6)_Enclosure_2__Key_Documents_revised_050913.xlsx
XLSX spreadsheet 250 KB Posted
- Attached to
- Vandenberg Air Force Base (AFB) Performance-Based Remediation (PBR) Federal contract opportunity
- Solicitation number
- FA8903-12-R-0033
About this file
Key Document List
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
File List
| Document Number | Document Title | Document Location on FTP site |
| 1 | AF PBR Guidebook_Final_3Jan2012.pdf | *PBR Guidance* |
| 2 | AFCEC AR Metadata Format, March 2013.pdf | *PBR Guidance* |
| 3 | CLIN_MPS_IMS_Guidance_Template_26Mar12.doc | *PBR Guidance* |
| 4 | Document Review Proccess Template_UNDER REVIEW_Mar 2013.docx | *PBR Guidance* |
| 5 | Draft AFCEC OES Compendium for PBR.doc | *PBR Guidance* |
| 6 | ERPIMS slides for PBR_Kickoff Briefing_revised_16Jan13.pptx | *PBR Guidance* |
| 7 | Instructions to develop a Project Management Plan (PMP) V09 28 Sep 11.docx | *PBR Guidance* |
| 8 | Template Sample for PBR Repository V6.0 3-25-2013.docx | *PBR Guidance* |
| 9 | 103Form.pdf | 103 332 Forms_Work Clearance |
| 10 | 332form.pdf | 103 332 Forms_Work Clearance |
| 11 | Coordination.pdf | 103 332 Forms_Work Clearance |
| 12 | Analytical Report for SDG 10G151 V_J Backfill Profile 7-14-10.pdf | AB139 (AOC33) |
| 13 | Appendix A_Site 139 Post Excavation SLERA.pdf | AB139 (AOC33) |
| 14 | Appendix E_Site 139-Water Disposal Receipt.pdf | AB139 (AOC33) |
| 15 | Appendix E_SMSL Waste Profile.pdf | AB139 (AOC33) |
| 16 | Appendix E_US Ecology Tonnage Reports1.pdf | AB139 (AOC33) |
| 17 | Appendix E_US Ecology Waste Profile.pdf | AB139 (AOC33) |
| 18 | Appendix E_VAFB Landfill Disposal Reports.pdf | AB139 (AOC33) |
| 19 | Appendix F_MNS Land survey data.pdf | AB139 (AOC33) |
| 20 | Appendix F_Site139 Shaw Field Survey Data.pdf | AB139 (AOC33) |
| 21 | Attachment A_part 1_TCDD TEQ calcs and ProUCL input and Output.xls | AB139 (AOC33) |
| 22 | Attachment A_part 2_ProUCL Input and Output with Original and Post Exc samples.xls | AB139 (AOC33) |
| 23 | Attachment A_part 3_EEQ_Post Exc Calcs for Site 139.pdf | AB139 (AOC33) |
| 24 | manifest MB-1E.pdf | AB139 (AOC33) |
| 25 | Sample Result_G0G130537.pdf | AB139 (AOC33) |
| 26 | Sample Results_G0F250510.pdf | AB139 (AOC33) |
| 27 | Sample Results_G0F250545.pdf | AB139 (AOC33) |
| 28 | Sample Results_G0F250552.pdf | AB139 (AOC33) |
| 29 | Sample Results_G0G080489.pdf | AB139 (AOC33) |
| 30 | Sample Results_G0G080583.pdf | AB139 (AOC33) |
| 31 | Sample Results_G0G100451.pdf | AB139 (AOC33) |
| 32 | Sample Results_G0G220551.pdf | AB139 (AOC33) |
| 33 | Sample Results_G0G220558.pdf | AB139 (AOC33) |
| 34 | Site 139 Confirmation Sample Data Table D-1.pdf | AB139 (AOC33) |
| 35 | Site 139 Confirmation Samples Data Quality Assessment.pdf | AB139 (AOC33) |
| 36 | Site 139 Final Excavation Report_12-20-2011.pdf | AB139 (AOC33) |
| 37 | Site 139 Waste Soil Data Table D-2.pdf | AB139 (AOC33) |
| 38 | Stockpiles E and F Final Lot No. G0F250544 (2) .pdf | AB139 (AOC33) |
| 39 | Transmittal Letter_Final Soil RACR.pdf | AB139 (AOC33) |
| 40 | Waste_Stockpile Characterization_G0F250543.pdf | AB139 (AOC33) |
| 41 | Waste_Stockpile Characterization_G0F250544.pdf | AB139 (AOC33) |
| 42 | Waste_Stockpile Characterization_G0F250547.pdf | AB139 (AOC33) |
| 43 | Waste_Stockpile Characterization_G0G020478 STLC Pb Cr Results.pdf | AB139 (AOC33) |
| 44 | Waste_Stockpile Characterization_G0G020478.pdf | AB139 (AOC33) |
| 45 | Waste_Stockpile Characterization_G0G080583 EDLs.pdf | AB139 (AOC33) |
| 46 | Waste_Stockpile Characterization_G0G080583 TEQs 2005 WHO.pdf | AB139 (AOC33) |
| 47 | Waste_Stockpile Characterization_G0G080583.pdf | AB139 (AOC33) |
| 48 | Waste_Stockpile Characterization_G0G100457.pdf | AB139 (AOC33) |
| 49 | Waste_Stockpile Characterization_G0G100457_RP_5YRs.pdf | AB139 (AOC33) |
| 50 | Waste_Stockpile Characterization_G0G120474.pdf | AB139 (AOC33) |
| 51 | Waste_Stockpile Characterization_G0G120476.pdf | AB139 (AOC33) |
| 52 | Waste_Stockpile Characterization_G0G130534revised.pdf | AB139 (AOC33) |
| 53 | Waste_Stockpile Characterization_G0G130536.pdf | AB139 (AOC33) |
| 54 | Waste_Stockpile Characterization_G0G220566.pdf | AB139 (AOC33) |
| 55 | Waste_Stockpile Characterization_G0G270493.pdf | AB139 (AOC33) |
| 56 | Waste_Stockpile Characterization_G0G270497.pdf | AB139 (AOC33) |
| 57 | Waste_Stockpile Characterization_G0G270499 TCLP lead.pdf | AB139 (AOC33) |
| 58 | Waste_Stockpile Characterization_G0G270499.pdf | AB139 (AOC33) |
| 59 | Waste_Stockpile Characterization_G0G290533.pdf | AB139 (AOC33) |
| 60 | Waste_Stockpile Characterization_G0G300491.pdf | AB139 (AOC33) |
| 61 | Waste_Stockpile Characterization_ITG2236.pdf | AB139 (AOC33) |
| 62 | Waste_Stockpile Characterization_ITG2820.pdf | AB139 (AOC33) |
| 63 | SpatialDataSubmittalStandardsUpdated2011.pdf | Air Force and Base Policies |
| 64 | 173_Cover_Letter_GW__5-24-2010_with appendicies.pdf | Background Threshold Values (BTVs) |
| 65 | AR-1896.pdf | Background Threshold Values (BTVs) |
| 66 | AR-1897.pdf | Background Threshold Values (BTVs) |
| 67 | Final Refined BTV for Soil Dec 2009.pdf | Background Threshold Values (BTVs) |
| 68 | VAFB Revised Final Arsenic Tech Memo.pdf | Background Threshold Values (BTVs) |
| 69 | 2011 2Q Comprehensive Reports.xlsx | Basewide Groundwater Monitoring Program (BGMP) |
| 70 | Attachments Final BGMP 3Q09 through 1Q10 Revision 1.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 71 | Attachments_1_Final BGMP 3Q09 through 1Q10 Revision 1.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 72 | Attachments_2_Final BGMP 3Q09 through 1Q10 Revision 1.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 73 | Copy of Final_BGMP_Data with highlights.xlsx | Basewide Groundwater Monitoring Program (BGMP) |
| 74 | DTSC_VAFB draft BGMP Work Plan Addendum comment ltr.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 75 | DTSC_VAFB draft BGMP Work Plan Addendum comment ltr.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 76 | Final BGMP WP Addendum.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 77 | RWQCB Comments to VAFB draft BGMP Work Plan Addendum comment ltr.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 78 | Text Final BGMP 3Q09 through 1Q10 Revision 1.pdf | Basewide Groundwater Monitoring Program (BGMP) |
| 79 | S1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 80 | S13C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 81 | S142_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 82 | S15_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 83 | S19_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 84 | S2_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 85 | S20A1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 86 | S20A2_3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 87 | S24_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 88 | S25C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 89 | S27_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 90 | S3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 91 | S31_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 92 | S32C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 93 | S33_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 94 | S50_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 95 | S5C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 96 | S60_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 97 | S8C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)/Sampling Results from 4Q2007 to 2Q2012 |
| 98 | BGMP Cover Winter 2007.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 99 | C155-3122 Winter 2007 cover letter.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 100 | Locations of IRP Sites and AOCs Figure.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 101 | Recommendations and Changes as of Winter 2007 w Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 102 | Site 13C Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 103 | Site 13C Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 104 | Site 13C Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 105 | Site 15 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 106 | Site 15 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 107 | Site 15 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 108 | Site 19 Appendix A - Purge Records (MWH).pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 109 | Site 19 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 110 | Site 19 Appendix B - COCs (MWH).pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 111 | Site 19 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 112 | Site 19 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 113 | Site 2 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 114 | Site 2 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 115 | Site 2 Appendix C - Supporting Table and Hydrograph.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 116 | Site 2 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 117 | Site 20 Area 1 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 118 | Site 20A1 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 119 | Site 20A1 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 120 | Site 20A1 Appendix C - Supporting Table and Figures.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 121 | Site 20A2 3 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 122 | Site 20A2 and 3 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 123 | Site 24 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 124 | Site 24 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 125 | Site 24 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 126 | Site 25C Appendix A - Purge Records (Fall 06).pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 127 | Site 25C Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 128 | Site 25C Appendix B - COCs (Fall 06).pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 129 | Site 25C Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 130 | Site 25C Appendix C - Supporting Tables and Hydrographs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 131 | Site 25C Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 132 | Site 27 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 133 | Site 27 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 134 | Site 27 Appendix C - Supporting Hydrographs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 135 | Site 27 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 136 | Site 32C Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 137 | Site 32C Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 138 | Site 32C Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 139 | Site 33 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 140 | Site 33 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 141 | Site 33 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 142 | Site 5 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 143 | Site 50 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 144 | Site 50 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 145 | Site 50 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 146 | Site 5C Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 147 | Site 5C Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 148 | Site 60 Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 149 | Site 60 Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 150 | Site 60 Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 151 | Site 8C Appendix A - Purge Records.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 152 | Site 8C Appendix B - COCs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 153 | Site 8C Appendix C - Hydrographs.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 154 | Site 8C Appendix D - Field Modification Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 155 | Site 8C Report.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 156 | Table2.1_AnalyticalPlan.pdf | Basewide Groundwater Monitoring Program (BGMP)/Summer 2007 - BGMP Report |
| 157 | 2012 3Q Comprehensive Reports.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 158 | 3Q12_VAFB BGMP Schedule_Rev77.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 159 | Copy of S1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 160 | Copy of S13C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 161 | Copy of S142_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 162 | Copy of S15_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 163 | Copy of S18_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 164 | Copy of S19_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 165 | Copy of S2_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 166 | Copy of S20A1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 167 | Copy of S20A2_3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 168 | Copy of S22_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 169 | Copy of S24_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 170 | Copy of S25C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 171 | Copy of S27_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 172 | Copy of S3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 173 | Copy of S31_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 174 | Copy of S32C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 175 | Copy of S33_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 176 | Copy of S50_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 177 | Copy of S5C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 178 | Copy of S60_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 179 | Copy of S8C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\3Q12 BGMP data |
| 180 | 2012_4Q_COMPREHENSIVE_REPORTS Rev 2.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 181 | S1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 182 | S13C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 183 | S142_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 184 | S15_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 185 | S18_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 186 | S19_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 187 | S2_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 188 | S20A1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 189 | S20A2_3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 190 | S22_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 191 | S24_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 192 | S25C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 193 | S27_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 194 | S3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 195 | S31_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 196 | S32C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 197 | S33_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 198 | S50_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 199 | S5C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 200 | S60_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 201 | S8C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 202 | Site 1 Table 1 rev 5.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 203 | Site 13C Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 204 | Site 142 (AOC 59) Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 205 | Site 15 Table 1 rev 5.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 206 | Site 18 Table 1 rev 2.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 207 | Site 19 Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 208 | Site 2 Table 1 rev3.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 209 | Site 20 A1 Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 210 | Site 20 Area 2-3 Table 1 rev 2.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 211 | Site 22 Table 1 rev 2.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 212 | Site 24 Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 213 | Site 25C Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 214 | Site 27 Table 1.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 215 | Site 3 Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 216 | Site 31 Table 1.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 217 | Site 32 C Table 1 rev 7.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 218 | Site 33 Table 1 rev 1.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 219 | Site 50 Table 1 rev 5.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 220 | Site 5C Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 221 | Site 60 Table 1 rev 3.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 222 | Site 8C Table 1 rev 4.pdf | Basewide Groundwater Monitoring Program (BGMP)\4Q12 BGMP data |
| 223 | AOC 59_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 224 | Attachment A.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 225 | Attachment B 2Q10-1Q11rev2.xls | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 226 | Attachment B Spring 2000-1Q11rev2.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 227 | Attachment B Spring 2000-1Q11rev2.xls | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 228 | Attachment B.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 229 | Attachment C.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 230 | Attachment D.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 231 | Attachment E.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 232 | Attachment F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 233 | Attachment G.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 234 | Attachment H.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 235 | Cover_Table of Contents_Map.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 236 | Site 1_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 237 | Site 13C_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 238 | Site 15_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 239 | Site 19_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 240 | Site 2_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 241 | Site 20 A1_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 242 | Site 20 A2-3_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 243 | Site 24_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 244 | Site 25C_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 245 | Site 3_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 246 | Site 32C_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 247 | Site 50_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 248 | Site 5C_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 249 | Site 60_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 250 | Site 8C_F.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011 |
| 251 | ENCL 1_SITE 2_COMPLETE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Enc 1 - Site 2 |
| 252 | ENCL 2_SITES 50_3_COMPLETE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 2 - Site 3_Site 5D |
| 253 | ENCL 3_SITE 5C_COMPLETE | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 3 - Site 5C |
| 254 | ENCL 4_SITE 8C_COMPLETE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 4 - Site 8C |
| 255 | ENCL 5_SITE 15_COMPLETED.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 5 - Site 15 |
| 256 | ENCL 6_SITE 20A2_3_COMPLETE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 6 - Site 20A2-3 |
| 257 | ENCL 7_SITE 24_COMPLETE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 7 - Site 24 |
| 258 | ENCL 9_Site 32C COMPLETE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Draft BGMP Annual Report 2010 to 2011\Attachment H Enclosures\Encl 9 - Site 32C |
| 259 | 1Q12_VAFB BGMP Schedule_rev73.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent BGMP and RAO Sampling Schedule |
| 260 | 2Q12_VAFB BGMP Schedule_Rev75.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent BGMP and RAO Sampling Schedule |
| 261 | 3Q12_VAFB BGMP Schedule_Rev77.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent BGMP and RAO Sampling Schedule |
| 262 | Copy of S25C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 263 | Site 1 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 264 | Site 13C Table 1 Rev 2.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 265 | Site 142 (AOC 59) Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 266 | Site 15 Table 1 rev 3.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 267 | Site 19 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 268 | Site 2 Table 1 rev1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 269 | Site 20 A1 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 270 | Site 20 Area 2-3 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 271 | Site 24 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 272 | Site 25C Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 273 | Site 27 Table 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 274 | Site 3 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 275 | Site 31 Table 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 276 | Site 32 C Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 277 | Site 33 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 278 | Site 50 Table 1 rev 3.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 279 | Site 5C Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 280 | Site 60 Table 1 rev 1.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 281 | Site 8C Table 1 rev 2.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Most Recent Water Level Data |
| 282 | Copy of Copy of S60_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 283 | Copy of S1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 284 | Copy of S13C_BGMP_ANALYTICAL_RESULT with highlights.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 285 | Copy of S13C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 286 | Copy of S13C_BGMP_ANALYTICAL_RESULTS thru 1Q2012.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 287 | Copy of S142_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 288 | Copy of S15_BGMP_ANALYTICAL_RESULT with highlights.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 289 | Copy of S15_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 290 | Copy of S19_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 291 | Copy of S2_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 292 | Copy of S20A1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 293 | Copy of S20A2_3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 294 | Copy of S24_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 295 | Copy of S25C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 296 | Copy of S27_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 297 | Copy of S3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 298 | Copy of S31_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 299 | Copy of S32C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 300 | Copy of S33_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 301 | Copy of S50_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 302 | Copy of S5C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 303 | Copy of S60_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 304 | Copy of S8C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 305 | S1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (1Q 2012) |
| 306 | Comprehensive Reports 4Q2011_32012_dah_YY.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 307 | Copy of S1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 308 | Copy of S13C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 309 | Copy of S142_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 310 | Copy of S15_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 311 | Copy of S19_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 312 | Copy of S2_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 313 | Copy of S20A1_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 314 | Copy of S20A2_3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 315 | Copy of S24_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 316 | Copy of S25C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 317 | Copy of S27_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 318 | Copy of S3_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 319 | Copy of S31_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 320 | Copy of S32C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 321 | Copy of S33_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 322 | Copy of S50_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 323 | Copy of S5C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 324 | Copy of S60_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 325 | Copy of S8C_BGMP_ANALYTICAL_RESULT.xlsx | Basewide Groundwater Monitoring Program (BGMP)\Sampling Results from (4Q2011) |
| 326 | 1_Introduction.doc | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 327 | 10_Acronyms and References.doc | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 328 | 2_QAQC Summary - Winter 2007.doc | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 329 | 3_Table 3.0 Analytical Data Summary Cross-Reference Index.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 330 | 3_Table 3.1 Analytical Data Summary RSK175 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 331 | 3_Table 3.1 Blanks RSK175 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 332 | 3_Table 3.10 Analytical Data Summary SW8330 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 333 | 3_Table 3.10 Blanks SW8330 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 334 | 3_Table 3.11 Analytical Data Summary E218.6 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 335 | 3_Table 3.11 Blanks E218.6 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 336 | 3_Table 3.12 Analytical Data Summary E300.0 Metabolic Acid Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 337 | 3_Table 3.12 Blanks E300.0 Metabolic Acid Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 338 | 3_Table 3.13 Analytical Data Summary E314.0 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 339 | 3_Table 3.13 Blanks E314.0 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 340 | 3_Table 3.14 Analytical Data Summary E504.1 EDB Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 341 | 3_Table 3.14 Blanks E504.1 EDB Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 342 | 3_Table 3.15 Analytical Data Summary GENMIN Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 343 | 3_Table 3.15 Blanks GENMIN Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 344 | 3_Table 3.2.1 Analytical Data Summary SW6010B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 345 | 3_Table 3.2.1 Blanks SW6010B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 346 | 3_Table 3.2.2 Analytical Data Summary SW6010B Soil.