TO MATCH EXISTING CONDITIONS OR PER REQUIREMENTS OF
NEW WORK, WHICHEVER IS APPLICABLE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES AND
TEMPORARY CONSTRUCTION FENCING SHALL BE IN PLACE
PRIOR TO COMMENCEMENT OF DEMOLITION WORK.
3. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL NETWORK
OUTSIDE LIMITS OF DEMOLITION PRIOR TO COMMENCEMENT
OF WORK. THIS WORK MUST BE PERFORMED BY LICENSED &
REGISTERED GEORGIA LAND SURVEYOR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH
CONTRACTOR'S SCHEDULE, LOGISTICS PLAN (APPROVED BY
OWNER), EROSION, SEDIMENTATION AND POLLUTION CONTROL
PLAN PRIOR TO WORK.
CIVIL SITE NOTES
1. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL
NECESSARY BARRICADES AROUND THE WORK AND PROVIDE
PROTECTION AGAINST WATER DAMAGE AND SOIL EROSION.
2. PAVEMENT MARKINGS, INCLUDING ANY STANDARD HANDICAP
SYMBOLS, PARKING STRIPING AND TRAFFIC ARROWS, SHALL BE
PAINTED ON PAVEMENT AT LOCATIONS SHOWN, UNLESS NOTED
OTHERWISE.
3. ALL SIGNAGE SHALL CONFORM TO THE MOST RECENT GDOT
AND MUTCD STANDARDS AND SPECIFICATIONS.
GRADING AND DRAINAGE NOTES
1. POSITIVE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES TO
PREVENT SATURATION OF EXPOSED SOILS IN CASE OF SUDDEN
RAINS, AND FOR ALL FINISHED GRADING. CONTRACTOR SHALL
LOCATE ALL EXISTING UTILITIES PRIOR TO ANY EXCAVATION.
2. CONTRACTOR SHALL INSTALL ALL PERIMETER EROSION AND
SEDIMENT CONTROL MEASURES PRIOR TO ANY SITE CLEARING
OR EXCAVATION. CONTRACTOR SHALL INSPECT ALL SEDIMENT
AND EROSION CONTROL MEASURES DAILY AND DURING
PROLONGED PERIODS OF CONTINUOUS RAINFALL EVENTS TO
ENSURE THAT ALL CONTROLS ARE FUNCTIONING PROPERLY.
DAMAGED CONTROLS SHALL BE REPLACED BY THE END OF THE
WORKDAY.
3. ALL BACKFILL AND FILL MATERIAL SHALL BE FREE OF ORGANIC
MATTER AND WASTE.
4. THE CONTRACTOR SHALL REMOVE ALL SEDIMENT CONTROL
FENCING FROM THE SITE PRIOR TO FINAL PROJECT
ACCEPTANCE, AND SHALL SMOOTH THE GROUND SURFACE
WHERE THE FENCE WAS REMOVED THEN MULCH OR SEED &
STRAW (SEASON APPROPRIATE GRASS) THE RESTORED
SURFACE AS SUNLIGHT CONDITIONS WARRANT.
5. CONTRACTOR SHALL MARK, PRESERVE AND PROTECT ALL
SURVEY BENCHMARKS. IF BENCHMARK MUST BE DEMOLISHED
FOR CONSTRUCTION, CONTRACTOR SHALL RELOCATE
BENCHMARK AND PROVIDE NEW DATA ON RECORD DRAWINGS.
6. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER (SEE
PLANS) UNLESS NOTED.
7. ALL SPOT ELEVATIONS NOTED ARE FINISH GRADE.
SF
LODLOD
FW FW
OE OE
UC UC
CIVIL LEGEND
DESCRIPTION EXISTING PROPOSED
FIRE WATER LINE N/A
SIDEWALK
SILT FENCE N/A
LIMITS OF DISTURBANCE N/A
FIRE HYDRANT N/A
CONCRETE PAVEMENT
ASPHALT PAVEMENT
FENCE N/A X X
OE OE
UE UE
UC UC
CO
S
D
CLEANOUT N/A
CURB INLET N/A
TRENCH DRAIN N/A
WEIR INLET N/A
SANITARY SEWER MANHOLE N/A
STORM SEWER MANHOLE N/A
SINGLE WING CATCH BASIN ST
W.M.
WATER TEE N/A
M
WATER LINE
WATER METER
WATER VALVE
OVERHEAD
ELECTRICAL
UNDERGROUND
ELECTRICAL N/A
STORM PIPE
UNDERGROUND
COMMUNICATIONS
W W
GAS LINE G G G
POWER POLE
FLAG POLE N/A
SANITARY SEWER SS SS SS
GRAVEL PAVEMENT
DPR SEAL
N
EW
S
C-01
INITIAL DATE: XX/XX/2016
DRAWN BY: ???
CHECKED BY: ???
PROJECT #: 2016-??
SHEET NUMBER:
REVISIONS:
1.
SHEET NAME:
TOPOGRAPHIC
SURVEY
2.
3.
4.
5.
6.
7.
8.
9.
10.
P A
R T
IA
L
T O
P O
G R
A P
H
IC
S U
R V
E Y
O F
A T
L A
S
SA
N D
M
IN
E
T
H G
M D
IS
T
R
IC
T E
F F
IN
G
H A
M C
O U
N T
Y , G
E O
R G
IA
LOD
LOD LOD
LOD LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LODLODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LODLOD
LO
D
LO
D
LO
D
LODLOD
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD LOD
OVERALL SITE
PLAN PHASE I
CS100SCALE: 1" = 100' 0 50' 100' 200' 300'A1 OVERALL SITE PLAN - PHASE I
A. BONNO
A. BONNO
J. BACH
L.OUBRE
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-S
IT
E
PL
AN
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
/2
1/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/21/2025
1220238
GENERAL SHEET NOTES
1. REFER TO SHEETS C-002 FOR CIVIL NOTES, LEGEND, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
3. CONTRACTOR MUST ENSURE AND MAINTAIN SITE ACCESS VIA SAND
HILL ROAD AND SHADY OAKS ROAD.
CONSTRUCTION SITE ACCESS
SEE NOTE 3
END OF SHADY OAKS ROAD
EXISTING DIRT ROAD
PHASE I
EXISTING BUILDING
TO BE DEMOLISHED
AutoCAD SHX Text
SAND HILL ROAD (100' R/W)
AutoCAD SHX Text
SHADY OAKS ROAD (XX R/W)
AutoCAD SHX Text
SAND HILL ROAD (100' R/W)
AutoCAD SHX Text
SHADY OAKS ROAD (XX R/W)
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EXISTING DIRT ROAD
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
FOB
AutoCAD SHX Text
FOB
AutoCAD SHX Text
FOB
AutoCAD SHX Text
FOB
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text
SAND HILL ROAD (100' R/W)
AutoCAD SHX Text
EX. CHAIN LINK FENCE
AutoCAD SHX Text
EX. CHAIN LINK FENCE
AutoCAD SHX Text
EX. CHAIN LINK FENCE
AutoCAD SHX Text
EX. WOOD FENCE
AutoCAD SHX Text
EX. WOOD FENCE
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
POND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text W
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
POND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
LIMITS OF SURVEY
AutoCAD SHX Text
LIMITS OF SURVEY
AutoCAD SHX Text
LIMITS OF SURVEY
AutoCAD SHX Text
LIMITS OF SURVEY
AutoCAD SHX Text
LIMITS OF SURVEY
AutoCAD SHX Text
LIMITS OF SURVEY
AutoCAD SHX Text
EDGE OF WATER
AutoCAD SHX Text
EDGE OF WATER
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
SAND HILL ROAD (100' R/W)
AutoCAD SHX Text
SHADY OAKS ROAD (30 R/W)
Kevin.Thomas Snapshot
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD LOD LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LODLODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD
LODLO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD LOD LOD
SITE PLAN
PHASE I
CS101SCALE: 1" = 80' 0 40' 80' 160' 240'A1 SITE PLAN - PHASE I
A. BONNO
A. BONNO
J. BACH
L.OUBRE
LEGEND
ASPHALT PAVEMENT
UNPAVED TRAIL
BOARDWALK
ASPHALT CAP
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-S
IT
E
PL
AN
P
LO
TT
ED
B
Y:
B
O N
N O
, A N
D R
ES
D
AT
E:
/1
4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
LIMIT OF AREA REQUIRING
SOIL CAP
PROPOSED FUTURE
DEVELOPMENT AREA
N.I.C.
CONCRETE BOAT RAMP
ASPHALT CAP
ASPHALT ROAD
C1 C-501
A1 C-501
C5 C-501
CROSSWALK (TYP)
C3
C-501
24'
24'
9'
64'
24'
24'
17'
35'
24'
17'
AREA OF SOIL CAP TO BE
PAVED WITH SIDEWALK,
COVERED IN STRUCTURE
PHASE 2
WHEEL STOP
MONOLITHIC CONCRETE MEDIAN
MONOLITHIC CONCRETE MEDIAN
END OF GRAVEL BASE
STOP SIGN
A3
C-501
GENERAL SHEET NOTES
1. REFER TO SHEETS C-002 FOR CIVIL NOTES, LEGEND, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
D3 C-501
D3 C-501
D3 C-501
PROVIDE 45 DEGREE 12"
WIDE TRAFFIC STRIPING
INSIDE 8" WIDE WHITE
ISLAND BORDERS (TYP)
PARKING STRIPING (TYP)
D3
C-501
ARROW TYPE 1
(TYP)
A5 C-501
NOTE: SEE CS100 FOR INFORMATION ON SITE ACCESS
DPR SEAL
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD LOD LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LODLODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD
LODLO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD LOD LOD
ENVIRONMENTAL
SOIL GRADING
PLAN
CG100SCALE: 1" = 80' 0 40' 80' 160' 240'A1 ENVIRONMENTAL SOIL GRADING PLAN
J. VICKERY
A. BONNO
J. BACH
L.OUBRE
LEGEND
SOIL ZONE I
SOIL ZONE II
SEDIMENT EXCAVATION
HISTORIC SBM STOCKPILE
BERM CONTAINING SBM
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-E N
VI
R
O N
M
EN
TA
L
G R
AD
IN
G P
LA
N
P
LO
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
TRAMMCO SOIL ZONE EARTHWORKS*
CATEGORY AREA DEPTH ROUGH EW
SOIL ZONE I (CAP) 114,970 SF -6" 2,129 CU YDS (HAUL OFF)
SOIL ZONE I (PERIPHERY) 60,235 SF -6" 1,116 CU YDS (HAUL OFF)
SOIL ZONE I (PERIPHERY) 60,235 SF -12" 2,231 CU YDS (CUT)
SOIL ZONE II 25,900 SF -6" 480 CU YDS (CUT)
SEDIMENT EXCAVATION 30,417 SF N/A N/A
HISTORIC SBM STOCKPILE 65,216 SF N/A 1,125 CU YDS (CUT)
BERM CONTAINING SBM 8,649 SF N/A N/A
*ALL SOIL INFORMATION AND DELINEATIONS ARE BASED ON INFORMATION PROVIDED BY
TRAMMCO ON JANUARY 28TH 2025 AND FEBRUARY 7TH 2025. ALL EARTHWORK VALUES ARE
APPROXIMATE, REFER TO TRAMMCO CONSTRUCTION DOCUMENTS FOR FINAL DESIGN. ALL
EARTHWORK VOLUMES ARE NEAT.
SEDIMENT EXCAVATION
SOIL ZONE I
CAP
SEE NOTE 4
BERM CONTAINING SBM
SOIL ZONE II
REMOVE 6"
SOIL SAMPLE LOCATION
SOIL ZONE I
CAP PERIPHERY
SEE NOTE 5 & 6
EARTHWORKS SUMMARY
CATEGORY ROUGH EW
HAUL OFF 3,245 CU YDS
SUITABLE BACKFILL 3,836 CU YDS
GENERAL SHEET NOTES
1. REFER TO SHEETS C-002 FOR CIVIL NOTES, LEGEND, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
3. ALL SOIL DELINEATION, DEPTHS, AND VOLUMES ARE BASED ON LATEST
REPORTS PREPARED BY TRAMMCO. POND BEARS NO RESPONSIBLILITY
FOR DISCREPANCIES IN DELINEATION, DEPTHS, AND VOLUME
DETERMINED IN THE FIELD. ALL INFORMATION SHOWN ON THESE
PLANS SHOULD BE CROSS REFERENCED WITH LATEST REPORTS
PREPARED BY TRAMMCO AND FIELD TESTING.
4. EXCAVATION AND HAUL OFF OF 6" OF ORGANIC RICH SOILS WITHIN
SOIL ZONE I 'CAP' EXTENTS AS DETERMINED BY TRAMMCO. SEE LATEST
REPORTS PREPARED BY TRAMMCO.
5. EXCAVATION AND HAUL OFF OF 6" OF ORGANIC RICH SOILS WITHIN
SOIL ZONE I 'CAP PERIPHERY' EXTENTS AS DETERMINED BY TRAMMCO.
SEE LATEST REPORTS PREPARED BY TRAMMCO.
6. EXCAVATION OF ADDITIONAL 12" OF SUITABLE BACKFILL MATERIAL
WITHIN SOIL ZONE I 'CAP PERIPHERY' EXTENTS AS DETERMINED BY
TRAMMCO. SEE LATEST REPORTS PREPARED BY TRAMMCO.
7. EXCAVATION OF 6" OF SUITABLE BACKFILL MATERIAL WITHIN SOIL
ZONE II AS DETERMINED BY TRAMMCO. SEE LATEST REPORTS
PREPARED BY TRAMMCO.
8. SUITABLE BACKFILL MATERIAL, 1,125 CU YDS OF MATERIAL AS
DETERMINED BY TRAMMCO.
BERM CONTAINING SBM
SOIL ZONE I
CAP PERIPHERY
SEE NOTE 5 & 6
SOIL ZONE I
CAP PERIPHERY
SEE NOTE 5 & 6
SEDIMENT EXCAVATION
HISTORIC SBM
STOCKPILE
SEE NOTE 8
NOTE: SEE CS100 FOR INFORMATION ON SITE ACCESS
DPR SEAL
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD LOD LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LODLODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD
LODLO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD LOD LOD
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
GRADING PLAN
PHASE I
CG101SCALE: 1" = 80' 0 40' 80' 160' 240'A1 GRADING PLAN - PHASE I
A. BONNO
A. BONNO
J. BACH
L.OUBRE
LEGEND
ASPHALT PAVEMENT
UNPAVED TRAIL
BOARDWALK
ASPHALT CAP
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-G R
AD
IN
G P
LA
N
P
LO
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
LIMIT OF AREA REQUIRING
SOIL CAP
PROPOSED FUTURE
DEVELOPMENT AREA
GENERAL SHEET NOTES
1. REFER TO SHEETS C-002 FOR CIVIL NOTES, LEGEND, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
NOTE: SEE CS100 FOR INFORMATION ON SITE ACCESS
DPR SEAL
ELEVATIO
N
EL
EV
AT
IO
N
STATION
CROSS SECTION SOUTHWEST - NORTHEAST PHASE I PROFILE
HORZ. SCALE 1"= 80'
VERT. SCALE 1"= 10'
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
ELEVATIO
N
EL
EV
AT
IO
N
STATION
CROSS SECTION SOUTHEAST - NORTHWEST PHASE I PROFILE
HORZ. SCALE 1"= 80'
VERT. SCALE 1"= 10'
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
SCALE: 1" = 80' 0 40' 80' 160' 240'A1 CROSS SECTION & EARTHWORKS
PHASE I CAP EARTHWORKS:
FINISHED GRADE
FINISHED GRADE
EX. GRADE
EX. GRADE
3" ASPHALT
5" GAB
12" CLEAN FILL
3" ASPHALT
5" GAB 12" CLEAN FILL
SCALE: 1" = 10' 0 5' 30'20'10'
HORIZITONAL
VERTICAL
A. BONNO
A. BONNO
J. BACH
L.OUBRE
CROSS
SECTION &
EARTHWORKS
CG201
CUT FILL NET
3" ASPHALT 0 1,064 CU YDS 1,064 CU YDS (FILL)
5" GAB 0 1,788 CU YDS 1,788 CU YDS (FILL)
CLEAN FILL 0 7,013 CU YDS 7,013 CU YDS (FILL)
ENV. SOIL BACKFILL 2,128 CU YDS 0 9,058 CU YDS (FILL)
TOTAL 2,128 CU YDS 7,013 CU YDS 4,885 CU YDS (FILL)
SEE CG100 FOR ENV. SOIL BACKFILL INFORMATION. CUT & FILL VOLUMES ARE NEAT AND BASED ON
LATEST SITE PLAN AT PLOT DATE.
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-G R
AD
IN
G P
LA
N
P
LO
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
PHASE I GENERAL EARTHWORKS:
CUT FILL NET
TOTAL EARTHWORKS 5,638 CU YDS 3,905 CU YDS 1,733 CU YDS (CUT)
PHASE I GENERAL VOLUMES EXCLUDE SOIL ZONE I & II EXCAVATIONS SHOWN ON CG100 AND PHASE I CAP VOLUMES PROVIDED ABOVE. CUT & FILL VOLUMES ARE NEAT AND BASED ON LATEST SITE PLAN AT
PLOT DATE.
SEE NOTE 4
SEE NOTE 4
GENERAL SHEET NOTES
1. REFER TO SHEETS C-002 FOR CIVIL NOTES, LEGEND, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
3. ALL SOIL DELINEATION, DEPTHS, AND VOLUMES ARE BASED ON LATEST
REPORTS PREPARED BY TRAMMCO. POND BEARS NO RESPONSIBLILITY
FOR DISCREPANCIES IN DELINEATION, DEPTHS, AND VOLUME
DETERMINED BY TRAMMCO AND FIELD TESTING. ALL INFORMATION
SHOWN ON THESE PLANS SHOULD BE CROSS REFERENCED WITH
LATEST REPORTS PREPARED BY TRAMMCO AND FIELD TESTING.
4. EXCAVATION OF 6" OF ORGANIC RICH SOILS WITHIN SOIL ZONE I CAP
EXTENTS AS DETERMINED BY TRAMMCO. SOIL TO BE HAULED OFF SITE
FOR DISPOSAL, SEE CG100 AND LATEST REPORTS PREPARED BY
TRAMMCO.
DPR SEAL
EROSION
CONTROL
NOTES
CE001
A. BONNO
A. BONNO
J. BACH
L.OUBRE
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-E R
O
SI
O N
N O
TE
S
PL
O
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
ACTIVITY SCHEDULE (FOR PERMITTING REFERENCE ONLY)
ACTIVITY
TIME / WEEKS
5-63-41-2
REMOVAL OF TEMPORARY EROSION
DEMOLITION OF SURFACE PAVEMENT, WALLS,
INSTALL SILT FENCE, CONSTRUCTION EXIT,
MAINTENANCE OF TEMPORARY EROSION
PERMANENT SEEDING
AND SEDIMENT CONTROL MEASURES
INSTALL REMAINDER OF INITIAL PERIMTER
BASINS, CHECK DAMS, ROCK DAMS, DIVERSION
BERMS, ROCK FILTER, DOWN DRAINS, INLET
SEDIMENT TRAPS, AND FILTER RINGS,
7-8 9-10 11-12
CONTROLS INCLUDING SEDIMENT
FENCES, AND UTILITY POLES
CLEARING AND GRUBBING
ROUGH GRADING OPERATIONS
FINAL PAVING
AND SEDIMENT CONTROL MEASURES
13-14 15-16
*SCHEDULE FOR PERMITTING PURPOSES ONLY. REFER TO OFFICIAL PROJECT SCHEDULE (AS PROVIDED BY
CONTRACTOR AND APPROVED BY OWNER) FOR OFFICIAL DATES AND DURATIONS.
N ORDER TO REMEDIATE CONTAMINATED SOILS THERE ARE BUFFER ENCROACHMENTS AND A
VARIANCE IS REQUIRED. TREE SAVE AREAS SHALL BE CLEARLY IDENTIFIED WITH FLAGGING
AND/OR FENCING PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE.
SEDIMENT STORAGE MAINTENANCE INDICATORS MUST BE INSTALLED IN SEDIMENT STORAGE
STRUCTURES, INDICATING THE 1/3 FULL VOLUME.
DESIGN PROFESSIONAL 7-DAY VISIT CERTIFICATION
DATE OF INSPECTION
I certify the site was in compliance with the ES&PC Plan on the date of inspection.
GSWCC LEVEL II DESIGN PROFESSIONAL CERTIFICATION #
Inspection revealed the following discrepancies from the ES&PC Plan.
These deficiencies must be addressed immediately and a re-inspection scheduled. Work shall not proceed on the site until Design Professional Certification is obtained.
THE PRIMARY PERMITTEE MUST RETAIN THE DESIGN PROFESSIONAL WHO PREPARED THE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, EXCEPT WHEN THE PRIMARY
PERMITTEE HAS REQUESTED IN WRITING AND EPD HAS AGREED TO AN ALTERNATE DESIGN
PROFESSIONAL, TO INSPECT THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE
REQUIREMENTS AND PERIMETER CONTROL BMPS WHICH THE DESIGN PROFESSIONAL DESIGNED
WITHIN SEVEN (7) DAYS AFTER INSTALLATION. THE DESIGN PROFESSIONAL SHALL DETERMINE IF
THESE BMPS HAVE BEEN INSTALLED AND ARE BEING MAINTAINED AS DESIGNED. THE DESIGN
PROFESSIONAL SHALL REPORT THE RESULTS OF THE INSPECTION TO THE PRIMARY PERMITTEE
WITHIN SEVEN (7) DAYS AND THE PERMITTEE MUST CORRECT ALL DEFICIENCIES WITHIN TWO (2)
BUSINESS DAYS OF RECEIPT OF THE INSPECTION REPORT FROM THE DESIGN PROFESSIONAL
UNLESS WEATHER RELATED SITE CONDITIONS ARE SUCH THAT ADDITIONAL TIME IS REQUIRED.
C4
FEMA FLOOD MAP
SCALE: N.T.S.
A4
SOIL MAP
NON-EXEMPT ACTIVITIES WILL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE
COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE
WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS.
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A
HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY
A SECTION 404 PERMIT.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION
AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND
DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT
SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED
WITH MULCH OR TEMPORARY SEEDING.
PROJECT DOES NOT ALLOW FOR THE CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS, OR THE REAR OF VEHICLES. WASHOUT OF THE DRUM AT THE CONSTRUCTION SITE IS
PROHIBITED.
C2
SAMPLING MAP
SCALE: N.T.S.
TREE PROTECTION INSTALLATION
MAINTAIN TREE PROTECTION INSTALLATION
AND TREE PROTECTION MEASURES
SCALE: N.T.S.
SOILS LEGEND
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
SEE ANNOTATED EROSION CONTROL
CHECKLIST ON SHEET CE-004
DESIGN PROFESSIONAL'S CERTIFICATION:
1. I CERTIFY THAT THE PERMITEE'S EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN
PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST MANAGEMENT
PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY CONTROL ACT AND THE DOCUMENT
"MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE
GEORGIA SOIL AND WATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE YEAR IN
WHICH THE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE SAMPLING OF
THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS AND THAT
THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND SAMPLING METHODS IS
EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO.
GAR 100001, GAR 1000002, AND GAR 1000003."
2. I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT TO
THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER MY
DIRECT SUPERVISION.
BRAD JONES, PLA DATE
GSWCC LEVEL II CERTIFICATION # 0000031792
EXPIRES: 01/12/2025
NOTE: REFER TO SHEET CE004 FOR SAMPLING MAP.
SITE LOCATION
MAP UNIT SYMBOL
ChA
EuA
LeA
PkA
TOTALS FOR AREA INTEREST
13.6
1.5%
27.4%
0.1%
29.7%
100%
MAP UNIT NAME ACRES IN AOI PERCENT OF AOI
SITE LOCATION
SITE LOCATION
DESIGN PROFESSIONAL:
BRAD JONES, PLA
LEVEL II CERTIFICATION
No.: 000031792
EXPIRES: 01/12/2028
(IN CONFORMANCE WITH STATE OF GEORGIA GENERAL NPDES PERMIT NO. GAR 100001.)
NAME OF RECEIVING WATERS: OGEECHEE RIVER
GPS COORDINATES OF SITE CONSTRUCTION EXIT:
LAT: N32.192827
LONG: W81.399114
EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN GENERAL NOTES
DESIGN PROFESSIONAL: POND & COMPANY
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GEORGIA 30092
PHONE: (678) 336-7740
FAX: (678) 336-7744
TOTAL PROPERTY ACREAGE: 314.32 ACRES
TOTAL DISTURBED ACREAGE: 8.67 ACRES
EXISTING SITE HAS AN EXISTING DIRT ROAD, TWO BUILDINGS,
WETLANDS AND A LAKE. THE SITE IS HEAVILY WOODED WITH SANDY
SOIL.
THE PROJECT CONSISTS OF 'CAPPING' AN AREA OF CONTAMINATED
SOIL WITH CLEAN FILL AND ASPHALT. THE CAP CONSISTS OF THE
CONSTRUCTION OF A PARKING LOT WITH AN ADA ACCESSIBLE BOAT
RAMP & DOCK. THIS PROJECT AIMS TO REMEDIATE A CURRENTLY
UNUSABLE CONTAMINATED AREA AND CONSTRUCT A PUBLIC PARK.
DESCRIPTIONS OF THE EXISTING SITE AND THE PROPOSED PROJECT:
EXISTING LAND USE:
PROPOSED LAND USE:
OWNER/ PRIMARY
PERMITEE:
AREA OF DISTURBED WETLAND = 0.38 ACRE
PRE-CONSTRUCTION CURVE NUMBER = 55
POST-CONSTRUCTION CURVE NUMBER = 85
CONTACT: JASON BACH, P.E.
EFFINGHAM COUNTY BOC
601 N LAUREL ST
SPRINGFIELD, GA, 31329
PHONE: 912-754-2123
Ud 25.1%
W WATER 16.2%
CHIPLEY SAND, 0 TO 2 PERCENT
SLOPES
EULONIA SANDY LOAM, 0 TO 2
PERCENT SLOPES
LEEFIELD LOAMY SAND, 0 TO 2
PERCENT SLOPES
PICKNEY MUCKY SAND, 0 TO 1
PERCENT SLOPES, FREQUENTLY
FLOODED
UDORTHENTS, LOAMY
0.8
0.0
14.7
12.5
8.1
49.7
24-HOUR EROSION AND
SEDIMENTATION CONTROL
CONTACT:
TRE WILKINS
(912) 667 0621
DPR SEAL
JonesB Date
JonesB Date
Signature
NOTES
CE002
A. BONNO
A. BONNO
J. BACH
L.OUBRE
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-E R
O
SI
O N
N O
TE
S
PL
O
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
OFFSITE VEHICLE TRACKING / DUST CONTROL
OFF-SITE VEHICLE TRACKING OF DIRT, SOILS, AND SEDIMENTS AND THE GENERATION OF DUST SHALL BE MINIMIZED OR ELIMINATED TO THE MAXIMUM EXTENT PRACTICAL. A STABILIZED CONSTRUCTION EXIT (CO) SHALL BE PROVIDED TO REDUCE VEHICLE TRACKING OF SEDIMENT. SEE ES&PC PLAN AND DETAIL SHEETS FOR THE CONSTRUCTION EXIT LOCATIONS AND DETAIL. THE PAVED STREET ADJACENT TO THE CONSTRUCTION EXIT SHALL BE INSPECTED DAILY BY A REPRESENTATIVE OF THE SITE CONTRACTOR FOR TRACKING OF MUD, DIRT, OR ROCK. DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED WITH A TARPAULIN. DUST CONTROL (DU) SHALL BE APPLIED AS NECESSARY TO
PREVENT SURFACE AND AIR MOVEMENT OF DUST.
SANITARY WASTES:
ALL PERMITTEES SHALL ENSURE THAT THIS PLAN IS IN COMPLIANCE WITH APPLICABLE STATE AND/OR LOCAL
WASTE DISPOSAL, SANITARY SEWER, OR SEPTIC SYSTEM REGULATIONS.
A MINIMUM OF ONE PORTABLE SANITARY UNIT SHALL BE PROVIDED FOR EVERY TEN (10) WORKERS ON THE SITE. ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONE TIME PER WEEK BY A LICENSED PORTABLE FACILITY PROVIDER IN COMPLETE COMPLIANCE WITH THE LOCAL STATE
REGULATIONS.
