Mechanical Remediation Dredging in the Lower Harbor

Award Notice Posted

Solicitation number
W912WJ-17-R-0003
Agency
Awarded
to Cashman Dredging & Marine Contracting Co LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W912WJ-17-C-0009 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
New Bedford, Massachusetts 02740, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

 

Update #1 ·


Solicitation Number: W912WJ-17-R-0003
Restrictions: Unrestricted
Title: Mechanical Dredging in the Lower Harbor, New Bedford Harbor Superfund Site, New Bedford, Massachusetts
Location: Lower Harbor of New Bedford and Fairhaven, Massachusetts

* Please note that the Presolicitation Notice was posted under W912WJ-16-R-0002 and the new Solicitation number is W912WJ-17-R-0003.
The U.S. Army Corps of Engineers is issuing a Request for proposal for a new Firm-Fixed-Price construction dredging contract utilizing a best Value Tradeoff acquisition approach. The project involves the mechanical remediation dredging of PCB contaminated sediments and disposal into a Confined Aquatic Disposal (CAD) Cell.


Work consists of providing materials, equipment and labor for mechanical dredging of approximately 138,000 cubic yards (CY) of material and depositing it in the Lower Harbor Confined Aquatic Disposal Cell (LHCC). The work requires the contractor to achieve precise dredge cuts. Dredging, placement of material into scows, transport of the material, and depositing of material into the LHCC must be performed with minimal spillage or turbidity. All work to be performed under this contract including all dredge areas and the LHCC is located between the Route 195 and Route 6 bridges.


The scope involves dredging in depths of up to 30 feet of water and as shallow as 3 feet. Sediments placed into the LHCC will be dredged using mechanical dredging equipment with an environmental bucket (closed bucket). Debris removal and disposal will be required prior to dredging and may include discarded metal objects, timber, and abandoned piers. Dredging accuracy will be key to minimizing the amount of over-depth dredging while still attaining the required dredge elevation. State-of-the-art monitoring and positioning systems are required to ensure dredge accuracy requirements are met.


The debris removal and dredging shall be performed so that the project-specific turbidity criterion of 50 neptholometric turbidity units (ntu) above background measured 300 feet down-current of the dredge area is not exceeded. The dredged sediments will be placed into split-hull scows for transport to the LHCC. Free-standing water collected in the scows/hoppers shall be decanted and filtered using activated carbon to ensure compliance with this same 50 ntu turbidity criterion. A silt curtain and oil boom shall be placed around the perimeter of the LHCC.


 

Files

File Type Posted
LHCC_PILES.XLSX XLSX spreadsheet
Core_Photos_a.pdf PDF
Amendment_W912WJ-17-R-0003-0005.pdf PDF
Dredge_Area_35F.DWG DWG drawing
Dredge_Area_34B.DWG DWG drawing
Dredge_Area_35E.DWG DWG drawing
Dredge_Area_37A.DWG DWG drawing
20170206_3ft_MIN_MLLW_Depth.xyz XYZ file
Amendment_W912WJ-17-R-0003-0004.pdf PDF
Dredge_Area_37B.DWG DWG drawing
Dredge_Area_35C.DWG DWG drawing
Dredge_Area_33B.DWG DWG drawing
Dredge_Area_35G.DWG DWG drawing
Dredge_Area_33C.DWG DWG drawing
Phase_2_CAD_Cell_20170206_20FT_SMOOTH_SHEET-actual.pdf PDF
Amendment_W912WJ-17-R-0003-0003.pdf PDF
Amendment_W912WJ-17-R-0003-0002.pdf PDF
35F_Boundary.dwg DWG drawing
37A_Target Elevations_XYZ.txt TXT text file
37B_Target Elevations_XYZ.txt TXT text file
Amendment_W912WJ-17-R-0003-0001.pdf PDF
33C_Target Elevations_XYZ.txt TXT text file
33B_Target Elevations_XYZ.txt TXT text file
Lower_Harbor_Pre_Dredge_Bathy_2014-2015_XYZ.txt TXT text file
33B_Boundary.dwg DWG drawing
35G_Target Elevations_XYZ.txt TXT text file
37A_Boundary.dwg DWG drawing
35E_Boundary.dwg DWG drawing
35E_Target Elevations_XYZ.txt TXT text file
35G_Boundary.dwg DWG drawing
34B_Target Elevations_XYZ.txt TXT text file
34B_Boundary.dwg DWG drawing
35C_Target Elevations_XYZ.txt TXT text file
35F_Target Elevations_XYZ.txt TXT text file
37B_Boundary.dwg DWG drawing
33C_Boundary.dwg DWG drawing
35C_Boundary.dwg DWG drawing
Solicitation_W912WJ-17-R-0003.pdf PDF
SPECS.pdf PDF
PLANS_.pdf PDF
Show all 40

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity