Vandenberg Air Force Base (AFB) Performance-Based Remediation (PBR)

Awarded Award Notice Posted

Solicitation number
FA8903-12-R-0033
Agency
Air Force Installation Contracting Agency Air Force Installation and Mission Support Center, Department of Defense
Awarded
to Arcadis U.s., Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
FA8903-14-C-0010 Federal contract award
NAICS code
562910 Remediation Services
PSC
Not on record
Place of performance
Vandenberg Air Force Base Santa Maria, California United States Santa Maria, California, United States

Notice details come from SAM.gov. Updated .

Notice text

19 versions

Update #19 · Latest ·

Added: Aug 08, 2014 4:36 pm

Award Type: Award Notice


Contract Award Date: 29 July 2014


Contract Award Dollar Amount: $27,055,427.00


Contract Line Item Number: 0001 - 0108


Contract Awarded Address: 2261 Hughes Ave, Suite 163                                       
                                          JBSA Lackland, TX 78236-9853


This notice if for informational purposes only.  This notice advises that 722 ESS/PKB, JBSA Lackland AFB, TX awarded the Vandenberg Air Force Base (AFB) Performance-Based Remediation (PBR) contract to ARCADIS U.S., INC., Highland Ranch, CO using FAR 15 Source Selection Procedures.  This award to ARCADIS U.S., INC, totals $27,055,427.00 at initial award and will total $125,667,862.00, if all options are exercised.  This is for procurement of environmental construction and remediation at 107 Defense Environmental Restoration sites on Vandenberg Air Force Base, California. 


The requirement was solicited on Federal Business Opportunities on 8 March 2013 under Full and Open, FAR 15 procedures.  The point of contact for this action is Rebecca Quint, Contracting Officer, phone (210) 395-8738, Email: rebecca.quint@us.af.mil .


 


 


 


 

Update #18 ·

Added: May 28, 2013 3:38 pm

The purpose of this amendment is to provide the revised Section L of the Vandenberg PBR Solicitation, FA8903-12-R-0033.  The revision to Section L allowed for the Life Cycle Cost (LCC) to be submitted on 8.5 x 11 inch, double-sided pages or 11 x 17 inch, single-sided pages.  All other documentation to the Vandenberg PBR remains the same.  The proposal due date for this solicitation is 2 pm, 30 May 2013, Central Time.

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Contracting Office Address :
Building 1,
1940 Allbrook Dr
Wright Patterson AFB, Ohio 45433-5006
United States
Place of Performance : Vandenberg Air Force Base
Santa Maria, California
United States

Primary Point of Contact. : Rebecca D.M. Quint, Contracting Officer rebecca.quint@us.af.mil Phone: 2103958754 Secondary Point of Contact : LaTorie Bivins, Contract Specialist latorie.bivins@us.af.mil Phone: 210-395-8724


 

Update #17 ·

Added: May 24, 2013 2:13 pm

The purpose of this amendment is to provide the Vandenberg PBR Solicitation, FA8903-12-R-0033, revised documents.   For additional information, please reference the revised SF33, SOO with its appropriate enclosures and attachments, Section L and M.  The new proposal due date for this solicitation is 2 pm, 30 May 2013, central standard time.

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Contracting Office Address :
Building 1,
1940 Allbrook Dr
Wright Patterson AFB, Ohio 45433-5006
United States
Place of Performance : Vandenberg Air Force Base
Santa Maria, California
United States

Primary Point of Contact. : Rebecca D.M. Quint, Contracting Officer rebecca.quint@us.af.mil Phone: 2103958754 Secondary Point of Contact : LaTorie Bivins, Contract Specialist latorie.bivins@us.af.mil Phone: 210-395-8724

Update #16 ·

Added: May 22, 2013 11:49 am

VANDENBERG PBR PROPOSAL DUE DATE IS EXTENDED FROM NOON, 29 May 2013 TO NOON, 30 MAY 2013 CENTRAL STANDARD TIME.

The Government is in the process of finalizing revised documents to complete the Vandenberg PBR Solicitation, FA8903-12-R-0033.  Please refer back to Federal Business Opportunities (FBO) for a future amendment on specific changes as it is possible that some contents may have changed. 

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Contracting Office Address :
Building 1,
1940 Allbrook Dr
Wright Patterson AFB, Ohio 45433-5006
United States
Place of Performance : Vandenberg Air Force Base
Santa Maria, California
United States

Primary Point of Contact. : Rebecca D.M. Quint, Contracting Officer rebecca.quint@us.af.mil Phone: 2103958754 Secondary Point of Contact : LaTorie Bivins, Contract Specialist latorie.bivins@us.af.mil Phone: 210-395-8724

Update #15 ·

Added: May 15, 2013 2:45 pm

The purpose of this amendment is to direct the offerors to review the additional documents that were posted to the FTP Google Site.  For the additional information, please reference the revised Enclosure 2-Key Documents List and the FTP website. 


 


Additionally, the revised Contractors' Questions and Answers documents were attached to this amendment to address the previous questions submitted on the final RFP for the Vandenberg PBR, (FA8903-12-R-0033).  In order to provide time to review the supplemental documents posted on the FTP website, the proposal date is extended to noon central daylight time, 29 May 2013. 

Due to current issues with the Government network, pending documents will be posted in a future amendment. Please refer to Federal Business Opportunities (FBO) for future amendments on specific changes as it is possible that some contents may change.  There is no formal Question and Answer period for the RFP. 


Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Contracting Office Address:
Building 1,
1940 Allbrook Dr
Wright Patterson AFB, Ohio 45433-5006
United States


Place of Performance:


Vandenberg Air Force Base
Santa Maria, California
United States

Primary Point of Contact.: Rebecca D.M. Quint, Contracting Officer rebecca.quint@us.af.mil Phone: 210-395-8754


Secondary Point of Contact: LaTorie Bivins, Contract Specialist latorie.bivins@us.af.mil Phone: 210-395-8724

Update #14 ·

Added: May 01, 2013 3:13 pm

The attached answers are provided to questions submitted on the final RFP for the Vandenberg PBR, (FA8903-12-R-0033).  These responses will be followed by a future amendment to include changes to the documents that are attached to the final RFP.  Please be sure to review the current amendment and any future amendments, when released, for specific changes as it is possible that some content may change.  There is no formal Question and Answer period for the RFP.  The new proposal due date is noon central standard time, 20 May 2013.


Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853



Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Contracting Office Address:
Building 1,
1940 Allbrook Dr
Wright Patterson AFB, Ohio 45433-5006
United States



Place of Performance:


Vandenberg Air Force Base
Santa Maria, California
United States

Primary Point of Contact.: Rebecca D.M. Quint, Contracting Officer rebecca.quint@us.af.mil Phone: 2103958754


 


Secondary Point of Contact: LaTorie Bivins, Contract Specialist latorie.bivins@us.af.mil Phone: 210-395-8724



Update #13 ·

Added: Apr 16, 2013 3:25 pm VANDENBERG PBR PROPOSAL DUE DATE IS EXTENDED FROM 22 APRIL 2013 TO 6 MAY 2013.

The Government is in the process of reviewing submitted industry questions to the final RFP; answers to the questions will be posted as they become available.

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Update #12 ·

Added: Apr 01, 2013 4:40 pm Added: Mar 28, 2013 5:07 pm

 The purpose of this Amendment is to correct/revise the the following Vandenberg PBR documents:

1. Vandenberg PBR FA8903-12-R-0033-SF33

The following documents were revised.  Offerors must refer to the Questions and Answers Spreadsheet to identify each correction to the following documents:

a. Attachment 1, VAFB Statement of Objective (SOO), 22 Feb 2013
b. Attachment 3, Davis Bacon General Decision Number CA130023, CA23

2.  Attachment L-6, CLIN Milestone Schedule Guidance 22 Feb 2013.  Offerors must refer to the Questions and Answers Spreadsheet to identify each correction to Attachment L-6.


3.   Section L-PDF Version.  Offerors must refer to the Questions and Answers Spreadsheet to identify each correction to Section L. 

The following document was added to provide additional information/clarification to potential offerors in reference to the revised documents:

1.  Vandenberg PBR Questions and Answers #2,
28 March 2013


Additionally, the SOO Enclosure 2-Key Documents is currently being revised to include additional documents.  Please refer to FBO for further amendments. 

If you have questions concerning this solicitation, please contact the 772 ESS/PKB Contracting Officer, Rebecca D. M. Quint or Contract Specialist, LaTorie M. Bivins 

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853 

Update #11 ·

Added: Mar 22, 2013 4:03 pm The attached answers are provided to questions submitted on the final RFP (including Amendment 001) for the Vandenberg PBR.  These responses will be followed by an Amendment to the RFP.  Please be sure to review the Amendment, when released, for specific changes as it is possible that some content may change.  There is no formal Question and Answer period for the RFP.  There is no change in the proposal due date.

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853

Update #10 ·

Added: Mar 11, 2013 3:47 pm

The following information is added to section K ADMINISTRATIVE AND ADVISOR ACCESS TO PROPRIETARY INFORMATION under subsection ADVISOR ACCESS TO PROPRIETARY INFORMATION:


(c) The contracting officer shall evaluate any objection to disclosure and make a determination whether the non-governmental advisor(s) shall be permitted to participate in the source selection. The contracting officer shall inform the objecting offeror of the final determination and if the use of non-governmental advisors has been changed shall inform all offerors of the change.



If you have questions concerning this solicitation please contact the Contracting Officer or Contract Specialist.

Update #9 ·

Added: Mar 08, 2013 5:57 pm

THIS IS A REQUEST FOR PROPOSAL (RFP)
This Solicitation is to fulfill requirements for a Performance-Based Remediation (PBR) approach for Installation Restoration Program (IRP) Sites at Vandenberg Air Force Base, CA.
Proprietary information shall be properly marked by Offerors. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations and Source Selection Procedures.


General Information:
The 772d Enterprise Sourcing Squadron/Environmental Contracting (772 ESS/PKB) at Lackland AFB, TX, has been asked to provide engineering, restoration and construction services to achieve Site Closeout (SC) through remedial action at Vandenberg Air Force Base, CA. The Contractor shall perform all necessary environmental construction and engineering activities required to meet the performance objectives identified in the corresponding Statement of Objective (SOO), dated 20 February 2013. The Period of Performance (POP) will be 120 months from date of award.


Request for Proposal:
The 772 ESS/PKB intends to award a single, Firm Fixed Price (FFP) PBR for remedial action efforts at Vandenberg Air Force Base in California using trade-off Source Selection Procedures.
You are hereby notified that the project owner has certified this project as a valid requirement. The Government reserves the right to cancel this solicitation either before or after the closing date. In the event funds are not made available for this project, you are not entitled to submit claims for proposal costs.

The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of Site Closeouts (SCs) or advance sites as close to SC as practicable during the period of performance (POP) in a cost effective manner. It is desirable to the Government that life-cycle cost (LCC) be reduced.
The anticipated award of the resultant contract is in the fourth quarter of FY13. The maximum POP for this contract, if all options are exercised, is 120 months from the date of award.

Based on executing the current Air Force environmental restoration strategy, the Air Force's ROM for this PBR is anticipated to be between $155,000,000 and $185,000,000. Offerors will not automatically be non-compliant if the proposed price exceeds the ROM.

Proposals shall be submitted in accordance with the RFP requirements and the date indicated in this announcement. There will be no formal questions and answers period concerning this RFP.

Access to JBSA, Building 171 is controlled by 802d Security Forces Squadron. Visitors' point of entry will be at the 802 SFS Visitor Center which is located adjacent to the General McMullen Gate. Therefore, if your firm intends to hand-deliver a proposal for this solicitation, the following information is required no later than (NLT) two days prior to the proposal submission date:


a. First and Last Name of visitor
b. Purpose of the visit, be concise and specific: Proposal drop-off
c. Date of visit and estimated duration of visit: (i.e., 1 hour meeting)
d. Location of visit: Bldg 171, Entrance 1
e. Drivers License number and state of issue
f. Company Name
The information provided will be forwarded to the 802d Security Forces Squadron. On the day of the visit, please confirm that your visitor information has been submitted to the 802d Security Forces Squadron. All visitors must report to the visitor center prior to entry.

Copies of this solicitation are available by INTERNET ACCESS ONLY. All solicitation documents are posted with this announcement and made available for viewing in FedBizOpps (http://www.fbo.gov).
Any amendments to the RFP (if required) will be posted in FedBizOpps. Interested parties are reminded that they are responsible for checking FedBizOpps for new information concerning this requirement.


Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Ms. Rebecca D.M. Quint. Email correspondence shall be sent to Ms. Quint with a copy to the contract specialists, Ms. LaTorie Bivins and Ms. Tracy Eubanks. Ms. LaTorie Bivins is the primary contract specialist for this requirement.


Key Documents: Documents listed as Key Documents in Enclosure 2 of the SOO are included under the following link: https://docs.google.com/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit
For assistance with locating the "Final Vandenberg Baseline Contamination Tech Memo", please follow the specific link here: https://docs.google.com/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit?pli=1#docId=0ByQK_Tqp86LwcVhNWVBtbFVKMjg


Also, for assistance in obtaining appropriate ERPIMS information, please refer to these recently posted documents that are duplicates of previously posted ERPIMS information presented in a different format:


RES_FL
Zip = 27.7mb
Unzipped = 482,936kb/471.617mb
NORES
Zip = 15.9MB
Unzipped = 205,856kb/201.031mb

If you experience difficulties accessing the site, please contact the PCO and contract specialists (rebecca.quint@us.af.mil; latorie.bivins@us.af.mil; and tracy.eubanks.1@us.af.mil).


 

Update #8 ·

Added: Feb 20, 2013 4:35 pm Modified: Feb 27, 2013 5:50 pmTrack Changes

THE PURPOSE OF THIS AMENDMENT TO THE PRE-SOLICITATION NOTICE IS TO PROVIDE ANSWERS TO THE DRAFT RFP QUESTIONS SUBMITTED FOR THE SUBJECT REQUIREMENT, TO UPDATE DRAFT DOCUMENTS, AND PROVIDE REVISED ACQUISTION STRATEGY INFORMATION AND SCHEDULE. NO FORMAL SOLICITATION HAS BEEN ISSUED TO-DATE. NO RESPONSES ARE REQUIRED AT THIS TIME.


This pre-solicitation notice is being updated for the purpose of providing revised answers to the DRAFT Request for Proposal (RFP) questions.  Answers to Questions as highlighted have changed since the prior amendment. Response to the request for questions was strictly voluntary and will not affect any firm's ability to submit an offer when a Final Solicitation is released. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.

This requirement is to provide a Performance-Based Remediation (PBR) approach for Site Closeout (SC) involving remedial action efforts at Vandenberg AFB in California. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. The Contractor shall perform all necessary environmental construction and engineering activities required to meet the performance objectives identified in the corresponding DRAFT Statement of Objective (SOO). The DRAFT SOO has been updated (dated 20 February 2013) and is provided as an attachment to this amendment. The Period of Performance remains at 120 months from date of award.


1. Site Visit: A site visit took place between 15 and 18 October 2012 at Vandenberg AFB. Attendance at the site visit is not required to participate in any resulting solicitation. Firms will not be reimbursed for bid and proposal costs incurred.


2. Updated Schedule: The below schedule is provided as an additional update for this requirement. This schedule is subject to change based on actual release of the Final RFP.


Final RFP Release - 8 March 2013
Proposal Due Date - 22 April 2013
Award Date - 16 September 2013


NOTE: If your firm elects to participate in the proposal process for this requirement and the projects are not funded, you shall not be entitled to submit any claim for bid and/or proposal costs. The Government reserves the right to cancel this requirement at any time.


3. CCR and ORCA Requirements: Please be advised of on-line registration requirement in Central Contractor Registration (CCR) database http://www.ccr.gov/ and directed DRAFT solicitation provisions concerning electronic annual On-line Representations and Certifications (ORCA) at http://orca.bpn.gov. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to ORCA.


4. Availability of DRAFT Documents: Copies of the DRAFT solicitation are available by INTERNET ACCESS ONLY. All DRAFT documents will be posted and made available for viewing in FedBizOpps (http://www.fbo.gov).


5. Key Documents: Documents listed as Key Documents in DRAFT Enclosure 2 of the SOO are included under the following link: https://docs.google.com/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit

For assistance with locating the "Final Vandenberg Baseline Contamination Tech Memo", please follow the specific link here: https://docs.google.com/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit?pli=1#docId=0ByQK_Tqp86LwcVhNWVBtbFVKMjg 

Also, for assistance in obtaining appropriate ERPIMS information, please refer to these recently posted documents that are duplicates of previously posted ERPIMS information presented in a different format:

RES_FL
Zip = 27.7mb
Unzipped = 482,936kb/471.617mb


NORES
Zip = 15.9MB
Unzipped = 205,856kb/201.031mb


If you experience difficulties accessing the site, please contact Ms. Larisa Dawkins (larisa.dawkins@us.af.mil). Please copy the Contracting Officer and Contract Specialists on all correspondence (rebecca.quint@us.af.mil; latorie.bivins@us.af.mil; and tracy.eubanks.1@us.af.mil. Please note that the primary contract specialist for this requirement is Ms. LaTorie Bivins.


6. Acquisition Strategy: This requirement will be issued under a Full and Open Competition Strategy.


 


 

Update #7 ·

Added: Feb 20, 2013 4:35 pm

THE PURPOSE OF THIS AMENDMENT TO THE PRE-SOLICITATION NOTICE IS TO PROVIDE ANSWERS TO THE DRAFT RFP QUESTIONS SUBMITTED FOR THE SUBJECT REQUIREMENT, TO UPDATE DRAFT DOCUMENTS, AND PROVIDE REVISED ACQUISTION STRATEGY INFORMATION AND SCHEDULE. NO FORMAL SOLICITATION HAS BEEN ISSUED TO-DATE. NO RESPONSES ARE REQUIRED AT THIS TIME.


This pre-solicitation notice is being updated for the purpose of providing answers to the DRAFT Request for Proposal (RFP) questions. Response to the request for questions was strictly voluntary and will not affect any firm's ability to submit an offer when a Final Solicitation is released. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.

This requirement is to provide a Performance-Based Remediation (PBR) approach for Site Closeout (SC) involving remedial action efforts at Vandenberg AFB in California. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. The Contractor shall perform all necessary environmental construction and engineering activities required to meet the performance objectives identified in the corresponding DRAFT Statement of Objective (SOO). The DRAFT SOO has been updated (dated 20 February 2013) and is provided as an attachment to this amendment. The Period of Performance remains at 120 months from date of award.


1. Site Visit: A site visit took place between 15 and 18 October 2012 at Vandenberg AFB. Attendance at the site visit is not required to participate in any resulting solicitation. Firms will not be reimbursed for bid and proposal costs incurred.


2. Updated Schedule: The below schedule is provided as an update for this requirement. This schedule is subject to change based on actual release of the Final RFP.


Final RFP Release - 28 February 2013
Proposal Due Date - 15 April 2013
Award Date - 8 September 2013


NOTE: If your firm elects to participate in the proposal process for this requirement and the projects are not funded, you shall not be entitled to submit any claim for bid and/or proposal costs. The Government reserves the right to cancel this requirement at any time.


3. CCR and ORCA Requirements: Please be advised of on-line registration requirement in Central Contractor Registration (CCR) database http://www.ccr.gov/ and directed DRAFT solicitation provisions concerning electronic annual On-line Representations and Certifications (ORCA) at http://orca.bpn.gov. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to ORCA.


4. Availability of DRAFT Documents: Copies of the DRAFT solicitation are available by INTERNET ACCESS ONLY. All DRAFT documents will be posted and made available for viewing in FedBizOpps (http://www.fbo.gov).


5. Key Documents: Documents listed as Key Documents in DRAFT Enclosure 2 of the SOO are included under the following link: https://docs.google.com/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit


If you experience difficulties accessing the site, please contact Ms. Larisa Dawkins (larisa.dawkins@us.af.mil). Please copy the Contracting Officer and Contract Specialists on all correspondence (rebecca.quint@us.af.mil; latorie.bivins@us.af.mil; and tracy.eubanks.1@us.af.mil. Please note that the primary contract specialist for this requirement is Ms. LaTorie Bivins.


6. Acquisition Strategy: This requirement will be issued under a Full and Open Competition Strategy.


 


 

Update #6 ·

Added: Dec 14, 2012 4:31 pm

The purpose of this Amendment to the DRAFT RFP is to provide the corrected URL link for the Key Documents:


https://docs.google.com/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit


Also provided are revised Attachment L-6: Contract Line Item Number (CLIN) Structures/Milestone Payment Schedules (MPS)/Integrated Master Schedule (IMS) Guidance with the SubCLIN Structure and Attachment 1E2: Key Documents.


 

Update #5 ·

Added: Dec 12, 2012 6:58 pm  

THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING A DRAFT SOLICITATION FOR PLANNING PURPOSES ONLY.  THIS REQUEST IS NOT A FINAL SOLICITATION.  PLEASE DO NOT SUBMIT A PROPOSAL.


This pre-solicitation notice is being updated for the purpose of obtaining industry feedback concerning DRAFT Request for Proposal (RFP) information. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.


This requirement is to provide a Performance-Based Remediation (PBR) approach for Site Closeout (SC) involving remedial action efforts at Vandenberg AFB in California. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. The Contractor shall perform all necessary environmental construction and engineering activities required to meet the performance objectives identified in the corresponding DRAFT Statement of Objective (SOO), dated 5 December 2012. The POP is estimated at 120 months from date of award. 

1. Site Visit: A site visit took place between 15 and 18 October 2012 at Vandenberg AFB. Attendance at the site visit is not required to participate in any resulting solicitation. Firms will not be reimbursed for bid and proposal costs incurred.


2. Request for Questions: The Government anticipates a Final Solicitation to be released in January 2013. This notification is provided to allow early review of DRAFT solicitation documentation for this requirement.  Questions concerning the DRAFT Request for Proposal (RFP) and attachments as well as any questions pertaining to the site visit that occurred in October 2012 are due by 4:00 PM CT on 27 December 2012.


 


NOTE: If your firm elects to participate in the proposal process for this requirement and the projects are not funded, you shall not be entitled to submit any claim for bid and/or proposal costs. The Government reserves the right to cancel this requirement at any time.


3. CCR and ORCA Requirements: Please be advised of on-line registration requirement in Central Contractor Registration (CCR) database http://www.ccr.gov/ and directed DRAFT solicitation provisions concerning electronic annual On-line Representations and Certifications (ORCA) at http://orca.bpn.gov. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to ORCA.


4. Availability of DRAFT Documents: Copies of the DRAFT solicitation are available by INTERNET ACCESS ONLY. All DRAFT documents will be posted and made available for viewing in FedBizOpps (http://www.fbo.gov).


5. Key Documents: Documents listed as Key Documents in DRAFT Enclosure 2 of the SOO are included under the following link:


 


https://sites.google.com/a/afcecpbrshare.org/folder/d/0B4B46sya0IUwck5nbnNvR0xUeG8/edit


If you experience difficulties accessing the site, please contact Ms. Larisa Dawkins (larisa.dawkins@us.af.mil).  Please copy the Contracting Officer and Contract Specialists on all correspondence (rebecca.quint@us.af.mil; latorie.bivins@us.af.mil; and estephon.ramirez@us.af.mil).


6.  Pending Acquisition Strategy: A determination has not been made concerning whether or not this acquisition will be solicited under full and open competition or as a small business set-aside.  This determination will be made prior to release of the Final Solicitation.

Procuring Contracting Office:
772 Enterprise Sourcing Squadron (ESS)/PKB
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853

Update #4 ·

Added: Nov 01, 2012 2:37 pm The purpose of this Amendment is to provide the Contractor Log-in sheet, the Contracting Briefing, the Sub-CLIN Briefing, and the Pitfalls & Best Practices Briefing from the Vandenberg PBR Site Visit. As it pertains to the requirement, this project is predominately construction under the NAICS 562910 - Environmental Remediation Services rather than Remediation Services. No responses are required or requested at this time.

Update #3 ·

Added: Aug 31, 2012 5:11 pm Modified: Sep 28, 2012 2:28 pmTrack Changes THIS IS A PRE-SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY. THIS IS NOT A FORMAL SOLICITATION [INVITATION FOR BID (IFB)] OR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.

This Pre-Solicitation Notice is being issued for the purpose of advising potential offerors of the Government’s requirement for a performance-based remediation (PBR) effort at Vandenberg Air Force Base, California. If your firm intends to participate in the site visit, a complete response is required as outlined within Further Pre-solicitation Information. Other than site visit attendee information, no further information is requested at this time. The subject pre-solicitation notice is to provide information for early planning and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the provision of this information. Note that official information concerning this pre-solicitation will be provided by the Contracting Officer only.
 
