SF 30 - Amendment 3 - 127EAW23R0004 - Bridge Modoc.pdf.pdf
PDF 2 MB Posted
- Solicitation number
- 127EAW23R0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an amendment to a request for proposal for a bridge replacement construction project on the Modoc National Forest. The amendment provides additional answers to industry questions, extends the proposal due date to May 18, 2023, and details requirements for the temporary bridge relocation. Contractors must break the existing 45-foot rolled girder bridge in half, transport it to an Alturas storage location, and stack the pieces along with hardware containers. The total project cost is estimated between $500,000 and $1,000,000. The USDA Forest Service is seeking proposals to replace the Middle Fork Parker Creek Bridge to current design standards under a small business set-aside contract.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
127EAW23R0004
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
7EAW
CONTRACT SPECIALIST
TANYA TORRES
PPS FPO SW ZONE CSA-6
USDA FOREST SERVICE
GAOA04/17/2023
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/07/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JEREMY B. BEDNER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
USDA Forest Service Request for Proposal.
PROJECT: Middle Fork Parker Creek Bridge Replacement, Modoc National Forest.
Amendment 3 provides additional answers to RFIs and associated revisions to the RFP document and attachments. Refer to continuation page.
Proposal due date is extended to NLT May 18 2023, 3PM (1500) PST.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SAME AS ITEM 6.
7EAW
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, Amendment 3
RFP 127EAW23R0004
FY23 Middle Fork Parker Creek
Bridge Replacement, Modoc National Forest
Amendment 3 Additional Requests for Information [RFIs] 1 - 2
Question 1. Is there any information available for the existing bridge that requires to be relocated back to the storage yard from the project site?
Answer: The temporary bridge is a 45’ x 16’ HS-20 Big R rolled girder style bridge: Big R Bridge Rolled Girders Bridges from Contech (conteches.com).
The contractor will break the bridge in half (lengthwise), deliver it to the Alturas storage location, and stack the pieces there (one half atop the other), along with a bag, crate, or other approved container, to contain all of the various hardware (including nuts and bolts).
Question 2. Can the solicitation due date be extended so that contractors will be able to safely visit the site?
Answer: Yes. This amendment extends the proposal due date to NLT May 18, 2023, 3PM (1500) PST.
| SF 30 - Amendment 1 - 127EAW23R0004 - Bridge Modoc |
| 127EAW23R0004 - SF 30 - Amendment 1 |
| RFI QnAs |
RFI QnAs. JB EDIT