GSA FBO SOW (base versus alternative plus option) 2020-03-09 Final.pdf

PDF 123 KB Posted

Attached to
O’Brien Upper Envelope Project Federal contract opportunity
Solicitation number
47PC0220R0014
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This solicitation notice and statement of work describe a roof replacement project at the Leo O'Brien Federal Building in Albany, New York. The project will replace approximately 17,225 square feet of existing roofing systems with a new fully adhered TPO membrane roofing system to a height of approximately 4.5 inches under the base bid. The alternative bid increases insulation height to 6.5 inches. An option to replace additional roofing is also included. The General Services Administration Region 2 Public Buildings Service is seeking bids for the project under solicitation number 47PC0220R0014 with a 100% total small business set-aside. Bids are due by April 9, 2020, work must be substantially completed by October 7, 2020 and fully completed by November 5, 2020. The selected contractor must provide warranties and perform an infrared scan within one year of substantial completion.

View the file

Other files for this federal contract opportunity

Other files attached to O’Brien Upper Envelope Project, newest first.
File Type Posted
Solicitation Amendment 47PC0220R0014_0005.pdf PDF
Amendment 0005 Q-A.pdf PDF
RFE-Report-RF_Pre_Install_Assessment_Patroon Island_(850-AWS3 Add).pdf PDF
028200 - ASBESTOS REMEDIATION r2.pdf PDF
16320.79 SPD O'Brien Upper Envelope_Pre-Bid-Addendum_#1_20200403.pdf PDF
Temp Antenna Placement (during roofwork) 2020-04-24.pptx PPTX presentation
OBrien Boiler Existing Stacks.pdf PDF
16320.79 SPD O'Brien Upper Envelope_Pre-Bid-Addendum_#2_20200424.pdf PDF
Amendment 0004 Q-A.pdf PDF
Solicitation Amendment 47PC0220R0014_0004.pdf PDF
000100 - TABLE OF CONTENTS r2.pdf PDF
Pages from 20190823_16320.79_OBrien Upper Envelope Preliminary DESIGN Report.pdf PDF
Solicitation Amendment 47PC0220R0014_0003.pdf PDF
Amendment 0002.pdf PDF
Solicitation Amendment 47PC0220R0014_0002.pdf PDF
Solicitation Amendment 47PC0220R0014_0001.pdf PDF
OBrien Upper Envelope Repairs - Key Personnel Qualifications Resume Form Attachment C.pdf PDF
For Construction_OBrien_Upper_Envelope_Drawings_2020-03-10.pdf PDF
GSA 527 - Contractor Qualifications and Financial Information.pdf PDF
For Construction_OBrien_Upper_Envelope_Specs_2020-03-10.pdf PDF
Final_SBSA GC Solicitation.pdf PDF
Final_SBSA GC Agreement aug19 r1 508 (2).pdf PDF
OBrien Upper Envelope Repairs - Experience on Similar Projects Offeror Form - Attachment A.pdf PDF
GC Reps andCerts dec19 508.pdf PDF
Wage Determination.pdf PDF
47PC0220R0014 Form.pdf PDF
Standard Form 24 - Bid Bond.pdf PDF
OBrien Upper Envelope Repairs - Past Performance Questionnaire Attachment B.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: O’Brien Upper Envelope Project – RNY12932 Site: Leo O’Brien Federal Building, 1 Clinton Ave., Albany, NY 12207 Date: March 9, 2020

Statement of Work: This document provides a summary of the project scope. For the complete details of the project’s scope (base work and all options) the contractor shall refer to the stamped set of the Contact Drawings and Specifications titled O’Brien Upper Envelope Project prepared by N.K. Bhandari Architecture & Engineering, P.C.

The project will be solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option. The government will determine which approach (base or alternative) to take prior to the award. It will be an either-or type situation regarding the base work versus the alternative and clearly identified within the award document. The Option work applies to both the base work and the alternative approach regardless of which is selected by the government.

Base Bid Work includes but is not limited to the following work: approximately 17,225 sf of existing roofing systems at the Leo O’Brien Federal Building (127 ft x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. A raised roof area will be created under each of the four (4) cell tower areas. The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system’s technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally, within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with labor and material warranty in accordance with project documents.

Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches. The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material. The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area. The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers.

Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing-in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally, within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents.

Period of Performance: All Base Bid Work and Option Work (if awarded) must be Substantial Complete no later than two hundred (200) calendar days after the Notice of Award is issued. All remaining contract work must be completed and accepted by the GSA no later than two hundred eighty (280) calendar days after the Notice of Award is issued. A Final Inspection will be performed after all roofing installations; drain work; masonry work;

coating application; and site restoration work is complete. The Substantial Completion Date will be established by the Contracting Officer after the Contracting Officer’s Representative (COR) verifies that the renovated HVAC systems operate properly, the various roofing systems do not leak, and the GSA has received the Roof Warranties.

Contacts for Project

Contracting Officer for this project is:

Jayshree Tank Contracts Specialist Acquisition Management Division GSA, Northeast and Caribbean Region One World Trade Center New York, NY 10007- 0089 Office (212) 577-8681 Cell (646) 599-3071

Project Manager and Contracting Officer’s Representative (COR) for this project is:

Jerry Boyle, MBA Project Manager GSA, Upstate NY Design & Construction Group (2PCU) James M. Hanley Federal Building 100 South Clinton Street Syracuse, NY 13261-7005 Office (315) 448-0956 Cell (315) 729-4262

Architect for this project is:

N.K. Bhandari, Architecture & Engineering, P.C.

1005 West Fayette Street, Suite 500 Syracuse, NY 13057

File details come from the government source that posted it. Updated .