Amendment_W912WJ-17-R-0003-0001.pdf

PDF 42 KB Posted

Attached to
Mechanical Remediation Dredging in the Lower Harbor
Solicitation number
W912WJ-17-R-0003
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
LHCC_PILES.XLSX XLSX spreadsheet
Amendment_W912WJ-17-R-0003-0005.pdf PDF
Core_Photos_a.pdf PDF
Dredge_Area_33B.DWG DWG drawing
Dredge_Area_35G.DWG DWG drawing
Dredge_Area_37B.DWG DWG drawing
Dredge_Area_35C.DWG DWG drawing
Dredge_Area_33C.DWG DWG drawing
Phase_2_CAD_Cell_20170206_20FT_SMOOTH_SHEET-actual.pdf PDF
Dredge_Area_34B.DWG DWG drawing
Dredge_Area_35F.DWG DWG drawing
Dredge_Area_37A.DWG DWG drawing
20170206_3ft_MIN_MLLW_Depth.xyz XYZ file
Dredge_Area_35E.DWG DWG drawing
Amendment_W912WJ-17-R-0003-0004.pdf PDF
Amendment_W912WJ-17-R-0003-0003.pdf PDF
Amendment_W912WJ-17-R-0003-0002.pdf PDF
33B_Target Elevations_XYZ.txt TXT text file
33C_Target Elevations_XYZ.txt TXT text file
Lower_Harbor_Pre_Dredge_Bathy_2014-2015_XYZ.txt TXT text file
34B_Target Elevations_XYZ.txt TXT text file
37B_Target Elevations_XYZ.txt TXT text file
34B_Boundary.dwg DWG drawing
33B_Boundary.dwg DWG drawing
35G_Target Elevations_XYZ.txt TXT text file
35C_Target Elevations_XYZ.txt TXT text file
35F_Target Elevations_XYZ.txt TXT text file
37B_Boundary.dwg DWG drawing
33C_Boundary.dwg DWG drawing
37A_Boundary.dwg DWG drawing
35E_Boundary.dwg DWG drawing
35E_Target Elevations_XYZ.txt TXT text file
35G_Boundary.dwg DWG drawing
35C_Boundary.dwg DWG drawing
35F_Boundary.dwg DWG drawing
37A_Target Elevations_XYZ.txt TXT text file
SPECS.pdf PDF
PLANS_.pdf PDF
Solicitation_W912WJ-17-R-0003.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment necessary to publish submitted Requests for Information and the Government Responses. The Amendment also necessary to post the Low er Harbor Pre-Dredge Bathymetric Survey of 2014-2015, Boundary files for each of the 9 Dredge Management Units (DMUs), and Target Elevations for each of the 9 DMUs.

All other aspect remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Feb-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-17-R-0003

X 9B. DATED (SEE ITEM 11)

20-Jan-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Feb-2017

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ-17-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

1. After review of the specifications, I have a question regarding page 8, “Quantity

Determination of Breakdown”. It states:

“Off-site disposal of the remainder of the sediment may be triggered at the discretion of the Contracting Officer if at any point the dredge verification survey shows the "Estimated Total Volume with 6" Allowable Over depth (cubic yards)" is exceeded for any of the Dredge Areas listed in the table below, and upon such exceedance, the contractor shall prepare a Corrective Action Plan within two calendar days of notification by the Contracting Officer.”

A. I am unsure as to the implication of this. What is the remainder? Does it mean that excess material shall be disposed of elsewhere, for example off loaded and trucked to a landfill?

RESPONSE: In Specification Section 01 11 00, Paragraph 1.1.1 Quantity Determination and Breakdown, on page 3, the word “remainder” refers to dredge volume in excess of the estimated total volume with 6” allowable overdepth in the table on page 3-4 for a dredge area.

Section 01 11 00, Paragraph 1.1.1 Quantity Determination and Breakdown, on page 3, explains the requirements of a Corrective Action Plan if dredge volume is in excess of the estimated total volume. Up to 6” of allowable overdepth is identified for a dredge area. The estimated allowable volumes are as shown in the table on page 3-4. If, after implementation of the Contractor’s approved Corrective Action Plan, volumes in excess of the allowable overdepth continue, the Contracting Officer may require the contractor to implement actions defined in the Contractor’s approved “Procedures and Approach for Off-Site Disposal of Contaminated Sediments Plan.”

Section 35 20 23, Paragraph 1.5 Submittals, on page 6, provides the requirements for the “Procedures and Approach for Off-Site Disposal of Contaminated Sediments Plan.” This may be triggered at the discretion of the Contracting Officer if at any point the dredge verification survey shows the "Estimated Total Volume with 6" Allowable Overdepth (cubic yards)" is exceeded for any of the Dredge Areas listed in the table on page 3-4 of Section 01 11 00, Paragraph 1.1.1

W912WJ-17-R-0003

B. I also read that sediment testing will be done after dredging and it may impact hold times. Currently it is not necessary for the contractor to hold material for 12 hours before disposal. Is this correct?

RESPONSE: Section 35 20 23, Paragraph 3.1.4, Page 12-13, discusses the requirement for scow decant water and associated requirements including decant time of up to 12 hours that must be met before disposal in the CAD Cell.

2. For Factor 1 – Company/Project Team Experience, may we use 11 x 17 size pages for our project descriptions?

RESPONSE: Section 00100, Proposal Submission Requirements, Paragraph 3, allows for 11X17 pages to be used for tables/graphic only.

3. Please provide a ROM for this opportunity.

RESPONSE: See p 38 of the Solicitation, “52.003-4015 MAGNITUDE OF PROJECT

4. If the two derelict barges (Scow Island) do not float, will they still be required to be moved for dredging operations? If the barges break apart and/or sink during handling will the contractor be required to remove and dispose of the barges?

RESPONSE: Yes, the barges are required to be moved in order to perform dredging activities. See Section 01 11 00, Paragraph 1.3.2. Coordination with Other Work. The Contractor is required to coordinate their construction activities and relocation of vessels with other private entities conducting business operations in or adjacent to the harbor. The Contractor shall coordinate the relocation of any vessel with the owner. The Contractor is not required to move or cleanup the barges as part of this requirement.

(End of Summary of Changes)