General Information: The 772d Enterprise Sourcing Squadron/Environmental Contracting (772 ESS/PKB) in conjunction with the Air Force Center for Engineering and the Environment (AFCEE), at Lackland AFB, TX, is contemplating a requirement to provide engineering, restoration, and construction services to achieve Site Closeout (SC) through remedial action at one-hundred and eight (108) Installation Restoration Program (IRP) sites at Vandenberg AFB, CA.

Project Narrative: The 772 ESS/PKB is considering a performance-based approach for SC involving remedial action efforts at Vandenberg AFB, CA. Performance-Based Remediation (PBR) emphasizes results in terms of environmental clean-up for an entire installation (fence-to-fence), or group of installations, in lieu of a study-based approach. The PBR approach looks for technically and cost-effective methods for achieving this clean-up by focusing on achievement of desired objectives without specifying the processes or technologies for obtaining those objectives. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. The awarded contractor shall perform all necessary environmental construction and engineering activities as required to meet the performance objectives of the Draft SOO.

The period of performance (POP) – if all target options are executed - is estimated at 120 months from date of award. The estimated Rough Order of Magnitude (ROM) anticipated for any resultant contract is between $150 Million and $180 Million. This ROM is an estimate range only and is provided only for informational purposes.

The following information is provided to assist potential offerors in planning for this requirement:

DRAFT Statement of Objectives (SOO), dated 31 Aug 2012;
DRAFT SOO Enclosure 1, Site List, dated 06 July 2012;
DRAFT SOO Enclosure 2, Key Documents List, dated 31 Aug 2012;
DRAFT SOO Enclosure 5, Acronyms and Definitions, dated 04 May 2012
DRAFT Bonding Stream, dated 04 May 2012

A single website is available to review the key, installation-specific environmental documents listed in DRAFT SOO, Enclosure 2, Key Documents List. The following website is established to review back-ground information for the included sites:

URL http://afcee-pbmc.com/vandenbergFY13/Contractors/Forms/AllItems.aspx

A schedule has been established for when this site will be open to potential offerors to view and download documentation:

31 August 2012 – 23 September 2012 – Open to potential offerors for viewing and download of documents.

24 September 2012 – 8 October 2012 – Closed to potential offerors; Government upload of additional documentation and update to DRAFT SOO Enclosure 2.

9 October 2012 - 22 October 2012 -  Open to potential offerors for viewing and download of documents.

Additional updates for time-frames to open and close the FTP website will be established as the pre-solicitation phase progresses. Updates will be conveyed via FebBizOpps.

A generic username and password allowing access to the site are provided below. Please note that should three incorrect attempts be made to access the site, the screen will go blank. The user should close the blank screen and re-open the URL to re-enter the username and password. NOTE: Do not cut and paste the username or password below for login purposes. This information must be typed in for login to be achieved (case sensitive and must include spaces).

Contractor User Name: pbmc\ctr

Password: password2011

**FTP password and technical support will be available 7 days a week via the FTP Help Desk at ftp_help@bah.com or 210-487-2623. Point of Contact (POC) is Sarah Alvarez. Hours of operations are as follows:

Monday through Friday, 9:00 A.M. to 7:00 P.M. CT via phone or email.

Saturday and Sunday, via phone only during the hours of 1:00 P.M. to 4:00 P.M. CT. Email will be monitored in the morning and evening.

If you have issues accessing the site or need technical assistance, your first line of support is ftp_help@bah.com.

Please include a description of the issue you are having and contact information in this correspondence. This email is closely monitored by support staff and all requests will be processed as soon as possible. Phone support is also available during our hours of operation; if you reach the voicemail please leave your contact information and follow up with an email when possible. Please copy the Contracting Officer and Contract Specialist on all correspondence.

ENVIRONMENTAL INSURANCE (EI) The Air Force is currently NOT proposing to require Cleanup Cost Cap (CCC) or any other type of Environmental Insurance (EI) for this PBR.

BONDING CAPACITY The Air Force is currently proposing to require performance and payment bonds for only the construction portion of this PBR. The bonding required for the construction portion of this effort is anticipated to be 51% of the total estimated contract amount, which has a ROM of between $150 Million and $180 Million, if all options are exercised. An estimated bonding stream is provided to show estimated bonding amounts per year. Note: Your price proposal may differ from the Air Force’s ROM based on the proposed technical approach.

ORGANIZATIONAL CONFLICT OF INTEREST (OCI) An organizational conflict of interest may result when factors create an actual or potential conflict of interest on a contract, or where the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. Some restrictions may apply to your firm under the proposed future action. In accordance with the parameters set forth in FAR Subpart 9.5 and 36.209, the Contracting Officer must ensure that there are no conflicting roles that might bias a contractor’s judgment and must ensure that an OCI does not give rise to an unfair competitive advantage. Performance of past clean-up related work at Vandenberg AFB may have created an OCI concerning this PBR effort. OCIs may exist in the following three ways.

a. Unequal access to information – access to non-public information that gives a contractor an unfair competitive advantage.

b. Biased ground rules – when a contractor has in some sense set the ground rules for another procurement action creating the potential that the contractor may have tilted the playing field in the new competition (usually toward its own strengths and away from its weaknesses).

c. Impaired objectivity – when the contract requires exercise of judgment and the independence of its judgment may be affected (e.g., when the contractor may be required to evaluate its own work in a way that could be adverse to its economic interests). Please keep in mind OCI or potential OCI issues your firm (including all subsidiaries, legacy companies, teaming partners, and subcontractors) may have with respect to the scope of effort at these sites.

FURTHER PRE-SOLICITATION INFORMATION

THIS IS A SAVE THE DATE NOTICE FOR SITE VISIT.
The 772 ESS/PKB is considering a performance-based approach for Site Closeout involving remedial action efforts at Vandenberg AFB, CA. The Acquisition Strategy has not yet been approved for this requirement. Should the Air Force determine to proceed with this requirement, it will be processed using FAR Part 15 procedures and will result in a "C" type contract, NOT a task order under any current Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract suites (AFCEE contract suites). If the Air Force elects to proceed with this requirement, a formal solicitation will be finalized and posted to FedBizOpps at a later date. It has NOT been determined if this requirement will be issued as a Small Business Set-Aside or under Full and Open Competition.

This effort is a validated FY2013 requirement; however funds are not currently available. The Government reserves the right to cancel this requirement at any time.


Attendance at this Site Visit is not mandatory and is at the sole discretion of each firm. The Government will not reimburse participating firms for site visit costs.


No formal Request for Proposal has been issued to-date. Currently, in order to meet time schedules, the Air Force is requesting that companies planning to send representatives to the Site Visit submit the names of the individuals attending. The Site Visit will be from the 15th - 18th of October 2012 (the 14th and 19th would be travel days) at Vandenberg AFB, CA. It is the Air Force's intention to review general base information, site specific information, provide a walk-around of sites (all sites may not be viewed, but representative sites will be viewed), and allow firms to speak with regulators individually. A schedule of events will be provided via email to firms that submit attendee information by the required time and date. We can only accommodate two individuals per firm. The names of interested parties will be added to a list of attendees. Each person attending the site visit will need to submit the following information to Estephon.ramirez@us.af.mil and Rebecca.quint@us.af.mil no later than 2:00 p.m. (CT) on 04 October 2012. If this information is not submitted by the required time and date indicated above, your company will not be able to attend the site visit due to security concerns. There will be NO EXCEPTIONS:


1) Name and title of individual(s), including First and Last name
2) Daytime Phone Number of personnel attending site visit
3) Date of Birth
4) Driver's License #
5) State of issue for Driver's License
6) Company Name

Place of Performance: Vandenberg Air Force Base, CA

Procuring Contracting Office:
772d Enterprise Sourcing Squadron
2261 Hughes Ave, Suite 163
Lackland AFB, TX 78236-9853

Update #2 ·

Added: Aug 31, 2012 5:11 pm Modified: Sep 21, 2012 4:22 pmTrack Changes THIS IS A PRE-SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY. THIS IS NOT A FORMAL SOLICITATION [INVITATION FOR BID (IFB)] OR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.

This Pre-Solicitation Notice is being issued for the purpose of advising potential offerors of the Government’s requirement for a performance-based remediation (PBR) effort at Vandenberg Air Force Base, California. At this time, no response is necessary. The subject pre-solicitation notice is to provide information for early planning and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the provision of this information. Note that official information concerning this pre-solicitation will be provided by the Contracting Officer only.
 
General Information: The 772d Enterprise Sourcing Squadron/Environmental Contracting (772 ESS/PKB) in conjunction with the Air Force Center for Engineering and the Environment (AFCEE), at Lackland AFB, TX, is contemplating a requirement to provide engineering, restoration, and construction services to achieve Site Closeout (SC) through remedial action at one-hundred and eight (108) Installation Restoration Program (IRP) sites at Vandenberg AFB, CA.

Project Narrative: The 772 ESS/PKB is considering a performance-based approach for SC involving remedial action efforts at Vandenberg AFB, CA. Performance-Based Remediation (PBR) emphasizes results in terms of environmental clean-up for an entire installation (fence-to-fence), or group of installations, in lieu of a study-based approach. The PBR approach looks for technically and cost-effective methods for achieving this clean-up by focusing on achievement of desired objectives without specifying the processes or technologies for obtaining those objectives. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. The awarded contractor shall perform all necessary environmental construction and engineering activities as required to meet the performance objectives of the Draft SOO.

The period of performance (POP) – if all target options are executed - is estimated at 120 months from date of award. The estimated Rough Order of Magnitude (ROM) anticipated for any resultant contract is between $150 Million and $180 Million. This ROM is an estimate range only and is provided only for informational purposes.

The following information is provided to assist potential offerors in planning for this requirement:

DRAFT Statement of Objectives (SOO), dated 31 Aug 2012;
DRAFT SOO Enclosure 1, Site List, dated 06 July 2012;
DRAFT SOO Enclosure 2, Key Documents List, dated 31 Aug 2012;
DRAFT SOO Enclosure 5, Acronyms and Definitions, dated 04 May 2012
DRAFT Bonding Stream, dated 04 May 2012

A single website is available to review the key, installation-specific environmental documents listed in DRAFT SOO, Enclosure 2, Key Documents List. The following website is established to review back-ground information for the included sites:

URL http://afcee-pbmc.com/vandenbergFY13/Contractors/Forms/AllItems.aspx

A schedule has been established for when this site will be open to potential offerors to view and download documentation:

31 August 2012 – 23 September 2012 – Open to potential offerors for viewing and download of documents

24 September 2012 – 9 October 2012 – Closed to potential offerors; Government upload of additional documentation and update to DRAFT SOO Enclosure 2.

Additional updates for time-frames to open and close the FTP website will be established as the pre-solicitation phase progresses. Updates will be conveyed via FebBizOpps.

A generic username and password allowing access to the site are provided below. Please note that should three incorrect attempts be made to access the site, the screen will go blank. The user should close the blank screen and re-open the URL to re-enter the username and password. NOTE: Do not cut and paste the username or password below for login purposes. This information must be typed in for login to be achieved (case sensitive and must include spaces).

Contractor User Name: pbmc\ctr

Password: password2011

**FTP password and technical support will be available 7 days a week via the FTP Help Desk at ftp_help@bah.com or 210-487-2623. Point of Contact (POC) is Sarah Alvarez. Hours of operations are as follows:

Monday through Friday, 9:00 A.M. to 7:00 P.M. CT via phone or email.

Saturday and Sunday, via phone only during the hours of 1:00 P.M. to 4:00 P.M. CT. Email will be monitored in the morning and evening.

If you have issues accessing the site or need technical assistance, your first line of support is ftp_help@bah.com.

Please include a description of the issue you are having and contact information in this correspondence. This email is closely monitored by support staff and all requests will be processed as soon as possible. Phone support is also available during our hours of operation; if you reach the voicemail please leave your contact information and follow up with an email when possible. Please copy the Contracting Officer and Contract Specialist on all correspondence.

ENVIRONMENTAL INSURANCE (EI) The Air Force is currently NOT proposing to require Cleanup Cost Cap (CCC) or any other type of Environmental Insurance (EI) for this PBR.

BONDING CAPACITY The Air Force is currently proposing to require performance and payment bonds for only the construction portion of this PBR. The bonding required for the construction portion of this effort is anticipated to be 51% of the total estimated contract amount, which has a ROM of between $150 Million and $180 Million, if all options are exercised. An estimated bonding stream is provided to show estimated bonding amounts per year. Note: Your price proposal may differ from the Air Force’s ROM based on the proposed technical approach.

ORGANIZATIONAL CONFLICT OF INTEREST (OCI) An organizational conflict of interest may result when factors create an actual or potential conflict of interest on a contract, or where the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. Some restrictions may apply to your firm under the proposed future action. In accordance with the parameters set forth in FAR Subpart 9.5 and 36.209, the Contracting Officer must ensure that there are no conflicting roles that might bias a contractor’s judgment and must ensure that an OCI does not give rise to an unfair competitive advantage. Performance of past clean-up related work at Vandenberg AFB may have created an OCI concerning this PBR effort. OCIs may exist in the following three ways.

a. Unequal access to information – access to non-public information that gives a contractor an unfair competitive advantage.

b. Biased ground rules – when a contractor has in some sense set the ground rules for another procurement action creating the potential that the contractor may have tilted the playing field in the new competition (usually toward its own strengths and away from its weaknesses).

c. Impaired objectivity – when the contract requires exercise of judgment and the independence of its judgment may be affected (e.g., when the contractor may be required to evaluate its own work in a way that could be adverse to its economic interests). Please keep in mind OCI or potential OCI issues your firm (including all subsidiaries, legacy companies, teaming partners, and subcontractors) may have with respect to the scope of effort at these sites.

FURTHER PRE-SOLICITATION INFORMATION This Pre-Solicitation Notice will be amended as further information concerning the requirement becomes available. Schedules along with site visit and formal question and answer periods will be conveyed via this notice until such time as the Government determines to release a Final RFP or cancel the requirement. At this time, no questions are requested or will be accepted.

Procuring Contracting Office:
772d Enterprise Sourcing Squadron
2261 Hughes Ave, Suite 163
Lackland AFB, TX 78236-9853

Update #1 ·

Added: Aug 31, 2012 5:11 pm THIS IS A PRE-SOLICITATION NOTICE FOR PLANNING PURPOSES ONLY. THIS IS NOT A FORMAL SOLICITATION [INVITATION FOR BID (IFB)] OR A REQUEST FOR PROPOSAL (RFP). PLEASE DO NOT SUBMIT A PROPOSAL.

This Pre-Solicitation Notice is being issued for the purpose of advising potential offerors of the Government’s requirement for a performance-based remediation (PBR) effort at Vandenberg Air Force Base, California. At this time, no response is necessary. The subject pre-solicitation notice is to provide information for early planning and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the provision of this information. Note that official information concerning this pre-solicitation will be provided by the Contracting Officer only.
 
General Information: The 772d Enterprise Sourcing Squadron/Environmental Contracting (772 ESS/PKB) in conjunction with the Air Force Center for Engineering and the Environment (AFCEE), at Lackland AFB, TX, is contemplating a requirement to provide engineering, restoration, and construction services to achieve Site Closeout (SC) through remedial action at one-hundred and eight (108) Installation Restoration Program (IRP) sites at Vandenberg AFB, CA.

Project Narrative: The 772 ESS/PKB is considering a performance-based approach for SC involving remedial action efforts at Vandenberg AFB, CA. Performance-Based Remediation (PBR) emphasizes results in terms of environmental clean-up for an entire installation (fence-to-fence), or group of installations, in lieu of a study-based approach. The PBR approach looks for technically and cost-effective methods for achieving this clean-up by focusing on achievement of desired objectives without specifying the processes or technologies for obtaining those objectives. The PBR initiative has an overarching goal to implement remedies as necessary to protect human health and the environment that maximizes the number of SCs or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost effective manner. It is desirable to the Government that Life-Cycle Costs (LCC) be reduced. If SC with no new institutional controls is not obtainable within the POP of this effort, the Contractor shall outline the Optimization Exit Strategy (OES) that will be implemented to accomplish SC. The awarded contractor shall perform all necessary environmental construction and engineering activities as required to meet the performance objectives of the Draft SOO.

The period of performance (POP) – if all target options are executed - is estimated at 120 months from date of award. The estimated Rough Order of Magnitude (ROM) anticipated for any resultant contract is between $150 Million and $180 Million. This ROM is an estimate range only and is provided only for informational purposes.

The following information is provided to assist potential offerors in planning for this requirement:

DRAFT Statement of Objectives (SOO), dated 31 Aug 2012;
DRAFT SOO Enclosure 1, Site List, dated 06 July 2012;
DRAFT SOO Enclosure 2, Key Documents List, dated 31 Aug 2012;
DRAFT SOO Enclosure 5, Acronyms and Definitions, dated 04 May 2012
DRAFT Bonding Stream, dated 04 May 2012

A single website is available to review the key, installation-specific environmental documents listed in DRAFT SOO, Enclosure 2, Key Documents List. The following website is established to review back-ground information for the included sites:

URL http://afcee-pbmc.com/vandenbergFY13/Contractors/Forms/AllItems.aspx

A schedule has been established for when this site will be open to potential offerors to view and download documentation:

31 August 2012 – 23 September 2012 – Open to potential offerors for viewing and download of documents

24 September 2012 – 30 September 2012 – Closed to potential offerors; Government upload of additional documentation and update to DRAFT SOO Enclosure 2.

Additional updates for time-frames to open and close the FTP website will be established as the pre-solicitation phase progresses. Updates will be conveyed via FebBizOpps.

A generic username and password allowing access to the site are provided below. Please note that should three incorrect attempts be made to access the site, the screen will go blank. The user should close the blank screen and re-open the URL to re-enter the username and password. NOTE: Do not cut and paste the username or password below for login purposes. This information must be typed in for login to be achieved (case sensitive and must include spaces).

Contractor User Name: pbmc\ctr

Password: password2011

**FTP password and technical support will be available 7 days a week via the FTP Help Desk at ftp_help@bah.com or 210-487-2623. Point of Contact (POC) is Sarah Alvarez. Hours of operations are as follows:

Monday through Friday, 9:00 A.M. to 7:00 P.M. CT via phone or email.

Saturday and Sunday, via phone only during the hours of 1:00 P.M. to 4:00 P.M. CT. Email will be monitored in the morning and evening.

If you have issues accessing the site or need technical assistance, your first line of support is ftp_help@bah.com.

Please include a description of the issue you are having and contact information in this correspondence. This email is closely monitored by support staff and all requests will be processed as soon as possible. Phone support is also available during our hours of operation; if you reach the voicemail please leave your contact information and follow up with an email when possible. Please copy the Contracting Officer and Contract Specialist on all correspondence.

ENVIRONMENTAL INSURANCE (EI) The Air Force is currently NOT proposing to require Cleanup Cost Cap (CCC) or any other type of Environmental Insurance (EI) for this PBR.

BONDING CAPACITY The Air Force is currently proposing to require performance and payment bonds for only the construction portion of this PBR. The bonding required for the construction portion of this effort is anticipated to be 51% of the total estimated contract amount, which has a ROM of between $150 Million and $180 Million, if all options are exercised. An estimated bonding stream is provided to show estimated bonding amounts per year. Note: Your price proposal may differ from the Air Force’s ROM based on the proposed technical approach.

ORGANIZATIONAL CONFLICT OF INTEREST (OCI) An organizational conflict of interest may result when factors create an actual or potential conflict of interest on a contract, or where the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. Some restrictions may apply to your firm under the proposed future action. In accordance with the parameters set forth in FAR Subpart 9.5 and 36.209, the Contracting Officer must ensure that there are no conflicting roles that might bias a contractor’s judgment and must ensure that an OCI does not give rise to an unfair competitive advantage. Performance of past clean-up related work at Vandenberg AFB may have created an OCI concerning this PBR effort. OCIs may exist in the following three ways.

a. Unequal access to information – access to non-public information that gives a contractor an unfair competitive advantage.

b. Biased ground rules – when a contractor has in some sense set the ground rules for another procurement action creating the potential that the contractor may have tilted the playing field in the new competition (usually toward its own strengths and away from its weaknesses).

c. Impaired objectivity – when the contract requires exercise of judgment and the independence of its judgment may be affected (e.g., when the contractor may be required to evaluate its own work in a way that could be adverse to its economic interests). Please keep in mind OCI or potential OCI issues your firm (including all subsidiaries, legacy companies, teaming partners, and subcontractors) may have with respect to the scope of effort at these sites.

FURTHER PRE-SOLICITATION INFORMATION This Pre-Solicitation Notice will be amended as further information concerning the requirement becomes available. Schedules along with site visit and formal question and answer periods will be conveyed via this notice until such time as the Government determines to release a Final RFP or cancel the requirement. At this time, no questions are requested or will be accepted.

Attachments

Files attached to this notice, newest first
File Type Posted
Vandenberg_Section_L_-_28_May_2013.pdf PDF
Vandenberg_Section_L_-_21_May_2013.pdf PDF
SF33_Amend_005_24_May_13.pdf PDF
Vandenberg_Section_M-21_May_2013.pdf PDF
VAFB_Questions_and_Answers_Spreadsheet__2_Final_RFP_RQ_revision.xlsx XLSX spreadsheet
VAFB_Questions_and_Answers_Spreadsheet__1_Final_RFP_RQ_revision.xlsx XLSX spreadsheet
6)_Enclosure_2__Key_Documents_revised_050913.xlsx XLSX spreadsheet
QA_Spreadsheet__2_-_VAFB_PBR__Final.xlsx XLSX spreadsheet
VAFB_Question_and_Answers_Spreadsheet_Final_RFP__2.xlsx XLSX spreadsheet
Vandenberg_Section_L_-_28_Mar_13.pdf PDF
Vandenberg_PBR_Solicitation-28_March_2013.pdf PDF
Attachment_L-6__CLIN_Milestone_Schedule_Guidance_27_Mar_13-Revised.pdf PDF
VAFB_Question_and_Answers_Spreadsheet_Final_RFP.xlsx XLSX spreadsheet
Attachment_L-3_Past_Performance_Questionnaire_22_Feb_13.pdf PDF
Attachment_L-2_MilestonePaymentSchedule_with_price_22_Feb_13.pdf PDF
Attachment_L-1_MilestonePaymentSchedule_without_price_22_Feb_13.pdf PDF
Attachment_L-4_Subcontractor_Consent_Letter_Sample_22_Feb_13.pdf PDF
Attachment_L-5_Client_Authorization_Letter_Sample_22_Feb_13.pdf PDF
Attachment_3_-_General_Decision_Number_CA23__8_Mar_13.pdf PDF
Attachment_L-6_CLIN_Milestone_Schedule_Guidance_22_Feb_13.pdf PDF
Vandenberg_Section_L_-_FINAL_22_Feb_13.pdf PDF
Vandenberg_Section_M_-_FINAL_22_Feb_13.pdf PDF
Vandenberg_PBR_FA8903-12-R-0033_8_March_2013.pdf PDF
DRAFT_RFP_QA_-_REV_1_to_FINAL_22_Feb_13.xls XLS spreadsheet
DRAFT_RFP_QA_-_FINAL_20_Feb_13.xls XLS spreadsheet
DRAFT_VAFB_PBR_SOO_022013.docx DOCX document
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure_revised_121312.doc DOC document
DRAFT_Enclosure_2__Key_Documents.xlsx XLSX spreadsheet
Vandenberg_draft_Section_L_-_11_Dec_12.docx DOCX document
Attachment_L-5_Client_Authorization_Letter_Sample.docx DOCX document
Attachment_L-4_Subcontractor_Consent_Letter_Sample.docx DOCX document
Attachment_L-3_Past_Performance_Questionnaire_5_Dec_12.docx DOCX document
Vandenberg-draftSection_M_-__11_Dec_12.doc DOC document
Attachment_L-1_MilestonePaymentSchedule_without_price_11_Dec_12.xlsx XLSX spreadsheet
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure.doc DOC document
Attachment_L-2_MilestonePaymentSchedule_with_price_11_Dec_12.xlsx XLSX spreadsheet
DRAFT_FA8903-12-R-0033.pdf PDF
PBR_Pitfalls_and_Best_Practices_VAFB_Site_Visit_15Oct12.pptx PPTX presentation
Site_Visit_Attendee_Sign-In_Redacted.pdf PDF
Vandenberg_PBR_Contracting_Slides.pptx PPTX presentation
Vandenberg_PBR_SubCLIN_Overview_11Oct12.pptx PPTX presentation
DRAFT SOO Enclosure 5 - Acronyms and Definitions.doc DOC document
DRAFT SOO - Vandenberg PBR 083112.docx DOCX document
DRAFT SOO Enclosure 1 Site List_070612.xlsx XLSX spreadsheet
Attachment - Bonding Stream.pptx PPTX presentation
DRAFT SOO Enclosure 2 Key Documents List_083112.xlsx XLSX spreadsheet
Show all 46

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Vandenberg Air Force Base (AFB) Performance-Based Remediation (PBR) This notice · Latest Award Notice
Amendment 2: Vandenberg Performance Based Remediation (PBR) - FA8903-12-R-0033 Original Award Notice