PN87539 SOF Operations Facility Secure Work Area

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912PM19R0019
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fort Bragg NC 28307 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Wilmington District is soliciting proposals to renovate an existing facility into a secure work area for special operations forces at Fort Bragg, North Carolina. The project scope involves upgrading approximately 8,000 square feet to meet intelligence community standards for security including private offices, restrooms, a divisible 120-person classroom, video teleconferencing spaces and a new HVAC system. Proposals will be evaluated based on the offeror's technical qualifications, past performance and price. The solicitation closes on March 15, 2020.

This is a 100% set-aside for small businesses. The NAICS code is 2362 and PSC code S206. The estimated value is between $1-5 million to be completed within 540 calendar days. Key requirements include STC-50 construction, fire suppression and alarm systems, mass notification, and cybersecurity integration for various building automation systems. The place of performance is the Security Operations Training Facility at Fort Bragg, North Carolina.

Notice text

5 versions

Update #5 · Latest ·

The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct Project Number 87539, SOF Operations Facility Secure Work Area.  The project includes renovation of an existing non-secure working area into a secure working area meeting ICD 705 requirements with private and semi-private offices, expanded Male/Female latrines, dividable 120 PN Classroom, VTC spaces, and upgraded HVAC system.  Provide for STC-50 rated walls, doors, ceiling and floors, fire suppression; fire alarm, mass notification and security measures.  Installation of cybersecurity measures including identity assurance and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furniture and equipment, comprehensive interior design, electronic security systems, and audio visual services are included.  Existing facility construction consists of composite concrete floor slab with a steel rigid frame structure.  Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Heating and air conditioning will be provided by two (2) self-contained systems. One system for the Secure Working Area and a separate system for the Team Room Vault. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

This solicitation is a 100% Small Business Set-aside

In accordance with DFARS 236.204(i) the magnitude of construction for this project will be between $1,000,0000.00 and $5,000,000.00.

AMENDMENT 0005 - incorporates the Plans .dwg and .dgn files as part of the solicitation.  These files are in consolidated into .zip files that cannot be uploaded to beta.SAM, as beta.SAM will not accept this file-type.  The .dwg and .dgn files will be provided to the successful offeror upon contract award.

AMENDMENT 0006 - Replaces Specification 01 91 00.00 37 Commissioning in its entirety with a corrected copy; provides As-built drawing M-141 for plumbing references (information only, not binding), and adds drawing TN-103 to be inserted in the contract drawings behind TN-102. 

Amendment 0007 - Extends the Proposal Due date by four(4) calendar days from 16MAR2020 to 20MAR2020; deletes Specification Section 01 20 00.00 20 in its entirety; replaces the specification Table of Contents with a new TOC; replaces six(6) revised drawings in response to Projnet Bidder Inquiries; replaces Vol 1 of the specifications in its entirety.

Amendment 0008 - Provides a correct Attachment 2 in the solicitation document for Corporate Specialized Experience as well as a copy of the form attached separately; provides a new drawing sheet PD100 (Amendment 0008) with information about first floor plumbing requirements; provides a revised drawing sheet  T601 to identify Rm 6322 as LAN 215.

Update #4 ·

The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct Project Number 87539, SOF Operations Facility Secure Work Area.  The project includes renovation of an existing non-secure working area into a secure working area meeting ICD 705 requirements with private and semi-private offices, expanded Male/Female latrines, dividable 120 PN Classroom, VTC spaces, and upgraded HVAC system.  Provide for STC-50 rated walls, doors, ceiling and floors, fire suppression; fire alarm, mass notification and security measures.  Installation of cybersecurity measures including identity assurance and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furniture and equipment, comprehensive interior design, electronic security systems, and audio visual services are included.  Existing facility construction consists of composite concrete floor slab with a steel rigid frame structure.  Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Heating and air conditioning will be provided by two (2) self-contained systems. One system for the Secure Working Area and a separate system for the Team Room Vault. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

This solicitation is a 100% Small Business Set-aside

In accordance with DFARS 236.204(i) the magnitude of construction for this project will be between $1,000,0000.00 and $5,000,000.00.

AMENDMENT 0005 - incorporates the Plans .dwg and .dgn files as part of the solicitation.  These files are in consolidated into .zip files that cannot be uploaded to beta.SAM, as beta.SAM will not accept this file-type.  The .dwg and .dgn files will be provided to the successful offeror upon contract award.

AMENDMENT 0006 - Replaces Specification 01 91 00.00 37 Commissioning in its entirety with a corrected copy; provides As-built drawing M-141 for plumbing references (information only, not binding), and adds drawing TN-103 to be inserted in the contract drawings behind TN-102. 

Amendment 0007 - Extends the Proposal Due date by four(4) calendar days from 16MAR2020 to 20MAR2020; deletes Specification Section 01 20 00.00 20 in its entirety; replaces the specification Table of Contents with a new TOC; replaces six(6) revised drawings in response to Projnet Bidder Inquiries; replaces Vol 1 of the specifications in its entirety.

Update #3 ·

The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct Project Number 87539, SOF Operations Facility Secure Work Area.  The project includes renovation of an existing non-secure working area into a secure working area meeting ICD 705 requirements with private and semi-private offices, expanded Male/Female latrines, dividable 120 PN Classroom, VTC spaces, and upgraded HVAC system.  Provide for STC-50 rated walls, doors, ceiling and floors, fire suppression; fire alarm, mass notification and security measures.  Installation of cybersecurity measures including identity assurance and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furniture and equipment, comprehensive interior design, electronic security systems, and audio visual services are included.  Existing facility construction consists of composite concrete floor slab with a steel rigid frame structure.  Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Heating and air conditioning will be provided by two (2) self-contained systems. One system for the Secure Working Area and a separate system for the Team Room Vault. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

This solicitation is a 100% Small Business Set-aside

In accordance with DFARS 236.204(i) the magnitude of construction for this project will be between $1,000,0000.00 and $5,000,000.00.

AMENDMENT 0005 - incorporates the Plans .dwg and .dgn files as part of the solicitation.  These files are in consolidated into .zip files that cannot be uploaded to beta.SAM, as beta.SAM will not accept this file-type.  The .dwg and .dgn files will be provided to the successful offeror upon contract award.

AMENDMENT 0006 - Replaces Specification 01 91 00.00 37 Commissioning in its entirety with a corrected copy; provides As-built drawing M-141 for plumbing references (information only, not binding), and adds drawing TN-103 to be inserted in the contract drawings behind TN-102. 

Update #2 ·

The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct Project Number 87539, SOF Operations Facility Secure Work Area.  The project includes renovation of an existing non-secure working area into a secure working area meeting ICD 705 requirements with private and semi-private offices, expanded Male/Female latrines, dividable 120 PN Classroom, VTC spaces, and upgraded HVAC system.  Provide for STC-50 rated walls, doors, ceiling and floors, fire suppression; fire alarm, mass notification and security measures.  Installation of cybersecurity measures including identity assurance and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furniture and equipment, comprehensive interior design, electronic security systems, and audio visual services are included.  Existing facility construction consists of composite concrete floor slab with a steel rigid frame structure.  Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Heating and air conditioning will be provided by two (2) self-contained systems. One system for the Secure Working Area and a separate system for the Team Room Vault. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

This solicitation is a 100% Small Business Set-aside

In accordance with DFARS 236.204(i) the magnitude of construction for this project will be between $1,000,0000.00 and $5,000,000.00.

AMENDMENT 0005 - incorporates the Plans .dwg and .dgn files as part of the solicitation.  These files are in consolidated into .zip files that cannot be uploaded to beta.SAM, as beta.SAM will not accept this file-type.  The .dwg and .dgn files will be provided to the successful offeror upon contract award.

Update #1 ·

The U.S. Army Corps of Engineers, Wilmington District, is conducting research to determine the market capabilities of potential contractors to construct Project Number 87539, SOF Operations Facility Secure Work Area.  The project includes renovation of an existing non-secure working area into a secure working area meeting ICD 705 requirements with private and semi-private offices, expanded Male/Female latrines, dividable 120 PN Classroom, VTC spaces, and upgraded HVAC system.  Provide for STC-50 rated walls, doors, ceiling and floors, fire suppression; fire alarm, mass notification and security measures.  Installation of cybersecurity measures including identity assurance and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furniture and equipment, comprehensive interior design, electronic security systems, and audio visual services are included.  Existing facility construction consists of composite concrete floor slab with a steel rigid frame structure.  Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Heating and air conditioning will be provided by two (2) self-contained systems. One system for the Secure Working Area and a separate system for the Team Room Vault. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

This solicitation is a 100% Small Business Set-aside

In accordance with DFARS 236.204(i) the magnitude of construction for this project will be between $1,000,0000.00 and $5,000,000.00.

Files

File Type Posted
W912PM19R00190008.pdf PDF
Amend_0008_87539_Corporate_Specialized_Exp_Data_Sheet.pdf PDF
Amend_0008_Technical_Summary_of_Changes.pdf PDF
W912PM19R00190008_Conformed.pdf PDF
Amend 0007 - PN87359_Specifications RTA_VOL 01.pdf PDF
Amend 0007 Technical Summary of Changes.pdf PDF
W912PM19R00190007_Conformed.pdf PDF
W912PM19R00190007.pdf PDF
Amend_0006_PN87539_Technical_Summary_of_Changes.pdf PDF
PN87539_2nd_SiteVisitAttendees_20FEB2020.pdf PDF
W912PM19R00190006.pdf PDF
PN87539_SiteVisitAttendees_12FEB20.pdf PDF
W912PM19R00190005.pdf PDF
W912PM19R00190005_Conformed.pdf PDF
W912PM19R00190004.pdf PDF
W912PM19R00190004_Conformed.pdf PDF
Amendment 0003 PN87359_RTA_SPECIFICATIONS_VOL 01.pdf PDF
W912PM19R00190003.pdf PDF
W912PM19R00190003_Conformed.pdf PDF
Amendment 0003 PN87539_RTA_SPECIFICATION_FF&E_VOL_02.pdf PDF
Amendment 0002 PN87359_RTA_SPECS.pdf PDF
W912PM19R00190002_Conformed.pdf PDF
Amendment 0002 PN87539_RTA_PLANS_unlocked.pdf PDF
Amendment 0002 PN87539_RTA_PLANS.pdf PDF
W912PM19R00190002.pdf PDF
W912PM19R00190001.pdf PDF
W912PM19R00190001_Conformed.pdf PDF
PN 87539 Corning Brand-name J&A.PDF PDF
pn87539_Contract_Drawings.pdf PDF
W912PM19R0019.pdf PDF
PN 85739 Siemon Brand-name J&A.PDF PDF
PN 87539 Site Visit Map.pdf PDF
pn87539_Contract_Specifications.pdf PDF
Show all 33

Notice history

Notice Type Posted
PN87539 SOF Operations Facility Secure Work Area Award Award Notice
This notice Latest solicitation Solicitation
PN87539 SOF Operations Facility Secure Work Area Pre-Solicitation
PN 87539 SOF Operations Facility Secure Work Area Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina Fort Bragg, NC · NAICS 236220 ENDIST Savannah No set-aside
FY26-FY31 JIOP Commercial Range Services BPA at Fort Bragg Fort Bragg, North Carolina 28310, United States · NAICS 561210 — Total Small Business
Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB Barksdale AFB, Louisiana 71110, United States · NAICS 236220 ENDIST Fort Worth No set-aside
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina Camp Lejeune, North Carolina 28547, United States · NAICS 236220 Naval Facilities Engineering Command No set-aside
Fort Benning Base Operations - W5168W26RA015 31905 · NAICS 561210 Department of the Army Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity