For Construction_OBrien_Upper_Envelope_Drawings_2020-03-10.pdf
PDF 11 MB Posted
- Attached to
- O’Brien Upper Envelope Project Federal contract opportunity
- Solicitation number
- 47PC0220R0014
About this file
This document is a solicitation notice for roof replacement services at the Leo O'Brien Federal Building. The General Services Administration (GSA) Region 2 is seeking proposals to replace approximately 17,225 square feet of existing roofing systems with a new fully adhered TPO membrane roofing system consisting of torch down vapor barrier, multiple layers of extruded polystyrene insulation ranging from 4.5 to 6.5 inches thick, cover board, and 80 mil TPO membrane. The project also includes installing OSHA-compliant guardrails, a roof tie-off system, and a new lightning protection system. Asbestos abatement will be required. The solicitation contains a base bid, one alternative, and one option. Proposals are due by April 15, 2022 and the contract is set aside for total small businesses.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
RENOVATION
SHEET SIZE: 34 X 44
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P H
IC
S C
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
C&S ENGINEERS
GS-07-P-16-UC-D-7008
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS IS
FOR GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
N/A
499 Col. Eileen Collins Blvd Syracuse, NY 13212
Phone www.cscos.com
315.455.2000
GENERAL SERVICES ADMINISTRATION
1 CLINTON SQUARE
ALBANY, NY 12207
AB
C D
UPPER ROOF
LOWER ROOF
ELEVATOR
PENTHOUSE
/1
/2
:2 :1
P
M
COVER
O'BRIEN UPPER ENVELOPE
PROJECT
DBH
CAL 03/10/2020
RNY#12932
03/10/2020
1 24
FOR CONSTRUCTION
G-001
JERRY BOYLE
LEO O'BRIEN FEDERAL BLDG
ARCHITECT, CIVIL ENGINEER, & STRUCTURAL ENGINEER:
N.K. BHANDARI,
ARCHITECTURE & ENGINEERING, P.C.
1005 W. FAYETTE STREET, SUITE 500
SYRACUSE, NEW YORK 13204
315.428.1177
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT
TO UNAUTHORIZED RECIPIENTS IS PROHIBITED
Do not remove this notice Properly destroy or return documents when no longer needed.
PROJECT CERTIFICATION:
TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL
JUDGMENT, THE DRAWINGS AND SPECIFICATIONS WHICH COMPRISE
THE CONSTRUCTION DOCUMENTS FOR THE PROJECT ARE IN
COMPLIANCE WITH APPLICABLE CODES, INCLUDING THE LATEST
EDITIONS OF THE INTERNATIONAL BUILDING CODE AND NFPA 101.
DRAWING LIST
SHEET NUMBER SHEET NAME DRAWING NO.
G-001 COVER 1
G-002 CODE,STAGING &PHASING 2
A001 GENERAL NOTES, SYMBOLS, & ABBREVIATIONS 3
AD101 DEMOLITION - ROOF PLAN 4
AD102 - A DEMOLITION - LOW ROOF - BID OPTION 5
AE101 CONSTRUCTION - ROOF PLAN 6
AE102 - A CONSTRUCTION - LOW ROOF - BID OPTION 7
AE301 SECTION AND DETAIL 8
AE501 DETAIL 9
AE502 - A DETAILS - BID OPTION 1 10
ALT- 1 DETAILS - BID ALTERNATE 1 11
P-001 GENERAL NOTES, SYMBOLS, DETAILS & SCHEDULES 12
PD101 PLUBMING ROOF DEMOLITION PLAN 13
PD101A DEMOLITION - LOW ROOF - BID OPTION 14
P-101 PENTHOUSE PLAN 15
P-101A MECHANICAL PENTHOUSE - BID OPTION 16
M-001 GENERAL NOTES, SYMBOLS, DETAILS & SCHEDULES 17
MD101 MECHANICAL ROOF DEMOLITION PLAN 18
M-101 ROOF PLAN 19
M-101A MECHANICAL PENTHOUSE - BID OPTION 20
MD101A DEMOLITION - LOW ROOF- BID OPTION 21
E-001 GENERAL NOTES, SYMBOLS, ABBREVIATIONS & DETAILS 22
ED101 ROOF DEMOLITION PLAN 23
E-101 ROOF PLAN 24
Grand total: 24
1 CLINTON SQUARE, ALBANY, NY 12207
LEO O'BRIEN FEDERAL BUILDING
UPPER ENVELOPE PROJECT
NKB PROJECT NO. 016320.79 A/E CONTRACT NO. GS-07-P-16-UC-D-7008
GSA PROJECT NO. RNY#12932
PROJECT LOCATION MAP STREET VIEW
MECHANICAL, ELECTRICAL & PLUMBING:
C&S COMPANIES
499 COL. EILEEN COLLINS BLVD.
SYRACUSE, NEW YORK 13212
315.445.2000
5842 Heritage Landing Drive East Syracuse, NY 13057 315.445.0847
COLDEN CORPORATION
HEALTH, SAFETY AND ENVIRONMENTAL CONSULTING
HAZARDOUS MATERIALS ABATEMENT:
cal Image
R E
F x x x x x x xx xxxxxxxxx x xx x x x x x x x x x x x x x x x xx xxxxxxxxxxxxxxxxxx x x x xx xx x x x x xx x x
KEEP A LANE OPEN FOR VEHICLES
TEMPORARY
SECURITY FENCE
CONSTRUCTION STAGING AREA
TEMPORARY SECURITY FENCE
PEDESTRIAN ROUTE
PEDESTRIAN ROUTE
POTENTIAL CRANE AREA
POTENTIAL CRANE AREA
PARKING LOT
AREA
PARKING LOT
AREA
PLAYGROUND
PLANTING BOXES
KEY LEGEND
PEDESTRIAN ROUTE
TEMPORARY SECURITY
FENCE
CONSTRUCTION STAGING
AREA
POTENTIAL CRANE AREA
PROHIBITED CRANE AREA
VEHICLE LANE
PROPERTY BOUNDARIES
PROVIDED
COVERED
WALKWAYS AT
ENTRANCES
PROVIDED COVERED
WALKWAYS AT ENTRANCES
PROVIDED COVERED
WALKWAYS AT
ENTRANCES
PLANTING BOXES
PLAZA/ LOW ROOF
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
RENOVATION
SHEET SIZE: 34 X 44
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
C&S ENGINEERS
GS-07-P-16-UC-D-7008
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS IS
FOR GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
N/A
499 Col. Eileen Collins Blvd Syracuse, NY 13212
Phone www.cscos.com
315.455.2000
GENERAL SERVICES ADMINISTRATION
1 CLINTON SQUARE
ALBANY, NY 12207
AB
C D
UPPER ROOF
LOWER ROOF
ELEVATOR
PENTHOUSE
/1
/2
:2 :1
P
M
CODE,STAGING &PHASING
O'BRIEN UPPER ENVELOPE
PROJECT
DBH
CAL 03/10/2020
RNY#12932
03/10/2020
2 24
FOR CONSTRUCTION
G-002
JERRY BOYLE
LEO O'BRIEN FEDERAL BLDG
1" = 20'-0"G-002
1 STAGING &PHASING PLAN
GENERAL STAGING NOTES
1. STAGING PLAN: THE STAGING PLAN SHOWN IS FOR REFERENCE ONLY AND SHALL NOT BE CONSIDERED THE FINAL PLAN. CONTRACTOR IS REQUIRED TO DEVELOP THEIR OWN PHASING PLAN, CRANE, DUMPSTER, AND MATERIALS STAGING, TEMPORARY FENCING & LOGISTICS PLANS INCLUDING LOCATIONS OF TEMPORARY COVERED WALKWAY PROTECTION IN CONFORMANCE WITH DIVISION 1
SPECIFICATIONS AND ALL GOVERNMENT REQUIREMENTS
2. PROPERTY BOUNDARIES: THE ESTIMATED PROPERTY BOUNDARY IS SHOWN FOR THE PURPOSES OF COORDINATION FOR REGULATORY COMPLIANCE. THIS PROPERTY BOUNDARY IS THE LIMIT OF FEDERAL PROPERTY AND THUS OUTSIDE THIS BOUNDARY ALL LOCAL AND STATE CODES APPLY IN ADDITION TO BUT NOT LIMITED TO BUILDING PERMITS AND STATE/ CITY OF ALBANY CRANE OPERATION LICENSES.
3. WORK ACTIVITIES: DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL DISRUPT BUILDING OCCUPANTS TO THE MINIMUM EXTENT POSSIBLE DURING THE NORMAL BUILDING WORK HOURS. DISRUPTIVE ROOF AND ROOF- RELATED WORK IS PROHIBITED DURING NORMAL BUILDING WORKING HOURS. DISRUPTIVE WORK MUST BE DONE DURING OFF-HOURS (“DISRUPTIVE” IS WORK THAT DISTURBS NORMAL BUSINESS ACTIVITIES AND OPERATIONS WITHIN BLDG., I.E. LOUD NOISE, DISCONNECTING POWER, LIMITING ACCESS, HVAC, DISRUPTION, ETC.). THE GOVERNMENT SHALL HAVE THE SOLE RIGHT TO
DETERMINE WHAT IS DEFINED AS "DISRUPTIVE".
4. NOISE LEVEL: NOISY WORK THAT DISRUPTS BUILDING ACTIVE AND OPERATIONS SHALL BE PERFORMED OUTSIDE OF NORMAL WORKING HOURS IF APPROVED BY GOVERNMENT, REFER TO SPECIFICATIONS FOR MORE INFORMATION. THE GOVERNMENT SHELL BE THE SOLE DETERMINER OF WHAT CONSTITUTES UNACCEPTABLE LEVEL OF NOISE.
5. WORK HOURS: NORMAL BUILDING WORK HOURS ARE 8:00 AM TO 6:00 PM. CONTRACTOR MAY PROPOSE STRATEGIC WORK HOURS TO EXPEDITE PRODUCTIVITY FOR REVIEW AND APPROVAL BY THE OWNER. FOR EXAMPLE, HOURS MAY VARY DAILY, FROM EARLY MORNING START-UP, MID-DAY WORK-STOP, AND THEN START-UP AGAIN AFTER HOUR IF APPROVED BY THE GOVERNMENT. REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
6. DISRUPTIONS: ANY DISRUPTION TO SERVICES OR ACCESS TO THE BUILDING OR BUILDING OCCUPANTS BY THE CONTRACTOR, ESPECIALLY ADA PARKING/ACCESS, WILL BE CONVEYED TO THE BUILDING MANAGER AT LEAST 48 HOURS IN ADVANCE OF ANY ANTICIPATED SERVICE DISRUPTION. ALL SERVICE OR ACCESS UPDATES AND NOTIFICATIONS TO BE MADE DAILY TO PROPERTY MANAGEMENT AND GSA.
7. PARKING & STREET ACCESS: DISRUPTION OF STREET PARKING AND SIDEWALKS MAY BE PERMITTED DURING CONSTRUCTION BUT WILL REQUIRE PERMITTING AND COORDINATION BY THE CONTRACTOR WITH THE CITY OF ALBANY PRIOR TO PROCEEDING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND NEGOTIATING WITH THE CITY OF ALBANY AND ALL OTHERS TO LOCATE ALTERNATIVE/TEMPORARY PARKING SPACES TO REPLACE THE SAME NUMBER OF PARKING SPACES DISPLACED BY THE STAGING AREAS REQUIRED FOR THE PROJECT DURATION. ONCE ALTERNATIVE/TEMPORARY PARKING SPACES ARE ESTABLISHED AND APPROVED BY PROPERTY MANAGEMENT AND GSA, NO ADDITIONAL DISRUPTION OR USE OF PARKING AREAS IS PERMITTED DURING REGULAR BUILDING BUSINESS HOURS THROUGHOUT ALL DEMOLITION AND CONSTRUCTION ACTIVITIES. USE OF THESE AREAS SHALL BE PERMITTED DURING NON-BUSINESS HOURS AND AS APPROVED/ESTABLISHED BY ACTIVITIES DESCRIBED ABOVE. CONTRACTOR SHALL OBTAIN ALL REQUIRED STREET SHUTDOWN PERMITS AND PROVIDE NECESSARY PEDESTRIAN BARRICADES COVERED
WALKWAYS AND RELATED SIGNAGE AS REQUIRED.
8. CRANE USAGE: ANY CRANE POSITIONED OR USED FOR THIS PROJECT SHALL BE CERTIFIED AND OPERATED BY A NEW YORK STATE CERTIFIED OPERATOR. CRANE MUST BE FULLY PROTECTED / SECURED / LOCKED / DISABLED WHEN WORKERS ARE NOT ON SITE. A CITY PERMIT IS REQUIRED AND PROPERTY MANAGEMENT & GSA APPROVAL IS NEEDED PRIOR TO CRANE PLACEMENT. DURATION OF CLOSURE MUST BE PROVIDED BY CONTRACTOR AS WELL. ENGINEERING CALCULATIONS AND SAFETY REQUIREMENTS FOR ANY SWING SCAFFOLDING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND PROPOSED USE MUST BE APPROVED BY PROPERTY MANAGEMENT AND GSA IN ADVANCE. CONTRACTOR IS ALWAYS TO MAINTAIN BLDG. ACCESS AT THE EAST AND WEST ENTRANCES AT ALL TIME DURING CONSTRUCTION. COORDINATE LOCATIONS OF TEMPORARY FENCING WITH PROPERTY MANAGEMENT.
9. DUMPSTER AREA: DUMPSTER LOCATIONS ARE BASED ON CONTRACTOR'S NEED - DUMPSTER MUST BE SECURED SO THAT NO ONE CAN PLACE ITEMS IN OR REMOVE ITEMS WHEN WORKERS ARE OFF SITE.
ALL DEMOLITION AND CONSTRUCTION DEBRIS ARE TO BE LIFTED FROM THE ROOF SURFACES TO THE DUMPSTER VIA CRANE. CHUTES ARE NOT PERMITTED FOR CONVEYING DEBRIS FROM ROOF TO THE DUMPSTER. MATERIALS CAN BE HAND TRANSPORTED IF CONTRACTOR RECEIVES APPROVAL BY PROPERTY MANAGEMENT AND GSA IN ADVANCE. DUMPSTERS SHALL BE LOCATED IN CONSTRUCTION
STAGING AREAS AS INDCATED ON THIS PLAN.
10. DEMOLITION, DAMAGES & REPAIRS: ALL DEBRIS IS TO BE PREVENTED FROM FALLING INTO ANY ROOF DRAINS, OPEN PENETRATIONS, PIPES, OR VENTS. REPAIRS OF ALL DAMAGE DONE ASSOCIATED WITH DEMOLITION, STAGING, CRANE USE AND DEBRIS REMOVAL SHALL BE REPAIRED TO EXISTING CONDITION PRIOR TO START OF WORK. THIS SHALL BE IN ADDITION TO ALL OTHER REPAIRS SPECIFIED
ELSEWHERE.
11. DAILY FLOW CLEARANCE: CONTRACTOR IS RESPONSIBLE TO VERIFY DAILY THAT ALL ROOF DRAINS AND VENTS ARE OPERATIONAL, FREE AND CLEAR, AND MUST SNAKE IF NECESSARY.
12. DAILY LIMITS: NO MORE ROOFING CAN BE DEMOLISHED IN ONE DAY THAN CAN BE MADE WEATHER-TIGHT WITH THE TORCH DOWN VAPOR RETARDER ON DECK IN THE SAME DAY. CONTRACTOR IS RESPONSIBLE FOR ENSURE ROOF IS WEATHER TIGHT AT END OF WORKDAY AND IS RESPONSIBLE FOR ANY WATER DAMAGE DURING CONSTRUCTION.
13. MATERIALS STAGING AREA: MATERIALS CAN BE STORED SECURELY ON-SITE FOR THE DURATION, AS NEEDED. MATERIALS CAN BE STORED IN LOCATIONS AS APPROVED BY THE OWNER'S PROPERTY MANAGER AND GSA, AS NEEDED. STORING MATERIALS ON THE PUBLIC WALKWAYS IS NOT ALLOWED. STORE MATERIALS IN OR NEAR CRANE STAGING AREA, OR OFF-SITE IN A SECURE LOCATION.
CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF ALL LANDSCAPE, LAWN AND PAVED AREAS AS WELL AS PROVIDING AND RELOCATING TEMPORARY FENCING AND COVERED WALKWAYS DURING THE
PROJECT DURATION.
14. ROOF TOP EQUIPMENT: IN COORDINATION WITH THE OWNER, EXISTING ROOF TOP EQUIPMENT INCLUDING BUT NOT LIMITED TO ANTENNAE AND SATELLITE DISH ARE TO BE REMOVED AND REINSTALLED BY CONTRACTOR AS INDICATED AND FOR THE APPROPRIATE COMPLETION OF ROOFING WORK. ALL EFFORTS SHOULD BE TAKEN TO PREVENT SERVICE DISRUPTION. ACTIVE OPERATION OF THESE DEVICES MUST BE MAINTAINED THROUGHOUT THE ENTIRE PROGRESS OF WORK FOR THIS PROJECT. RELOCATION OR DISCONNECTION OF ACTIVE ROOF TOP EQUIPMENT SHALL BE PERFORMED AFTER NORMAL BUILDING HOURS IN ORDER TO MINIMIZE DISRUPTION TO BUILDING OCCUPANTS. PROVIDE TEMPORARY LOCATIONS FOR DEVICES WHILE WORK IS BEING PERFORMED ON DIFFERENT ROOF SURFACES.
CONTRACTOR TO PROVIDE LABOR AND COORDINATION WITH PROPERTY MANAGEMENT AND GSA FOR ANY RELOCATIONS, REINSTALLATIONS, AND RE-ALIGNMENTS NOT SHOWN.
15. ROOF TOP WORK BY OTHERS:VERIZON HOLDS AND MAINTAINS EXISTING DEVICE AND ACCESSORY EQUIPMENT AND STRUCTURES, IN CLUDING PENERATION, ON THE ROOF. CONTRACTOR SHALL COORDINATE WITH VERIZON DURING AN WORK ACTIVITLES. REFER TO GENERAL NOTES FOR VERIZON TEL-COM WORK ACTIVIES ON SHEET AD101.
GENERAL PHASING NOTES
1. TEMPORARY CONSTRUCTION FENCING IS TO BE MAINTAINED AT ALL TIMES; PROVIDING A BARRIER FROM THE AREA OF WORK TO AREAS OUTSIDE THE AREA OF WORK. TEMPORARY
CONSTRUCTION FENCE IS TO NOT OBSTRUCT AREAS OUTSIDE THE AREA OF WORK AT ANYTIME.
2. IN GENERAL, PHASING OF WORK SHALL BEGIN WITH THE REMOVALS/REPLACEMENTS STARTING AT THE HIGHEST ROOF LEVEL FIRST. ONCE THIS IS COMPLETED, WORK SHALL PROCEED AT
THE NEXT LOWEST LEVEL AND SO ON.
CODE REVIEW
CHAPTER/ REF DESCRIPTION REQUIRED PROVIDED
NATIONAL FIRE PROTECTION ASSOCIATION
(NFPA 101 : 2015)
CHAPTER REQUIRED PROVIDED
6 CLASSIFICATION OF OCCUPANCY
6.1.2 ASSEMBLY "GATHERING OF 50 PEOPLE OR MORE"
COMPLY WITH CHAPTERS 12 OR 13. 6.1.2.1
"FEWER THAN 50 PERSON SHALL BE
CLASSIFIED AS PART OF OTHER
OCCUPANCY AND SHOULD BE SUBJECT
TO THE PROVISIONS APPLICABLE
THERETO."
6.1.11 BUSINESS COMPLY W/ CHAPTERS 38 OR 39
INTERNATIONAL BUILDING CODE (IBC) 2015
CHAPTER CIVIC ADMINISTRATION PROVIDED
3 USE AND OCCUPANCY CLASSIFICATION
304.1 BUSINESS GROUP B OFFICE
4 SPECIAL DETAILED REQUIREMENTS
BASED ON USE AND OCCUPANCY
422.5 AUTOMATIC SPRINKLER SYSTEMS NOT ALTERED BY SCOPE
422.6 FIRE ALARM SYSTEMS NOT ALTERED BY SCOPE
5 GENERAL BUILDING HEIGHTS AND AREAS
503 OCCUPANCY B NOT ALTERED BY SCOPE
CONSTRUCTION TYPE IIA / EXIST NOT ALTERED BY SCOPE
504 BUILDING HEIGHT BASIC EXIST NOT ALTERED BY SCOPE
504.2 SPRINKLER INCREASE EXIST NOT ALTERED BY SCOPE
506 BUILDING AREA BASIC EXIST NOT ALTERED BY SCOPE
506.2 FRONTAGE INCREASE EXIST NOT ALTERED BY SCOPE
506.3 SPRINKLER INCREASE EXIST NOT ALTERED BY SCOPE
TOTAL AREA: EXIST NOT ALTERED BY SCOPE
6 CONSTRUCTION TYPE
T. 601 TYPE IIA / EXIST NOT ALTERED BY SCOPE
PRIMARY FRAME 1.000000 NOT ALTERED BY SCOPE
BEARING WALL - EXTERIOR 1.000000 NOT ALTERED BY SCOPE
BEARING WALL - INTERIOR 1.000000 NOT ALTERED BY SCOPE
NON BEARING WALL - EXTERIOR 0 (T. 602) NOT ALTERED BY SCOPE
NON BEARING WALL - INTERIOR 0 NOT ALTERED BY SCOPE
FLOOR CONSTRUCTION 1.000000 NOT ALTERED BY SCOPE
ROOF CONSTRUCTION 1 NOT ALTERED BY SCOPE
T. 602 FIRE SEPARATION DISTANCE < 30 FEET REQUIRED 1 HOUR NOT ALTERED BY SCOPE
602.3 TYPE IIA ALL MATERIALS MADE FROM
NONCOMBUSTABLE MATERIALS UNLESS
ALLOWED BY 603
NOT ALTERED BY SCOPE
9 FIRE PROTECTION SYSTEM
901 FIRE PROTECTION SYSTEM AUTOMATIC SYSTEM NOT ALTERED BY SCOPE
906 PORTABLE FIRE EXTINGUISHER
SYSTEMS
EXIST NOT ALTERED BY SCOPE
13 ENERGY EFFICIENCY
REQUIRES DESIGN AND COMPLIANCE
WITH INTERNATIONAL ENERGY CODE
NOT ALTERED BY SCOPE
APPLICABLE CODES
THE APPLICABLE MODEL CODES, STANDARDS AND REFERENCES DOCUMENTS PERTINENT TO THE
PROJECT ARE AS FOLLOWS:
• NFPA 101 LIFE SAFETY CODE (2015)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS (2013)
• INTERNATIONAL BUILDING CODE (IBC 2015)
• INTERNATIONAL MECHANICAL CODE (IBC 2015)
• NATIONAL ELECTRICAL CODE - NFPA 70 (NEC 2014)
• INTERNATIONAL PLUMBING CODE (IBC 2015)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, ASME A 17.1.
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURALSTEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPAct)
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2013.
• ASHRAE STANDARDS AND HANDBOOKS
• FACILITIES STANDARDS FOR THE PUBLIC BUILDINGS SERVICE - PBS-P100 (2014)
0 10' 40'20'
Recommended phasing options. Roofing Contractor is responsible for coordinating with GSA and Verizon at all times during the contract understanding that durations estimated may vary. Weather conditions can restrict planned work activities that could delay scheduled tasks. Contractor will need to coordinate all weather-dependent work activities accordingly.
Phasing Option 1:
Verizon Mobilization #1 (minimum 2-days estimated duration)
1. Verizon requests 2-week notice prior to Roofing Contractor starting work activities
2. Thursday / Friday prior to roofers starting work, Verizon to remove cables and cable tray from north east enclosure and relocate some antennas to south east enclosure.
3. The south portion of the roof will still have cables connected and in place.
Verizon Mobilization #2 (minimum 3-days total estimated duration)
1. Verizon requests 2-week notice prior to Roofing Contractor starting work activities beginning with the
South portion of roof. Contractor may allow Verizon to work on the roof when they are working the rest of the roof.
2. Three days prior to roofers starting work on south portion only – Verizon will suspend cables from doghouse to south east enclosure and remove existing cable tray. Verizon will remove cables and cable tray from doghouse to south west enclosure. (minimum 2-days estimated duration)
3. Verizon to return immediately after roofing work is finished on the south section to re-connect south west enclosure (minimum 1-day estimated duration)
Verizon will then re-mobilize to reconnect the northeast enclosure once roof work in this section is completed to the Government’s acceptability. Cable and cable tray storage on site to be coordinated in advance of delivery and placement.
Phasing Option 2:
Verizon Mobilization #1 (minimum 4-days total estimated duration)
1. Verizon requests 2-week notice prior to Roofing Contractor starting work activities
2. This option will only work if roofing contractor agrees to work south section of roof first and allow
Verizon to work on the roof when they are working the rest of the roof, or Verizon will work on the weekend but only if the south section of roofing work is finished first.
3. Verizon to remove cables and cable tray from northeast enclosure, relocate some antennas to south east enclosure, suspend cables from doghouse to south east enclosure. remove cables and tray from south west enclosure (minimum 3-days estimated duration)
4. Verizon will return immediately after roofing work is finished on the south section to reconnect south west enclosure (minimum 1-day estimated duration)
Verizon will then re-mobilize to reconnect the northeast enclosure once roof work in this section is completed to the Government’s acceptability. Cable and cable tray storage on site to be coordinated in advance of delivery and placement.
1/8" = 1'-0"A0102 A0101
1 View Name
ROOM NAME
150 SF
ZZZ
ROOM TAG
VIEW TAG
BUILDING SECTION
WALL SECTION
FLOOR LEVEL
COLUMN GRID
METAL PANEL /
CURTAIN WALL
PANEL TAG
ITEM TAG
KEYED NOTE
REVISION TAG
DEMOLITION TAG
SHEET
NUMBER OF
VIEW
SHEET NUMBER
OF VIEW
ORIGINATION
SHEET
NUMBER OF
VIEW
SECTION NUMBER
BREAK LINE
ALIGN
ALIGN ELEMENTS
FLOOR
ELEVATION
FLOOR NAME
EXTERIOR ELEVATION
CALLOUT
ELEVATION
NUMBER
AE001
SIM
DETAIL CALLOUT
SHEET
NUMBER OF
VIEW
DETAIL NUMBER
ROOM NAME
ROOM NUMBER
ROOM AREA
AE001
AE001
INTERIOR ELEVATION
CALLOUT
NORTH ARROW
MAGNETIC
NORTH
PROJEC
T NORTH
TP1
SHEET
NUMBER OF
VIEW
SECTION NUMBER
SHEET
NUMBER OF
VIEW
ELEVATION
NUMBER
SHEET
NUMBER OF
VIEW
AE001
SIM
AE001
SIM
Name Elevation
10"
M1
WALL TYPE 410:
UL --
RATING 0 HOUR
STC ---
CMU
9 5/8" CMU
REINFORCING PER
STRUCTURAL
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
RENOVATION
SHEET SIZE: 34 X 44
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
C&S ENGINEERS
GS-07-P-16-UC-D-7008
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS IS
FOR GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
N/A
499 Col. Eileen Collins Blvd Syracuse, NY 13212
Phone www.cscos.com
315.455.2000
GENERAL SERVICES ADMINISTRATION
1 CLINTON SQUARE
ALBANY, NY 12207
AB
C D
UPPER ROOF
LOWER ROOF
ELEVATOR
PENTHOUSE
/1
/2
:2 :5
P
M
GENERAL NOTES, SYMBOLS, &
ABBREVIATIONS
O'BRIEN UPPER ENVELOPE
PROJECT
DBH
CAL 03/10/2020
RNY#12932
03/10/2020
3 24
FOR CONSTRUCTION
A001
JERRY BOYLE
LEO O'BRIEN FEDERAL BLDG
GENERAL CONSTRUCTION NOTES
1 DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE “INTERNATIONAL BUILDING CODE 2015 (IBC)", THE NFPA 101 LIFE SAFETY CODE, LATEST REVISION, ANSI A117.1 - LATEST REVISION, OSHA, "FACILITIES STANDARDS FOR THE PUBLIC BUILDINGS SERVICE (P100)" - LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THIS PROJECT IS BEING CONSTRUCTED
2 THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THE AREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALL MATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER OR NOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHER PORTION OF THE DRAWINGS AND/OR NOTES.
3 WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BEST QUALITY MATERIAL.
WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNER'S APPROVAL. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORK WHICH HAS BEEN DAMAGED SHALL BE REPAIRED TO A “NEW CONDITION,” OR WHERE THE STRUCTURAL INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BE REPLACED AT NO COST TO THE OWNER.
4 CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE CONSTRUCTION MANAGER AND ARCHITECT/ENGINEER AND REQUEST CLARIFICATION.
5 DRAWINGS MAY NOT INDICATE ALL DEMOLITION/REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER WHICH ITEMS ARE TO
BE SAVED FOR OWNER’S USE OR REINSTALLATION BY CONTRACTOR.
6 WHERE CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES AND INFILLED SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. ALL ABANDONED OPENINGS (I.E., DUCT/PIPE REMOVALS, ETC.) AT WALLS, ROOF OR FLOOR TO BE INFILLED SOLID.
7 WHERE CONSTRUCTION RESULTS IN DEPRESSIONS AND/OR UNEVEN FLOOR CONDITIONS, PATCH, LEVEL AND FEATHER AREAS AS REQUIRED TO PROVIDE UNIFORMITY OF NEW
FLOORING.
8 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (I.E. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF PLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM
WORK AND RESTORE THESE SPACES OR AREAS TO ORIGINAL CONDITIONS.
9 CONTRACTOR SHALL OBTAIN FROM OWNER ALL REQUIREMENTS FOR INSTALLATION OF OWNER PROVIDED EQUIPMENT INCLUDING ROUGHING DIAGRAMS, INSTALLATION INSTRUCTIONS, ELECTRICAL SCHEMATICS, TEMPLATES, LAYOUTS AND DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER, WELL COORDINATED INSTALLATION.
PRIOR TO ROUGH-IN OF SERVICES, CONFER WITH OWNER EXACT LOCATION OF ALL ITEMS.
10 CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH TRADE EXACT LOCATION
OF ALL ITEMS
11 ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRE STOPPING
INCLUDES BOTH FORM OR PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.
12 WOOD USED FOR BLOCKING OR OTHER PURPOSES ON OR ABOVE THE ROOF DECK WITHIN 2’-0” OF GRADE AND OTHER LOCATIONS OUTSIDE THE BUILDING ENVELOPE WHERE EXPOSED TO THE WEATHER, SHALL BE PRESSURE TREATED TYPE. WOOD USED FOR BLOCKING OR OTHER PURPOSES SHALL BE FIRE RETARDANT TYPE.
13 ALL DRAWINGS INDICATED AS GENERAL APPLY TO ENTIRE PROJECT, INCLUSIVE OF ALL BUILDINGS.
ABBREVIATIONS
RB RUBBER BASE
RD ROOF DRAIN
RECP RECEPTICLE
REF REFERENCE
REFL REFLECT (ED), (IVE), (OR)
REFR REFRIGERATOR,
REFRIGERATION
REINF REINFORCE (D), (ING)
REQD REQUIRED
RES RESILIENT
RET RETURN, RETAINING
REV REVISION (S), REVISED
RH RIGHT HAND
RI RIGID INSULATION
RM ROOM
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RUBR RUBBER
S
S SOUTH
SA SUPPLY AIR
SAD SADDLE
SAN SANITARY
SC SOLID CORE
SCH SCHEDULE
SCW SOLID CORED WOOD
SDT STATIC DISSIPATIVE TILE
SECT SECTION
SF SQUARE FOOT (FEET)
SG SPANDREL GLASS
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SP SPECIAL
SPEC SPECIFICATION (S)
SPKR SPEAKER
SPL SPANDREL PANEL
SQ SQUARE
SS SOLID SURFACE
SST STAINLESS STEEL
ST STREET
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURE (AL)
SURF SURFACE
SUSP SUSPENDED
SW SWITCH
SY SQUARE YARD
SYM SYMMETRY (ICAL)
SYS SYSTEM
T
T TREAD
T&B TOP & BOTTOM
T&G TONGUE & GROOVE
T&P TAPE & PRIME
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPORARY
TERR TERRAZZO
THK THICK (NESS)
TO TOP OF
TOL TOLERANCE
TOS TOP OF STEEL
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TRANS TRANSVERSE
TS TERMINATION STRIP
TV TELEVISION
TYP TYPICAL
TYPOS TYPICAL OTHER SIDE
U
UC UNDERCUT
UH UNIT HEATER
UL UNDERWRITERS'
LABORATORIES
UNEX UNEXCAVATED
UNF UNFINISHED
UON UNLESS OTHERWISE
NOTED
UR URINAL
V
VAR VARIES (ABLE)
VB VINYL BASE
VC VINYL COVE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VG VISION GLASS
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WNCT WAINSCOTING
WP WATERPROOFED (ING)
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
X
XPS EXTRUDED POLYSTYRENE
INSULATION
ABBREVIATIONS
L
L LENGTH, LONG
LAB LABORATORY
LAM LAMINATE (D)
LAV LAVATORY
LF LINEAR FOOT (FEET)
LH LEFT HAND
LIN LINEAR
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LOUV LOUVER
LP LOW POINT
LT LIGHT
LW LONG WAY
M
MAG MAGNETIC
MAR MARBLE
MAS MASONRY
MAX MAXIMUM
MBD MARKER BOARD
ME MATCH EXISTING
MECH MECHANICAL
MED MEDIUM
MEM MEMBER
MEMB MEMBRANE
MEP MECHANICAL,
ELECTRICAL, PLUMBING
MEPFP MECHANICAL,
ELECTRICAL, PLUMBING,
FIRE PROTECTION
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOULDING
MO MASONRY OPENING
MR
GWB
MOISTURE RESISTANT
GYPSUM WALL BOARD
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
N
N NORTH
NAT NATURAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NORM NORMAL
NTS NOT TO SCALE
O
OA OVERALL
OBS OBSCURE
OC ON CENTER (S)
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
P
P LAM PLASTIC LAMINATE
P&R PATCH & REPAIR
PAVMT PAVEMENT
PC PLUMBING CONTRACTOR
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATED
PERM PERMANENT
PL PLATE
PLAS PLASTER
PLAST PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLYIS
O
POLYISOCYANURATE
INSULATION
PR PAIR
PREP PREPARE (ATION)
PROJ PROJECT (ION)
PROP PROPERTY
PRTN PARTITION
PSF POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT PRESSURE TREATED
PTD PAINTED
PVC POLYVINYL CHLORIDE
Q
QTY QUANTITY
R
R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
ABBREVIATIONS
EMER EMERGENCY
ENCL ENCLOSURE
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EPS EXPANDED POLYSTYRENE
INSULATION
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED SLAB
EST ESTIMATE (D)
ETR EXISTING TO REMAIN
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION, EXPAND
EXPO EXPOSED
EXT EXTERIOR
EXTR EXTRUDED
F
FA FIRE ALARM
FAB FABRICATE
FAP FIRE ALARM CONTROL
PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISHED FLOOR
FH FLOOR HATCH
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH (ED)
FIXT FIXTURE
FL FLANGE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR (ING)
FLUOR FLUORESCENT
FM FLOOR MOUNTED
FNDN FOUNDATION
FO FACE OF
FP FIRE PROTECTION
FR FRAME (ING)
FRP FIBERGLASS REINFORCED
PANEL
FT FOOT OR FEET
FTG FOOTING
FURR FURRING
FUT FUTURE
G
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENEARL
GL GLASS / GLAZING
GR GUARDRAIL
GRG GLASS REINFORCED
GYPSUM
GT GLAZED TILE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
H/C HANDICAPPED
HB HOSE BIB
HC HOLLOW CORE
HD HAND
HDR HEADER
HDWE HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HMI HOLLOW METAL
INSULATED
HORIZ HORIZONTAL
HP HIGH POINT
HR HANDRAIL, HOUR
HTG HEATING
HTR HEATER
HVAC HEATING/VENTILATING/AIR
CONDITIONING
HW HOT WATER
I
ID INSIDE DIAMETER
IN INCH OR INCHES
INCL INCLUDE (ING)
INSUL INSULATE (D), (ION)
INT INTERIOR
INV INVERT
J
J JOIST
JAN JANITOR
JCT JUNCTION
JT JOINT
K
KD KNOCKED DOWN
KIT KITCHEN
ABBREVIATIONS
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ACC ACCESS
ACOUS ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
ADJ ADJACENT
ADJUST ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPRO
X
APPROXIMATE (LY)
ARCH ARCHITECTURAL
ASPH ASPHALT
AVG AVERAGE
B
BD BOARD
BET BETWEEN
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BENCHMARK
BN BULLNOSE
BO BOTTOM OF
BOD BASIS OF DESIGN
BRD BOARD
BSMT BASEMENT
BUR BUILT-UP-ROOF
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CF CUBIC FOOT (FEET)
CFMF COLD FORMED METAL
FRAMING
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CKBD CORKBOARD
CL CLOSET
CLG CEILING
CLKG CAULKING
CLL CONTRACT LIMIT LINE
CLR CLEAR
CM CEILING MOUNTED
CMU CONCRETE MASONRY
UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE (OUS)
CONTR CONTRACTOR
CPT CARPET
CR CHAIR RAIL
CT CERAMIC TILE
CTR CENTER
CW COLD WATER
CY CUBIC YARD (S)
D
DBL DOUBLE
DEG DEGREES
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVISION
DL DEAD LOAD
DN DOWN
DO DOOR OPENING
DOM DOMESTIC
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
E EAST
EA EACH
EC ELECTRICAL
CONTRACTOR
EF EACH FACE
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EJ EXPANSION JOINT
EJCP EXPANSION JOINT COVER
PLATE
EL ELEVATION
ELEC ELECTRIC (AL)
ELEV ELEVATOR
TYPICAL SYMBOLS
1" = 1'-0"A001
1 WALL TYPE 410
V
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
VERIZON VERIZONVERIZON VERIZON VERIZON V
E R
IZO
N
V E R
IZO
N
V.I.F
5' - 5" +/-
V.I.F
145' - 0" +/-
V.I.F
5' - 5" +/-
V.I.F
155' - 10" +/-
V .I .F
V .I .F
V .I .F
V .I .F
H.1F.1E.1D.1C.1
1.A
1.C
1.D
1.E
1.G
A.1 B.1
1.B
1.F
G.1
COOLING TOWER
TO REMAIN
COOLING TOWER
TO REMAIN
5 5
LOWER
UPPER
L O
W E
R
U P
P
LOWER
UPPER
L O
W E
R
U P
P
L O
W E
R
U P
P
L O
W E
R
U P
P
OPEN TO BELOW
IF
V
IF
V
IF
VIF
5' - 5" +/-
VIF
146' - 0" +/-
VIF
5' - 5" +/-
V
IF
VIF
15' - 0" +/-
VIF
36' - 11" +/-
V
IF
V
IF
V
IF
V
IF
ANTENNAE
SECTOR B
ANTENNAE
SECTOR A
ANTENNAE
SECTOR D
ANTENNAE
SECTOR C
4'0 8' 16'
TYP
TYP
TYP
TYP
TYP
EXISTING STEEL
EXISTING PIPES
ALT- 1
ALT- 1
AE301
AE301
ROOF ZONE AREAS
ROOF ZONE A1 = 2,150 SQ. FT.
ROOF ZONE A2 = 983 SQ. FT.
ROOF ZONE B1 = 15,531 SQ. FT.
ROOF ZONE B2 = 1,120 SQ. FT.
ROOF ZONE B3 = 565 SQ. FT.
TOTAL ROOF ZONE AREAS =
20,349 SQ. FT.
ALL AREA CALCULATIONS ARE
APPROXIMATE.
ROOF ZONE B2
ROOF ZONE B3
ROOF ZONE B1 ROOF ZONE B1
WALKING PAD (SPACE PER
MFR RECOMMENDATION TO
ALLOW FOR PROPER
DRAINAGE)
ROOF DRAINROOF EQUIPMENT RD ROOF DRAIN, REFER
TO PLUMB DRAWINGS
HIGH
LOW
VENTS ROOF EQUIPMENT ROOF DRAIN NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
RENOVATION
SHEET SIZE: 34 X 44
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
C&S ENGINEERS
GS-07-P-16-UC-D-7008
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS IS
FOR GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
N/A
499 Col. Eileen Collins Blvd Syracuse, NY 13212
Phone www.cscos.com
315.455.2000
GENERAL SERVICES ADMINISTRATION
1 CLINTON SQUARE
ALBANY, NY 12207
AB
C D
UPPER ROOF
LOWER ROOF
ELEVATOR
PENTHOUSE
/1
/2
:2 :5
P
M
DEMOLITION - ROOF PLAN
O'BRIEN UPPER ENVELOPE
PROJECT
DBH
CAL 03/10/2020
RNY#12932
03/10/2020
4 24
FOR CONSTRUCTION
AD101
JERRY BOYLE
LEO O'BRIEN FEDERAL BLDG
1/8" = 1'-0"AD101
1 UPPER ROOF - DEMOLITION PLAN
GENERAL DEMOLITION NOTES
1 ANY ITEM NOT SPECIFICALLY IDENTIFIED BUT REQUIRED TO BE REMOVED OR REPAIRED TO PREPARE THE BUILDING FOR THE NEW WORK OR TO OTHERWISE PRODUCE THE FINISHED PRODUCT SHOWN IN THE CONTRACT DOCUMENTS IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
2 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE DIRECTION AND APPROVAL OF THE PROPERTY MANAGER AND/OR GSA.
3 EXISTING CONSTRUCTION TO REMAIN SHALL BE PRESERVED AND PROTECTED DURING CONSTRUCTION. DAMAGE TO EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER, INCLUDING THE MAINTENANCE OF ALL FIRE
RATINGS AT STRUCTURAL MEMBERS, FLOORS, WALLS, CEILINGS, ETC.
4 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING
ELEMENTS OF THE BUILDING AS REQUIRED.
5 CONTRACTOR SHALL REMOVE ALL MATERIALS IN A WORKMAN-LIKE MANNER APPROVED BY THE OWNER AND DISPOSE OF ALL MATERIALS PER APPLICABLE
CODES.
6 COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION CONTROL & HAZARDOUS MATERIALS.
7 REFER TO M/E/P DEMOLITION DRAWINGS FOR REMOVAL OF EXISTING ELECTRICAL, TELECOMMUNICATION, DATA, WALL-MOUNTED CONDUITS, LINES, METERS, DUCT WORK, PLUMBING.
8 FOLLOWING ROOF REMOVALS, A CONTRACTOR SHALL CONFIRM EXISTING ROOF DECK SLOPES MEETING DESIRED 1/8” PER 12” MINIMUM – IF EXISTING ROOF
DECK SLOPE ARE LESS THAN REQUIRED, CONTRACTOR SHALL PROVIDE ADDITIONAL.
DEMO PLAN- KEYED NOTES- SHEET AD101
NUMBER DESCRIPTION
1 HAZARDOUS MATERIALS (ASBESTOS) ARE KNOWN TO EXIST ON THE UPPER ROOF AT THE LOCATIONS SHOWN, SPECIFICALLY BLACK TAR ON APPLIED TO THE LIGHTNING GROUND WIRE. ROOFING CONTRACTOR TO ABATE AND DISCARD HAZARDOUS MATERIALS ENCOUNTERED DURING THE INSTALLATION OF THE SCHEDULED ROOF WORK. ALL REGULATIONS AND PROCEDURES ON ROOF ARE TO BE FOLLOWED IN THE ABATEMENT OF ALL HAZARDOUS MATERIALS. NOTE THAT ALL OPENINGS AND PENETRATIONS TO THE BUILDING WITHIN 25 FEET OF THE IMMEDIATE HAZARDOUS MATERIAL REMOVAL WORK SHALL SHUT OR SEALED AIRTIGHT TO PREVENT FIBER MIGRATION INTO THE BUILDING. HEPA FILTERS COVERING AHU OR HVAC INTAKES OR EXHAUSTS THAT CANNOT BE TURNED OFF IS AN ACCEPTABLE OPTION. SEE PLAN FOR APPROXIMATE LOCATION OF EXISTING SYSTEM, CONTACTOR SHALL VERIFY IN FIELD. ONCE ABATEMENT IS COMPLETED REMAIN SYSTEMS TO BE SALVAGED FOR POTENTIAL REUSE IN PART & WHOLE, COORDINATE WITH ELECTRICAL.
2 REMOVE AND PROPERLY DISCARD EXISTING ROOF CONSTRUCTION DOWN TO ORIGINAL CONCRETE DECKING TO A CLEAN, SMOOTH, SOUND SURFACE.
REMOVALS SHALL INCLUDE, BUT ARE NOT LIMITED TO, ROOF MEMBRANE, GRANULAR TOP, BUILT-UP ROOF, COVER BOARD, POLYISO INSULATION (THICKNESS VARIES), BITUMEN-TYPE VAPOR BARRIER, AND MEMBRANE FLASHINGS. PREPARE SURFACES TO RECEIVE SCHEDULED WORK.
3 PREPARE EXISTING CONCRETE DECK TO A CLEAN SOUND SURFACE, PATCH AND RE-LEVEL CONCRETE DECK AS NEEDED TO A SMOOTH SURFACE AND
PREPARE EXISTING ADJACENT CONSTRUCTION FOR SCHEDULED CONSTRUCTION.
4 REMOVE AND PROPERLY DISCARD EXISTING ROOF DRAIN DOME ONLY TO RECEIVE RETRO FIT ROOF DRAIN. FLOW TEST ROOF DRAINS BEFORE AND AFTER SCHEDULED ROOF WORK. PROVIDE WRITTEN DOCUMENTATION OF BOTH TESTS TO ARCHITECT AND GSA. PREPARE SURFACES TO RECEIVE
SCHEDULED WORK.
5 REMOVE AND PROPERLY DISCARD EXISTING PITCH POCKET. EXISTING PIPE PENETRATION TO REMAIN. PREPARE SURFACES TO RECEIVE SCHEDULED
WORK.
6 THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND VERIZON REGARDING PHASING OF ROOF WORK TO ACCOMMODATE KEEPING TWO OF THE THREE ANTENNAS ON THE ROOF ACTIVE DURING CONSTRUCTION. VERIZON IS TO TAKE CARE OF ANY DISCONNECTING, RECONNECTING AND MOVING OF THE ANTENNA/CABLES DURING CONSTRUCTION. THE CONTRACTOR WILL NOT BE PERMITTED TO PERFORM THIS WORK. VERIZON WILL ALWAYS BE REQUIRED TO COORDINATE WITH THE GOVERNMENT AND THE CONTRACTOR DURING CONSTRUCTION. REFER TO ELECTRICAL FOR MORE
INFORMATION.
7 TEMPORARILY DISCONNECT AND LIFT UNIT. SEE MECHANICAL ON M-SERIES DRAWINGS. PREPARE SURFACE TO RECEIVE SCHEDULED WORK. UNIT.
SEE MECHANICAL ON M-SERIES DRAWINGS. PREPARE SURFACE TO RECEIVE SCHEDULED WORK.
8 CAREFULLY REMOVE EXISTING LADDER (FOR REUSE).
9 REMOVE AND DISCARD ROOF EDGE COPING, BLOCKING AND RELATED CONSTRUCTION TO A CLEAN SOUND SURFACE. PREPARE EXISTING ADJACENT
CONSTRUCTION FOR SCHEDULED CONSTRUCTION.
10 REMOVE AND DISCARD 2” MINIMUM OF CONCRETE AROUND EXISTING OPENING, BLOCKING AND RELATED CONSTRUCTION TO A CLEAN SOUND
SURFACE. PREPARE EXISTING ADJACENT CONSTRUCTION FOR SCHEDULED CONSTRUCTION.
NO SCALEAD101
2 UPPER ROOF - ROOF ZONE KEY PLAN
ROOF LEGEND
UP
PIPE PIPEPIPE PIPEPIPE PIPE
H.1F.1E.1D.1C.1
1.A
1.C
1.D
1.E
1.G
A.1 B.1
1.B
1.F
G.1
1 1
2 2 2 2 2
22222
3 3
11747 SF
MECHANICAL
SPACE
264 SF
OFFICE
690 SF
ELEVATOR ROOM
214 SF
STAIR WELL
231 SF
STAIR WELL
44 5
4 4
V.I.F
87' - 11" +/-
/8
COOLING TOWER
TO REMAIN
AREA NOT IN SCOPE AREA NOT IN SCOPE
AREA NOT IN SCOPE AREA NOT IN SCOPE
V
IF
VIF
148' - 6" +/-
V
IF
VIF
2' - 4" +/-
VIF
2' - 4" +/-
4'0 8' 16'
AE102 - A
ROOF ZONE AREAS
LOW ROOFS
ROOF ZONE A1 = 2,150 SQ. FT.
ROOF ZONE A2 = 983 SQ. FT.
UPPER ROOFS
ROOF ZONE B1 = 15,531 SQ. FT.
ROOF ZONE B2 = 1,120 SQ. FT.
ROOF ZONE B3 = 565 SQ. FT.
TOTAL ROOF ZONE AREAS =
20,349 SQ. FT.
ALL AREA CALCULATIONS ARE
APPROXIMATE.
ROOF ZONE A1
ROOF ZONE A2
ROOF ZONE A2
ROOF ZONE A2
ROOF ZONE A2
AREA NOT IN SCOPE AREA NOT IN SCOPE
WALKING PAD (SPACE PER
MFR RECOMMENDATION TO
ALLOW FOR PROPER
DRAINAGE)
ROOF DRAINROOF EQUIPMENT RD ROOF DRAIN, REFER
TO PLUMB DRAWINGS
HIGH
LOW
VENTS ROOF EQUIPMENT ROOF DRAIN NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
RENOVATION
SHEET SIZE: 34 X 44
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
C&S ENGINEERS
GS-07-P-16-UC-D-7008
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS IS
FOR GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
N/A
499 Col. Eileen Collins Blvd Syracuse, NY 13212
Phone www.cscos.com
315.455.2000
GENERAL SERVICES ADMINISTRATION
1 CLINTON SQUARE
ALBANY, NY 12207
AB
C D
UPPER ROOF
LOWER ROOF
ELEVATOR
PENTHOUSE
/1
/2
:2 :5
P
M
DEMOLITION - LOW ROOF - BID
OPTION
O'BRIEN UPPER ENVELOPE
PROJECT
DBH
CAL 03/10/2020
RNY#12932
03/10/2020
5 24
FOR CONSTRUCTION
AD102 - A
JERRY BOYLE
LEO O'BRIEN FEDERAL BLDG
1/8" = 1'-0"AD102 - A
1 LOW ROOF DEMOLITION PLAN
DEMO PLAN- KEYED NOTES- SHEET AD100
NUMBER DESCRIPTION
1 REMOVE AND PROPERLY DISCARD EXISTING ROOF CONSTRUCTION DOWN TO ORIGINAL CONCRETE DECKING TO A CLEAN, SMOOTH, SOUND SURFACE.
REMOVALS SHALL INCLUDE, BUT ARE NOT LIMITED TO, ROOF MEMBRANE, PAVERS, BUILT-UP ROOF, BITUMEN-TYPE VAPOR BARRIER, AND MEMBRANE
FLASHINGS. PREPARE SURFACES TO RECEIVE SCHEDULED WORK.
2 REMOVE AND PROPERLY DISCARD EXISTING ROOF CONSTRUCTION DOWN TO ORIGINAL CONCRETE DECKING TO A CLEAN, SMOOTH, SOUND SURFACE.
REMOVALS SHALL INCLUDE, BUT ARE NOT LIMITED TO, ROOF MEMBRANE, GRANULAR TOP, BUILT-UP ROOF, COVER BOARD, POLYISO INSULATION (THICKNESS VARIES), BITUMEN-TYPE VAPOR BARRIER, AND MEMBRANE FLASHINGS. PREPARE SURFACES TO RECEIVE SCHEDULED WORK.
3 REMOVE AND PROPERLY DISCARD EXISTING FLASHING. PROVIDE NEW FLASHING TERMINATIONS PER DETAILS.
4 REMOVE AND PROPERLY DISCARD EXISTING ROOF DRAIN DOME ONLY TO RECEIVE RETRO FIT ROOF DRAIN. FLOW TEST ROOF DRAINS BEFORE AND AFTER SCHEDULED ROOF WORK. PROVIDE WRITTEN DOCUMENTATION OF BOTH TESTS TO ARCHITECT AND GSA. PREPARE SURFACES TO RECEIVE
SCHEDULED WORK.
5 REMOVE AND PROPERLY DISCARD EXISTING MEP SUPPORT. PREPARE SURFACES TO RECEIVE SCHEDULED WORK. REMOVE AND INFILL ALL EXIST
PITCH POCKETS AND PREP FOR NEW ROOF SYSTEM,
6 REMOVE LOOSE PAINT TO A CLEAN SOUND SURFACE AND PREPARE EXISTING ADJACENT CONSTRUCTION TO RECEIVE SCHEDULED WORK.
7 REMOVE EXISTING DOOR, FRAME & HARDWARE, PREPARE SURFACE TO RECEIVE SCHEDULED WORK
8 REMOVE EXISTING DOOR THRESHOLD, PREPARE SURFACE TO RECEIVE SCHEDULED WORK
GENERAL DEMOLITION NOTES
1 ANY ITEM NOT SPECIFICALLY IDENTIFIED BUT REQUIRED TO BE REMOVED OR REPAIRED TO PREPARE THE BUILDING FOR THE NEW WORK OR TO OTHERWISE PRODUCE THE FINISHED PRODUCT SHOWN IN THE CONTRACT DOCUMENTS IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
2 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE DIRECTION AND APPROVAL OF THE PROPERTY MANAGER AND/OR GSA.
3 EXISTING CONSTRUCTION TO REMAIN SHALL BE PRESERVED AND PROTECTED DURING CONSTRUCTION. DAMAGE TO EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER, INCLUDING THE MAINTENANCE OF ALL FIRE
RATINGS AT STRUCTURAL MEMBERS, FLOORS, WALLS, CEILINGS, ETC.
4 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING
ELEMENTS OF THE BUILDING AS REQUIRED.
5 CONTRACTOR SHALL REMOVE ALL MATERIALS IN A WORKMAN-LIKE MANNER APPROVED BY THE OWNER AND DISPOSE OF ALL MATERIALS PER APPLICABLE
CODES.
6 COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION CONTROL & HAZARDOUS MATERIALS.
7 REFER TO M/E/P DEMOLITION DRAWINGS FOR REMOVAL OF EXISTING ELECTRICAL, TELECOMMUNICATION, DATA, WALL-MOUNTED CONDUITS, LINES, METERS, DUCT WORK, PLUMBING.
8 FOLLOWING ROOF REMOVALS, A CONTRACTOR SHALL CONFIRM EXISTING ROOF DECK SLOPES MEETING DESIRED 1/8” PER 12” MINIMUM – IF EXISTING ROOF
DECK SLOPE ARE LESS THAN REQUIRED, CONTRACTOR SHALL PROVIDE ADDITIONAL.
NO SCALEAD102
- A
2 LOW ROOF - ROOF ZONE KEY PLAN
ROOF LEGEND
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
VERIZON VERIZONVERIZON VERIZON VERIZON VERIZON VERIZON VERIZON VERIZON VERIZON VERIZON
V E R
IZ
O
N
V E R
IZ
O
N
V E R
IZ
O
N
V E R
IZ
O
N
V E R
IZ
O
N
VERIZONVERIZON
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
V E
R
IZ
O N
VERIZON VERIZONVERIZON VERIZON VERIZON V
E R
IZO
N
V E R
IZO
N
VIF
87' - 11" +/-
VIF
4' - 3" +/-
VIF
156' - 10" +/-
VIF
66' - 6" +/-
VIF
36' - 11" +/-
VIF
53' - 5" +/-
V
IF
V
IF
V
IF
V
IF
VIF
15' - 0" +/-
VIF
15' - 0" +/-
VIF
15' - 0" +/-
V
IF
RD
RD
RD
RD
RD
OPEN TO BELOW
LOWER
UPPER
LOWER
UPPER
L O
W E
R
U P
P
L O
W E
R
U P
P
IF
O V
E R
A L
L
RD
AE301
AE301
AE301
28' - 11"
1/4" / 1'-0" 1/4" / 1'-0"
H.1F.1E.1D.1C.1
VIF
156' - 10" +/-
VIF
4' - 3" +/- VIF
1' - 2" +/-
VIF
28' - 0" +/-
VIF
30' - 0" +/-
VIF
30' - 0" +/-
VIF
30' - 0" +/-
VIF
28' - 0" +/- VIF
1' - 2" +/-
VIF
4' - 3" +/-
VIF
5' - 5" +/-
VIF
146' - 0" +/-
VIF
5' - 5" +/-
1.A V
IF
V
IF
V
IF
V
IF
V
IF
1.C
1.D
1.E
1.G
V
IF
V
IF
V
IF
V
IF
1/4" / 1'-0"
/8
" / 1 '-0
1/8" / 1'-0"
/8
1/8" / 1'-0"
1/4" / 1'-0"
1/4" / 1'-0"
/8
1/4" / 1'-0"
/4
/4
1/4" / 1'-0"
/4
1/8" / 1'-0"
V
IF
A.1 B.1
1.B
1.F
G.1
AE501
SIM
1/4" / 1'-0"
AE501
SIM
VT
VT
AE501
SIM
AE501
SIM
AE501
SIM
AE501
SIM
AE501
SIM
AE301
/4
1/4" / 1'-0"
L O
W E
R
U P
P
U P
P
L O
W E
R
/8
/8
AE301
AE301
Sim
AE301
Sim
AE301
Sim
AE301
Sim
AE301
Sim
1/4" / 1'-0"1/4" / 1'-0"
/8
/8
" / 1 ' -0
AE501
/8
" 1
/8 " / 1
'-0
5 5
EXISTING COOLING
TOWER
WALKWAY
SYSTEM - TYP
H
IG
H P
O
IN
T
HIGH POINT
H
IG
H P
O
IN
T
HIGH POINT
V A
LLE
Y S
LO
P E
HIGH POINT
V A
LL
E Y
S
LO
P E
V A
LLE
Y S
LO
P E
V A
LL
E
YS
LO
P E
H
IG
H P
O
IN
T
HIGH POINTHIGH POINT
H
IG
H P
O
IN
T H
IG
H
P O
IN
T
HIGH POINT HIGH POINT
H
IG
H P
O
IN
T
VALLEY
SLO
PE
H
IG
H P
O
IN
T
H
IG
H P
O
IN
T
V A
LL
E
YS
LO
P E
VALLEY
SLOPE
V A
LLE
Y S
LO
P
EV
A
LL
E
YS
LO
P E
V A
LL
E
Y
S
LO
P E
VALLEY
SLOPE
V A
LL
E
YS
LO
P E
V A
LLE
Y S
LO
P E
VALLEY
SLOPE
V A
LL
E Y
S
LO
P E
VALLEY
SLO
PE
ANTENNAE
SECTOR B
ANTENNAE
SECTOR C
ANTENNAE
SECTOR D
ANTENNAE
SECTOR A
VALLE
Y
S
LO
P E
V A
LLE
Y S
LO
P E
EXISTING STEEL
4'0 8' 16'
AE501
TYP
1/8" / 1'-0"1/8" / 1'-0"1/8" / 1'-0"1/8" / 1'-0"
ALT- 1
AE301
AE301
"3
"3 "3
"3 "3
"3 "3
"3 "3
"3 "3
"3 "3
"3
2" 2"
NOTE:
1. INSULATION TO BE CUT TO ALLOW FOR ANY TRANSITION OR CHANGE IN THE SLOPE OF THE
ROOF SURFACE. TYPICAL IN ALL LOCATIONS.
2. 4' X 4' EXTRUDED POLYSTYRENE INSULATION BOARD AND 4' X 4' ROOFING COVER BOARD.
3. EACH SUCCESSIVE LAYER OF INSULATION AND CORNER BOARD ARE TO HAVE THEIR JOINTS
STAGGERED.
4. ADHESIVE PATTERN SHOWN IS SCHEMATIC IN NATURE. MANUFACTURER AND INSTALLER TO
SELECT PROPER ADHESIVE PATTERNS BASED ON DESIGN WIND LOADS.
5. DESIGN WIND UPLIFT: CATWALK: 131 LBF/SQ. FT.
6. DESIGN WIND UPLIFT: UPPER ROOF: 118 LBF/SQ. FT.
7. DESIGN WIND UPLIFT: MECH. PENTHOUSE: 76 LBF/SQ. FT.
OFFSET INSULATION
AND COVERBOARDS
O F
F S
E T
OFFSET
2' - 0"
FOAM
ADHESIVE
0 1' 2' 4'
Zone 1
Zone 2
Zone 3
Upper Flat roof
1. Zone 1 (Roof Area Field): 47 lbf/sq. ft.
2. Zone 2 (Roof Area Perimeter): 79 lbf/sq. ft.
3. Zone 3 (Roof Area Corners): 118 lbf/sq. ft.
A. Zone width “a” = 10’-0”
Catwalk
1. Zone 1 (Roof Area Field): 44 lbf/sq. ft.
2. Zone 2 (Roof Area Perimeter): 68 lbf/sq. ft.
3. Zone 3 (Roof Area Corners): 131 lbf/sq. ft.
A. Zone width “a” = 3’-0”
OPEN TO BELOW
NOTE:
LOWER ROOF LEVEL DATUM: 126'-10" VARIES
UPPER ROOF LEVEL DATUM: 148'-0" VARIES
ELEVATOR PENTHOUSE DATUM: 126' 10" VERIES
WALKING PAD (SPACE PER
MFR RECOMMENDATION TO
ALLOW FOR PROPER
DRAINAGE)
ROOF DRAINROOF EQUIPMENT RD ROOF DRAIN, REFER
TO PLUMB DRAWINGS
HIGH
LOW
VENTS ROOF EQUIPMENT ROOF DRAIN
ROOF ZONE AREAS
LOWER ROOFS
ROOF ZONE A1 = 2,150 SQ. FT.
ROOF ZONE A2 = 983 SQ. FT.
UPPER ROOFS
ROOF ZONE B1 = 15,531 SQ. FT.
ROOF ZONE B2 = 1,120 SQ. FT.
ROOF ZONE B3 = 565 SQ. FT.
TOTAL ROOF ZONE AREAS =
20,349 SQ. FT.
ALL AREA CALCULATIONS ARE
APPROXIMATE.
ROOF ZONE B2
ROOF ZONE B3
(CATWALK)
ROOF ZONE B1 ROOF ZONE B1
OPEN TO BELOW
FULLY ADHERED WHITE TPO MEMBRANE SYSTEM
REFER TO SPECIFICATIONS FOR THICKNESS AND OTHER
INFORMATION
1/2" ROOFING COVER BOARD
4” MIN. OF EXTRUDED POLYSTYRENE (XPS)
INSULATION. TYPICAL UNLESS NOTED OTHERWISE.
6" XPS INSULATION AT ROOF ELEVATOR
PENTHOUSE AS SHOWN ON DETAIL 8/AE-301
TORCH DOWN VAPOR RETARDER ON DECK AND
EXTEND UP VERTICAL PARAPET WALL - TYP.
PATCH ALL HOLES IN EXISTING ROOF STRUCTURE
TO MATCH EXISTING ADJACENT
LAP DIMENSIONS TO COMPLY WITH MFR
HOT AIR WELD TO COMPLY WITH
MANUFACTURER REQUIREMENTS
NOTE:
APPROXIMATELY 1/8" (3mm) DIAMETER BEAD OF CUT-EDGE SEALANT
IS REQUIRED ON CUT EDGES OF SURE- WELD REINFORCED
MEMBRANE
X P
S
3" MIN
0 6" 1'3"
FULLY ADHERED WHITE TPO MEMBRANE SYSTEM
REFER TO SPECIFICATIONS FOR THICKNESS AND
OTHER INFORMATION
1/2" ROOFING COVER BOARD
4” MIN. OF EXTRUDED POLYSTYRENE (XPS)
INSULATION (R-15 MIN). TYPICAL UNLESS
NOTED OTHERWISE. 6" XPS INSULATION AT
ROOF ELEVATOR PENTHOUSE AS SHOWN ON
DETAIL 8/AE-301
TORCH DOWN VAPOR RETARDER ON DECK AND
EXTEND UP VERTICAL PARAPET WALL - TYP.
PATCH ALL HOLES IN EXISTING ROOF
STRUCTURE TO MATCH EXISTING ADJACENT
X P
S
0 6" 1'3"
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
RENOVATION
SHEET SIZE: 34 X 44
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
C&S ENGINEERS
GS-07-P-16-UC-D-7008
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS IS
FOR GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
N/A
499 Col. Eileen Collins Blvd Syracuse, NY 13212
Phone www.cscos.com
315.455.2000
GENERAL SERVICES ADMINISTRATION
1 CLINTON SQUARE
ALBANY, NY 12207
AB
C D
UPPER ROOF
LOWER ROOF
ELEVATOR
PENTHOUSE
/1
/2
:2 :0
P
M
CONSTRUCTION - ROOF PLAN
O'BRIEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .