US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge, Modoc National Forest

Closed Solicitation Posted

Solicitation number
127EAW23R0004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
California 96101, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is seeking proposals for a bridge replacement construction project on the Middle Fork Parker Creek within the Modoc National Forest in California. Offerors must replace the existing burned bridge with a new permanent structure according to the plans and specifications provided, and remove the temporary bridge. Proposals will be evaluated based on relevant experience, technical approach, and price, with award made to the lowest price technically acceptable offeror. Proposals are due by May 25, 2023.

This is a total small business set-aside designated under NAICS code 237990 with an estimated value between $500,000 and $1,000,000. The single award firm-fixed price construction contract will have a period of performance of 145 calendar days from notice to proceed. The place of performance is in Alturas, California. Offerors must break down the existing 45-foot rolled girder bridge, transport and stack the pieces along with hardware at a storage location in Alturas by the specified completion date of October 2023.

Notice text

6 versions

Update #6 · Latest ·

5/11/2023

IMPORTANT: SITE ACCESS UPDATE
The MODOC NF advises the following: Prospective contractors may now access the project work site behind the public closure area while exercising caution with their vehicles. Contractors shall ensure that all public barricades remain in place and intact upon departure from the site. Short-term repairs are expected to take place this month and improved single-lane access is expected by 5/22/2023.

This update does not change any of the solicitation requirements.

//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////

05/05/2023. Amendment 4 is published.

Amendment 4 provides an additional RFI answer and extends the due date.

Proposal due date is extended to NLT May 25, 2023, (5 PM) 1700 PST.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

04/17/2023. Amendment 3 is published.

Amendment 3 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT May 18, 2023, (3 PM) 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

03/21/2023. Amendment 2 is published.

Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT April 20, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/27/2023. Amendment 1 is published.

Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT March 24, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/03/2023. Request for Proposal and RFP attachments 1-4 published.

Proposal due date is NLT March 7, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #5 ·

05/05/2023. Amendment 4 is published.

Amendment 4 provides an additional RFI answer and extends the due date.

Proposal due date is extended to NLT May 25, 2023, (5 PM) 1700 PST.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

04/17/2023. Amendment 3 is published.

Amendment 3 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT May 18, 2023, (3 PM) 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

03/21/2023. Amendment 2 is published.

Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT April 20, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/27/2023. Amendment 1 is published.

Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT March 24, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/03/2023. Request for Proposal and RFP attachments 1-4 published.

Proposal due date is NLT March 7, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #4 ·

04/17/2023. Amendment 3 is published.

Amendment 3 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT May 18, 2023, (3 PM) 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

03/21/2023. Amendment 2 is published.

Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT April 20, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/27/2023. Amendment 1 is published.

Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT March 24, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/03/2023. Request for Proposal and RFP attachments 1-4 published.

Proposal due date is NLT March 7, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #3 ·

03/21/2023. Amendment 2 is published.

Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT April 20, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/27/2023. Amendment 1 is published.

Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT March 24, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/03/2023. Request for Proposal and RFP attachments 1-4 published.

Proposal due date is NLT March 7, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #2 ·

02/27/2023. Amendment 1 is published.

Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.

Proposal due date is extended to NLT March 24, 2023, 1500 PST.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

02/03/2023. Request for Proposal and RFP attachments 1-4 published.

Proposal due date is NLT March 7, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #1 ·

02/03/2023. Request for Proposal and RFP attachments 1-4 published.

Proposal due date is NLT March 7, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Files

Show all 13

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge, Modoc National Forest Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Purchase of 2 or 3 Temporary Road Bridges Duluth, Minnesota 55808, United States · NAICS 332312 Forest Service No set-aside
GAOA Facilities, Barracks Inyo NF Lone Pine, California, United States · NAICS 236220 Forest Service Total Small Business
Camptonville Housing Decommissioning Nevada City, California 95959, United States · NAICS 238910 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity