CA FLAP INY CR2022(1) South Lake Road
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF19B000010
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Inyo National Forest, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks bids for the rehabilitation and improvement of 6.9 miles of South Lake Road and adjacent facilities located in Inyo County, California. The Department of Transportation Federal Highway Administration seeks to procure roadway construction services including pulverizing and paving existing road sections, minor widening, grading, drainage improvements, slope scaling, signage upgrades, and improvements to four campgrounds and parking areas. Bids are due on December 10, 2019 and contract award will occur in December 2019, with construction to begin in January 2020 and be complete by October 2020. The estimated value of the project is between $7-10 million.
There is no set-aside designation for this procurement. The primary NAICS code is 237110 and PSC code is D301. Major work items include approximately 8,100 cubic yards of excavation and 17,625 tons of asphalt pavement. The place of performance will be on Inyo National Forest lands along South Lake Road in Inyo County, California.
Notice text
2 versions
Update #2 · Latest ·
THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE
CA FLAP INY CR2022(1) South Lake Road
Project Location
South Lake Road, also designated as County Road 2022, is located in Inyo County, California, and provides access to South Lake, Inyo National Forest lands, several campgrounds, lodges, trailheads, picnic areas, and numerous privately-owned properties. The route begins at the junction with State Route 168, approximately 15 miles southwest of Bishop, and continues 6.9 miles to South Lake. The route is primarily on US Forest Service land (Inyo National Forest), and is maintained by Inyo County. The route is functionally classified as a rural major collector. Facilities along the route are associated with the use of adjacent lands, and the majority of traffic on South Lake Road is related to recreational use in the forest.
Scope of the Work
The existing South Lake Road is a two-lane paved roadway with varying widths and variable width unpaved shoulders, as well as multiple paved and unpaved pull-offs and intersecting roadways. Roadway shoulder widths are typically narrow or non-existent. The roadway surface is showing signs of deterioration including thermal and block cracking with some areas showing signs of fatigue cracking. The speed limit on the route is currently not posted, with the exception of two locations posted at 25 mph and 15 mph. The entire 6.9 miles is in steep mountainous terrain with narrow roadway bench widths along the majority of the route. There are numerous recreational facilities and parking areas adjacent to the roadway throughout the route. There is heavy pedestrian and bicycle use along portions of the route and the average daily traffic is approximately 800.
The proposed road improvements include pulverizing and paving, minor widening, grading, and drainage improvements to 6.9 miles of South Lake Road and adjacent campgrounds and parking facilities. Specific project elements, which would generally follow the existing roadway, include the following:
1) Segment 1: Rehabilitate and widen the first 2.1 miles from the intersection with State Route 168 to the Bishop Creek Lodge and Resort to accommodate a widened, shared-use shoulder. The proposed roadway section for this segment is 28 feet wide with 11-foot lanes and 3-foot shoulders. The existing paved width along this segment varies from 24-27 feet, with a wider bench width. Grading, including cuts and fills, will be required where the proposed section does not fit within the existing
roadway bench. Construction of left-turn lanes into the Four Jeffrey Campground is also included in Segment 1.
2) Segment 2: Rehabilitate the next 4.8 miles from the Bishop Creek Lodge and Resort to the end of the project at South Lake. The proposed paved roadway section for this segment is 22 feet with 10-foot lanes and 1-foot shoulders. The existing paved width along this segment varies from 21-26 feet. In general, the original paved roadway width will be maintained, with only minimal widening proposed to maintain a consistent paved width.
3) Drainage improvements in Segments 1 and 2, including the repair or replacement of 2 larger corrugated metal pipes with headwalls. Dewatering will be required at the 2 larger culverts.
4) Improvements to paved and unpaved pullouts maintained by the County.
5) Improvements to paved and unpaved pullouts maintained by the Forest Service, including:
• Grading, paving, signing, and striping a bike staging area at a current unpaved informal pullout;
• Pulverizing, paving, and striping the dump station at Four Jeffrey's Campground;
• Grading, paving, signing, and striping the Tyee Lakes Trailhead
• Pulverizing, paving, signing, and striping several existing paved parking areas; and
• Pulverizing and paving the boat ramp at the end of South Lake Road
6) Improvements to 4 Forest Service Campgrounds and the South Lake Trailhead parking area. Improvements include pulverizing, paving, striping, signing, roadbed reconditioning with new surface course aggregate, and minor drainage improvements.
7) Slope scaling of existing slopes with unstable rock.
8) Upgrading regulatory/warning signs and guardrails to meet MUTCD guidelines.
Principal Work Items
Approximate quantities for major work items:
• 15 acres of clearing and grubbing
• 8,100 cubic yards of roadway excavation
• 725 cubic yards of subexcavation
• 4,650 tons of roadway aggregate
• 7 miles of full depth reclamation
• 17,625 tons of asphalt concrete pavement (superpave)
• 2,000 linear feet of pipe culvert (including a 90-inch equivalent diameter arch)
• 4,000 linear feet of geocomposite underdrain system
• 13,000 linear feet of asphalt curb
• 40 hours of slope scaling
• 23,375 square yards of furnishing and placing topsoil
Anticipated Schedule
Advertise: October 2019
Award: December 2019
Construction: January 2020 - October 2020
This will be solicited as a full and open competition.
The estimated value is between $7,000,000 - $10,000,000.
Update #1 ·
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
CA FLAP INY CR2022(1) South Lake Road
Project Location
South Lake Road, also designated as County Road 2022, is located in Inyo County, California, and provides access to South Lake, Inyo National Forest lands, several campgrounds, lodges, trailheads, picnic areas, and numerous privately-owned properties. The route begins at the junction with State Route 168, approximately 15 miles southwest of Bishop, and continues 6.9 miles to South Lake. The route is primarily on US Forest Service land (Inyo National Forest), and is maintained by Inyo County. The route is functionally classified as a rural major collector. Facilities along the route are associated with the use of adjacent lands, and the majority of traffic on South Lake Road is related to recreational use in the forest.
Scope of the Work
The existing South Lake Road is a two-lane paved roadway with varying widths and variable width unpaved shoulders, as well as multiple paved and unpaved pull-offs and intersecting roadways. Roadway shoulder widths are typically narrow or non-existent. The roadway surface is showing signs of deterioration including thermal and block cracking with some areas showing signs of fatigue cracking. The speed limit on the route is currently not posted, with the exception of two locations posted at 25 mph and 15 mph. The entire 6.9 miles is in steep mountainous terrain with narrow roadway bench widths along the majority of the route. There are numerous recreational facilities and parking areas adjacent to the roadway throughout the route. There is heavy pedestrian and bicycle use along portions of the route and the average daily traffic is approximately 800.
The proposed road improvements include pulverizing and paving, minor widening, grading, and drainage improvements to 6.9 miles of South Lake Road and adjacent campgrounds and parking facilities. Specific project elements, which would generally follow the existing roadway, include the following:
1) Segment 1: Rehabilitate and widen the first 2.1 miles from the intersection with State Route 168 to the Bishop Creek Lodge and Resort to accommodate a widened, shared-use shoulder. The proposed roadway section for this segment is 28 feet wide with 11-foot lanes and 3-foot shoulders. The existing paved width along this segment varies from 24-27 feet, with a wider bench width. Grading, including cuts and fills, will be required where the proposed section does not fit within the existing
roadway bench. Construction of left-turn lanes into the Four Jeffrey Campground is also included in Segment 1.
2) Segment 2: Rehabilitate the next 4.8 miles from the Bishop Creek Lodge and Resort to the end of the project at South Lake. The proposed paved roadway section for this segment is 22 feet with 10-foot lanes and 1-foot shoulders. The existing paved width along this segment varies from 21-26 feet. In general, the original paved roadway width will be maintained, with only minimal widening proposed to maintain a consistent paved width.
3) Drainage improvements in Segments 1 and 2, including the repair or replacement of 2 larger corrugated metal pipes with headwalls. Dewatering will be required at the 2 larger culverts.
4) Improvements to paved and unpaved pullouts maintained by the County.
5) Improvements to paved and unpaved pullouts maintained by the Forest Service, including:
• Grading, paving, signing, and striping a bike staging area at a current unpaved informal pullout;
• Pulverizing, paving, and striping the dump station at Four Jeffrey's Campground;
• Grading, paving, signing, and striping the Tyee Lakes Trailhead
• Pulverizing, paving, signing, and striping several existing paved parking areas; and
• Pulverizing and paving the boat ramp at the end of South Lake Road
6) Improvements to 4 Forest Service Campgrounds and the South Lake Trailhead parking area. Improvements include pulverizing, paving, striping, signing, roadbed reconditioning with new surface course aggregate, and minor drainage improvements.
7) Slope scaling of existing slopes with unstable rock.
8) Upgrading regulatory/warning signs and guardrails to meet MUTCD guidelines.
Principal Work Items
Approximate quantities for major work items:
• 15 acres of clearing and grubbing
• 8,100 cubic yards of roadway excavation
• 725 cubic yards of subexcavation
• 4,650 tons of roadway aggregate
• 7 miles of full depth reclamation
• 17,625 tons of asphalt concrete pavement (superpave)
• 2,000 linear feet of pipe culvert (including a 90-inch equivalent diameter arch)
• 4,000 linear feet of geocomposite underdrain system
• 13,000 linear feet of asphalt curb
• 40 hours of slope scaling
• 23,375 square yards of furnishing and placing topsoil
Anticipated Schedule
Advertise: October 2019
Award: December 2019
Construction: January 2020 - October 2020
This will be solicited as a full and open competition.
The estimated value is between $7,000,000 - $10,000,000.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA FLAP INY CR2022(1) South Lake Road | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business |