028200 - ASBESTOS REMEDIATION r2.pdf

PDF 156 KB Posted

Attached to
O’Brien Upper Envelope Project Federal contract opportunity
Solicitation number
47PC0220R0014
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This document provides details for a federal solicitation requesting proposals for roof replacement work at the Leo O'Brien Federal Building. The General Services Administration Public Buildings Service Region 2 is soliciting bids for a base scope of work to replace an existing roofing system with a new fully adhered TPO membrane roofing system. An alternative to the base scope and an additional option are also described. The base scope and alternative differ in the amount of insulation installed and whether a raised roof area is created under cell towers. The option applies to both and includes work on cooling tower areas. Proposals are due by April 15, 2020 and the contract is set aside for total small businesses. The selected contractor must provide warranties and schedule an infrared scan within one year of substantial completion to ensure proper installation.

View the file

Other files for this federal contract opportunity

Other files attached to O’Brien Upper Envelope Project, newest first.
File Type Posted
Solicitation Amendment 47PC0220R0014_0005.pdf PDF
Amendment 0005 Q-A.pdf PDF
Amendment 0004 Q-A.pdf PDF
Solicitation Amendment 47PC0220R0014_0004.pdf PDF
000100 - TABLE OF CONTENTS r2.pdf PDF
Pages from 20190823_16320.79_OBrien Upper Envelope Preliminary DESIGN Report.pdf PDF
RFE-Report-RF_Pre_Install_Assessment_Patroon Island_(850-AWS3 Add).pdf PDF
16320.79 SPD O'Brien Upper Envelope_Pre-Bid-Addendum_#1_20200403.pdf PDF
Temp Antenna Placement (during roofwork) 2020-04-24.pptx PPTX presentation
OBrien Boiler Existing Stacks.pdf PDF
16320.79 SPD O'Brien Upper Envelope_Pre-Bid-Addendum_#2_20200424.pdf PDF
Solicitation Amendment 47PC0220R0014_0003.pdf PDF
Amendment 0002.pdf PDF
Solicitation Amendment 47PC0220R0014_0002.pdf PDF
Solicitation Amendment 47PC0220R0014_0001.pdf PDF
For Construction_OBrien_Upper_Envelope_Specs_2020-03-10.pdf PDF
Final_SBSA GC Solicitation.pdf PDF
Final_SBSA GC Agreement aug19 r1 508 (2).pdf PDF
OBrien Upper Envelope Repairs - Experience on Similar Projects Offeror Form - Attachment A.pdf PDF
GC Reps andCerts dec19 508.pdf PDF
GSA FBO SOW (base versus alternative plus option) 2020-03-09 Final.pdf PDF
Wage Determination.pdf PDF
47PC0220R0014 Form.pdf PDF
Standard Form 24 - Bid Bond.pdf PDF
OBrien Upper Envelope Repairs - Past Performance Questionnaire Attachment B.pdf PDF
OBrien Upper Envelope Repairs - Key Personnel Qualifications Resume Form Attachment C.pdf PDF
For Construction_OBrien_Upper_Envelope_Drawings_2020-03-10.pdf PDF
GSA 527 - Contractor Qualifications and Financial Information.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Leo O’Brien Federal Building For Construction Upper Envelope Repairs 03/10/2020 GSA Project # RNY 12932 Addendum No. 1 - 4/3/2020

ASBESTOS REMEDIATION 028200 - 1

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 028200 – ASBESTOS REMEDIATION

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. The Asbestos Abatement Contractor, herein referred to as the Contractor will be responsible for performing all work in strict accordance with the Project Documents and all governing codes, rules, and regulations. Where conflicts occur between the Project Documents and applicable codes, rules, and regulations, the more stringent shall apply. Unless otherwise expressly indicated, the requirements of this specification are solely the Contractor’s responsibility.

B. This asbestos abatement project will consist of the removal and disposal of asbestos containing materials as part of the scheduled roof demolition. All regulations and procedures as specified herein are to be followed in the abatement of all hazardous materials.

C. The work shall include, but not be limited to, the removal of asbestos-containing roofing materials

– specifically, the black tar applied to the lightning protection ground wires found on the elevator penthouse and upper main roof is an ACM.

1. All openings and penetrations in the building within 25 feet of the immediate hazardous material removal work shall be completely shut or sealed airtight to prevent fiber migration into the building.

2. HEPA filters covering AHU or HVAC intakes or exhausts that cannot be turned off is an acceptable option. Notify the Government of such conditions before creating the final abatement plan.

D. The Contractor shall be aware of all conditions of the Project and is responsible for verifying quantities and locations of all Work to be performed. Failure to do so shall not relieve the Contractor of its obligation to furnish all labor and materials necessary to perform the work.

E. The Contractor shall coordinate all work with the work of other trades.

1.2 SPECIAL JOB CONDITIONS

A. The facility will remain occupied during abatement. Currently no other special conditions exist.

B. Access to roofing and material removals shall be contained and restricted to the south section of the middle roof and loading dock area. No transfer of any materials, workers, etc. shall be though or within the building itself. Refer also to paragraph 1.4 A.5 for further work plan restrictions and requirements.

1.3 PERMITS AND COMPLIANCE

A. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local laws, rules, and regulations pertaining to Work practices, protection of Workers, authorized visitors to the site, persons, and property adjacent to the Work.

ASBESTOS REMEDIATION 028200 - 2

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

B. Perform asbestos related Work in accordance with New York State Industrial Code Rule 56, 40 CFR 61, and 29 CFR 1926.1101, as specified herein.

C. The Contractor must maintain current licenses pursuant to New York State Department of Labor and Department of Environmental Conservation for all Work related to this Project, including the removal, handling, transport, and disposal of asbestos containing materials.

D. The Contractor must have and submit proof upon request that any persons employed by the Contractor to engage in or supervise Work on any asbestos Project have a valid NYS asbestos handling certificate pursuant to Industrial Code Rule 56.

E. The Contractor shall comply fully with any variances secured from regulatory agencies. Should the Contractor choose to apply for any variance, approval of the Contracting Officer or designated Government Representative is required.

F. It is the sole responsibility of the Contractor to determine what, if any, patents are applicable to the Project. The Contractor shall pay all royalties and/or license fees. The Contractor shall defend all suits or claims for infringement of any patent rights and save the Government, Contracting Officer or designated Government Representative harmless from loss, including attorney's fees, on account thereof.

G. Failure to adhere to the Project Documents shall constitute a breach of the Contract and the Government shall have the right to and may terminate the Contract provided, however, the failure of the Government to terminate shall not relieve the Contractor from future compliance.

1.4 SUBMITTALS

A. Pre-Abatement Submittals: No work shall begin until these submittals are returned with the

Contracting Officer or designated Government Representative’s approved action stamp. The Contractor shall submit 7 copies of the documents listed below:

1. Permits, Licenses, Notifications, and Certifications:

a. New York State Department of Labor (NYSDOL) Asbestos Contractor License.

b. NYSDOL Asbestos Handler or Supervisor Certificate for each employee who works on the project.

c. Copy of DOH-2832 form or equivalent proof of training for each handler or supervisor who works on the project.

d. NESHAPS Notification (include proof of transmittal i.e. certified mail return receipt), if applicable.

e. Copies of all variances, amendments and re-openings being used for the project, if applicable.

f. Any other Notifications: As required by Federal, State, and local regulatory agencies together with proof of transmittal (i.e. certified mail return receipt) including but not limited to Building Occupant Notification.

g. NYSDEC Part 364 Waste Haulers Permit.

h. NYSDEC Part 360 Solid Waste Disposal Permit (or out of state equivalent).

i. New York State Department of Health (NYSDOH) Approved Laboratory Certification for required OSHA air sampling.

2. Equipment: The Contractor shall submit the Manufacturer’s information on all of the following equipment:

a. HEPA Vacuums

ASBESTOS REMEDIATION 028200 - 3

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

b. Negative Air Pressure Equipment

c. Manometers. (Note: if magnahelic manometers are used, submit calibration certification required semi-annually).

d. Respirators (including filter cartridges)

e. Protective Clothing

f. Polyethylene Sheeting- 6 mil fire retardant

g. Duct Tape

h. Disposal Bags- 6 mil

3. Safety Data Sheets (SDS): The Contractor shall submit copies of the current SDS for each chemical or material used for projects including but not limited to:

a. Encapsulants

b. Remover/Solvents

c. Cleaner/Disinfectants

d. Surfactants

e. Spray glue adhesive

4. Preliminary Schedule: provide an estimate of manpower to be utilized and the time required for completion of each work area. Include estimated size and number of crews and work shifts. The time work will be performed shall be included in this detailed schedule/ time line.

