O’Brien Upper Envelope Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
47PC0220R0014
Agency
Region 2 Public Buildings Service, General Services Administration
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
Albany NY 12207 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration Public Buildings Service Region 2 is soliciting proposals to replace the existing roofing systems at the Leo O'Brien Federal Building located in Albany, New York. The solicitation includes a base bid to replace approximately 17,225 square feet of roofing with a new fully adhered TPO membrane roofing system. An alternative bid and option are also specified. Proposals are due by May 14, 2020 with award by July 15, 2020. The selected contractor must provide warranties, conduct inspections, and perform an infrared scan within one year of substantial completion to verify proper installation.

This requirement is set aside as a 100% total small business set-aside under NAICS code 238160, PSC code R499. The place of performance is the Leo O'Brien Federal Building located at 12207 Patroon Island, Albany, New York. Under the base bid scope, the contractor must complete all work within 280 calendar days of receiving the notice to proceed. The alternative bid increases insulation height and includes raised roof areas under four cell towers, while the option adds work replacing additional roofing and sealing areas around cooling towers.

Notice text

6 versions

Update #6 · Latest ·

This Amendment 0005 is being issued to provide a revised GSA response to RFI No. 8 of the Amendment 0004 and an additional RFI that was inadvertently left out from previous Amendments.

Please see attached Amendment 0005 Q-A document for details.

This amendment must be signed and returned with your offer.

_________________________________________________________________________________________________

This Amendment No. 0004 is being issued to extend the proposal due date and provide additional information in response to RFIs received.  Please see Amendment No. 0004 and attachments to it for details.

This amendment must be signed and returned with your offer.

_________________________________________________________________________________________________

This Amendment No. 0003 (see attached SF30) is being issued to:
1.  Postpone the site visit scheduled on March 31, 2020; once GSA has determined  the new site visit date, a follow on amendment will be issued providing the information for it;
2.  Please submit your questions/RFIs, if any, by COB, Monday April 6, 2020;
3.  Extend the proposal due date to Thursday, April 30, 2020, by 4:00 P.M. EST. 
This amendment must be signed and returned with your offer.

_________________________________________________________________________________________________

This Amendment 0002 is being issued to reschedule the Pre-Proposal and Site Visit information.  Please see attached Amendment 0002 for details.
 
This amendment must be signed and returned with your offer.

____________________________________________________________________________________________

This Amendment 0001 (See Attached Amendment 0001) is being issued to postpone the Pre-Proposal/Site Visit as follows:
I.D. Pre-Proposal Conference
Date: March 31, 2020
Time: 10:00 AM to 12:00 PM
Location: Leo W. O’Brien Federal Building
                    1 Clinton Ave.
                    Albany, NY 12207
Conference Room - TBD

Interested parties must contact Jayshree Tank, Contract Specialist to register, by COB March 27, 2020, by sending
an email with the names of attendees, company name, contact information mobile phone no. as well as email
address. Only those parties who have notified the Contract Specialist and provided necessary information in
advance of the walk-through will be allowed to attend. To request reasonable accommodations due to a disability,
contact Jayshree Tank, Contract Specialist at (212) 577-8681.
_______________________________________________________________________________________________

THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O’Brien Federal Building.

The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option.  The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document.  The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work:  approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft  x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof  tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor.  Contractor shall resolve any concerns identified.  Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas.  The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures.  The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material.  The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area.  The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Update #5 ·

This Amendment No. 0004 is being issued to extend the proposal due date and provide additional information in response to RFIs received.  Please see Amendment No. 0004 and attachments to it for details.

This amendment must be signed and returned with your offer.

_________________________________________________________________________________________________

This Amendment No. 0003 (see attached SF30) is being issued to:
1.  Postpone the site visit scheduled on March 31, 2020; once GSA has determined  the new site visit date, a follow on amendment will be issued providing the information for it;
2.  Please submit your questions/RFIs, if any, by COB, Monday April 6, 2020;
3.  Extend the proposal due date to Thursday, April 30, 2020, by 4:00 P.M. EST. 
This amendment must be signed and returned with your offer.

_________________________________________________________________________________________________

This Amendment 0002 is being issued to reschedule the Pre-Proposal and Site Visit information.  Please see attached Amendment 0002 for details.
 
This amendment must be signed and returned with your offer.

____________________________________________________________________________________________

This Amendment 0001 (See Attached Amendment 0001) is being issued to postpone the Pre-Proposal/Site Visit as follows:
I.D. Pre-Proposal Conference
Date: March 31, 2020
Time: 10:00 AM to 12:00 PM
Location: Leo W. O’Brien Federal Building
                    1 Clinton Ave.
                    Albany, NY 12207
Conference Room - TBD

Interested parties must contact Jayshree Tank, Contract Specialist to register, by COB March 27, 2020, by sending
an email with the names of attendees, company name, contact information mobile phone no. as well as email
address. Only those parties who have notified the Contract Specialist and provided necessary information in
advance of the walk-through will be allowed to attend. To request reasonable accommodations due to a disability,
contact Jayshree Tank, Contract Specialist at (212) 577-8681.
_______________________________________________________________________________________________

THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O’Brien Federal Building.

The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option.  The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document.  The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work:  approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft  x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof  tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor.  Contractor shall resolve any concerns identified.  Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas.  The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures.  The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material.  The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area.  The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Update #4 ·

This Amendment No. 0003 (see attached SF30) is being issued to:
1.  Postpone the site visit scheduled on March 31, 2020; once GSA has determined  the new site visit date, a follow on amendment will be issued providing the information for it;
2.  Please submit your questions/RFIs, if any, by COB, Monday April 6, 2020;
3.  Extend the proposal due date to Thursday, April 30, 2020, by 4:00 P.M. EST. 
This amendment must be signed and returned with your offer.

_________________________________________________________________________________________________

This Amendment 0002 is being issued to reschedule the Pre-Proposal and Site Visit information.  Please see attached Amendment 0002 for details.
 
This amendment must be signed and returned with your offer.

____________________________________________________________________________________________

This Amendment 0001 (See Attached Amendment 0001) is being issued to postpone the Pre-Proposal/Site Visit as follows:
I.D. Pre-Proposal Conference
Date: March 31, 2020
Time: 10:00 AM to 12:00 PM
Location: Leo W. O’Brien Federal Building
                    1 Clinton Ave.
                    Albany, NY 12207
Conference Room - TBD

Interested parties must contact Jayshree Tank, Contract Specialist to register, by COB March 27, 2020, by sending
an email with the names of attendees, company name, contact information mobile phone no. as well as email
address. Only those parties who have notified the Contract Specialist and provided necessary information in
advance of the walk-through will be allowed to attend. To request reasonable accommodations due to a disability,
contact Jayshree Tank, Contract Specialist at (212) 577-8681.
_______________________________________________________________________________________________

THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O’Brien Federal Building.

The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option.  The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document.  The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work:  approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft  x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof  tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor.  Contractor shall resolve any concerns identified.  Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas.  The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures.  The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material.  The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area.  The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Update #3 ·

This Amendment 0002 is being issued to reschedule the Pre-Proposal and Site Visit information.  Please see attached Amendment 0002 for details.
 
This amendment must be signed and returned with your offer.

____________________________________________________________________________________________

This Amendment 0001 (See Attached Amendment 0001) is being issued to postpone the Pre-Proposal/Site Visit as follows:
I.D. Pre-Proposal Conference
Date: March 31, 2020
Time: 10:00 AM to 12:00 PM
Location: Leo W. O’Brien Federal Building
                    1 Clinton Ave.
                    Albany, NY 12207
Conference Room - TBD

Interested parties must contact Jayshree Tank, Contract Specialist to register, by COB March 27, 2020, by sending
an email with the names of attendees, company name, contact information mobile phone no. as well as email
address. Only those parties who have notified the Contract Specialist and provided necessary information in
advance of the walk-through will be allowed to attend. To request reasonable accommodations due to a disability,
contact Jayshree Tank, Contract Specialist at (212) 577-8681.
_______________________________________________________________________________________________

THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O’Brien Federal Building.