ALL SANITARY WASTE UNITS SHALL BE LOCATED IN AN AREA WHERE THE LIKELIHOOD OF THE UNIT CONTRIBUTING TO STORM WATER DISCHARGE IS NEGLIGIBLE. ADDITIONAL CONTAINMENT OF BMP'S SHALL BE IMPLEMENTED AS NECESSARY, SUCH AS GRAVEL BAGS OR SPECIFICALLY DESIGNED PLASTIC SKID
CONTAINERS AROUND THE BASE, TO PREVENT WASTE FROM CONTRIBUTING TO STORM WATER
DISCHARGES. THE LOCATION OF SANITARY WASTE UNITS MUST BE IDENTIFIED ON THE EROSION CONTROL
PLAN GRADING PHASE BY THE CONTRACTOR ONCE THE LOCATIONS HAVE BEEN DETERMINED.
WASTE MATERIALS AND DISPOSAL:
NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL BE DISCHARGED INTO STORM WATER INLETS
OR WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT.
ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A SECURELY LIDDED METAL DUMPSTER OR OTHER APPROPRIATE WASTE MANAGEMENT FACILITY PERMISSIBLE UNDER GAR PERMIT NO. 100001. WASTE MANAGEMENT FACILITIES SHALL MEET ALL SOLID WASTE MANAGEMENT REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE SHALL BE DEPOSITED IN THE WASTE MANAGEMENT FACILITIES.
WASTE MANAGEMENT FACILITIES SHALL BE EMPTIED A MINIMUM OF ONCE PER WEEK OR MORE OFTEN IF NECESSARY AND TRASH SHALL BE HAULED AS REQUIRED BY LOCAL REGULATIONS. NO CONSTRUCTION
WASTE SHALL BE BURIED ON-SITE.
ALL PERSONNEL SHALL BE INSTRUCTED ON PROPER PROCEDURES FOR WASTE DISPOSAL. A NOTICE STATING THESE PRACTICES SHALL BE POSTED AT THE JOB SITE AND THE CONTRACTOR SHALL BE
RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED.
LOCATE WASTE COLLECTION AREAS AWAY FROM STREETS, GUTTERS, WATERCOURSES AND STORM DRAINS.
WASTE COLLECTION AREAS, SUCH AS DUMPSTERS, ARE OFTEN BEST LOCATED NEAR CONSTRUCTION SITE
ENTRANCES TO MINIMIZE TRAFFIC ON DISTURBED SOILS.
KEEPING PLANS CURRENT:
THE PRIMARY, SECONDARY OR TERTIARY PERMITTEES, AS APPLICABLE, SHALL AMEND THEIR PLAN WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION , OR MAINTENANCE, WHICH HAS A SIGNIFICANT EFFECT ON BMPS WITH A HYDRAULIC COMPONENT (I.E., THOSE BMPS WHERE THE DESIGN IS BASED UPON RAINFALL INTENSITY, DURATION AND RETURN FREQUENCY STORMS) OR IF THE PLAN PROVES TO BE INEFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING POLLUTANTS FROM SOURCES IDENTIFIED UNDER PART IV.D.3. OF THIS PERMIT. AMENDMENTS TO THE PLAN MUST BE CERTIFIED BY A DESIGN PROFESSIONAL AS PROVIDED IN THIS PERMIT. SECONDARY PERMITTEES MUST NOTIFY THE PRIMARY PERMITTEE WITHIN 24-HOURS OF BECOMING AWARE OF ANY SUSPECTED BMP DESIGNED DEFICIENCIES WHICH ARE NOT EFFECTIVE IN CONTROLLING THE DISCHARGE OF POLLUTANTS FROM THE SECONDARY PERMITTEE'S SITE. THE PRIMARY PERMITTEE MUST EVALUATE WHETHER THESE DEFICIENCIES EXIST WITHIN 48-HOURS OF SUCH NOTICE, AND IF THESE DEFICIENCIES ARE FOUND TO EXIST MUST AMEND THE PLAN IN ACCORDANCE WITH THIS PARAGRAPH TO ADDRESS THOSE DEFICIENT BMPS WITHIN SEVEN (7) DAYS OF BEING NOTIFIED BY THE SECONDARY PERMITTEE. WHEN THE PLAN IS AMENDED, THE PRIMARY PERMITTEE MUST NOTIFY AND PROVIDE A COPY OF THE AMENDMENT TO ALL AFFECTED SECONDARY PERMITTEES WITHIN THIS SEVEN (7) DAY PERIOD. THE SECONDARY PERMITTEE(S) MUST IMPLEMENT ANY NEW PLAN REQUIREMENTS AFFECTING THEIR SITE(S) WITHIN 48-HOURS OF NOTIFICATION BY THE PRIMARY PERMITTEE. NOTWITHSTANDING THE FOREGOING, THE PRIMARY OR TERTIARY PERMITTEE REMAINS RESPONSIBLE FOR INSURING THAT THE PLAN, AS APPROPRIATE, MEETS THE REQUIREMENTS OF THIS
PERMIT.
CRITICAL WORK ZONE:
ALL SLOPES 3:1 OR STEEPER SHALL RECEIVE SURFACE ROUGHENING, POLYMERS, AND EROSION
CONTROL MATTING.
STABILIZATION MEASURES:
THE STABILIZATION MEASURES SHOWN ON THESE PLANS HAVE BEEN DESIGNED TO STABILIZE THE
DISTURBED AREAS FOLLOWING THE TEMPORARY OR PERMANENT COMPLETION OF CONSTRUCTION.
ALL EXPOSED AREAS SHALL BE STABILIZED WITH TEMPORARY MULCHING (DS1) PRIOR TO GRADING
IF THEY ARE TO REMAIN INACTIVE FOR 14 DAYS OR MORE. ALL DISTURBED AREAS SHALL BE
STABILIZED WITH TEMPORARY (DS2) OR PERMANENT (DS3) VEGETATION AS INDICATED ON THE PLAN. DITCHES, TEMPORARY DIVERSION BERMS, AND SLOPES (WHICH HAVE 3:1 OR STEEPER SLOPE AND 10 FEET OR MORE HEIGHT) ARE TO BE STABILIZED WITH EROSION CONTROL MATTING (MB).
DUST CONTROL (DU) SHALL ALSO BE PROVIDED AS NEEDED DURING GRADING ACTIVITIES. SEE EROSION, SEDIMENTATION, AND POLLUTION CONTROL (ES&PC) DETAIL SHEETS FOR MORE DETAILS
REGARDING THESE STABILIZATION MEASURES.
STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE
HAS TEMPORARILY OR PERMANENTLY CEASED, EXCEPT:
WHERE THE INITIATION OF STABILIZATION MEASURES BY THE 14TH DAY AFTER CONSTRUCTION
ACTIVITY TEMPORARILY OR PERMANENTLY CEASED IS PRECLUDED BY SNOW COVER OR OTHER
ADVERSE WEATHER CONDITIONS, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS
PRACTICABLE.
WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM
WHEN ACTIVITIES CEASED (E.G. THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS
TEMPORARILY CEASED IS LESS THAN 21 DAYS) THEN STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE BY THE 14TH DAY AFTER CONSTRUCTION ACTIVITY
TEMPORARILY CEASED.
NON-STORM WATER DISCHARGES:
NON-STORM WATER DISCHARGES (DISCHARGES FROM FIRE FIGHTING ACTIVITIES, FIRE HYDRANT FLUSHING, POTABLE WATER SOURCES INCLUDING WATER LINE FLUSHING, IRRIGATION DRAINAGE, AIR CONDITIONING CONDENSATE, SPRINGS, UNCONTAMINATED GROUNDWATER, AND FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS OR POLLUTANTS) THAT ARE COMBINED WITH STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY SHALL BE DISCHARGED TO THE PROPOSED STORM DRAINAGE SYSTEM AND ROUTED THROUGH THE EROSION AND SEDIMENTATION CONTROLS IDENTIFIED WITHIN THIS PLAN. NOTIFY THE LICENSED PROFESSIONAL WHO
PREPARED THIS PLAN IF THIS IS NOT POSSIBLE.
INVENTORY FOR POLLUTION PREVENTION PLAN
THE FOLLOWING MATERIALS ARE EXPECTED TO BE ONSITE DURING CONSTRUCTION: CONCRETE PRODUCTS, ASPHALT, PETROLEUM BASED FUELS AND LUBRICANTS FOR EQUIPMENT, TAR, METAL BUILDING MATERIALS, LUMBER, SHEET ROCK, FLOOR COVERINGS, ELECTRICAL WIRE AND FIXTURES, PAINTS/STAINS/FINISHING TREATMENTS, PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CLEANING SOLVENTS, PESTICIDES, FERTILIZERS, HERBICIDES, CRUSHED STONE, PLASTIC AND METAL PIPES.
PROPER OPERATION AND MAINTENANCE:
THE PERMITTEE SHALL AT ALL TIMES PROPERLY OPERATE AND MAINTAIN ALL FACILITIES AND SYSTEMS OF TREATMENT AND CONTROL (AND RELATED APPURTENANCES) WHICH ARE INSTALLED OR USED BY THE PERMITTEE TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THIS PERMIT AND WITH THE REQUIRED PLANS. PROPER OPERATION AND MAINTENANCE ALSO INCLUDES ADEQUATE LABORATORY CONTROLS AND APPROPRIATE QUALITY ASSURANCE PROCEDURES. PROPER OPERATION AND MAINTENANCE REQUIRES THE OPERATION OF BACKUP OR AUXILIARY FACILITIES OR SIMILAR SYSTEMS, INSTALLED BY PERMITTEE ONLY
WHEN NECESSARY TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THE PERMIT.
EROSION AND SEDIMENT CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION AND SEDIMENT CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO
CONTROL OR TREAT THE SEDIMENT SOURCE.
REFER TO THE DETAILS CONTAINED WITHIN THIS PLAN SET FOR ADDITIONAL MAINTENANCE INSTRUCTION.
HAZARDOUS WASTES:
ALL HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER AS REQUIRED BY LOCAL, STATE, AND/OR FEDERAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. THE JOB SITE
SUPERINTENDENT, WHO WILL ALSO BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE
FOLLOWED, SHALL INSTRUCT SITE PERSONNEL IN THESE PRACTICES. MATERIAL SAFETY DATA SHEETS (MSDS'S) FOR EACH SUBSTANCE WITH HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE SHALL BE OBTAINED AND USED FOR THE PROPER MANAGEMENT OF POTENTIAL WASTES THAT MAY RESULT FROM THESE PRODUCTS. AN MSDS SHALL BE POSTED IN THE IMMEDIATE AREA WHERE SUCH PRODUCT IS STORED AND/OR USED AND ANOTHER COPY OF EACH MSDS SHALL BE MAINTAINED IN THE EROSION SEDIMENTATION AND POLLUTION CONTROL PLAN (ES&PC) FILE AT THE JOB SITE CONSTRUCTION TRAILER
OFFICE. EACH EMPLOYEE WHO HANDLES A SUBSTANCE WITH HAZARDOUS PROPERTIES WILL BE
INSTRUCTED ON THE USE OF MSDS SHEETS AND THE SPECIFIC INFORMATION IN THE APPLICABLE MSDS FOR THE PRODUCT HE/SHE IS USING, PARTICULARLY REGARDING SPILL CONTROL TECHNIQUES.
THE CONTRACTOR WILL IMPLEMENT THE SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN FOUND WITHIN THIS ES&PC AND WILL TRAIN ALL PERSONNEL IN THE PROPER CLEANUP AND HANDLING OF SPILLED MATERIALS. NO SPILLED HAZARDOUS MATERIALS OR HAZARDOUS WASTES SHALL BE ALLOWED TO COME IN CONTACT WITH STORM WATER DISCHARGES. IF SUCH CONTACT OCCURS, THE
STORM WATER DISCHARGE SHALL BE CONTAINED ON SITE UNTIL APPROPRIATE MEASURES IN
COMPLIANCE WITH STATE AND FEDERAL REGULATIONS ARE TAKEN TO DISPOSE OF SUCH CONTAMINATED STORM WATER. IT SHALL BE THE RESPONSIBILITY OF THE JOB SITE SUPERINTENDENT TO PROPERLY
TRAIN ALL PERSONNEL IN THE USE OF THE SPCC PLAN.
NOTHING IN THIS PERMIT SHALL BE CONSTRUED TO PRECLUDE THE INSTITUTION OF ANY LEGAL ACTION OR RELIEVE THE PERMITTEE FROM ANY RESPONSIBILITIES, LIABILITIES, OR PENALTIES TO WHICH THE
PERMITTEE IS OR MAY BE SUBJECT UNDER THE GEORGIA HAZARDOUS WASTE MANAGEMENT ACT,
O.C.G.A. § 12-8-60, ET SEQ. OR UNDER CHAPTER 14 OF TITLE 12 OF THE OFFICIAL CODE OF GEORGIA ANNOTATED; NOR IS THE OPERATOR RELIEVED FROM ANY RESPONSIBILITIES, LIABILITIES OR PENALTIES TO WHICH THE PERMITTEE IS OR MAY BE SUBJECT UNDER SECTION 311 OF THE CLEAN WATER ACT OR SECTION 106 OF COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT.
SPILL PREVENTION
PRACTICES SUCH AS GOOD HOUSEKEEPING, PROPER HANDLING OF HAZARDOUS PRODUCTS AND
PROPER SPILL CONTROL PRACTICES WILL BE FOLLOWED TO REDUCE THE RISK OF SPILLS AND SPILLS
FROM DISCHARGING INTO STORM WATER RUNOFF.
GOOD HOUSEKEEPING
A. QUANTITIES OF PRODUCTS STORED ONSITE WILL BE LIMITED TO THE AMOUNT NEEDED FOR THE JOB.
B. PRODUCTS AND MATERIALS WILL BE STORED IN A NEAT, ORDERLY MANNER IN APPROPRIATE
CONTAINERS PROTECTED FROM RAINFALL, WHERE POSSIBLE.
C. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH MANUFACTURER LABELS LEGIBLE
AND VISIBLE.
D. PRODUCT MIXING, PRODUCT DISPOSAL, AND DISPOSAL OF PRODUCT CONTAINERS WILL BE
ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
E. THE CONTRACTOR WILL INSPECT SUCH MATERIALS TO ENSURE PROPER USE, STORAGE AND
DISPOSAL.
SAMPLING NARRATIVE
AN SS101 STORMWATER SAMPLER BY GLOBAL WATER (OR EQUIVALENT) WILL BE USED TO COLLECT AND HANDLE THE STORM WATER DISCHARGE SAMPLES PRIOR TO ANALYSIS. PART OF THIS SAMPLING PLAN INCLUDES THE SS101 STORMWATER SAMPLER USER'S MANUAL BY GLOBAL WATER (OR EQUIVALENT).
THE STORM WATER SAMPLES WILL BE ANALYZED USING THE LAMOTTE 2020 TURBIDIMETER (OR
EQUIVALENT). PART OF THIS SAMPLING PLAN INCLUDES THE INSTRUCTION MANUAL FOR THE LAMOTTE
2020 TURBIDIMETER BY LAMOTTE COMPANY (OR EQUIVALENT).
STRUCTURAL PRACTICES:
THE STRUCTURAL PRACTICES SHOWN ON THIS PLAN HAVE BEEN DESIGNED TO DIVERT FLOWS
FROM EXPOSED SOILS, STORE FLOWS, OR OTHERWISE LIMIT RUNOFF AND THE DISCHARGE OF
POLLUTANTS FROM EXPOSED AREAS OF THE SITE. FOR SEDIMENT AND EROSION CONTROL
PURPOSES, STRUCTURAL PRACTICES HAVE BEEN SHOWN IN THREE PHASES, BASED ON
CONSTRUCTION ACTIVITIES. THESE PHASES INCLUDE INITIAL, INTERMEDIATE AND FINAL EROSION
& SEDIMENT CONTROL PHASES.
DPR SEAL
NOTES
CE003
A. BONNO
A. BONNO
J. BACH
L.OUBRE
FI
LE
P
AT
H
: X :\F
Y2 2\
8\
.C
AD
_B
IM
\0
4.
.C
AD
\A
TL
AS
C
O N
C
EP
TS
\C
AD
\P
H
AS
E I\C
-E R
O
SI
O N
N O
TE
S
PL
O
TT
ED
B Y:
B O
N N
O , A
N D
R
ES
D
AT
E:
/1 4/
Copyright © 2024 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond &
Company.
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
PROJECT NAME
ATLAS SITE
216 SHADY OAKS RD
GUYTON, GA 31312
EFFINGHAM COUNTY
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
ORIGINAL SHEET SIZE:
30" X 42"
PROJECT #
E
D
C
B
A
1 2 3 4 5 6
DRAWING ISSUE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
2/14/2025
1220238
SEE ANNOTATED EROSION CONTROL
CHECKLIST ON SHEET CE-004
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
DESIGN PROFESSIONAL:
BRAD JONES, PLA
LEVEL II CERTIFICATION
No.: 000031792
EXPIRES: 01/12/2028
PART IV.D.6. SAMPLING REQUIREMENTS
THIS PERMIT REQUIRES THE MONITORING OF NEPHELOMETRIC TURBIDITY IN RECEIVING WATER(S) OR OUTFALLS IN ACCORDANCE WITH THIS PERMIT. THIS PARAGRAPH SHALL NOT APPLY TO ANY LAND DISTURBANCE ASSOCIATED WITH THE CONSTRUCTION OF SINGLE-FAMILY HOMES WHICH ARE NOT PART OF A SUBDIVISION OR PLANNED COMMON DEVELOPMENT UNLESS FIVE (5)…