5. Abatement Work Plan: The Work Plan shall be written by a NYS certified asbestos project designer and shall reference that all work will be done in compliance with New York State Industrial Code Rule 56. It shall include a detailed narrative with plans and illustrations to explain and demonstrate how work will be accomplished. The plans submitted by the Contractor shall clearly indicate the following:

a. All Work Areas/containments numbered sequentially.

b. Locations and types of all decontamination enclosures, personal and waste.

c. Entrances and exits to the Work Areas/containments.

d. Type of abatement activity/technique for each Work Area/containment.

e. Number and location of negative air units and exhaust. Also provide calculations for determining number of negative air pressure units.

f. Proposed location and construction of storage facilities and field office.

g. Location of water and electrical connections to building services

h. Waste transport routes through the building to the waste storage container

i. Any applicable variances

j. Quality Control Plans

The work plan must be submitted to the Government (GSA) for approval.

B. On-Site Information: Refer to Code Rule 56, Subpart 7.3, Asbestos Abatement Contractor Daily

Project Logs and Subpart 3.4(a)(2) Project Record.

C. Post Abatement Submittals: The Contractor shall submit 7 copies of the documents listed below:

1. The name, address, NYS Department of Motor Vehicle Photo Identification Card number, last four digits of social security number and asbestos certificate number of the person who supervised the asbestos project.

2. The location and description of the asbestos project.

3. The amount of asbestos or asbestos material (including asbestos contaminated elements) that was abated.

4. The commencement and completion dates of the project.

ASBESTOS REMEDIATION 028200 - 4

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

5. The name, asbestos handling license number, and address of the air sampling asbestos contractor that was used on the project.

6. The name, address and current NYS ELAP registration number of the laboratory that was used for air sample analysis on the project.

7. The name, asbestos handling license number, and address of the project monitoring asbestos contractor that was used on the project.

8. The name and address of the deposit or waste disposal site or sites where the asbestos waste material was deposited or disposed.

9. The name and address of any sites that were used for the interim storage of asbestos or asbestos waste materials prior to final deposit or disposal.

10. The name and address of any transporter(s) that were used to transport asbestos or asbestos material.

11. The name, addresses, NYS Department of Motor Vehicle Photo Identification Card number, last four digits of social security number and asbestos license or certificate number of all persons who were engaged on that portion of the asbestos project for which the asbestos contractor has responsibility.

12. Copy of the asbestos abatement supervisor’s daily project log specified in 56-7.3.

13. Copy of all waste disposal manifests, and disposal logs. Waste manifests must be signed and dated by the generator, transporter, and disposal facility.

14. Copy of the Work Area entry/exit logs.

1.5 APPLICABLE STANDARDS AND REGULATIONS

A. The Contractor shall comply with the codes and standards referenced in this specification, except where more stringent requirements are shown or specified:

B. Federal Regulations:

1. 29 CFR 1910.1001, "Asbestos" (OSHA)

2. 29 CFR 1910.1200, "Hazard Communication" (OSHA)

3. 29 CFR 1910.134, "Respiratory Protection" (OSHA)

4. 29 CFR 1910.145, "Specification For Accident Prevention Signs and Tags" (OSHA)

5. 29 CFR 1910.146 “Permit Required Confined Space” (OSHA)

6. 29 CFR 1926, "Safety And Health Regulations For Construction" (OSHA)

7. 29 CFR 1926.1101, "Asbestos " (OSHA)

8. 29 CFR 1926.500 "Guardrails" (OSHA)

9. 40 CFR 61, Subpart A, "General Provisions" (EPA)

10. 40 CFR 61, Subpart M, "National Emission Standard for Asbestos" (EPA)

11. 49 CFR 171-172, Transportation Standards (DOT)

C. New York State Regulations:

1. 12 NYCRR, Part 56, "Asbestos", Industrial Code Rule 56 (DOL)

2. 6 NYCRR, Parts 360, 364, Disposal and Transportation (DEC)

3. 10 NYCRR, Part 73, "Asbestos Safety Program Requirements" (DOH)

D. Local Regulations: None Specified

E. Standards and Guidance Documents:

1. American National Standard Institute (ANSI) Z88.2-80, Practices for Respiratory Protection

2. ANSI Z9.2-79, Fundamentals Governing the Design and Operation of Local Exhaust

Systems

ASBESTOS REMEDIATION 028200 - 5

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

3. EPA 560/585-024, Guidance for Controlling Asbestos Containing Materials in Buildings (Purple Book)

4. EPA 530-SW-85-007, Asbestos Waste Management Guidance

1.6 NOTICES

A. The Contractor shall provide notification for a Large Sized Project (greater than 160 SF of 260 LF) of intent to commence asbestos abatement activities as indicated below.

1. At least ten (10) Working days prior to beginning abatement activities, send written notification to: U.S. Environmental Protection Agency – Region 2

National Emissions Standards for Hazardous Air Pollutants (NESHAPS) Coordinator 290 Broadway New York, NY 10007-1866

B. The Contractor shall post and/or provide Building Occupant Notification at least 10 calendar days prior to beginning abatement activities as required by NYS Industrial Code Rule 56. The posting shall be submitted with the Work Plan and be approved prior to posting. The posting shall include the following information:

1. The locations of the abatement Project.

2. The amounts and types of asbestos containing materials being abated.

3. The commencement and completion dates of the Project.

4. The name and asbestos license number of the abatement Contractor.

5. The name and address of the Air Monitoring Firm and laboratory.

C. This project falls under Federal jurisdiction, therefore a notification to the NYSDOL and associated fees are not required.

1.7 PROJECT MONITORING AND AIR SAMPLING

A. The Government shall engage the services of an Air Monitoring and Project Monitoring Firm who shall serve as the Contracting Officer or designated Government Representative in regard to the performance of the asbestos abatement Project and provide direction as required throughout the entire abatement period.

B. The Contractor is required to ensure cooperation of its personnel with the Air and Project Monitoring Firms for the Air and Project monitoring functions. The Contractor shall comply with all direction given by the Project Monitor during the course of the Project.

C. The Project Monitoring Firm shall staff the Project with a trained and certified person(s) to act on the Government's behalf at the job site. This individual shall be designated as the Abatement Project Monitor.

1. The Project Monitor shall have the authority to direct the Contractor verbally and in writing to ensure compliance with the Project documents and asbestos regulations. The Project Monitor shall have the authority to Stop Work when gross Work practice deficiencies or unsafe practices are observed, or when ambient fiber concentrations outside the removal area equal or exceed 0.01f/cc or the background level.

a. Such Stop Work order shall be effective immediately and remain in effect until corrective measures have been taken and the situation has been corrected.

b. Standby time required to resolve the situation shall be at the Contractor's expense.

ASBESTOS REMEDIATION 028200 - 6

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

D. The Project Monitor shall be on-site during all abatement activities.

E. The Independent Air Monitoring Firm hired by the Government shall provide abatement air sampling and analysis as required by applicable regulations. Sampling will include background, work area preparation, during-abatement, and clearance sampling per Code Rule 56 requirements. In addition, for tent removals, a minimum of at least one clearance sample inside and outside shall be collected in each tent. Additional samples shall be collected in accordance with small or large Project requirements if cumulative Project quantities exceed those of a minor Project.

1. If the air sampling during abatement reveals airborne fiber levels at or above 0.01 fibers/cc or the background level (whichever is greater) outside the Work Area, then an immediate Stop Work order shall be issued. The Contractor shall then inspect the barriers for leakage and HEPA vacuum and/or wet clean the surface outside the Work Area. The Contractor shall bear the burden of any and all costs incurred by this delay.

2. Should air sampling results fail for a work area, the cost associated with the additional air monitoring and technician time shall be borne by the Contractor.

1.8 CONTRACTOR AIR SAMPLING

A. The Contractor shall conduct air sampling that is representative of both the 8-hour time weighted average and 30-minute short-term exposures to indicate compliance with OSHA’s permissible exposure and excursion limits. A negative exposure assessment will not relieve the Contractor from wearing respiratory protection.

B. The Contractor's laboratory analysis of air samples shall be conducted by an NYSDOH ELAP approved laboratory, subject to approval of the Government.

C. Results of personnel air sample analyses shall be available, verbally, within twenty-four (24) hours of sampling and shall be posted upon receipt. Written laboratory reports shall be delivered and posted at the Work site within five (5) days.

1.9 PROJECT SUPERVISOR

A. The Contractor shall designate a full-time Project Supervisor who shall meet the following qualifications:

1. The Project Supervisor shall hold New York State certification as an Asbestos Supervisor.

2. The Project Supervisor shall meet the requirements of a "Competent Person" as defined by OSHA 1926.1101 and shall have a minimum of one-year experience as a supervisor.

B. If the Project Supervisor is not on-site at any time whatsoever, all Work shall be stopped. The Project Supervisor cannot be removed from the Project without the written consent of the Contracting Officer or designated Government Representative. The Project Supervisor shall be removed from the Project if so requested by the Contracting Officer or designated Government Representative.

C. The Project Supervisor shall be responsible for the performance of the Work and shall represent the Contractor in all respects at the Project site. The Supervisor shall be the primary point of contact for the Asbestos Project Monitor.

ASBESTOS REMEDIATION 028200 - 7

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

1.10 DELIVERY AND STORAGE

A. The Contractor shall deliver all materials to the job site in original packages with containers bearing manufacturer's name and label.

B. The Contractor shall store all materials at the job site in a suitable and designated area.

1. Store materials subject to deterioration or damage away from wet or damp surfaces and under cover.

2. Protect materials from unintended contamination.

C. The Contractor shall remove damaged or deteriorated materials from the job site. Materials contaminated with asbestos shall be disposed of as asbestos debris as herein specified.

1.11 TEMPORARY UTILITIES

A. The Contractor shall provide sufficient temporary electric power to complete the abatement project in a timely manner. The Contractor shall provide Ground Fault Circuit Interrupters (GFCI) located at the source for all electric requirements within the asbestos Work Area.

1. Where available, the Contractor can obtain temporary electric power from building’s existing system. Otherwise provide power from other sources (i.e. generator).

2. The Contractor shall provide temporary wiring and "weatherproof" receptacles in sufficient quantity and location to serve all HEPA equipment and tools.

3. The Contractor shall provide wiring and receptacles as required by the Air Sampling Technician for air sampling equipment.

4. All power to the Work Area shall be brought in from outside the area through GFCI's at the source.

B. The Contractor shall provide temporary lighting with "weatherproof" fixtures for all Work Areas including decontamination chambers.

1. The entire Work Area shall be kept illuminated at all times.

2. The Contractor shall provide lighting as required by the Project Monitor for the purposes of performing required inspections.

C. All temporary devices and wiring used in the Work Area shall be capable of decontamination procedures including HEPA vacuuming and wet-wiping.

D. All temporary water connections shall be turned-off at the source at the end of each shift.

PART 2 - PRODUCTS

2.1 PROTECTIVE CLOTHING

A. The Contractor shall provide personnel utilized during the Project with disposable protective whole body clothing, head coverings, gloves and foot coverings as well as provide disposable plastic or rubber gloves to protect hands. Cloth gloves may be worn inside the plastic or rubber for comfort, but shall not be used alone. Make sleeves secure at the wrists and make foot

ASBESTOS REMEDIATION 028200 - 8

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed coverings secure at the ankles by the use of tape, or provide disposable coverings with elastic wrists or tops.

B. The Contractor shall provide sufficient quantities of protective clothing to assure a minimum of four (4) complete disposable outfits per day for each individual performing abatement Work including the air/project monitor.

C. Eye protection and hard hats shall be provided by the Contractor and made available for all personnel entering any Work Area.

D. The Contractor shall provide Authorized visitors with suitable protective clothing, headgear, eye protection, and footwear whenever they enter the Work Area.

2.2 SIGNS AND LABELS

A. Generator identification information shall be affixed to each waste container indicating the following printed in indelible ink:

Generator Name: General Services Administration (GSA) Facility Name: Alexander Pirnie Federal Building Facility Address: Utica, NY

2.3 PROJECT LOG BOOK

A. The Project Supervisor shall document all Work performed daily and note all inspections required by NYS Industrial Code Rule 56, i.e. testing and inspection of barriers and enclosures.

2.4 SCAFFOLDING AND LADDERS

A. The Contractor shall provide all scaffolding and/or staging as necessary to accomplish the Work of this Contract. Scaffolding may be of suspension type or standing type such as metal tube and coupler, tubular welded frame, pole or outrigger type or cantilever type. Scaffolding must be installed in accordance with designs and instructions of a registered professional engineer and supervised by a competent designated person. The type, erection and use of all scaffolding and ladders shall comply with all applicable OSHA construction industry standards.

B. The Contractor shall provide scaffolding and ladders as required by the Contracting Officer or designated Government Representative’s for the purposes of performing required inspections.

2.5 DISPOSAL BAGS, DRUMS, AND CONTAINERS

A. Provide 6-mil polyethylene disposal bags printed with asbestos danger labels. Bags shall also be imprinted with U.S. Department of Transportation required markings.

B. Provide 30- or 55-gallon capacity fiber or metal drums capable of being sealed air and water tight if asbestos waste has the potential to damage or puncture disposal bags. Affix asbestos danger labels on lids and at one-third points around drum circumference to assure ready identification.

C. Containers and bags must be labeled with the names of the waste generator and the location at which the waste was generated in accordance with 40 CFR Part 61 NESHAPS.

D. Labeled ACM waste containers or bags shall not be used for non-ACM waste or trash. Any material placed in labeled containers or bags, whether turned inside out or not shall be handled and disposed of as ACM waste.

ASBESTOS REMEDIATION 028200 - 9

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

2.6 HEPA VACUUM EQUIPMENT

A. All vacuuming performed under this contract shall be performed with High Efficiency Particulate Absolute (HEPA) filter equipped industrial vacuums conforming to ANSI Z9.2.

B. Provide tools and specialized equipment including scraping nozzles with integral vacuum hoods connected to a HEPA vacuum with flexible hose.

C. Each HEPA equipped vacuum shall be equipped with a HEPA filter that has never been used or each HEPA equipped vacuum must be inspected and tested prior to being brought on site for the proper operation and performance of the HEPA filter. Inspection and testing shall be in accordance with the manufacturer’s recommendations. Proof of inspection and testing for each HEPA equipped vacuum must be made available to the Contracting Officer or designated Government Representative upon request. Each HEPA equipped vacuum must be tagged with the date of the last HEPA filter change.

2.7 POWER TOOLS

A. Power tools used to drill, cut into, or otherwise disturb asbestos material shall be equipped with HEPA filtered local exhaust ventilation.

B. Each HEPA equipped power tool shall be equipped with a HEPA filter that has never been used or each HEPA equipped power tool must be inspected and tested prior to being brought on site for the proper operation and performance of the HEPA filter. Inspection and testing shall be in accordance with the manufacturer’s recommendations. Proof of inspection and testing for each HEPA equipped power tool must be made available to the Contracting Officer or designated Government Representative upon request. Each HEPA equipped power tool must be tagged with the date of the last HEPA filter change.

2.8 HEPA EQUIPPED NEGATIVE AIR UNITS

A. Each HEPA equipped negative air unit shall be equipped with a HEPA filter that has never been used or each HEPA equipped negative air unit must be inspected and tested prior to being brought on site for the proper operation and performance of the HEPA filter. Inspection and testing shall be in accordance with the manufacturer’s recommendations. Proof of inspection and testing for each HEPA negative air unit must be made available to the Contracting Officer or designated Government Representative upon request. Each HEPA equipped negative air unit must be tagged with the date of the last HEPA filter change. At a minimum, the Primary HEPA filter must be replaced every 600 hours.

B. Each negative air unit must be capable of fitting through a standard door or access hatch where required.

2.9 POLYETHYLENE SHEETING

A. All polyethylene (plastic) sheeting used on the Project (including but not limited to sheeting used for critical and isolation barriers, fixed objects, walls, floors, ceilings, waste container) shall be at least 6-mil fire retardant sheeting.

B. Decontamination enclosure systems shall utilize at least 6-mil opaque fire retardant plastic sheeting. At least two (2) layers of 6-mil reinforced fire retardant plastic sheeting shall be used for the decontamination enclosure flooring.

ASBESTOS REMEDIATION 028200 - 10

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

PART 3 - EXECUTION

3.1 GENERAL REQUIREMENTS

A. Should the area beyond the Work Area(s) become contaminated with asbestos containing materials or elevated fiber levels, immediately stop Work and institute emergency procedures.

Contaminated non-Work Areas shall be isolated and decontaminated in accordance with procedures established for asbestos removal. All costs incurred in decontaminating such non- Work Areas and the contents thereof shall be borne by the Contractor, at no additional cost to the Government. Abatement work shall not continue in the work area until satisfactory clearance air samples prove the non-work areas are properly decontaminated.

B. Prior to decontamination enclosure construction and Work Area preparation the Work Area must be vacated by non-certified persons and building occupants.

C. All demolition necessary to access asbestos containing materials for removal must be conducted within negative pressure enclosures by licensed asbestos workers. Demolition debris may be disposed of as construction and demolition debris provided the Asbestos Project Monitor determines that it is not contaminated with asbestos. Demolition debris contaminated with asbestos must be disposed of as asbestos waste.

D. Comply with the rules and regulations referenced in Part 1 of this Section

3.2 REMOVAL OF ASBESTOS CONTAINING MATERIALS

A. Do not remove materials through the building. Move Materials to the Middle Roof and then lower materials over the south wall to the loading area.

B. The Contractor shall remove asbestos containing materials in accordance with the Contract Documents and the approved Asbestos Work Plan.

C. The Contractor shall coordinate with the Contracting Officer or Designated Government

Representative what time containerized waste may be brought out of the work area.

3.3 RESTORATION OF UTILITIES, FIRE STOPPING, AND FINISHES

A. After final clearance, remove locks and restore electrical and HVAC systems. All temporary power shall be disconnected, power lockouts removed and power restored. All temporary plumbing shall be removed.

B. Finishes:

1. All foam and expandable foam products and materials used to seal Work Area openings shall be completely removed upon completion of abatement activities.

PART 4 - DISPOSAL OF ASBESTOS WASTE

4.1 APPLICABLE REGULATIONS

ASBESTOS REMEDIATION 028200 - 11

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

A. All asbestos waste shall be stored, transported and disposed of in accordance with the following regulations as a minimum:

1. NYS DEC 6 NYCRR Part 360 and 364

2. US EPA NESHAPS 40 CFR 61

3. US EPA Asbestos Waste Management Guidance EPA/530-SW85

B. Do not remove materials through the building. Move Materials to the Middle Roof and then lower materials over the south wall to the loading area.

4.2 TRANSPORTATION AND DISPOSAL SITE

A. The Contractor's Hauler and Disposal Site shall be approved by the Contracting Officer or designated Government Representative.

B. The Hauler, with the Contractor and the Contracting Officer or designated Government Representative shall inspect all material in the transport container prior to taking possession and signing the Asbestos Waste Manifests.

C. Unless specifically approved by the Contracting Officer or designated Government Representative, the Contractor shall not permit any off-site transfers of the waste or allow the waste to be transported or combined with any other off-site asbestos material. The Hauler must travel directly to the disposal site with no unauthorized stops.

4.3 WASTE STORAGE CONTAINERS

A. All waste containers shall be fully enclosed and lockable (i.e. enclosed dumpster, trailer, etc.). No open containers will be permitted on-site (i.e. open dumpster with canvas cover, etc.) unless specifically permitted by a site-specific variance.

B. The Contracting Officer or designated Government Representative shall verify that the waste storage container tags (license plates) match that listed on the New York State Department of Environmental Conservation Part 364 permit. Any container not listed on the permit shall be removed from the site immediately.

C. The container shall be plasticized and sealed with a minimum of two (2) layers of 6 mil polyethylene on the sides and two (2) layers of 6 mil polyethylene on the floor. Once on site, it shall be kept locked at all times, except during loading.

D. While on-site, all four sides of the container shall be labeled with EPA Danger signage:

DANGER

CONTAINS ASBESTOS FIBERS AVOID CREATING DUST

CANCER AND LUNG DISEASE HAZARD

E. The New York State Department of Environmental Conservation Asbestos Hauler's Permit number shall be stenciled on both sides and back of the container.

F. The container is not permitted to be loaded unless it is properly plasticized, has the appropriate danger signage affixed, and has the permit number appropriately stenciled on the container.

ASBESTOS REMEDIATION 028200 - 12

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

G. The waste container(s) shall be located on site in such a location that the waste can be directly carried by hand or covered cart from the waste decontamination enclosure to the waste container(s).

H. The waste shall be removed from the site no later than 10 calendar days from project completion.

Delay in removing waste from site may prevent the Contractor from obtaining the retainage withheld. Final waste manifests, signed and dated by the transporter and disposal facility, shall be provided to the Contracting Officer or designated Government Representative within 35 calendar days of leaving the site.

END OF SECTION 028200