NEW BEDFORD HARBOR
LOWER HARBOR MECHANICAL DREDGING PROJECT
CONTRACT #W912WJ-17-R-0003
December 2016
NEW BEDFORD HARBOR, NEW BEDFORD, MASSACHUSETTS
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
G-001
COVER SHEET
G-101
LOWER HARBOR DREDGE AREAS OVERVIEW
G-102
LOWER HARBOR HISTORICAL AND IA CORE SAMPLING LOCATIONS - UPPER PORTION
G-103
LOWER HARBOR HISTORICAL AND IA CORE SAMPLING LOCATIONS - LOWER PORTION
G-104
C-101
LOWER HARBOR DREDGE PLAN FOR AREAS 33B AND 33C SHOWING TARGET CONTOURS
C-102
C-103
C-104
C-105
C-301
CROSS SECTIONS 1C THROUGH 3C
C-302
CROSS SECTIONS 4C AND 5C
LOWER HARBOR EPA CAD CELLS SHOWING CAD CELL CHANNEL
C-303 CROSS SECTIONS 6C AND 7C
G-105
LOWER HARBOR EPA CAD CELLS SHOWING PHASE II FILL LIMITS
C-304
C-305
C-306
C-307
C-308
CROSS SECTIONS 8C THROUGH 11C
CROSS SECTIONS 12C THROUGH 15C
CROSS SECTIONS 16C AND 17C
CROSS SECTIONS 20C THROUGH 22C
C-309
LOWER HARBOR DREDGE PLAN FOR AREA 34B SHOWING TARGET CONTOURS
LOWER HARBOR DREDGE PLAN FOR AREAS 35F AND 35G SHOWING TARGET CONTOURS
LOWER HARBOR DREDGE PLAN FOR AREAS 37A AND 37B SHOWING TARGET CONTOURS
LOWER HARBOR DREDGE PLAN FOR AREAS 35C AND 35E SHOWING TARGET CONTOURS
CROSS SECTIONS 18C AND 19C
CROSS SECTIONS 23C THROUGH 25C
C-310
CROSS SECTIONS 26C THROUGH 28C
EXISTING SITE CONDITIONS MAP 1 BATHYMETRY MLLW APRIL 2014/MAY 2015
EXISTING SITE CONDITIONS MAP 2 BATHYMETRY MLLW APRIL 2014/MAY 2015
G-106
G-107
3C' 3C
EPA SLURRY PIPELINE
LEGEND
COMBINED SEWER OVERFLOW
SHORELINE PARCELS
MLLW
MHW
CROSS SECTION
DREDGE AREA
33B
BUILDING
CONB = CITY OF NEW BEDFORD
TOWN/CITY LINE
SUSPECTED SHELL PILE FROM
FISHING OPERATIONS
IA CORE SAMPLE LOCATION (2014/2015)
HISTORICAL CORE SAMPLING LOCATION (1998-2003)
NO SPUD ZONE (PIPELINE/UTILITY/CAD CELL BUFFER)
CAD CELL AREA (NO SPUD ZONE)
TARGET DREDGE SURFACE CONTOUR (1FT. INTERVALS)
TARGET DREDGE ELEVATION-21
FEDERAL NAVIGATIONAL CHANNEL
6-INCH ALLOWABLE OVERDEPTH
SHEET PILE WITH 25'
STANDOFF DISTANCE
GENERAL NOTES:
1. REFER TO SPECIFICATION SECTION 00 32 00 GEOTECHNICAL DATA
FOR INFORMATION REGARDING GEOTECHNICAL DETAILS OF NEW
BEDFORD HARBOR.
2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL KEEP A COPY OF
THE DRAWINGS AND SPECIFICATIONS ONSITE AT ALL TIMES DURING
THE PROJECT.
3. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SURVEY CONTROL
AT ALL TIMES TO ESTABLISH AND MAINTAIN ALL LINES AND
ELEVATIONS.
4. KNOWN UTILITIES ARE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND
AND SUBMERGED UTILITIES WITHIN THE LIMITS OF THE WORK PRIOR TO
COMMENCING ANY EXCAVATION OR GROUND PENETRATING WORK.
IDENTIFICATION AND PROTECTION OF EXISTING UTILITIES IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
5. LOCAL, STATE AND FEDERAL REGULATIONS REGARDING
ENVIRONMENTAL CONTROLS SHALL BE FOLLOWED.
6. MATERIAL WHICH IS LEAKED FROM A CONTRACTOR BARGE,
WHETHER WITHIN OR OUTSIDE OF A DESIGNATED DREDGE OR
DISPOSAL LOCATION, SHALL BE REMOVED BY THE CONTRACTOR AT NO
COST TO THE GOVERNMENT.
HYDROGRAPHIC SURVEY, DREDGING AND DISPOSAL NOTES:
1. COORDINATES SHOWN ARE IN THE STATE PLANE COORDINATE
SYSTEM, MASSACHUSETTS MAINLAND ZONE 2001, REFERENCED TO
THE 1983 NORTH AMERICAN DATUM (NAD83) EXPRESSED IN US SURVEY
FEET.
2. ELEVATIONS SHOWN ARE DEPTH IN FEET BELOW MEAN LOWER LOW
WATER (MLLW) FOR CLARK'S POINT NOAA STATION 8447712. THE MLLW
ELEVATION FOR THE NEW BEDFORD INNER HARBOR IS -1.92 FEET
NORTH AMERICAN VERTICAL DATUM (NAVD) 1988.
3. BASE PLAN OBTAINED FROM U.S. ARMY CORPS OF ENGINEERS.
EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR.
4. LIMITS OF FEDERAL NAVIGATIONAL CHANNEL WERE OBTAINED FROM
U.S. ARMY CORPS OF ENGINEERS.
5. THE INFORMATION DEPICTED ON THIS PLAN REPRESENTS THE
RESULTS OF PAST SURVEYS (APRIL 2014 & MAY 2015) AND CAN ONLY
BE CONSIDERED AS INDICATING THE CONDITIONS AT THE TIME OF THE
SURVEYS AND AT THE SOUNDING POINTS NOTED ON THE PLAN.
DEPENDING ON WATER DEPTH, SINGLE AND MULTI-BEAM TECHNOLOGY
WAS EMPLOYED USING THE AVERAGE SOUNDINGS WITHIN 3X3 FOOT
BLOCKS.
6. NUMEROUS SUBSURFACE EXPLORATIONS HAVE BEEN CONDUCTED
WITHIN THE PROJECT SITE TO PROVIDE GEOTECHNICAL AND
ANALYTICAL DATA REQUIRED FOR PROJECT DESIGN AND
CONSTRUCTION. REFER TO THE SPECIFICATIONS FOR RESULTS.
7. CONTRACTOR IS TO VERIFY THAT THERE ARE NO EXISTING HAZARDS
OR OBSTRUCTIONS IN THE WORK AREAS SHOWN HEREON. THERE
SHALL BE NO DREDGING OR SPUDDING IN THE EPA PIPELINE BUFFER
ZONE AND CAD CELL BUFFER ZONES. CONTRACTOR SHALL NOT
DAMAGE THE EPA PIPELINE.
8. THE LOWER HARBOR OF NEW BEDFORD USES A LOCAL VERTICAL
DATUM OF MLLW REFERENCING NOAA STATION #8447712 AT CLARKS
POINT. VERTICAL DATA COLLECTED USING OTHER VERTICAL DATUMS
WAS CONVERTED TO MLLW. NAD 1983 STATEPLANE MASSACHUSETTS
MAINLAND (FIPS_2001_FEET) IS THE HORIZONTAL DATUM.
FAIRHAVEN
NEW BEDFORD
KYLER
SEAFOOD
C
O
N
B
W
A
S
H
B
U
R
N
S
T
K
IL
B U
R
N
S T
REVERE
COPPER
ISLAND
MARSH
R O
U T
E
PRESERVATION TRUST
FAIRHAVEN LAND
BUZZARDS BAY INC
COALITION FOR
LTD PARTNERSHIP
BS REALTY
MOBY DICK
MARINA
CEMETARY
RIVERSIDE
MARLEES
SEAFOOD
AREA D
MARINE
HYDRAULICS
TISBURY TOWING
AND TRANSPORTATION
ACUSHNET RIVER
SHIPYARD INC
CAD CELL #2
CAD CELL #3
COZY COVE
DOCK
PRIVATE
S-947
S-946
S-945
S-894
S-893
S-892
S-891
S-890
S-889
S-888
S-887
S-886
S-885
S-884
S-882
S-881
S-873
S-872
S-871
S-870
S-869
S-868
S-867
S-866
S-865
S-864
S-863
S-862
S-813
S-808
S-633
S-632
S-631
S-630
S-629
S-628
S-627
S-626
S-625
S-624
S-623
S-622
S-621
S-558
S-507
S-402
S-322
S-321
S-320
S-319
S-318
S-317
S-316
S-315
S-314
S-313
S-312
S-311
S-310
S-309
S-308
S-307
S-306
S-305
S-304
S-303
S-220
S-219
S-190
S-189
S-188S-187
S-186
S-185
S-184
S-183
S-182
S-181
FD205
FD204
FD203
S-4159
S-4158
S-4157
S-4156
S-4155
S-4154
S-4153
S-4152
S-4151
S-4129
S-4128
S-4127
S-4126
S-4125S-4124
S-4123
S-4122
S-4121
S-4120
S-4119
S-4118
S-4117
S-4116
S-4115
S-4114
S-4113
S-4112
S-4111
S-4110
S-4109
S-4108
S-4107
S-4106
S-4105
S-4104
S-4103
S-4102
S-4101
S-4100
S-4099
S-4098
S-4097
S-4096
S-4095
S-4094
S-4093S-4092
S-4091S-4090
S-4089
S-4088
S-4062
S-4061
S-4060
S-4059
S-4058
S-4057
S-4056
S-4055
S-4054
S-4053
S-4033
S-4032
S-4031
S-4030
S-4029
S-4028
S-4027
S-4026
S-4025
S-4024
S-4023
S-4022
S-4021
S-4020
S-4019
S-4018
S-4016
S-4015
S-4014
S-4013
S-4011
S-4010
S-4009
S-4008
S-4007
S-4006
S-4005
S-4004
S-4003
S-4002
S-4001
S-4000
S-3947
S-3946
S-3945
S-3944
S-3943
S-3942
S-3941
S-3940
S-3939
S-3938
S-3937
S-3936
S-3928
S-3912
S-3911
S-3910
S-3909
S-3908
S-3907
S-3856
S-3855
S-3853
S-3851
S-3850
S-3624
S-3623
S-3620
S-3228
S-3227
S-3226
S-3225
S-3224
S-3223
S-3169
S-3163
S-3162
S-3161
S-3160
S-3159
S-3158
S-3157
S-3156
S-3155
S-3154
S-3153
S-3151
S-3148
S-3147
S-3146
S-3145
S-3144
S-3143
S-3142
S-3141
S-3140
S-3139
S-3138
S-3137
S-3136
S-3135
S-3111
S-3110
S-3109
S-3108
S-3107
S-3106
S-3105
S-3104
S-3103
S-3102
S-3101
S-3100
S-3099
S-3098
S-3097
S-3096
S-3095
S-3094
S-3093
S-3092
S-3091
S-3090
S-3089
S-3088
S-3086
S-3058
S-3057
S-3056
S-3055
S-3054
S-3053
S-3052
S-3047
S-af805
S-af804
S-af288
S-af287
S-af286
S-af284
S-af266 S-af265
S-af264
S-af248
S-af247
S-af245
S-af243
S-af241
S-af240
S-af239
S-af238
S-af235
S-af228
S-ac336
S-ac308
S-4150
S-4149
S-4148
S-4147
S-4146
S-4145
S-4144
S-4143
S-4142
S-4141
S-4140
S-4139
S-4138
S-4137
S-4136
S-4135
S-4134
S-4133
S-4132
S-4131
S-4130
S-4087
S-4086
S-4083
S-4082
S-4081
S-4080
S-4079
S-4078
S-4077
S-4076
S-4075
S-4074
S-4073
S-4072
S-4071
S-4070
S-4069
S-4066
S-4065S-4064
S-4063
S-3134
S-3133
S-3132
S-3131
S-3130
S-3128
S-3127
S-3125
S-3124
S-3123
S-3122
S-3121
S-3120
S-3119
S-3118
S-3117
S-3116
S-3115
S-3114
S-3113
S-3112
S-af543
S-af295
S-af294
S-207417
S-207416
S-207316
S-206416
S-206316
S-4068
S-4067
S-4012
S-3129
S-3085
2014-35-68
2014-35-73
2014-35-72
2014-35-70
2014-34-48
2014-35-69
2014-35-71
2014-34-41
2014-34-45
2014-34-46
2014-34-47
2014-34-42
2014-34-43
2014-34-44
2014-36-65
2014-36-57
2014-36-58
2014-36-64
2014-33-40
2014-33-44
2014-33-43
2014-33-42
2014-33-41
2014-36-67
2014-36-89
2014-36-66
2014-36-88
2014-36-90
2014-36-76
2014-36-75
2014-36-59
2014-36-86
2014-36-77
2014-36-78
2014-36-81
2014-36-79
2014-35-9
2014-35-8
2014-35-7
2014-35-6
2014-35-5
2014-35-4
2014-35-3
2014-35-2
2014-35-1
2014-34-9
2014-34-8
2014-34-7
2014-34-6
2014-34-5
2014-34-4
2014-34-3
2014-34-2
2014-34-1
2014-35-64
2014-35-63
2014-35-62
2014-35-60
2014-35-59
2014-35-58
2014-35-57
2014-35-56
2014-35-55
2014-35-54
2014-35-53
2014-35-52
2014-35-51
2014-34-38
2014-34-37
2014-34-36
2014-34-35
2014-34-34
2014-34-33
2014-34-32
2014-34-31
2014-34-30
2014-36-54
2014-35-67
2014-36-26
2014-36-24
2014-36-23
2014-36-22
2014-36-20
2014-36-19
2014-36-18
2014-36-17
2014-36-16
2014-36-15
2014-35-49
2014-35-48
2014-35-45
2014-35-44
2014-35-43
2014-35-42
2014-35-40
2014-35-39
2014-35-38
2014-35-37
2014-35-36
2014-35-35
2014-35-34
2014-35-33
2014-35-32
2014-35-31
2014-35-30
2014-35-29
2014-35-28
2014-35-27
2014-35-26
2014-35-25
2014-35-24
2014-35-23
2014-35-22
2014-35-21
2014-35-20
2014-35-19
2014-35-18
2014-35-17
2014-35-16
2014-35-15
2014-35-14
2014-35-13
2014-35-12
2014-35-11
2014-35-10
2014-34-29
2014-34-28
2014-34-27
2014-34-24
2014-34-22
2014-34-21
2014-34-20
2014-34-19
2014-34-18
2014-34-17
2014-34-16
2014-34-15
2014-34-14
2014-34-13
2014-34-12
2014-34-11
2014-34-10
2014-33-39
2014-33-38
2014-36-14
2014-36-13
2014-36-12
2014-34-25
2014-34-26
2014-35-41
2014-34-39
2014-34-40
2014-35-65
2014-35-66
2014-36-53
2014-33-5
2014-33-7
2014-33-4
2014-36-1
2014-33-23
2014-33-17
2014-33-27
2014-36-10
2014-33-19
2014-33-11
2014-33-25
2014-33-29
2014-33-31
2014-33-26
2014-33-2
2014-33-6
2014-33-8
2014-33-3
2014-33-36-3
2014-36-8
2014-36-6
2014-36-4
2014-33-9
2014-33-1
2014-36-7
2014-36-5
2014-36-9
2014-36-2
2014-36-3
2014-33-32
2014-33-35
2014-33-22
2014-33-24
2014-33-21
2014-33-18
2014-33-13
2014-33-15
2014-33-16
2014-33-14
2014-33-34
2014-33-30
2014-33-12
2014-33-37
2014-33-20
2014-33-10
2014-33-33
2014-36-11
2014-33-28
2014-33-36-1
2014-33-36-2
2014-33-36
2014-35-52A
2014-36-92
2014-36-91
EPA CAD CELL
PHASE I
PHASE I
(ACTIVE CELL)
EPA CAD CELL
PHASE II
33B
33C
34B
35C
35E
NEW
BEDFORD
F
E
D
E
R
A
L
C
H
A
N
N
E
L
F
E
D
E
R
A
N
N
E
L
R
O
U
E
FISH
ISLAND
COZY COVE
FAIRHAVEN
EASTERN
FISHERIES
EASTERN
FISHERIES
T
IC
H O
N A
V E
SEA WATCH
INTERNATIONAL
AMERICAN PRIDE
SEAFOODS
A N
T O
N
IO
C O
S T
A A
V E
BORROW PIT
CAD CELL #1
CAD CELL #2
TRUST
BLF REALTY
MARINE PARK
CONB
CROW ISLAND
POPE'S
R
O
U
TRUE VALUE
HARDWARE
SEAPORT INN
AND MARINA
ISLAND
F
E
D
E
R
A
N
N
E
L
F E
D E
R A
L
C
H A
N N
E L
F
E
D
E
R
A
N
N
E
L
F
E
D
E
R
A
N
N
E
L
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
S-639
S-638
S-637
S-636
S-635
S-634
S-633
S-558
S-511
S-510
S-509
S-327
S-326
S-325
S-324
S-323
S-219
S-218
S-217
S-216
S-201
S-200
S-199
S-198
S-197
S-196
S-195
S-194
S-193
S-192
S-191
M-417
M-416
M-415
M-414
M-413
M-412
M-411
M-410
M-409
M-408
M-407
M-406
M-405
M-404
M-403
M-402M-401
M-224
M-223
M-222
M-221
M-220
M-219
M-218
M-217
M-216
M-214
M-213
M-212
M-211
M-210
M-209
M-208
M-207
M-206
M-205
M-204
M-203
M-202
M-201
FD205
FD204
FD203
S-3856
S-3855
S-3853
S-3654
S-3653
S-3626
S-3625
S-3221
S-3219
S-3218
S-3217
S-3216
S-3215
S-3214
S-3212
S-3211
S-3209
S-3208
S-3207
S-3201
S-3200
S-3195
S-3194
S-3088
S-3084
S-3083
S-3082
S-3072
S-3071
S-3070
S-3069
S-3068
S-3067
S-3066
S-3065
S-3064
S-3063
S-3062
S-3061
S-3060
S-3059
S-3058
S-af816
S-af815
S-af812
S-af811
S-af806
S-af801
S-af290
S-af289
S-af242
S-af118
S-af117
S-af115
S-af114
S-af113
S-af112
S-af111
S-af110
S-ae869
S-ae864
S-ae854
S-ae853
S-ae852
S-ae819
S-ac332
S-ac317
S-ac316
S-ac313
S-af398
S-af397
S-af396
S-af395S-af394
S-af393
S-af315
S-af314
S-af311
S-af309
S-af308
S-af305
S-af301
S-af300
S-af299
S-af298
S-af294
S-af204
S-af203
S-af201
S-af170
S-af155
S-af119
S-208416
S-208116
S-208016
S-207816
S-207616
S-207516
S-207216S-207116
S-207016
S-206916
S-206816
2014-37-35
2014-37-34
2014-37-33
2014-36-56
2014-36-82
2014-36-80
2014-36-55
2014-35-74
2014-35-76
2014-35-78
2014-35-80
2014-35-79
2014-35-77
2014-35-75
2014-36-63
2014-36-62
2014-36-85
2014-36-68
2014-36-87
2014-36-69
2014-36-60
2014-36-61
2014-36-70
2014-36-72
2014-36-71
2014-36-90
2014-36-84
2014-36-73
2014-36-76
2014-36-75
2014-36-74
2014-37-9
2014-37-8
2014-37-7
2014-37-6
2014-37-5
2014-37-4
2014-37-3
2014-37-2
2014-37-1
2014-35-62
2014-35-61
2014-37-32
2014-36-51
2014-36-50
2014-36-49
2014-36-48
2014-36-47
2014-36-46
2014-37-31
2014-37-30
2014-36-44
2014-37-29
2014-37-28
2014-37-27
2014-37-26
2014-37-25
2014-37-24
2014-37-23
2014-37-22
2014-37-21
2014-37-20
2014-37-19
2014-37-18
2014-37-17
2014-37-16
2014-37-15
2014-37-14
2014-37-13
2014-37-12
2014-37-11
2014-37-10
2014-36-41
2014-36-40
2014-36-39
2014-36-38
2014-36-37
2014-36-36
2014-36-34
2014-36-33
2014-36-32
2014-36-31
2014-36-30
2014-36-29
2014-36-28
2014-36-27
2014-36-25
2014-36-24
2014-36-23
2014-36-22
2014-36-21
2014-36-20
2014-35-50
2014-35-48
2014-35-47
2014-35-46
2014-35-45
2014-35-81
2014-36-35
2014-36-53
2014-36-52
2014-36-45
2014-37-37
2014-37-36
37B
37A
35E
35G
35F
CLAM
SHELL
MOUND
NOTES:
1. SOUNDINGS SHOWN ARE FROM BATHYMETRIC
SURVEYS CONDUCTED IN APRIL 2014 AND MAY
2015 AND DO NOT REFLECT CHANGES RESULTING
FROM IRAC DREDGING ACTIVITIES PERFORMED
IN 2016.
NOTES:
1. SOUNDINGS SHOWN ARE FROM BATHYMETRIC
SURVEYS CONDUCTED IN APRIL 2014 AND MAY 2015
AND DO NOT REFLECT CHANGES RESULTING FROM
IRAC DREDGING ACTIVITIES PERFORMED IN 2016.
CAD CELL #2
X
E 815310
N 2696486
X
E 814689
N 2696217
AREA D
MARINE
HYDRAULICS
T
O
W
O
F
I
R
H
A
V
E
N
C
I
Y
B
D
F
O
R
D
TISBURY TOWING
AND TRANSPORTATION
ACUSHNET RIVER
SHIPYARD INC
X
X
E 813951
N
E 814137 E 814324 E 814511 E 814697 E 814884 E 815070 E 815257 E 815444 E 815630 E 815817 E 816003
N
N
N
N
N
CAD CELL CHANNEL
X
E 815429
N 2696493
X
E 815589
N 2696427
X
E 815641
N 2696365
X
X
X
X
X
SCOW
ISLAND
X
CAD CELL #3
X
X
X
X
X
X
X
E 815477
N 2697000
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
P-23
E 815583
N 2696992
N
E 815544
N 2696987
E 815477
N 2697000
E 815422
N 2697002
E 815450
N 2696996
E 815300
N 2696985
E 815089
N 2696971
E 815087
N 2696969
E 814981
N 2696972
E 814988
N 2696960
E 814964
N 2696955
E 814940
N 2696775
E 815416
N 2696986
E 815342
N 2696612
E 815423
N 2696989
E 815875
N 2697201
E 815879
N 2697203
E 815934
N 2697335
E 815944
N 2697335
E 815440
N 2697442
E 815374
N 2697438
E 815364
N 2697432
E 815226
N 2697422
E 815215
N 2697415
E 815098
N 2697407
E 815090
N 2697398
E 815071
N 2697396
E 815947
N 2697340
E 815771
N 2696954
E 815992
N 2696874
E 815897
N 2696405
E 815329
N 2696519
E 814965
N 2696971
E 814949
N 2696975
P-01
P-02
P-03
P-04
P-05
P-06
P-07
P-08
P-09
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-20
P-21
P-22
P-24
P-25
P-26
P-27
P-28
P-29
P-30
P-31
P-32
P-33
P-34
P-35
P-36
P-37
P-38
P-39
EPA CAD CELL
PHASE I
EPA CAD CELL
PHASE II
(ACTIVE CELL)
X
X
X
X
E 814677
N 2696566
E 815226
N 2696658
E 814695
N 2696752
X
CAD CELL #2
AREA D
MARINE
HYDRAULICS
TISBURY TOWING
AND TRANSPORTATION
ACUSHNET RIVER
SHIPYARD INC
E 813951
N
E 814137 E 814324 E 814511 E 814697 E 814884 E 815070 E 815257 E 815444 E 815630 E 815817 E 816003
N
N
N
N
N
SCOW
ISLAND
CAD CELL #3
P-23
N
E 815408
N 2697007
E 815309
N 2697405
E 815081
N 2697390
E 814965
N 2696991
P-01
P-02
P-03
P-04
P-05
P-06
P-07
P-08
P-09
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-20
P-22
P-24
P-25
P-26
P-27
P-28
P-29
P-30
P-31
P-32
P-33
P-34
P-35
P-36
P-37
P-38
P-39
CAD CELL CHANNEL
BASELINE 1
(FROM APEX
DRAWINGS)
P-21
X
E 815018
N 2699044
E 814556
N 2698961
E 814694
N 2699165
FAIRHAVEN
NEW
BEDFORD
N 2699832
E
N 2699645 N 2699459 N 2699272 N 2699086 N 2698899 N 2698712 N 2698526 N 2698339 N 2698152 N 2697966 N 2697779
E
X
E 814817
N 2698679
X
E 815117
N 2699279
X
E 814583
N 2698706
X
E 814711
N 2699027
X
E 814862
N 2699008
X
KYLER
SEAFOOD
C
O
N
B
W
A
S
H
B
U
K I L B
U
REVERE
COPPER
P A
C K
E R
ISLAND
MARSH
R O
U T
E
T
O
I
R
H
A
V
E
N
C
I
D
F
O
R
D
PRESERVATION TRUST
FAIRHAVEN LAND
BUZZARDS BAY INC
COALITION FOR
LTD PARTNERSHIP
BS REALTY
X
E 815036
N 2698972
X
E 815085
N 2698520
SEE SHEET C-102
34B
33B
33C
X
E 815119
N 2698918
C
C
C
C
C
C
C
C
C
C
APPROXIMATE LOCATION
OF EPA PIPELINE
NO SPUD ZONE
NOTES:
1. THE FOLLOWING NOTES ARE APPLICABLE TO SHEETS C-101 THROUGH C-105.
2. FINAL DREDGE ELEVATIONS ARE DEPTH BELOW MLLW CREATED FROM A 3 FOOT BY
3 FOOT GRID OF DREDGE ELEVATIONS REQUIRED TO REMOVE THE SEDIMENT
CONTAINING MORE THAN THE TARGET CONCENTRATION OF PCB.
3. FINAL DREDGE ELEVATION DOES NOT INCLUDE THE ALLOWED 6 INCH OVERDEPTH.
4. CONTOUR LINES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL USE THE
ELECTRONIC DATA SUPPLIED BY GOV (TARGET ELEVATIONS, BATHYMETRIC SURVEY
AND DREDGE AREA AUTOCAD FILES) FOR ITS DREDGE PLAN PREPARATION.
5. FINAL DREDGE PLAN DETAILS SHALL BE BY CONTRACTOR SHOWING THE DREDGING
LANES AND LAYOUT THAT SATISFIES THE PROJECT REQUIREMENTS LISTED IN SECTION
35 20 23 AND SUITS CONTRACTORS PROPOSED DREDGE EQUIPMENT.
FAIRHAVEN
NEW
BEDFORD
E 814667
N 2698292
MARLEES
SEAFOOD
TISBURY TOWING
ISLAND
MARSH
PRESERVATION TRUST
FAIRHAVEN LAND
BUZZARDS BAY INC
COALITION FOR
COPPER
REVERE
AND TRANSPORTATION
X
E 815439
N 2697422
X
E 815074
N 2697399
T
O
I R
H
A
V
E
N C
I
D
F
O
R
D
EPA CAD CELL
PHASE II
(ACTIVE CELL)
33C
SEE SHEET C-101
34B
35C
X
E 814688
N 2698517
E 814652
N 2698430
E 814655
N 2698142
E 814646
N 2697926
E 814562
N 2697863
E 814625
N 2697764
E 814607
N 2697716
E 814610
N 2697617
E 814658
N 2697524
E 814737
N 2697485
E 814820
N 2697539
E 814844
N 2697641
E 814973
N 2697626
E 815189
N 2697656
E 815357
E 815273
N 2698274
E 815048
N 2698457
E 814883
N 2698490
E 814796
N 2698559
SEE SHEET C-103
6C
7C
8C
9C
9C'
7C'
8C'
6C'
E 815156
N 2698412
E 815300
N 2698118
APPROXIMATE LOCATION
OF EPA PIPELINE
N 2697929
P-24
P-25
P-26
P-27
P-28
P-29
P-30
P-31
P-32
P-33
P-34
E 815543 E 815729E 815357E 815170E 814983E 814797E 814610E 814423E 814237E 814050E 813863E 813677
N
N
N
N
N
N
N
25' PILING
STANDOFF
(TYP.)
50ft BUFFER (CAD CELL)
NO SPUD ZONE
BEDFORD
CAD CELL #1
CAD CELL #2
X
E 814574
N 2697161
E 814553
N 2697266
X
E 814460
N 2696966
X
X
E 814388
N 2696300
X
E 814694
N 2696756
X
E 814997
N 2697308
BORROW PIT
X
X
E 814934
N 2696755
X
X
E 815229
N 2696145
E 815310
N 2696486
X
E 814500
N 2696047
X
E 814689
N 2696217
AREA D
MARINE
HYDRAULICS
T
O
I
R
H
A
V
E
N
C
I
D
F
O
R
D
TISBURY TOWING
AND TRANSPORTATION
RIVER
SHIPYARD INC
EASTERN
FISHERIES
H E
R V
I C
H O
N
A
V E
X
E 815159
N 2697455
E 814667
N 2697344
X
E 815326
N 2696541
X
E 814950
N 2696981
X
X
E 815074
N 2697399
ACUSHNET
EPA CAD CELL
PHASE II
(ACTIVE CELL)
EPA CAD CELL
PHASE I
35F
SEE SHEET C-104
34B
35C
35E
E 814577
N 2697311 X
E 814889
N 2697461
X
E 814982
N 2697509
X
E 815048
N 2697524
X
E 815108
N 2697506
X
E 814481
N 2697149
X
E 814439
N 2697101
X
E 814529
N 2696918
X
E 814502
N 2696699
X
E 814520
N 2696567
X
E 814763
N 2696567
X
E 814820
N 2697428
X
X
E 814952
N 2697443
E 814952
N 2697158
X
X
X
E 814799
N 2697317
E 814532
N 2696807
X
X
X
X
X
E 814373
N 2696468
X
E 814436
N 2696189
X
E 814496
N 2696153
X
E 814592
N 2696165
X
E 814715
N 2696351
X
E 814730
N 2696468
SEE SHEET C-102
10C
11C
14C
15C'
16C
14C'
16C'
17C'
17C
15C
E 815036
N 2697446
P-01
P-02
P-03
P-04
P-05
P-06
P-28
P-29
P-30
P-31
P-32
P-33
P-34 P-35
P-36
P-37
P-38
P-39
P-07
P-08
N 2697569
E
N 2697755 N 2697382 N 2697195 N 2697009 N 2696821 N 2696635 N 2696449 N 2696262 N 2696075 N 2695889 N 2695703
E 814880
N 2696942
E 814916
N 2697035
E 814859
N 2696825
E 814793
N 2696780
13C'
12C'
11C'
10C'
EPA CAD CELL
CHANNEL
SCOW
ISLAND
25' PILING
STANDOFF
(TYP.)
12C
13C
50ft BUFFER (CAD CELL)
NO SPUD ZONE
50ft BUFFER (CAD CELL)
NO SPUD ZONE
N 2699832
N 2696191
E
N 2695817 N 2695631 N 2695444 N 2695071 N 2694885 N 2694698 N 2694511 N 2694325
F
E
D
E
R
A
N
N
E
L
BORROW PIT
CAD CELL #1
UTILITY AREA
FEDERAL C
HANNEL
POPE'S
ISLAND
E 814469
N 2695847
X
EASTERN
FISHERIES
EASTERN
FISHERIES
H E
R V
C
H O
N
A
V E
SEA WATCH
INTERNATIONAL
AMERICAN PRIDE
SEAFOODS
A N
T O
N
S
V E
POPE'S ISLAND MDC
E
N 2696004 N 2695257
N 2694138
E 814689
N 2696217
X
E 814500
N 2696047
X
X
35F
35G
SHIPWRECK
35E
SEE SHEET
E
FISH
ISLAND
E 815337
N 2694218
E 815298
N 2694444
E 814893
N 2694491
E 815065
N 2695066
X
X
E 814318
N 2695066
E 814651
N 2694409
E 814893
N 2694491
C-103
CLAM SHELL
MOUND
E 814592
N 2695853
X
E 814367
N 2695715
X
E 814394
N 2695298
X
E 814568
N 2695280
X
E 814748
N 2695325
X
E 814814
N 2695385
X
E 814859
N 2695469
X
E 814829
N 2695559
X
X
X
E 814355
N 2695508
X
X
E 814400
N 2695532
E 814364
N 2695685
E 814400
N 2695661
E 814691
N 2695019
X
E 814649
N 2695142
X
E 814649
N 2695211
X
E 814784
N 2694896
X
E 814697
N 2695241
X
E 814802
N 2695244
X
E 814880
N 2694800
X
E 814970
N 2694839
X
E 814907
N 2695133
X
E 814859
N 2695166
X
18C
20C
23C
21C
22C
21C'
19C'
19C
18C'
20C'
22C'
23C'
50ft BUFFER (CAD CELL)
NO SPUD ZONE
N
E 814494 E 814681 E 815057
N
N
N
N
N
N
E 814869 E 815246 E 815433 E 815621 E 815809 E 815997 E 816185 E 816373 E 816560
F
E
D
E
R
A
N
N
E
L
F
E
D
E
R
A
N
N
E
L
E 815261
N 2693153
E 815459
N 2693003
E 815246
N 2693042
E 815381
N 2693012
E 815834
N 2693606
E 815681
N 2693564
E 815873
N 2693408
E 815693
N 2693465
E 815762
N 2693405
R
O
U
FISH
ISLAND
TRUST
BLF REALTY
MARINE PARK
CONB
X
E 814580
N 2694036
X
E 815065
N 2692825
X
E 815196
N 2692825
X
E 815441
N 2694074
E 816105
N 2692997
X
E 815746
N 2692845
E 815549
N 2693171
ISLAND
FISH
E 815876
N 2693531
E 815576
N 2693276
E 815459
N 2693387
E 815336
N 2693312
24C
27C
28C
25C
26C
28C'
27C'
24C'
25C'
26C'
37A
37B
UTILITY AREA
UTILITY AREA
UTILITY AREA
UTILITY AREA
U
T
I
L
I
E
A
U
T
I
L
I
E
A
U
T
I
L
I
SCALE: HOR. 1" = 50'
VER. 1" = 5'
1C
C101
1C 1C'
(WEST)
(EAST)
EXISTING BOTTOM
2C 2C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 33B SECTION
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i o n e e t
M
L L
W
0 4
-5
-10
-15
-20
-25
-30
-35
-40
3C 3C'
(WEST)
(EAST)
SCALE: HOR. 1" = 50'
VER. 1" = 5'
3C
C101
LOWER HARBOR DREDGE AREA 33C SECTION
33C
REQUIRED MATERIAL TO BE REMOVED
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
33B
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
0 4
-5
-10
-15
-20
-25
-30
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
33B
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
SCALE: HOR. 1" = 50'
VER. 1" = 5'
2C
C101
LOWER HARBOR DREDGE AREA 33B SECTION
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
NOTES:
1. THE FOLLOWING NOTES ARE APPLICABLE TO DRAWINGS C-301 THROUGH C-310.
2. REFER TO SPEC SECTION 35 20 23, 1.10 FOR SLOPE CUTTING METHODOLOGY.
3. SEE ATTACHMENT K TO THE SPECIFICATIONS FOR EXAMPLES OF CONTOUR DREDGING APPROACH.
4. DREDGE ELEVATIONS BELOW MLLW ARE FROM 3 FOOT BY 3 FOOT GRID OF DATA AND MAY NOT EXACTLY MATCH SMOOTHED CONTOUR
LINES ON DREDGE PLANS.
5. DREDGE TO ELEVATION LINE IS INTERPOLATED FROM THE INDIVIDUAL 3X3 FT GRID ELEVATION CENTERS ALONG THE TRANSECT LINE.
6. ACTUAL DREDGE TO ELEVATIONS MAY VARY BASED ON EQUIPMENT AND DREDGING LANES PROPOSED BY CONTRACTOR.
7. DREDGE ELEVATION MUST MEET LOWEST ELEVATION IN INDIVIDUAL BUCKET GRAB FROM THE 3 FOOT BY 3 FOOT GRID OF DATA
SUPPLIED TO CONTRACTOR.
8. WHERE SEDIMENT REQUIRING REMOVAL EXCEEDS ONE FOOT THICK, SEDIMENT MUST BE REMOVED IN TWO PASSES AS DETAILED IN
SECTION 35 20 23.
9. ON FINAL PASS, THE CONTRACTOR SHALL DETERMINE THE NECESSARY OVERLAP DISTANCE OF THE BUCKET FROM THE PREVIOUS
LOCATION DREDGED IN ORDER TO CAPTURE ANY SLOUGHING FROM THE SIDE SLOPE ON THE UNCUT FACE AND SHALL PROCEED FROM
HIGHEST TO LOWEST ELEVATION.
Elevation (Feet, MLLW)
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
5C 5C'
(EAST)
(WEST)
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
6 INCH ALLOWABLE OVERDEPTH
TO BE REMOVED
REQUIRED MATERIAL
SCALE: HOR. 1" = 50'
VER. 1" = 5'
4C
C101
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
4C 4C'
(WEST)
(EAST)
33C
6 INCH ALLOWABLE OVERDEPTH
LOWER HARBOR DREDGE AREA 33C SECTION
-5
-10
-15
-20
-25
-30
-35
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
SCALE: HOR. 1" = 50'
VER. 1" = 5'
5C
C101
LOWER HARBOR DREDGE AREA 33C SECTION
33C33C
-5
-10
-15
-20
-25
-30
-35
-5
-10
-15
-20
-25
-30
-35
E l e v a t i o n
F e e t
M
L L W
LOWER HARBOR DREDGE AREA 34B SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
7C
C102
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
7C 7C'
(WEST)
(EAST)
0 7
34B
6 INCH ALLOWABLE OVERDEPTH
C102
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L
W
-5
-10
-15
-20
-25
-30
SCALE: HOR. 1" = 50'
VER. 1" = 5'
6C
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
34B
6C 6C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 34B SECTION
-5
-10
-15
-20
-25
-30
-35
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
11C 11C'
(WEST)
(EAST)
35C
10C
(WEST)
10C'
(EAST)
35C
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-5
-10
-15
-20
-25
-30
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
REQUIRED MATERIAL TO BE REMOVED
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
LOWER HARBOR DREDGE AREA 35C SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C103
11C
LOWER HARBOR DREDGE AREA 35C SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C103
10C
LOWER HARBOR DREDGE AREA 34B SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
9C
C102
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
9C 9C'
(EAST)
(WEST)
34B
6 INCH ALLOWABLE OVERDEPTH
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
8C 8C'
(WEST)
(EAST)
0 7
LOWER HARBOR DREDGE AREA 34B SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
8C
C102
34B
6 INCH ALLOWABLE OVERDEPTH
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
P
I
L
I
G
P
25' STANDOFF DISTANCE FROM P-34
35E
15C 15C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 35E SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C103
15C
6 INCH ALLOWABLE OVERDEPTH
REQUIRED MATERIAL TO BE REMOVED
EXISTING BOTTOM
-5
-10
-15
-20
-25
-30
E l e v a t i e e t
M
L L
W
-5
-10
-15
-20
-25
-30
13C 13C'
(WEST)
(EAST)
14C 14C'
(WEST)
(EAST)
35C
35C
-5
-10
-15
-20
-25
-30
E l e v a t i e e t
M
L L
W
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-5
-10
-15
-20
-25
-30
6 INCH ALLOWABLE OVERDEPTH
6 INCH ALLOWABLE OVERDEPTH
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
LOWER HARBOR DREDGE AREA 35C SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C103
LOWER HARBOR DREDGE AREA 35C SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C103
13C
14C
12C 12C'
(WEST)
(EAST)
35C
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
LOWER HARBOR DREDGE AREA 35C SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
12C
C103
25'
QUARRY SPALL
MARKER BED
EXISTING BOTTOM
UPPER HARBOR
DREDGE PIPELINE
BACKFILL W/
CLEAN SEDIMENT
2'
PIPELINE
6 INCH ALLOWABLE
OVERDEPTH
DREDGE ELEVATION
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
17C 17C'
(NORTH)
(SOUTH)
LOWER HARBOR DREDGE AREAS 35C AND 35E SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
17C
C103
0 4
35C
35E
6 INCH ALLOWABLE OVERDEPTH
EXISTING BOTTOM
REQUIRED MATERIAL
TO BE REMOVED
PIPELINE DETAIL
SCALE: HOR. 1" = 20'
VER. 1" = 2'
17C
C103
REQUIRED MATERIAL
TO BE REMOVED
BACKFILL W/
CLEAN SEDIMENT
16C 16C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 35E SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C103
35E
16C
6 INCH ALLOWABLE OVERDEPTH
REQUIRED MATERIAL TO BE REMOVED
EXISTING BOTTOM
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
19C 19C'
(EAST)
(WEST)
35F
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
18C 18C'
(WEST)
(EAST)
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i o n
F e e t
M
L L W
LOWER HARBOR DREDGE AREA 35F SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C104
18C
-5
-10
-15
-20
-25
-30
-35
-40
35F
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
-5
-10
-15
-20
-25
-30
-35
-40
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i o n
F e e t
M
L L W
LOWER HARBOR DREDGE AREA 35F SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C104
19C
0 4
22C 22C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 35G SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C104
35G
22C
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
REQUIRED MATERIAL TO BE REMOVED
21C 21C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 35G SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C104
35G
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
21C
20C 20C'
(EAST)
(WEST)
LOWER HARBOR DREDGE AREA 35F SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C104
35F
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
20C
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
-5
-10
-15
-20
-25
-30
-35
-40
6 INCH ALLOWABLE OVERDEPTH
LOWER HARBOR DREDGE AREA 37A SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C105
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
25C
24C 24C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 37A SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C105
37A
24C
23C 23C'
(WEST)
(EAST)
LOWER HARBOR DREDGE AREA 35G SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C104
35G
23C
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
-5
-10
-15
-20
-25
-30
-35
EXISTING BOTTOM
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
6 INCH ALLOWABLE OVERDEPTH
REQUIRED MATERIAL TO BE REMOVED
REQUIRED MATERIAL TO BE REMOVED
-5
-10
-15
-20
-25
-30
-35
-40
E l e v a t i o n
F e e t
M
L L W
-5
-10
-15
-20
-25
-30
-35
-40
25C 25C'
(WEST)
(EAST)
37A
EXISTING BOTTOM
6 INCH ALLOWABLE OVERDEPTH
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
EXISTING BOTTOM
REQUIRED MATERIAL TO BE REMOVED
6 INCH ALLOWABLE OVERDEPTH
LOWER HARBOR DREDGE AREA 37A SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C105
26C
LOWER HARBOR DREDGE AREA 37B SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
C105
27C
LOWER HARBOR DREDGE AREA 37B SECTION
SCALE: HOR. 1" = 50'
VER. 1" = 5'
28C
C105
26C 26C'
(EAST)
(WEST)
27C 27C'
(WEST)
(EAST)
28C 28C'
(WEST)
(EAST)
37A
37B
37B
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L
W
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L
W
-5
-10
-15
-20
-25
-30
E l e v a t i o n
F e e t
M
L L
W
-35 -35 -35
| G-001_Cover Sheet |
| G-101_Lower Harbor Dredge Areas Overview |
| G-102_Historical and IA Core Sampling Locations_Upper Portion |
| G-103_Historical and IA Core Sampling Locations_Lower Portion |
| G-104_Existing Site Conditions_Map 1_Bathy_Apr 2014-May 2015 |
| G-105_Existing Site Conditions_Map 2_Bathy_Apr 2014-May 2015 |
| G-106_EPA CAD Cells_Entrance Channel |
| G-107_EPA CAD Cells_Fill Limits |
| C-101_33BC_Dredge Plan_Target Contours |
| C-102_34B_Dredge Plan_Target Contours |
| C-103_35CE_Dredge Plan_Target Contours |
| C-104_35FG_Dredge Plan_Target Contours |
| C-105_37AB_Dredge Plan_Target Contours |
| C-301_Cross Sections 1C thru 3C |
| C-302_Cross Sections 4C and 5C |
| C-303_Cross Sections 6C and 7C |
| C-304_Cross Sections 8C thru 11C |
| C-305_Cross Sections 12C thru 15C |
| C-306_Cross Sections 16C and 17C |
| C-307_Cross Sections 18C and 19C |
| C-308_Cross Sections 20C thru 22C |
| C-309_Cross Sections 23C thru 25C |
| C-310_Cross Sections 26C thru 28C |