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 347 | 3_Table 3.2.2 Blanks SW6010B Soil.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 348 | 3_Table 3.3 Analytical Data Summary SW6020A Soil.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 349 | 3_Table 3.3 Blanks SW6020A Soil.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 350 | 3_Table 3.4 Analytical Data Summary SW7470A Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 351 | 3_Table 3.4 Blanks SW7470A Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 352 | 3_Table 3.5 Analytical Data Summary SW8015B GRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 353 | 3_Table 3.5 Blanks SW8015B GRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 354 | 3_Table 3.6 Analytical Data Summary SW8015B DRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 355 | 3_Table 3.6 Blanks SW8015B DRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 356 | 3_Table 3.7 Analytical Data Summary SW8081B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 357 | 3_Table 3.7 Blanks SW8081B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 358 | 3_Table 3.8.1 Analytical Data Summary SW8260B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 359 | 3_Table 3.8.1 Blanks SW8260B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 360 | 3_Table 3.8.2 Analytical Data Summary SW8260B BTEX Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 361 | 3_Table 3.8.2 Blanks SW8260B BTEX Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 362 | 3_Table 3.8.3 Analytical Data Summary SW8260B SIM 1,2,3-TCP Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 363 | 3_Table 3.8.3 Blanks SW8260B SIM 1,2,3-TCP Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 364 | 3_Table 3.9.1 Analytical Data Summary SW8270C Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 365 | 3_Table 3.9.1 Blanks SW8270C Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 366 | 3_Table 3.9.2 Analytical Data Summary SW8270C SIM PAHs Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 367 | 3_Table 3.9.2 Blanks SW8270C SIM PAHs Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 368 | 3_Table 3.9.3 Analytical Data Summary Mod SW8270C SIM 1,4-Dioxane Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 369 | 3_Table 3.9.3 Blanks Mod SW8270C SIM 1,4-Dioxane Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 370 | 4_Table 4.1 Extraction and Analysis Dates RSK175 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 371 | 4_Table 4.10 Extraction and Analysis Dates SW8330 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 372 | 4_Table 4.11 Extraction and Analysis Dates E218.6 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 373 | 4_Table 4.12 Extraction and Analysis Dates E300.0 Metabolic Acid Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 374 | 4_Table 4.13 Extraction and Analysis Dates E314.0 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 375 | 4_Table 4.14 Extraction and Analysis Dates E504.1 EDB Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 376 | 4_Table 4.15 Extraction and Analysis Dates GENMIN Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 377 | 4_Table 4.2.1 Extraction and Analysis Dates SW6010B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 378 | 4_Table 4.2.2 Extraction and Analysis Dates SW6010B Soil.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 379 | 4_Table 4.3 Extraction and Analysis Dates SW6020A Soil.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 380 | 4_Table 4.4 Extraction and Analysis Dates SW7470A Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 381 | 4_Table 4.5 Extraction and Analysis Dates SW8015B GRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 382 | 4_Table 4.6 Extraction and Analysis Dates SW8015B DRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 383 | 4_Table 4.7 Extraction and Analysis Dates SW8081B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 384 | 4_Table 4.8.1 Extraction and Analysis Dates SW8260B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 385 | 4_Table 4.8.2 Extraction and Analysis Dates SW8260B BTEX Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 386 | 4_Table 4.8.3 Extraction and Analysis Dates SW8260B SIM 1,2,3-TCP Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 387 | 4_Table 4.9.1 Extraction and Analysis Dates SW8270C Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 388 | 4_Table 4.9.2 Extraction and Analysis Dates SW8270C SIM PAHs Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 389 | 4_Table 4.9.3 Extraction and Analysis Dates Mod SW8270C SIM 1,4-Dioxane Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 390 | 5_Table 5.1 Quality Control Report RSK175.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 391 | 5_Table 5.10 Quality Control Report SW8330.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 392 | 5_Table 5.11 Quality Control Report E218.6.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 393 | 5_Table 5.12 Quality Control Report E300.0 Metabolic Acid.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 394 | 5_Table 5.13 Quality Control Report E314.0.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 395 | 5_Table 5.14 Quality Control Report E504.1 EDB.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 396 | 5_Table 5.15 Quality Control Report GENMIN.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 397 | 5_Table 5.2 Quality Control Report SW6010B.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 398 | 5_Table 5.3 Quality Control Report SW6020A.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 399 | 5_Table 5.4 Quality Control Report SW7470A.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 400 | 5_Table 5.5 Quality Control Report SW8015B GRO.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 401 | 5_Table 5.6 Quality Control Report SW8015B DRO.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 402 | 5_Table 5.7 Quality Control Report SW8081B.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 403 | 5_Table 5.8.1 Quality Control Report SW8260B.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 404 | 5_Table 5.8.2 Quality Control Report SW8260B BTEX.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 405 | 5_Table 5.8.3 Quality Control Report SW8260B SIM 1,2,3- TCP.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 406 | 5_Table 5.9.1 Quality Control Report SW8270C.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 407 | 5_Table 5.9.2 Quality Control Report SW8270C SIM PAHs.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 408 | 5_Table 5.9.3 Quality Control Report Mod SW8270C SIM 1,4-Dioxane.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 409 | 6_Table 6.1 QC Surrogate Recovery SW8015B GRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 410 | 6_Table 6.2 QC Surrogate Recovery SW8015B DRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 411 | 6_Table 6.3 QC Surrogate Recovery SW8081B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 412 | 6_Table 6.4.1 QC Surrogate Recovery SW8260B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 413 | 6_Table 6.4.2 QC Surrogate Recovery SW8260B BTEX Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 414 | 6_Table 6.4.3 QC Surrogate Recovery SW8260B SIM 1,2,3- TCP Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 415 | 6_Table 6.5.1 QC Surrogate Recovery SW8270C Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 416 | 6_Table 6.5.2 QC Surrogate Recovery SW8270C SIM PAHs Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 417 | 6_Table 6.5.3 QC Surrogate Recovery Mod SW8270C SIM 1,4-Dioxane Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 418 | 6_Table 6.6 QC Surrogate Recovery SW8330 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 419 | 6_Table 6.7 QC Surrogate Recovery E504.1 EDB Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 420 | 7_Table 7.1 RPD Duplicate Samples RSK175 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 421 | 7_Table 7.10 RPD Duplicate Samples E218.6 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 422 | 7_Table 7.11 RPD Duplicate Samples E314.0 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 423 | 7_Table 7.12 RPD Duplicate Samples E504.1 EDB Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 424 | 7_Table 7.13 RPD Duplicate Samples GENMIN Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 425 | 7_Table 7.2 RPD Duplicate Samples SW6010B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 426 | 7_Table 7.3 RPD Duplicate Samples SW7470A Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 427 | 7_Table 7.4 RPD Duplicate Samples SW8015B GRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 428 | 7_Table 7.5 RPD Duplicate Samples SW8015B DRO Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 429 | 7_Table 7.6 RPD Duplicate Samples SW8081B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 430 | 7_Table 7.7.1 RPD Duplicate Samples SW8260B Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 431 | 7_Table 7.7.2 RPD Duplicate Samples SW8260B BTEX Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 432 | 7_Table 7.7.3 RPD Duplicate Samples SW8260B SIM 1,2,3- TCP Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 433 | 7_Table 7.8.1 RPD Duplicate Samples SW8270C Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 434 | 7_Table 7.8.2 RPD Duplicate Samples SW8270C SIM PAHs Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 435 | 7_Table 7.8.3 RPD Duplicate Samples Mod SW8270C SIM 1,4-Dioxane Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 436 | 7_Table 7.9 RPD Duplicate Samples SW8330 Water.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 437 | 8_Table 8.0 Performance Evaluation Results.xls | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 438 | 9_Chain of Custody Records - Winter 2007.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 439 | Form 298.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 440 | NOTICE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 441 | PREFACE.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 442 | Table of Contents - Winter 2007.doc | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Analysis ITR 1 |
| 443 | 07B039.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Lab Data |
| 444 | 07B040.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Lab Data |
| 445 | 07B065.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Lab Data |
| 446 | 07B066.pdf | Basewide Groundwater Monitoring Program (BGMP)\Summer 2007 - BGMP Report\Lab Data |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .