W912PM19R00190006.pdf
PDF 26 KB Posted
- Attached to
- PN87539 SOF Operations Facility Secure Work Area
- Solicitation number
- W912PM19R0019
About this file
This document provides details for a federal contract solicitation to construct Project Number 87539, SOF Operations Facility Secure Work Area. The solicitation is seeking to renovate an existing non-secure working area at a U.S. Army facility into a secure working area meeting ICD 705 requirements. Requirements include private and semi-private offices, expanded latrines, a 120-person classroom, VTC spaces, and an upgraded HVAC system. The secure area must meet STC-50 standards for walls, doors, ceilings and floors, and include fire suppression, alarm, and mass notification systems. Cybersecurity measures are required for identity assurance and operational resilience of fire safety, building automation, electronic access control, CCTV, and protected data distribution systems. Access for individuals with disabilities, furniture, equipment, interior design, audiovisual, and sustainability/energy measures are also included. The solicitation is a 100% small business set-aside with a magnitude of construction between $1,000,000 and $5,000,000. The agency is the U.S. Army Corps of Engineers Engineering District Wilmington.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRNONO 87539
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912PM19R0019 is hereby amended for the follow ing purpose:
a) To incorporate into the solicitation additional draw ings, as-builts, and informational specif ication
b) See attached Technical Summary of Changes
c) All other terms and conditions remain unchanged
///////////////// LAST ITEM \\\\\\\\\\\\\\\\
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Feb-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM19R0019
X 9B. DATED (SEE ITEM 11)
30-Jan-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2020
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM19R0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 10 Amendment 0003
PN87539_RTA_SPECIFI
CATIONS_VOL_01.PDF
12-FEB-2020
Attachment 11 Amend_0005_PN87539_
RTS_DWGfiles.pdf
30-JAN-2020
Attachment 12 Amend_0005_PN87539_
RTS_DGNfiles.pdf
30-JAN-2020
Attachment 3 PN 87539 Site Visit Map 06-NOV-2019
Attachment 4 J&A - Corning 18-NOV-2019
Attachment 5 J&A - Siemon 18-NOV-2019
Attachment 7 Amendment 0002
PN87539_RTA_PLANS.
31-JAN-2020
Attachment 8 Amendment 0002
PN87539_RTA_PLANS_
UNLOCKED.pdf
31-JAN-2020
Attachment 9 Amendment 0003
PN87539_RTA_SPECIFI
CATION_FF&E_VOL-
12-FEB-2020
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 10 Amendment 0003
PN87539_RTA_SPECIFI
CATIONS_VOL_01.PDF
12-FEB-2020
Attachment 11 Amend_0005_PN87539_
RTS_DWGfiles.pdf
30-JAN-2020
Attachment 12 Amend_0005_PN87539_
RTS_DGNfiles.pdf
30-JAN-2020
Attachment 13 Amend_0006_TN103 28-FEB-2020
Attachment 14 Amend_0006_01_91_00.
00_37
28-FEB-2020
Attachment 15 Amend 0006_As-
Built_M-141
28-FEB-2020
Attachment 3 PN 87539 Site Visit Map 06-NOV-2019
Attachment 4 J&A - Corning 18-NOV-2019
Attachment 5 J&A - Siemon 18-NOV-2019
W912PM19R0019
Attachment 7 Amendment 0002
PN87539_RTA_PLANS.
31-JAN-2020
Attachment 8 Amendment 0002
PN87539_RTA_PLANS_
UNLOCKED.pdf
31-JAN-2020
Attachment 9 Amendment 0003
PN87539_RTA_SPECIFI
CATION_FF&E_VOL-
12-FEB-2020
(End of Summary of Changes)
File details come from the government source that posted it. Updated .