GAOA Road 42 Asphalt Reclamation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1240BH21R0013
- Agency
-
Region 6 - Pacific Northwest Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Prineville OR 97754 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to perform full depth reclamation and asphalt concrete resurfacing of Road 42 located on the Ochoco National Forest in Prineville, Oregon. The Department of Agriculture Forest Service Pacific Northwest Region will evaluate proposals to pulverize existing asphalt and mix it with cement and base material to create a stabilized base, construct a new asphalt running surface, restripe markings, replace surfaces on two bridges, upgrade an intersecting road, and conduct asphalt patching. Proposals will be evaluated based on technical qualifications, past performance, and price, with award by November 30, 2022. The deadline for questions is May 3, 2021 and completed proposals are due May 17, 2021.
This is a total small business set-aside designated under NAICS codes 237310 and 238990, with an estimated value between $1-5 million. Incumbent contractors may include [contractor names redacted]. The work must be performed on Road 42 in Prineville, Oregon and be completed under the oversight of the Forest Service between the award date and November 2023. Bidders must also hold a PSC code D304 for road construction and meet all licensing and insurance requirements for the location.
Notice text
2 versions
Update #2 · Latest ·
This project is to perform Full Depth Reclamation (FDR) of existing asphalt and place an Asphalt Concrete (AC) surfacing on the finished FDR layer of a section of Road 42. The work includes pulverizing existing asphalt and mixing with existing base and added cement to make a stabilized base, constructing a new AC running surface on the prepared stabilized base, restriping, resetting cattle guards to new grade, removing and replacing asphalt running surfaces on two bridges that fall within project area, and upgrading intersecting road to meet new grade. The project also includes asphalt patching (skin and pothole patching) of Road 42 outside of the FDR section.
04/26/2021: Amendment #1 posted
Update #1 ·
This project is to perform Full Depth Reclamation (FDR) of existing asphalt and place an Asphalt Concrete (AC) surfacing on the finished FDR layer of a section of Road 42. The work includes pulverizing existing asphalt and mixing with existing base and added cement to make a stabilized base, constructing a new AC running surface on the prepared stabilized base, restriping, resetting cattle guards to new grade, removing and replacing asphalt running surfaces on two bridges that fall within project area, and upgrading intersecting road to meet new grade. The project also includes asphalt patching (skin and pothole patching) of Road 42 outside of the FDR section.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| GAOA Road 42 Asphalt Reclamation | Award Notice | |
| This notice | Solicitation | |
| GAOA Road 42 Asphalt Reclamation | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| CO-rocky MTN arsnl NWR-patch hill road | — | No set-aside | |
| Barlow Ranger District Barlow Rd | Forest Service | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity