DRAFT SOO Enclosure 5 - Acronyms and Definitions.doc

DOC document 145 KB Posted

Attached to
Vandenberg Air Force Base (AFB) Performance-Based Remediation (PBR) Federal contract opportunity
Solicitation number
FA8903-12-R-0033
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

DRAFT SOO Enclosure 5 Acronyms and Definitions

View the file

Other files for this federal contract opportunity

Other files attached to Vandenberg Air Force Base (AFB) Performance-Based Remediation (PBR), newest first.
File Type Posted
Vandenberg_Section_L_-_28_May_2013.pdf PDF
Vandenberg_Section_M-21_May_2013.pdf PDF
Vandenberg_Section_L_-_21_May_2013.pdf PDF
SF33_Amend_005_24_May_13.pdf PDF
6)_Enclosure_2__Key_Documents_revised_050913.xlsx XLSX spreadsheet
VAFB_Questions_and_Answers_Spreadsheet__2_Final_RFP_RQ_revision.xlsx XLSX spreadsheet
VAFB_Questions_and_Answers_Spreadsheet__1_Final_RFP_RQ_revision.xlsx XLSX spreadsheet
QA_Spreadsheet__2_-_VAFB_PBR__Final.xlsx XLSX spreadsheet
Attachment_L-6__CLIN_Milestone_Schedule_Guidance_27_Mar_13-Revised.pdf PDF
Vandenberg_PBR_Solicitation-28_March_2013.pdf PDF
VAFB_Question_and_Answers_Spreadsheet_Final_RFP__2.xlsx XLSX spreadsheet
Vandenberg_Section_L_-_28_Mar_13.pdf PDF
VAFB_Question_and_Answers_Spreadsheet_Final_RFP.xlsx XLSX spreadsheet
Attachment_3_-_General_Decision_Number_CA23__8_Mar_13.pdf PDF
Attachment_L-6_CLIN_Milestone_Schedule_Guidance_22_Feb_13.pdf PDF
Vandenberg_Section_L_-_FINAL_22_Feb_13.pdf PDF
Vandenberg_Section_M_-_FINAL_22_Feb_13.pdf PDF
Vandenberg_PBR_FA8903-12-R-0033_8_March_2013.pdf PDF
Attachment_L-3_Past_Performance_Questionnaire_22_Feb_13.pdf PDF
Attachment_L-2_MilestonePaymentSchedule_with_price_22_Feb_13.pdf PDF
Attachment_L-4_Subcontractor_Consent_Letter_Sample_22_Feb_13.pdf PDF
Attachment_L-5_Client_Authorization_Letter_Sample_22_Feb_13.pdf PDF
Attachment_L-1_MilestonePaymentSchedule_without_price_22_Feb_13.pdf PDF
DRAFT_RFP_QA_-_REV_1_to_FINAL_22_Feb_13.xls XLS spreadsheet
DRAFT_VAFB_PBR_SOO_022013.docx DOCX document
DRAFT_RFP_QA_-_FINAL_20_Feb_13.xls XLS spreadsheet
DRAFT_Enclosure_2__Key_Documents.xlsx XLSX spreadsheet
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure_revised_121312.doc DOC document
Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure.doc DOC document
Attachment_L-2_MilestonePaymentSchedule_with_price_11_Dec_12.xlsx XLSX spreadsheet
DRAFT_FA8903-12-R-0033.pdf PDF
Vandenberg_draft_Section_L_-_11_Dec_12.docx DOCX document
Attachment_L-3_Past_Performance_Questionnaire_5_Dec_12.docx DOCX document
Vandenberg-draftSection_M_-__11_Dec_12.doc DOC document
Attachment_L-1_MilestonePaymentSchedule_without_price_11_Dec_12.xlsx XLSX spreadsheet
Attachment_L-5_Client_Authorization_Letter_Sample.docx DOCX document
Attachment_L-4_Subcontractor_Consent_Letter_Sample.docx DOCX document
Vandenberg_PBR_SubCLIN_Overview_11Oct12.pptx PPTX presentation
PBR_Pitfalls_and_Best_Practices_VAFB_Site_Visit_15Oct12.pptx PPTX presentation
Vandenberg_PBR_Contracting_Slides.pptx PPTX presentation
Site_Visit_Attendee_Sign-In_Redacted.pdf PDF
Attachment - Bonding Stream.pptx PPTX presentation
DRAFT SOO Enclosure 2 Key Documents List_083112.xlsx XLSX spreadsheet
DRAFT SOO - Vandenberg PBR 083112.docx DOCX document
DRAFT SOO Enclosure 1 Site List_070612.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- Former Plattsburgh AFB PBR RFI -

SOO Enclosure 5

Acronyms and Definitions

DRAFT SOO Enclosure 5

Acronyms

FA8903-12-R-0033

14 May 2012

Acronyms

ACOE
Army Corps of Engineer
ADF
Aerospace Defense Facility
AFB
Air Force Base
AFCEE
Air Force Center for Engineering and the Environment
AOC
Area of Concern
AOI
Area of Interest
API
American Petroleum Institute
AR/IR
Administrative Record/ Information Repository
ASTM
American Society for Testing and Materials
BCE
Base Civil Engineer
BGMP
Basewide Groundwater Monitoring Program
BSA
Background Standard Approach
CAB
Community Advisory Board
CAC
Common Access Card
CADD
Computer-aided Design and Drafting
CDUT
Contract Deliverables Upload Tool
CERCLA
Comprehensive Environmental Response, Compensation, and Liability Act
CFR
Code of Federal Regulations
CLIN
Contract Line Item Number
CO
Contracting Officer
COC
Contaminant of Concern
COR
Contracting Officer Representative
CPSMR
Contractor’s Progress, Status, and Management Report
CQP
Construction Quality Plan
CRP
Compliance Restoration Program
CSM
Conceptual Site Model
CTC
Cost-to-Complete
CWM
Chemical Warfare Materiel
DBIDS
Defense Biometric Identification System
DD
Decision Document
DERP
Defense Environmental Restoration Program
DFG
Department of Fish and Game
DLH
Data Loading Handbook
DoD
Department of Defense
DQO
Data Quality Objectives
DTSC
Department of Toxic Substances Control
EDITT
Environmental Decision Information Tracking Tool
EO
Executive Order
EOD
Explosive Ordnance Disposal
ELAP
Environmental Laboratory Accreditation Program
EPCRA
Emergency Planning and Community Right-to-Know Act
ERP
Environmental Restoration Program
ERPIMS
Environmental Resources Program Information Management System
ESD
Explanation of Significant Difference
FAR
Federal Acquisition Regulation
FFA
Federal Facility Agreement
FFSRA
Federal Facility Site Remediation Agreement
FSP
Field Sampling Plan
GFE
Government-Furnished Equipment
GFI
Government-Furnished Information
GFP
Government-Furnished Property
GIO
Geospatial Integration Office
GIS
Geographic Information System
GSR
Green and Sustainable Remediation
HAZWOPER
Hazardous Waste Operations and Emergency Response
HSP
Health and Safety Plan
IBC
International Building Code
ICBM
Intercontinental Ballistic Missiles
IMS
Integrated Master Schedule
INRMP
Integrated Natural Resources Management Plan
IRP
Installation Restoration Program
LCC
Life-cycle Cost
LTM
Long Term Management
LUC/IC
Land Use Control/Institutional Control
LUFT
Leaking Underground Fuel Tank
MCL
Maximum Contaminant Level
MDL
Master Document List
MMRP
Military Munitions Response Program
MPS
Milestone Payment Schedule
NACE
National Association of Corrosion Engineers
NCP
National Oil and Hazardous Substances Contingency Plan
NEC
National Electrical Code
NFA
No Further Action
NFPA
National Fire Protection Agency
NOV
Notice of Violation
NPL
National Priorities List
NTP
Notice To Proceed
O&M
Operations and Maintenance
OES
Optimized Exit Strategy
OSHA
Occupational Safety and Health Administration
OU
Operable Unit
PAO
Public Affairs Officer
PA/SI
Preliminary Assessment/Site Inspection
PBR
Performance-Based Remediation
PCEAD
Project Cost Estimating Assumptions Document
.pdf
Portable Document File
PI
Performance Indicators
PMP
Project Management Plan
PMR
Project Management Review
POC
Point of Contact
POP
Period of Performance
PTT
Performance Tracking Tool
QAPP
Quality Assurance Project Plan
QA/QC
Quality Assurance/Quality Control
QPP
Quality Program Plan
QSM
Quality Systems Manual
RAB
Restoration Advisory Board
RA-O
Remedial Action – Operation
RC
Response Complete
RCRA
Resource Conservation and Recovery Act
RECAP
Risk Evaluation Corrective Action Program
RFI
RCRA Facility Investigation
RFP
Request for Proposal
RI
Remedial Investigation
RIP
Remedy in Place
ROD
Record of Decision
RPM
Restoration Program Manager
RPO
Remedial Process Optimization
RWQCB
Regional Water Quality Control Board
SAP
Sampling and Analysis Plan
SARA
Superfund Amendments and Reauthorization Act
SC
Site Closeout
SDSFIE
Spatial Data Standard for Infrastructure and Environment
SOO
Statement of Objectives
SSPC
Steel Structures and Painting Counsel
TBD
To Be Determined
TCE
Trichloroethene
TO
Task Order
TPH
Total Petroleum Hydrocarbons
UFC
Uniform Fire Code
UFP
Uniform Federal Policy
UFP-QAPP
Uniform Federal Policy - Quality Assurance Project Plan
USEPA
United States Environmental Protection Agency
USFWS
US Fish and Wildlife Service
UST
Underground Storage Tank
UXO
Unexploded Ordnance
WP
Work Plan

Definitions

Emerging contaminant
Chemicals and materials that have pathways to enter the environment and present real or perceived unacceptable human health or environmental risks and either do not have regulatory peer-reviewed human health standards or the regulatory standards are evolving due to new science, detection capabilities, or pathways. *Note that emerging contaminants may be site-specific given state-led regulatory standards and site-specific conditions.
Long-term Management (LTM)
Environmental monitoring, review of site conditions, and/or maintenance of a remedial action to ensure continued protection as designed once a site achieves RC. LTM includes O&M, which are the measures required to maintain the effectiveness of response actions. LTM should not be used until no further environmental restoration response actions are appropriate or anticipated. LTM should not be used to refer to monitoring after Remedy in Place (this includes sites for which the selected response action is natural attenuation). Examples of LTM include landfill cap maintenance, leachate disposal, fence monitoring and repair, management of performance of five-year review execution, and LUC maintenance.
Remedial Action (RA)
Actions consistent with a permanent remedy taken instead of, or in addition to, a removal action in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment.
Remedial Action -Construction (RA-C)
A DoD term to define the period of time that a response action is being implemented, but is not yet operating as designed. At the end of this phase of work, a remedy is in place.
Remedial Action Objectives (RAO)
Remedial Action Objectives define the end goal of remedial activities such as the regulatory standard to be achieved, risk management approach implemented, or land use controls utilized. RAO should not be confused with Remedial Action-Operation.
Remedial Action -Operation (RA-O)
A DoD term to define the period of time that a selected remedy must operate before achieving remedial action objectives. It is the activity or process of implementing a selected remedy following RIP and preceding Response Complete (RC). At the end of this phase of work, the response is complete. The processes and monitoring in this phase of work are primary targets of optimization.
Remedy in Place (RIP)
Designation that a final remedial action has been constructed and implemented and is operating as planned in the remedial design. An example of a remedy in place is a pump-and-treat system that is installed, operating as designed, and will continue to operate until cleanup levels have been attained. Because operation of the remedy is ongoing, the site cannot be considered RC. For some sites, achieving RIP may not require any active remediation activities but would require USAF approval that the remedy is operating properly (e.g. MNA).
Response Complete (RC)
A milestone reached when the selected remedy has achieved remedial action objectives specified in the decision document. Signifies that DoD has completed the RIP and the required RA-O have achieved the cleanup objectives. If there is no RA-O phase, then the RA-C end date will also be the RC date. LTM may only occur after RC is achieved.
Site Closeout (SC)
Site Closeout signifies when the USAF has completed all active management and monitoring at an environmental cleanup site, no additional environmental cleanup funds will be expended at the site and the USAF has obtained regulatory concurrence. For practical purposes, Site Closeout occurs when cleanup goals have been achieved that allow unrestricted use of the property (i.e., no further LTM, including institutional controls, is required) and that all site decommissioning has been completed. Achieving Site Closeout may include, but not be limited to, the dismantling, removal, recycling, reclamation and/or disposal of all remedial activity systems and ancillary equipment above and underground to return the site to its natural state, well abandonment, and site restoration in accordance with Base and regulatory requirements. Note: Regulatory concurrence may include “no further action” (NFA) but does not include variations such as “no further active remediation”, “regulatory closure with restrictions”, “conditional site closure” or functional equivalents. These variations would involve requirements for LTM and would therefore not allow for unrestricted use.
Optimized Exit Strategy
A logical approach and plan to achieve SC or advance sites as close to SC as practicable while maximizing effectiveness and efficiency and minimizing LCCs. An OES identifies a series of actions, some of which may occur beyond the POP
Life-Cycle Cost
An estimate of POP and post POP costs based on proposed activities, activity duration, and assumptions from task order award through Contractor’s projected Site Closeout date (or FY41 for sites with indefinite closeout dates).
Post-POP Life-Cycle Cost
An estimate of post-POP costs based on proposed activities, activity duration, and assumptions from completion of the final performance objective or task order completion (whichever comes first) through Contractor’s projected Site Closeout date (or FY41 for sites with indefinite closeout dates).
Sustainability
As defined by the UN World Summit in 2005 recognized the key elements of sustainability to include environmental, social, and economic considerations. The USAF defines sustainability, in so far as the ERA program to be the practice of considering all environmental effects of remedy implementation and operation, incorporating options to minimize the environmental footprint of a cleanup. The key elements of green and sustainable remediation include energy use for treatment systems; water use/impacts on water resources; material consumption/waste generation; impacts on land and ecosystem; and air emissions.
Draft Documents
Internal documents that are submitted for Air Force review and approval. In all respects, draft documents shall be complete; substantively correct and consistent with applicable laws, regulations, Department of Defense/Air Force policies; in proper format; and free of grammatical and typographical errors. In general, draft documents are the initial version of documents that will be reviewed by the Air Force. Draft copy documents shall not be submitted to regulatory agencies for review.
Draft Final Document
Document incorporating Air Force comments and submitted for regulatory agency review may also be required prior to Final document preparation. Note that some documents may initially be submitted to the regulatory agencies as Final with any comments being incorporated into subsequent documents as appropriate (e.g., system status reports, monitoring reports, “data dumps”).
Final Document
The version of the document that has received Air Force and regulatory, where applicable, concurrence. At least one electronic copy of the final document consisting of original productivity software files and all quality control data, drawings, and GIS-type information, shall be provided to the Air Force. Electronic copies should be compatible with the current Air Force Microsoft™ Office Suite and GIS software versions. All figures shall be delivered in original application files GIS format as described in Section 4.7. In addition, an electronic version of the final document shall be submitted in a single portable document file (.pdf) format approved by the Air Force complete with electronic bookmarks.

File details come from the government source that posted it. Updated .