The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option.  The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document.  The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work:  approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft  x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof  tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor.  Contractor shall resolve any concerns identified.  Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas.  The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures.  The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material.  The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area.  The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Update #2 ·

This Amendment 0001 (See Attached Amendment 0001) is being issued to postpone the Pre-Proposal/Site Visit as follows:
I.D. Pre-Proposal Conference
Date: March 31, 2020
Time: 10:00 AM to 12:00 PM
Location: Leo W. O’Brien Federal Building
                    1 Clinton Ave.
                    Albany, NY 12207
Conference Room - TBD

Interested parties must contact Jayshree Tank, Contract Specialist to register, by COB March 27, 2020, by sending
an email with the names of attendees, company name, contact information mobile phone no. as well as email
address. Only those parties who have notified the Contract Specialist and provided necessary information in
advance of the walk-through will be allowed to attend. To request reasonable accommodations due to a disability,
contact Jayshree Tank, Contract Specialist at (212) 577-8681.
 

THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O’Brien Federal Building.

The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option.  The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document.  The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work:  approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft  x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof  tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor.  Contractor shall resolve any concerns identified.  Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas.  The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures.  The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material.  The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area.  The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Update #1 ·

THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O’Brien Federal Building.

The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option.  The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document.  The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work:  approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft  x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof  tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor.  Contractor shall resolve any concerns identified.  Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas.  The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures.  The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material.  The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area.  The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Attachments

Files attached to this notice, newest first
File Type Posted
Solicitation Amendment 47PC0220R0014_0005.pdf PDF
Amendment 0005 Q-A.pdf PDF
RFE-Report-RF_Pre_Install_Assessment_Patroon Island_(850-AWS3 Add).pdf PDF
028200 - ASBESTOS REMEDIATION r2.pdf PDF
Amendment 0004 Q-A.pdf PDF
Solicitation Amendment 47PC0220R0014_0004.pdf PDF
000100 - TABLE OF CONTENTS r2.pdf PDF
Pages from 20190823_16320.79_OBrien Upper Envelope Preliminary DESIGN Report.pdf PDF
16320.79 SPD O'Brien Upper Envelope_Pre-Bid-Addendum_#1_20200403.pdf PDF
Temp Antenna Placement (during roofwork) 2020-04-24.pptx PPTX presentation
OBrien Boiler Existing Stacks.pdf PDF
16320.79 SPD O'Brien Upper Envelope_Pre-Bid-Addendum_#2_20200424.pdf PDF
Solicitation Amendment 47PC0220R0014_0003.pdf PDF
Amendment 0002.pdf PDF
Solicitation Amendment 47PC0220R0014_0002.pdf PDF
Solicitation Amendment 47PC0220R0014_0001.pdf PDF
OBrien Upper Envelope Repairs - Key Personnel Qualifications Resume Form Attachment C.pdf PDF
For Construction_OBrien_Upper_Envelope_Specs_2020-03-10.pdf PDF
Final_SBSA GC Solicitation.pdf PDF
Final_SBSA GC Agreement aug19 r1 508 (2).pdf PDF
OBrien Upper Envelope Repairs - Experience on Similar Projects Offeror Form - Attachment A.pdf PDF
GC Reps andCerts dec19 508.pdf PDF
GSA FBO SOW (base versus alternative plus option) 2020-03-09 Final.pdf PDF
Wage Determination.pdf PDF
47PC0220R0014 Form.pdf PDF
Standard Form 24 - Bid Bond.pdf PDF
OBrien Upper Envelope Repairs - Past Performance Questionnaire Attachment B.pdf PDF
For Construction_OBrien_Upper_Envelope_Drawings_2020-03-10.pdf PDF
GSA 527 - Contractor Qualifications and Financial Information.pdf PDF
Show all 29

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
O’Brien Upper Envelope Project Award Award Notice
O’Brien Upper Envelope Project This notice · Latest solicitation Solicitation
O’Brien Upper Envelope Project Pre-Solicitation
O’Brien Upper Envelope Project Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity