US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge, Modoc National Forest
Closed Solicitation Posted
- Solicitation number
- 127EAW23R0004
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- California 96101, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service is seeking proposals for a bridge replacement construction project on the Middle Fork Parker Creek within the Modoc National Forest in California. Offerors must replace the existing burned bridge with a new permanent structure according to the plans and specifications provided, and remove the temporary bridge. Proposals will be evaluated based on relevant experience, technical approach, and price, with award made to the lowest price technically acceptable offeror. Proposals are due by May 25, 2023.
This is a total small business set-aside designated under NAICS code 237990 with an estimated value between $500,000 and $1,000,000. The single award firm-fixed price construction contract will have a period of performance of 145 calendar days from notice to proceed. The place of performance is in Alturas, California. Offerors must break down the existing 45-foot rolled girder bridge, transport and stack the pieces along with hardware at a storage location in Alturas by the specified completion date of October 2023.
Notice text
6 versions
Update #6 · Latest ·
5/11/2023
IMPORTANT: SITE ACCESS UPDATE
The MODOC NF advises the following: Prospective contractors may now access the project work site behind the public closure area while exercising caution with their vehicles. Contractors shall ensure that all public barricades remain in place and intact upon departure from the site. Short-term repairs are expected to take place this month and improved single-lane access is expected by 5/22/2023.
This update does not change any of the solicitation requirements.
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
05/05/2023. Amendment 4 is published.
Amendment 4 provides an additional RFI answer and extends the due date.
Proposal due date is extended to NLT May 25, 2023, (5 PM) 1700 PST.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
04/17/2023. Amendment 3 is published.
Amendment 3 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT May 18, 2023, (3 PM) 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
03/21/2023. Amendment 2 is published.
Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT April 20, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/27/2023. Amendment 1 is published.
Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT March 24, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/03/2023. Request for Proposal and RFP attachments 1-4 published.
Proposal due date is NLT March 7, 2023, by 3pm PST.
USDA Forest Service Request for Proposal.
PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.
Total Small Business Set Aside
Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.
Section L.5 includes Site Visit information.
Update #5 ·
05/05/2023. Amendment 4 is published.
Amendment 4 provides an additional RFI answer and extends the due date.
Proposal due date is extended to NLT May 25, 2023, (5 PM) 1700 PST.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
04/17/2023. Amendment 3 is published.
Amendment 3 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT May 18, 2023, (3 PM) 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
03/21/2023. Amendment 2 is published.
Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT April 20, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/27/2023. Amendment 1 is published.
Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT March 24, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/03/2023. Request for Proposal and RFP attachments 1-4 published.
Proposal due date is NLT March 7, 2023, by 3pm PST.
USDA Forest Service Request for Proposal.
PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.
Total Small Business Set Aside
Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.
Section L.5 includes Site Visit information.
Update #4 ·
04/17/2023. Amendment 3 is published.
Amendment 3 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT May 18, 2023, (3 PM) 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
03/21/2023. Amendment 2 is published.
Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT April 20, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/27/2023. Amendment 1 is published.
Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT March 24, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/03/2023. Request for Proposal and RFP attachments 1-4 published.
Proposal due date is NLT March 7, 2023, by 3pm PST.
USDA Forest Service Request for Proposal.
PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.
Total Small Business Set Aside
Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.
Section L.5 includes Site Visit information.
Update #3 ·
03/21/2023. Amendment 2 is published.
Amendment 2 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT April 20, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/27/2023. Amendment 1 is published.
Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT March 24, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/03/2023. Request for Proposal and RFP attachments 1-4 published.
Proposal due date is NLT March 7, 2023, by 3pm PST.
USDA Forest Service Request for Proposal.
PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.
Total Small Business Set Aside
Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.
Section L.5 includes Site Visit information.
Update #2 ·
02/27/2023. Amendment 1 is published.
Amendment 1 provides answers to all RFIs and associated revisions to the RFP document and attachments and extends the due date.
Proposal due date is extended to NLT March 24, 2023, 1500 PST.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
02/03/2023. Request for Proposal and RFP attachments 1-4 published.
Proposal due date is NLT March 7, 2023, by 3pm PST.
USDA Forest Service Request for Proposal.
PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.
Total Small Business Set Aside
Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.
Section L.5 includes Site Visit information.
Update #1 ·
02/03/2023. Request for Proposal and RFP attachments 1-4 published.
Proposal due date is NLT March 7, 2023, by 3pm PST.
USDA Forest Service Request for Proposal.
PROJECT: US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge. Modoc National Forest.
IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $500,000 and $1,000,000.
Total Small Business Set Aside
Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.
Section L.5 includes Site Visit information.
Files
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| US Forest Service. Construction for Bridge Replacement, Middle Fork Parker Creek Bridge, Modoc National Forest | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Camptonville Housing Decommissioning | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity