Bid Tabs.pdf
PDF 735 KB Posted
- Attached to
- CA FLAP INY CR2022(1) South Lake Road
- Solicitation number
- 6982AF19B000010
About this file
This document contains a bid tabulation report for a federal-aid highway project. The report summarizes bids received for the South Lake Road project in Inyo County, California to rehabilitate and widen approximately 6.9 miles of the roadway. Work includes pulverizing and paving existing surfaces, minor widening, drainage improvements including repair of two large culverts, upgrades to signage and guardrails, improvements to pullouts and campgrounds, and slope scaling. The engineer's estimate for the project is between $7-10 million. Four contractors submitted bids ranging from $9.3 million to $13.6 million. The report lists estimated quantities and unit prices for over 80 line items. The Department of Transportation Federal Highway Administration will administer the project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 12/11/19
1 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Contractor Responsive?
Engineer's Estimate
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Qualcon Contractors, Inc.
Base Schedule A
$8,580,600.00
$13,599,670.00
$9,301,103.00
$9,665,171.45
$10,727,045.00
Option: X
$473,000.00
$353,185.00
$498,925.00
$387,878.99
$521,825.00
Option: Y
$290,000.00
$258,850.00
$461,083.00
$323,662.00
$415,585.00
Contractor Responsive?
Engineer's Estimate
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Qualcon Contractors, Inc.
Option: Z
$137,000.00
$174,918.00
$225,978.00
$217,896.55
$303,575.00
2 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Contractor Responsive?
Engineer's Estimate
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Qualcon Contractors, Inc.
Total Base Schedule A and Option(s): X
$9,053,600.00
$13,952,855.00
$9,800,028.00
$10,053,050.44
$11,248,870.00
Total Base Schedule A and Option(s): XY
$9,343,600.00
$14,211,705.00
$10,261,111.00
$10,376,712.44
$11,664,455.00
Total Base Schedule A and Option(s): XYZ
$9,480,600.00
$14,386,623.00
$10,487,089.00
$10,594,608.99
$11,968,030.00
Contractor Responsive?
Engineer's Estimate
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Qualcon Contractors, Inc.
Total Base Schedule A and Option(s): XZ
$9,190,600.00
$14,127,773.00
$10,026,006.00
$10,270,946.99
$11,552,445.00
Total Base Schedule A and Option(s): Y
$8,870,600.00
$13,858,520.00
$9,762,186.00
$9,988,833.45
$11,142,630.00
Total Base Schedule A and Option(s): YZ
$9,007,600.00
$14,033,438.00
$9,988,164.00
$10,206,730.00
$11,446,205.00
3 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Contractor Responsive?
Engineer's Estimate
Granite Construction Company
Hat Creek Construction & Materials, Inc.
Herback General Engineering, LLC
Qualcon Contractors, Inc.
Total Base Schedule A and Option(s): Z
$8,717,600.00
$13,774,588.00
$9,527,081.00
$9,883,068.00
$11,030,620.00
4 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF19B000010
Division: Central Federal Lands
State: CA County: Inyo
Federal Land: Inyo National Forest Opened at: Lakewood, CO
Opened by: Ryan Phillips
Date: 12/10/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Hat Creek Construction & Materials, Inc. $9,301,103.00 24339 Highway 89 N Burney, CA 96013
Herback General Engineering, LLC $9,665,171.45 2531 Nowlin Road Minden, NV 89423
Qualcon Contractors, Inc. $10,727,045.00 1645 Esmeralda Ave Minden, NV 89423
Granite Construction Company $13,599,670.00 3005 James Road Bakersfield, CA 93308
Engineer's Estimate $8,580,600.00
Contracting Officer 12/11/2019
5 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0010 15101-0000 MOBILIZATION
Hat Creek Construction & Materials, Inc. Lump Sum $930,000.00 Herback General Engineering, LLC Lump Sum $897,000.00 Qualcon Contractors, Inc. Lump Sum $1,000,000.00 Granite Construction Company Lump Sum $1,300,000.00 Engineer's Estimate ALL LPSM Lump Sum $953,755.00
A0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Hat Creek Construction & Materials, Inc. $9,000.00 $20,700.00 Herback General Engineering, LLC $4,650.00 $10,695.00 Qualcon Contractors, Inc. $10,000.00 $23,000.00 Granite Construction Company $20,000.00 $46,000.00 Engineer's Estimate 2.300 MILE $15,000.00 $34,500.00
A0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Hat Creek Construction & Materials, Inc. $5,280.00 $26,400.00 Herback General Engineering, LLC $4,600.00 $23,000.00 Qualcon Contractors, Inc. $6,000.00 $30,000.00 Granite Construction Company $8,000.00 $40,000.00 Engineer's Estimate 5.000 MILE $8,000.00 $40,000.00
A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Hat Creek Construction & Materials, Inc. $1,000.00 $40,000.00 Herback General Engineering, LLC $1,350.00 $54,000.00 Qualcon Contractors, Inc. $1,000.00 $40,000.00 Granite Construction Company $800.00 $32,000.00 Engineer's Estimate 40 EACH $1,000.00 $40,000.00
A0050 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
Hat Creek Construction & Materials, Inc. $5,300.00 $12,190.00 Herback General Engineering, LLC $4,650.00 $10,695.00 Qualcon Contractors, Inc. $15,000.00 $34,500.00 Granite Construction Company $20,000.00 $46,000.00 Engineer's Estimate 2.300 MILE $13,000.00 $29,900.00
A0060 15301-0000 CONTRACTOR QUALITY CONTROL
Hat Creek Construction & Materials, Inc. Lump Sum $500,000.00 Herback General Engineering, LLC Lump Sum $106,485.00 Qualcon Contractors, Inc. Lump Sum $300,000.00 Granite Construction Company Lump Sum $1,254,000.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
6 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0070 15401-0000 CONTRACTOR TESTING
Hat Creek Construction & Materials, Inc. Lump Sum $414,466.00 Herback General Engineering, LLC Lump Sum $150,000.00 Qualcon Contractors, Inc. Lump Sum $175,000.00 Granite Construction Company Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $175,000.00
A0080 15501-0000 CONSTRUCTION SCHEDULE
Hat Creek Construction & Materials, Inc. Lump Sum $10,000.00 Herback General Engineering, LLC Lump Sum $10,300.00 Qualcon Contractors, Inc. Lump Sum $5,000.00 Granite Construction Company Lump Sum $1,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0090 15705-0100 SOIL EROSION CONTROL, SILT FENCE
Hat Creek Construction & Materials, Inc. $10.00 $9,600.00 Herback General Engineering, LLC $7.00 $6,720.00 Qualcon Contractors, Inc. $20.00 $19,200.00 Granite Construction Company $10.00 $9,600.00 Engineer's Estimate 960 LNFT $6.00 $5,760.00
A0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Hat Creek Construction & Materials, Inc. $15.00 $16,500.00 Herback General Engineering, LLC $6.50 $7,150.00 Qualcon Contractors, Inc. $10.00 $11,000.00 Granite Construction Company $8.00 $8,800.00 Engineer's Estimate 1,100 LNFT $8.00 $8,800.00
A0110 15706-0200 SOIL EROSION CONTROL, CHECK DAM
Hat Creek Construction & Materials, Inc. $210.00 $13,650.00 Herback General Engineering, LLC $176.00 $11,440.00 Qualcon Contractors, Inc. $200.00 $13,000.00 Granite Construction Company $750.00 $48,750.00 Engineer's Estimate 65 EACH $200.00 $13,000.00
A0120 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
Hat Creek Construction & Materials, Inc. $200.00 $8,000.00 Herback General Engineering, LLC $335.00 $13,400.00 Qualcon Contractors, Inc. $150.00 $6,000.00 Granite Construction Company $250.00 $10,000.00 Engineer's Estimate 40 EACH $200.00 $8,000.00
7 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0130 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
Hat Creek Construction & Materials, Inc. $2,500.00 $5,000.00 Herback General Engineering, LLC $2,720.00 $5,440.00 Qualcon Contractors, Inc. $5,000.00 $10,000.00 Granite Construction Company $11,000.00 $22,000.00 Engineer's Estimate 2 EACH $3,000.00 $6,000.00
A0140 15802-0000 WATERING FOR DUST CONTROL
Hat Creek Construction & Materials, Inc. Lump Sum $80,000.00 Herback General Engineering, LLC Lump Sum $74,000.00 Qualcon Contractors, Inc. Lump Sum $100,000.00 Granite Construction Company Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00
A0150 20101-0000 CLEARING AND GRUBBING
Hat Creek Construction & Materials, Inc. $3,500.00 $54,250.00 Herback General Engineering, LLC $6,795.00 $105,322.50 Qualcon Contractors, Inc. $13,000.00 $201,500.00 Granite Construction Company $50,000.00 $775,000.00 Engineer's Estimate 15.5 ACRE $3,000.00 $46,500.00
A0160 20201-0000 SELECTIVE CLEARING
Hat Creek Construction & Materials, Inc. $13,000.00 $13,000.00 Herback General Engineering, LLC $13,589.00 $13,589.00 Qualcon Contractors, Inc. $13,000.00 $13,000.00 Granite Construction Company $200,000.00 $200,000.00 Engineer's Estimate 1.0 ACRE $1,500.00 $1,500.00
A0170 20301-0700 REMOVAL OF DELINEATOR (SNOW POLE)
Hat Creek Construction & Materials, Inc. $25.00 $5,000.00 Herback General Engineering, LLC $30.00 $6,000.00 Qualcon Contractors, Inc. $30.00 $6,000.00 Granite Construction Company $60.00 $12,000.00 Engineer's Estimate 200 EACH $50.00 $10,000.00
A0180 20301-1100 REMOVAL OF GATE
Hat Creek Construction & Materials, Inc. $1,200.00 $1,200.00 Herback General Engineering, LLC $785.00 $785.00 Qualcon Contractors, Inc. $5,000.00 $5,000.00 Granite Construction Company $5,000.00 $5,000.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
8 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0190 20301-1900 REMOVAL OF PIPE CULVERT
Hat Creek Construction & Materials, Inc. $500.00 $20,000.00 Herback General Engineering, LLC $790.00 $31,600.00 Qualcon Contractors, Inc. $1,200.00 $48,000.00 Granite Construction Company $7,000.00 $280,000.00 Engineer's Estimate 40 EACH $2,000.00 $80,000.00
A0200 20301-2400 REMOVAL OF SIGN
Hat Creek Construction & Materials, Inc. $200.00 $6,000.00 Herback General Engineering, LLC $55.00 $1,650.00 Qualcon Contractors, Inc. $150.00 $4,500.00 Granite Construction Company $150.00 $4,500.00 Engineer's Estimate 30 EACH $125.00 $3,750.00
A0210 20301-3400 REMOVAL OF WHEELSTOP
Hat Creek Construction & Materials, Inc. $80.00 $2,480.00 Herback General Engineering, LLC $55.00 $1,705.00 Qualcon Contractors, Inc. $150.00 $4,650.00 Granite Construction Company $100.00 $3,100.00 Engineer's Estimate 31 EACH $50.00 $1,550.00
A0220 20401-0000 ROADWAY EXCAVATION
Hat Creek Construction & Materials, Inc. $35.00 $283,500.00 Herback General Engineering, LLC $41.00 $332,100.00 Qualcon Contractors, Inc. $112.00 $907,200.00 Granite Construction Company $100.00 $810,000.00 Engineer's Estimate 8,100 CUYD $35.00 $283,500.00
A0230 20402-0000 SUBEXCAVATION
Hat Creek Construction & Materials, Inc. $125.00 $90,625.00 Herback General Engineering, LLC $164.00 $118,900.00 Qualcon Contractors, Inc. $160.00 $116,000.00 Granite Construction Company $140.00 $101,500.00 Engineer's Estimate 725 CUYD $150.00 $108,750.00
A0240 20441-0000 WASTE
Hat Creek Construction & Materials, Inc. $11.00 $10,450.00 Herback General Engineering, LLC $38.00 $36,100.00 Qualcon Contractors, Inc. $135.00 $128,250.00 Granite Construction Company $70.00 $66,500.00 Engineer's Estimate 950 CUYD $20.00 $19,000.00
9 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0250 20820-0000 DEWATERING
Hat Creek Construction & Materials, Inc. Lump Sum $100,000.00 Herback General Engineering, LLC Lump Sum $66,555.00 Qualcon Contractors, Inc. Lump Sum $150,000.00 Granite Construction Company Lump Sum $850,000.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00
A0260 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Hat Creek Construction & Materials, Inc. $260.00 $24,700.00 Herback General Engineering, LLC $288.00 $27,360.00 Qualcon Contractors, Inc. $600.00 $57,000.00 Granite Construction Company $500.00 $47,500.00 Engineer's Estimate 95 CUYD $300.00 $28,500.00
A0270 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
Hat Creek Construction & Materials, Inc. $200.00 $10,000.00 Herback General Engineering, LLC $288.00 $14,400.00 Qualcon Contractors, Inc. $750.00 $37,500.00 Granite Construction Company $500.00 $25,000.00 Engineer's Estimate 50 CUYD $500.00 $25,000.00
A0280 25110-0400 GROUTED RIPRAP, METHOD A, CLASS 4
Hat Creek Construction & Materials, Inc. $460.00 $23,920.00 Herback General Engineering, LLC $320.00 $16,640.00 Qualcon Contractors, Inc. $950.00 $49,400.00 Granite Construction Company $600.00 $31,200.00 Engineer's Estimate 52 CUYD $700.00 $36,400.00
A0290 25125-0000 BOULDER
Hat Creek Construction & Materials, Inc. $410.00 $3,280.00 Herback General Engineering, LLC $300.00 $2,400.00 Qualcon Contractors, Inc. $500.00 $4,000.00 Granite Construction Company $300.00 $2,400.00 Engineer's Estimate 8 EACH $500.00 $4,000.00
A0300 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
Hat Creek Construction & Materials, Inc. $325.00 $40,625.00 Herback General Engineering, LLC $295.00 $36,875.00 Qualcon Contractors, Inc. $500.00 $62,500.00 Granite Construction Company $600.00 $75,000.00 Engineer's Estimate 125 CUYD $400.00 $50,000.00
10 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0310 30202-2000 ROADWAY AGGREGATE, METHOD 2
Hat Creek Construction & Materials, Inc. $60.00 $279,000.00 Herback General Engineering, LLC $61.00 $283,650.00 Qualcon Contractors, Inc. $65.00 $302,250.00 Granite Construction Company $100.00 $465,000.00 Engineer's Estimate 4,650 TON $50.00 $232,500.00
A0320 30302-1000 DITCH RECONDITIONING
Hat Creek Construction & Materials, Inc. $3.00 $22,875.00 Herback General Engineering, LLC $4.44 $33,855.00 Qualcon Contractors, Inc. $7.00 $53,375.00 Granite Construction Company $10.00 $76,250.00 Engineer's Estimate 7,625 LNFT $10.00 $76,250.00
A0330 30302-2000 SHOULDER RECONDITIONING
Hat Creek Construction & Materials, Inc. $7.00 $10,675.00 Herback General Engineering, LLC $3.95 $6,023.75 Qualcon Contractors, Inc. $10.00 $15,250.00 Granite Construction Company $15.00 $22,875.00 Engineer's Estimate 1,525 LNFT $10.00 $15,250.00
A0340 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
Hat Creek Construction & Materials, Inc. $50,000.00 $350,000.00 Herback General Engineering, LLC $66,775.00 $467,425.00 Qualcon Contractors, Inc. $85,000.00 $595,000.00 Granite Construction Company $125,000.00 $875,000.00 Engineer's Estimate 7.000 MILE $50,000.00 $350,000.00
A0350 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
Hat Creek Construction & Materials, Inc. $19.00 $49,875.00 Herback General Engineering, LLC $4.82 $12,652.50 Qualcon Contractors, Inc. $15.00 $39,375.00 Granite Construction Company $15.00 $39,375.00 Engineer's Estimate 2,625 SQYD $6.00 $15,750.00
A0360 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
Hat Creek Construction & Materials, Inc. $157.00 $2,767,125.00 Herback General Engineering, LLC $200.00 $3,525,000.00 Qualcon Contractors, Inc. $150.00 $2,643,750.00 Granite Construction Company $115.00 $2,026,875.00 Engineer's Estimate 17,625 TON $160.00 $2,820,000.00
11 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Hat Creek Construction & Materials, Inc. $1.00 $176.00 Herback General Engineering, LLC $9.75 $1,716.00 Qualcon Contractors, Inc. $850.00 $149,600.00 Granite Construction Company $800.00 $140,800.00 Engineer's Estimate 176 TON $500.00 $88,000.00
A0400 40601-0000 FOG SEAL
Hat Creek Construction & Materials, Inc. $900.00 $42,300.00 Herback General Engineering, LLC $1,125.00 $52,875.00 Qualcon Contractors, Inc. $1,000.00 $47,000.00 Granite Construction Company $700.00 $32,900.00 Engineer's Estimate 47 TON $1,000.00 $47,000.00
A0410 41102-1000 PRIME COAT, METHOD 1
Hat Creek Construction & Materials, Inc. $1.65 $178,695.00 Herback General Engineering, LLC $1.75 $189,525.00 Qualcon Contractors, Inc. $1.00 $108,300.00 Granite Construction Company $0.50 $54,150.00 Engineer's Estimate 108,300 SQYD $1.00 $108,300.00
A0420 41105-0000 BLOTTER
Hat Creek Construction & Materials, Inc. $105.00 $15,750.00 Herback General Engineering, LLC $77.50 $11,625.00 Qualcon Contractors, Inc. $140.00 $21,000.00 Granite Construction Company $50.00 $7,500.00 Engineer's Estimate 150 TON $100.00 $15,000.00
A0430 41201-0000 TACK COAT
Hat Creek Construction & Materials, Inc. $1,000.00 $45,000.00 Herback General Engineering, LLC $1,675.00 $75,375.00 Qualcon Contractors, Inc. $1,400.00 $63,000.00 Granite Construction Company $700.00 $31,500.00 Engineer's Estimate 45 TON $1,000.00 $45,000.00
A0440 60103-0000 CONCRETE, HEADWALL
Hat Creek Construction & Materials, Inc. $95,000.00 $285,000.00 Herback General Engineering, LLC $52,000.00 $156,000.00 Qualcon Contractors, Inc. $25,000.00 $75,000.00 Granite Construction Company $100,000.00 $300,000.00 Engineer's Estimate 3 EACH $25,000.00 $75,000.00
12 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0450 60201-0600 18-INCH PIPE CULVERT
Hat Creek Construction & Materials, Inc. $200.00 $120,000.00 Herback General Engineering, LLC $205.00 $123,000.00 Qualcon Contractors, Inc. $175.00 $105,000.00 Granite Construction Company $300.00 $180,000.00 Engineer's Estimate 600 LNFT $190.00 $114,000.00
A0460 60201-0800 24-INCH PIPE CULVERT
Hat Creek Construction & Materials, Inc. $215.00 $279,500.00 Herback General Engineering, LLC $215.00 $279,500.00 Qualcon Contractors, Inc. $200.00 $260,000.00 Granite Construction Company $325.00 $422,500.00 Engineer's Estimate 1,300 LNFT $240.00 $312,000.00
A0470 60202-1500 90-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hat Creek Construction & Materials, Inc. $580.00 $30,160.00 Herback General Engineering, LLC $940.00 $48,880.00 Qualcon Contractors, Inc. $1,000.00 $52,000.00 Granite Construction Company $1,500.00 $78,000.00 Engineer's Estimate 52 LNFT $1,000.00 $52,000.00
A0480 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
Hat Creek Construction & Materials, Inc. $117.00 $1,170.00 Herback General Engineering, LLC $740.00 $7,400.00 Qualcon Contractors, Inc. $500.00 $5,000.00 Granite Construction Company $700.00 $7,000.00 Engineer's Estimate 10 EACH $800.00 $8,000.00
A0490 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Hat Creek Construction & Materials, Inc. $175.00 $4,725.00 Herback General Engineering, LLC $830.00 $22,410.00 Qualcon Contractors, Inc. $600.00 $16,200.00 Granite Construction Company $800.00 $21,600.00 Engineer's Estimate 27 EACH $1,000.00 $27,000.00
A0500 60403-0000 INLET
Hat Creek Construction & Materials, Inc. $3,800.00 $91,200.00 Herback General Engineering, LLC $4,950.00 $118,800.00 Qualcon Contractors, Inc. $7,000.00 $168,000.00 Granite Construction Company $5,000.00 $120,000.00 Engineer's Estimate 24 EACH $4,000.00 $96,000.00
13 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0510 60405-0000 MANHOLE ADJUSTMENT
Hat Creek Construction & Materials, Inc. $2,450.00 $22,050.00 Herback General Engineering, LLC $915.00 $8,235.00 Qualcon Contractors, Inc. $1,800.00 $16,200.00 Granite Construction Company $1,500.00 $13,500.00 Engineer's Estimate 9 EACH $1,500.00 $13,500.00
A0520 60409-0000 INLET TOP, METAL FRAME AND GRATE
Hat Creek Construction & Materials, Inc. $705.00 $16,920.00 Herback General Engineering, LLC $165.00 $3,960.00 Qualcon Contractors, Inc. $1,200.00 $28,800.00 Granite Construction Company $1,500.00 $36,000.00 Engineer's Estimate 24 EACH $1,000.00 $24,000.00
A0530 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM
Hat Creek Construction & Materials, Inc. $80.00 $320,000.00 Herback General Engineering, LLC $100.00 $400,000.00 Qualcon Contractors, Inc. $130.00 $520,000.00 Granite Construction Company $85.00 $340,000.00 Engineer's Estimate 4,000 LNFT $50.00 $200,000.00
A0540 60601-0000 SPILLWAY ASSEMBLY
Hat Creek Construction & Materials, Inc. $4,500.00 $4,500.00 Herback General Engineering, LLC $3,540.00 $3,540.00 Qualcon Contractors, Inc. $7,500.00 $7,500.00 Granite Construction Company $15,000.00 $15,000.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
A0550 60705-0000 REPAIRING DRAINAGE STRUCTURE
Hat Creek Construction & Materials, Inc. $40,000.00 $40,000.00 Herback General Engineering, LLC $43,135.00 $43,135.00 Qualcon Contractors, Inc. $40,000.00 $40,000.00 Granite Construction Company $200,000.00 $200,000.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00
A0560 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
Hat Creek Construction & Materials, Inc. $12.00 $156,000.00 Herback General Engineering, LLC $9.25 $120,250.00 Qualcon Contractors, Inc. $5.00 $65,000.00 Granite Construction Company $1.25 $16,250.00 Engineer's Estimate 13,000 LNFT $10.00 $130,000.00
14 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0570 60901-8000 CURB, TIMBER
Hat Creek Construction & Materials, Inc. $55.00 $1,100.00 Herback General Engineering, LLC $68.00 $1,360.00 Qualcon Contractors, Inc. $500.00 $10,000.00 Granite Construction Company $150.00 $3,000.00 Engineer's Estimate 20 LNFT $25.00 $500.00
A0580 60907-1000 PAVED DITCH, ASPHALT
Hat Creek Construction & Materials, Inc. $6.00 $8,400.00 Herback General Engineering, LLC $18.30 $25,620.00 Qualcon Contractors, Inc. $35.00 $49,000.00 Granite Construction Company $4.00 $5,600.00 Engineer's Estimate 1,400 LNFT $20.00 $28,000.00
A0590 60915-1000 WHEELSTOP, CONCRETE
Hat Creek Construction & Materials, Inc. $50.00 $2,000.00 Herback General Engineering, LLC $58.00 $2,320.00 Qualcon Contractors, Inc. $500.00 $20,000.00 Granite Construction Company $80.00 $3,200.00 Engineer's Estimate 40 EACH $100.00 $4,000.00
A0600 61504-1000 ACCESSIBILITY RAMP, CONCRETE
Hat Creek Construction & Materials, Inc. $1,200.00 $3,600.00 Herback General Engineering, LLC $665.00 $1,995.00 Qualcon Contractors, Inc. $4,000.00 $12,000.00 Granite Construction Company $1,500.00 $4,500.00 Engineer's Estimate 3 SQYD $200.00 $600.00
A0610 61701-5100 GUARDRAIL SYSTEM MGS, TYPE 4, CLASS B STEEL POSTS
Hat Creek Construction & Materials, Inc. $65.00 $17,875.00 Herback General Engineering, LLC $74.00 $20,350.00 Qualcon Contractors, Inc. $100.00 $27,500.00 Granite Construction Company $250.00 $68,750.00 Engineer's Estimate 275 LNFT $100.00 $27,500.00
A0620 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Hat Creek Construction & Materials, Inc. $7,750.00 $54,250.00 Herback General Engineering, LLC $8,786.00 $61,502.00 Qualcon Contractors, Inc. $9,000.00 $63,000.00 Granite Construction Company $14,000.00 $98,000.00 Engineer's Estimate 7 EACH $4,000.00 $28,000.00
15 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0630 61702-1700 TERMINAL SECTION, TYPE MGS-BAT
Hat Creek Construction & Materials, Inc. $5,995.00 $5,995.00 Herback General Engineering, LLC $6,796.00 $6,796.00 Qualcon Contractors, Inc. $7,500.00 $7,500.00 Granite Construction Company $15,000.00 $15,000.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00
A0640 61902-1400 GATE, METAL, 16 FEET WIDTH
Hat Creek Construction & Materials, Inc. $8,900.00 $8,900.00 Herback General Engineering, LLC $10,400.00 $10,400.00 Qualcon Contractors, Inc. $10,000.00 $10,000.00 Granite Construction Company $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00
A0650 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Hat Creek Construction & Materials, Inc. $125.00 $10,000.00 Herback General Engineering, LLC $155.00 $12,400.00 Qualcon Contractors, Inc. $150.00 $12,000.00 Granite Construction Company $180.00 $14,400.00 Engineer's Estimate 80 HOUR $110.00 $8,800.00
A0660 62201-0350 BACKHOE
Hat Creek Construction & Materials, Inc. $131.00 $10,480.00 Herback General Engineering, LLC $150.00 $12,000.00 Qualcon Contractors, Inc. $100.00 $8,000.00 Granite Construction Company $225.00 $18,000.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00
A0670 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
Hat Creek Construction & Materials, Inc. $181.00 $7,240.00 Herback General Engineering, LLC $250.00 $10,000.00 Qualcon Contractors, Inc. $150.00 $6,000.00 Granite Construction Company $225.00 $9,000.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00
A0680 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Hat Creek Construction & Materials, Inc. $205.00 $8,200.00 Herback General Engineering, LLC $250.00 $10,000.00 Qualcon Contractors, Inc. $150.00 $6,000.00 Granite Construction Company $250.00 $10,000.00 Engineer's Estimate 40 HOUR $170.00 $6,800.00
16 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0690 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Hat Creek Construction & Materials, Inc. $170.00 $6,800.00 Herback General Engineering, LLC $250.00 $10,000.00 Qualcon Contractors, Inc. $150.00 $6,000.00 Granite Construction Company $250.00 $10,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A0700 62301-0000 GENERAL LABOR
Hat Creek Construction & Materials, Inc. $80.00 $8,000.00 Herback General Engineering, LLC $96.00 $9,600.00 Qualcon Contractors, Inc. $80.00 $8,000.00 Granite Construction Company $95.00 $9,500.00 Engineer's Estimate 100 HOUR $85.00 $8,500.00
A0710 62302-0100 SPECIAL LABOR, SLOPE SCALING
Hat Creek Construction & Materials, Inc. $1,100.00 $44,000.00 Herback General Engineering, LLC $100.00 $4,000.00 Qualcon Contractors, Inc. $300.00 $12,000.00 Granite Construction Company $1,100.00 $44,000.00 Engineer's Estimate 40 HOUR $500.00 $20,000.00
A0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Hat Creek Construction & Materials, Inc. $150.00 $6,000.00 Herback General Engineering, LLC $250.00 $10,000.00 Qualcon Contractors, Inc. $180.00 $7,200.00 Granite Construction Company $220.00 $8,800.00 Engineer's Estimate 40 HOUR $165.00 $6,600.00
A0730 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Hat Creek Construction & Materials, Inc. $205.00 $8,200.00 Herback General Engineering, LLC $250.00 $10,000.00 Qualcon Contractors, Inc. $300.00 $12,000.00 Granite Construction Company $300.00 $12,000.00 Engineer's Estimate 40 HOUR $190.00 $7,600.00
A0740 62401-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
Hat Creek Construction & Materials, Inc. $10.00 $233,750.00 Herback General Engineering, LLC $7.00 $163,625.00 Qualcon Contractors, Inc. $13.00 $303,875.00 Granite Construction Company $9.00 $210,375.00 Engineer's Estimate 23,375 SQYD $5.00 $116,875.00
17 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0750 62510-2000 SEEDING, HYDRAULIC METHOD
Hat Creek Construction & Materials, Inc. $5,891.00 $29,455.00 Herback General Engineering, LLC $4,540.00 $22,700.00 Qualcon Contractors, Inc. $6,500.00 $32,500.00 Granite Construction Company $14,000.00 $70,000.00 Engineer's Estimate 5.0 ACRE $3,500.00 $17,500.00
A0760 62515-2000 MULCHING, HYDRAULIC METHOD
Hat Creek Construction & Materials, Inc. $2,495.00 $12,475.00 Herback General Engineering, LLC $2,830.00 $14,150.00 Qualcon Contractors, Inc. $3,000.00 $15,000.00 Granite Construction Company $2,000.00 $10,000.00 Engineer's Estimate 5.0 ACRE $2,500.00 $12,500.00
A0770 63301-0000 SIGN SYSTEM
Hat Creek Construction & Materials, Inc. $450.00 $31,500.00 Herback General Engineering, LLC $625.00 $43,750.00 Qualcon Contractors, Inc. $750.00 $52,500.00 Granite Construction Company $1,200.00 $84,000.00 Engineer's Estimate 70 EACH $500.00 $35,000.00
A0780 63308-4000 OBJECT MARKER, TYPE CALTRANS TYPE L
Hat Creek Construction & Materials, Inc. $55.00 $440.00 Herback General Engineering, LLC $140.00 $1,120.00 Qualcon Contractors, Inc. $300.00 $2,400.00 Granite Construction Company $200.00 $1,600.00 Engineer's Estimate 8 EACH $75.00 $600.00
A0790 63309-1000 DELINEATOR, TYPE SNOW POLE (OBJECT MARKER)
Hat Creek Construction & Materials, Inc. $30.00 $9,000.00 Herback General Engineering, LLC $187.00 $56,100.00 Qualcon Contractors, Inc. $120.00 $36,000.00 Granite Construction Company $200.00 $60,000.00 Engineer's Estimate 300 EACH $90.00 $27,000.00
A0800 63309-1000 DELINEATOR, TYPE SNOW POLE
Hat Creek Construction & Materials, Inc. $55.00 $17,600.00 Herback General Engineering, LLC $187.00 $59,840.00 Qualcon Contractors, Inc. $120.00 $38,400.00 Granite Construction Company $200.00 $64,000.00 Engineer's Estimate 320 EACH $90.00 $28,800.00
18 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0810 63316-1000 REMOVE AND RESET SIGN
Hat Creek Construction & Materials, Inc. $350.00 $1,050.00 Herback General Engineering, LLC $285.00 $855.00 Qualcon Contractors, Inc. $800.00 $2,400.00 Granite Construction Company $600.00 $1,800.00 Engineer's Estimate 3 EACH $300.00 $900.00
A0820 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Hat Creek Construction & Materials, Inc. $0.55 $2,310.00 Herback General Engineering, LLC $0.62 $2,604.00 Qualcon Contractors, Inc. $1.00 $4,200.00 Granite Construction Company $1.00 $4,200.00 Engineer's Estimate 4,200 LNFT $2.00 $8,400.00
A0830 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Hat Creek Construction & Materials, Inc. $715.00 $32,175.00 Herback General Engineering, LLC $810.00 $36,450.00 Qualcon Contractors, Inc. $1,200.00 $54,000.00 Granite Construction Company $1,000.00 $45,000.00 Engineer's Estimate 45.0 MILE $1,000.00 $45,000.00
A0840 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Hat Creek Construction & Materials, Inc. $455.00 $910.00 Herback General Engineering, LLC $516.00 $1,032.00 Qualcon Contractors, Inc. $1,200.00 $2,400.00 Granite Construction Company $700.00 $1,400.00 Engineer's Estimate 2.0 MILE $1,000.00 $2,000.00
A0850 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW
Hat Creek Construction & Materials, Inc. $80.00 $80.00 Herback General Engineering, LLC $91.00 $91.00 Qualcon Contractors, Inc. $500.00 $500.00 Granite Construction Company $150.00 $150.00 Engineer's Estimate 1 EACH $500.00 $500.00
A0860 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
Hat Creek Construction & Materials, Inc. $80.00 $240.00 Herback General Engineering, LLC $91.00 $273.00 Qualcon Contractors, Inc. $500.00 $1,500.00 Granite Construction Company $150.00 $450.00 Engineer's Estimate 3 EACH $500.00 $1,500.00
19 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0870 63405-0700 PAVEMENT MARKINGS, TYPE B, "STOP" WORD MESSAGE
Hat Creek Construction & Materials, Inc. $150.00 $300.00 Herback General Engineering, LLC $170.00 $340.00 Qualcon Contractors, Inc. $500.00 $1,000.00 Granite Construction Company $200.00 $400.00 Engineer's Estimate 2 EACH $700.00 $1,400.00
A0880 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
Hat Creek Construction & Materials, Inc. $125.00 $250.00 Herback General Engineering, LLC $142.00 $284.00 Qualcon Contractors, Inc. $600.00 $1,200.00 Granite Construction Company $200.00 $400.00 Engineer's Estimate 2 EACH $350.00 $700.00
A0890 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
Hat Creek Construction & Materials, Inc. $30.00 $1,500.00 Herback General Engineering, LLC $320.00 $16,000.00 Qualcon Contractors, Inc. $200.00 $10,000.00 Granite Construction Company $110.00 $5,500.00 Engineer's Estimate 50 EACH $100.00 $5,000.00
A0900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Hat Creek Construction & Materials, Inc. $55.00 $440.00 Herback General Engineering, LLC $385.00 $3,080.00 Qualcon Contractors, Inc. $600.00 $4,800.00 Granite Construction Company $300.00 $2,400.00 Engineer's Estimate 8 EACH $300.00 $2,400.00
A0910 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
Hat Creek Construction & Materials, Inc. $30.00 $1,500.00 Herback General Engineering, LLC $122.00 $6,100.00 Qualcon Contractors, Inc. $120.00 $6,000.00 Granite Construction Company $75.00 $3,750.00 Engineer's Estimate 50 EACH $50.00 $2,500.00
A0920 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
Hat Creek Construction & Materials, Inc. $75.00 $7,500.00 Herback General Engineering, LLC $122.00 $12,200.00 Qualcon Contractors, Inc. $150.00 $15,000.00 Granite Construction Company $125.00 $12,500.00 Engineer's Estimate 100 EACH $100.00 $10,000.00
20 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0930 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Hat Creek Construction & Materials, Inc. $15,000.00 $30,000.00 Herback General Engineering, LLC $3,700.00 $7,400.00 Qualcon Contractors, Inc. $10,000.00 $20,000.00 Granite Construction Company $18,000.00 $36,000.00 Engineer's Estimate 2 EACH $10,000.00 $20,000.00
A0940 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
Hat Creek Construction & Materials, Inc. $140.00 $42,000.00 Herback General Engineering, LLC $98.00 $29,400.00 Qualcon Contractors, Inc. $250.00 $75,000.00 Granite Construction Company $100.00 $30,000.00 Engineer's Estimate 300 LNFT $75.00 $22,500.00
A0950 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Hat Creek Construction & Materials, Inc. $8.00 $5,200.00 Herback General Engineering, LLC $6.25 $4,062.50 Qualcon Contractors, Inc. $15.00 $9,750.00 Granite Construction Company $25.00 $16,250.00 Engineer's Estimate 650 LNFT $7.00 $4,550.00
A0960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Hat Creek Construction & Materials, Inc. $38.00 $8,436.00 Herback General Engineering, LLC $35.00 $7,770.00 Qualcon Contractors, Inc. $100.00 $22,200.00 Granite Construction Company $15.00 $3,330.00 Engineer's Estimate 222 SQFT $30.00 $6,660.00
A0970 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Hat Creek Construction & Materials, Inc. $1,600.00 $33,120.00 Herback General Engineering, LLC $1,026.00 $21,238.20 Qualcon Contractors, Inc. $600.00 $12,420.00 Granite Construction Company $700.00 $14,490.00 Engineer's Estimate 20.7 MILE $1,000.00 $20,700.00
A0980 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Hat Creek Construction & Materials, Inc. $80.00 $480,000.00 Herback General Engineering, LLC $89.00 $534,000.00 Qualcon Contractors, Inc. $90.00 $540,000.00 Granite Construction Company $95.00 $570,000.00 Engineer's Estimate 6,000 HOUR $75.00 $450,000.00
21 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0990 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Hat Creek Construction & Materials, Inc. $100.00 $200,000.00 Herback General Engineering, LLC $107.00 $214,000.00 Qualcon Contractors, Inc. $110.00 $220,000.00 Granite Construction Company $115.00 $230,000.00 Engineer's Estimate 2,000 HOUR $90.00 $180,000.00
A1000 64620-0400 REMOVE AND RESET MAILBOX
Hat Creek Construction & Materials, Inc. $600.00 $600.00 Herback General Engineering, LLC $1,225.00 $1,225.00 Qualcon Contractors, Inc. $10,000.00 $10,000.00 Granite Construction Company $1,500.00 $1,500.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00
Total Schedule - All Items
Hat Creek Construction & Materials, Inc. $9,301,103.00 Herback General Engineering, LLC $9,665,171.45 Qualcon Contractors, Inc. $10,727,045.00 Granite Construction Company $13,599,670.00 Engineer's Estimate $8,580,600.00
22 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF19B000010
Division: Central Federal Lands
State: CA County: Inyo
Federal Land: Inyo National Forest Opened at: Lakewood, CO
Opened by: Ryan Phillips
Date: 12/10/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Granite Construction Company $353,185.00 3005 James Road Bakersfield, CA 93308
Herback General Engineering, LLC $387,878.99 2531 Nowlin Road Minden, NV 89423
Hat Creek Construction & Materials, Inc. $498,925.00 24339 Highway 89 N Burney, CA 96013
Qualcon Contractors, Inc. $521,825.00 1645 Esmeralda Ave Minden, NV 89423
Engineer's Estimate $473,000.00
23 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0010 15101-0000 MOBILIZATION
Granite Construction Company Lump Sum $35,000.00 Herback General Engineering, LLC Lump Sum $42,769.66 Hat Creek Construction & Materials, Inc. Lump Sum $49,000.00 Qualcon Contractors, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $51,880.00
X0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Granite Construction Company $24,000.00 $31,200.00 Herback General Engineering, LLC $5,151.41 $6,696.83 Hat Creek Construction & Materials, Inc. $5,280.00 $6,864.00 Qualcon Contractors, Inc. $25,000.00 $32,500.00 Engineer's Estimate 1.300 MILE $8,000.00 $10,400.00
X0030 15301-0000 CONTRACTOR QUALITY CONTROL
Granite Construction Company Lump Sum $15,000.00 Herback General Engineering, LLC Lump Sum $15,462.00 Hat Creek Construction & Materials, Inc. Lump Sum $25,000.00 Qualcon Contractors, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
X0040 15401-0000 CONTRACTOR TESTING
Granite Construction Company Lump Sum $2,000.00 Herback General Engineering, LLC Lump Sum $17,005.00 Hat Creek Construction & Materials, Inc. Lump Sum $19,316.00 Qualcon Contractors, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
X0050 15501-0000 CONSTRUCTION SCHEDULE
Granite Construction Company Lump Sum $100.00 Herback General Engineering, LLC Lump Sum $2,061.00 Hat Creek Construction & Materials, Inc. Lump Sum $5,000.00 Qualcon Contractors, Inc. Lump Sum $1,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
X0060 15802-0000 WATERING FOR DUST CONTROL
Granite Construction Company Lump Sum $1,000.00 Herback General Engineering, LLC Lump Sum $21,161.00 Hat Creek Construction & Materials, Inc. Lump Sum $10,000.00 Qualcon Contractors, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
24 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0070 20101-0000 CLEARING AND GRUBBING
Granite Construction Company $20,000.00 $6,000.00 Herback General Engineering, LLC $6,795.00 $2,038.50 Hat Creek Construction & Materials, Inc. $15,000.00 $4,500.00 Qualcon Contractors, Inc. $50,000.00 $15,000.00 Engineer's Estimate 0.3 ACRE $3,000.00 $900.00
X0080 20301-1100 REMOVAL OF GATE
Granite Construction Company $2,000.00 $12,000.00 Herback General Engineering, LLC $765.00 $4,590.00 Hat Creek Construction & Materials, Inc. $1,200.00 $7,200.00 Qualcon Contractors, Inc. $5,000.00 $30,000.00 Engineer's Estimate 6 EACH $1,000.00 $6,000.00
X0090 30202-2000 ROADWAY AGGREGATE, METHOD 2
Granite Construction Company $100.00 $15,500.00 Herback General Engineering, LLC $86.00 $13,330.00 Hat Creek Construction & Materials, Inc. $60.00 $9,300.00 Qualcon Contractors, Inc. $120.00 $18,600.00 Engineer's Estimate 155 TON $50.00 $7,750.00
X0100 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
Granite Construction Company $8.00 $44,400.00 Herback General Engineering, LLC $4.75 $26,362.50 Hat Creek Construction & Materials, Inc. $15.00 $83,250.00 Qualcon Contractors, Inc. $12.00 $66,600.00 Engineer's Estimate 5,550 SQYD $6.00 $33,300.00
X0110 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Granite Construction Company $150.00 $135,000.00 Herback General Engineering, LLC $155.00 $139,500.00 Hat Creek Construction & Materials, Inc. $210.00 $189,000.00 Qualcon Contractors, Inc. $230.00 $207,000.00 Engineer's Estimate 900 TON $225.00 $202,500.00
X0120 40601-0000 FOG SEAL
Granite Construction Company $700.00 $3,500.00 Herback General Engineering, LLC $1,715.00 $8,575.00 Hat Creek Construction & Materials, Inc. $900.00 $4,500.00 Qualcon Contractors, Inc. $1,000.00 $5,000.00 Engineer's Estimate 5 TON $1,000.00 $5,000.00
25 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0130 40605-0000 BLOTTER
Granite Construction Company $1,000.00 $1,000.00 Herback General Engineering, LLC $65.00 $65.00 Hat Creek Construction & Materials, Inc. $105.00 $105.00 Qualcon Contractors, Inc. $5,000.00 $5,000.00 Engineer's Estimate 1 TON $70.00 $70.00
X0140 41102-1000 PRIME COAT, METHOD 1
Granite Construction Company $0.70 $3,885.00 Herback General Engineering, LLC $2.35 $13,042.50 Hat Creek Construction & Materials, Inc. $2.00 $11,100.00 Qualcon Contractors, Inc. $1.50 $8,325.00 Engineer's Estimate 5,550 SQYD $1.00 $5,550.00
X0150 41201-0000 TACK COAT
Granite Construction Company $700.00 $2,100.00 Herback General Engineering, LLC $3,250.00 $9,750.00 Hat Creek Construction & Materials, Inc. $1,000.00 $3,000.00 Qualcon Contractors, Inc. $1,400.00 $4,200.00 Engineer's Estimate 3 TON $1,000.00 $3,000.00
X0160 61902-2100 GATE, METAL, 30 FEET WIDTH
Granite Construction Company $7,500.00 $7,500.00 Herback General Engineering, LLC $12,950.00 $12,950.00 Hat Creek Construction & Materials, Inc. $10,000.00 $10,000.00 Qualcon Contractors, Inc. $12,000.00 $12,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00
X0170 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Granite Construction Company $180.00 $3,600.00 Herback General Engineering, LLC $155.00 $3,100.00 Hat Creek Construction & Materials, Inc. $125.00 $2,500.00 Qualcon Contractors, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $110.00 $2,200.00
X0180 62201-0350 BACKHOE
Granite Construction Company $225.00 $4,500.00 Herback General Engineering, LLC $150.00 $3,000.00 Hat Creek Construction & Materials, Inc. $131.00 $2,620.00 Qualcon Contractors, Inc. $100.00 $2,000.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00
26 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0190 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
Granite Construction Company $225.00 $4,500.00 Herback General Engineering, LLC $250.00 $5,000.00 Hat Creek Construction & Materials, Inc. $181.00 $3,620.00 Qualcon Contractors, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00
X0200 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Granite Construction Company $250.00 $5,000.00 Herback General Engineering, LLC $250.00 $5,000.00 Hat Creek Construction & Materials, Inc. $205.00 $4,100.00 Qualcon Contractors, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
X0210 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Granite Construction Company $250.00 $5,000.00 Herback General Engineering, LLC $250.00 $5,000.00 Hat Creek Construction & Materials, Inc. $170.00 $3,400.00 Qualcon Contractors, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
X0220 62301-0000 GENERAL LABOR
Granite Construction Company $95.00 $1,900.00 Herback General Engineering, LLC $96.00 $1,920.00 Hat Creek Construction & Materials, Inc. $80.00 $1,600.00 Qualcon Contractors, Inc. $80.00 $1,600.00 Engineer's Estimate 20 HOUR $85.00 $1,700.00
X0230 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Granite Construction Company $220.00 $2,200.00 Herback General Engineering, LLC $100.00 $1,000.00 Hat Creek Construction & Materials, Inc. $150.00 $1,500.00 Qualcon Contractors, Inc. $180.00 $1,800.00 Engineer's Estimate 10 HOUR $165.00 $1,650.00
X0240 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Granite Construction Company $300.00 $3,000.00 Herback General Engineering, LLC $250.00 $2,500.00 Hat Creek Construction & Materials, Inc. $205.00 $2,050.00 Qualcon Contractors, Inc. $300.00 $3,000.00 Engineer's Estimate 10 HOUR $190.00 $1,900.00
27 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0250 63308-5000 OBJECT MARKER, TYPE CALTRANS TYPE P
Granite Construction Company $200.00 $800.00 Herback General Engineering, LLC $250.00 $1,000.00 Hat Creek Construction & Materials, Inc. $100.00 $400.00 Qualcon Contractors, Inc. $300.00 $1,200.00 Engineer's Estimate 4 EACH $200.00 $800.00
X0260 63501-0000 TEMPORARY TRAFFIC CONTROL
Granite Construction Company Lump Sum $7,500.00 Herback General Engineering, LLC Lump Sum $25,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $40,000.00 Qualcon Contractors, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
Total Schedule - All Items
Granite Construction Company $353,185.00 Herback General Engineering, LLC $387,878.99 Hat Creek Construction & Materials, Inc. $498,925.00 Qualcon Contractors, Inc. $521,825.00 Engineer's Estimate $473,000.00
28 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF19B000010
Division: Central Federal Lands
State: CA County: Inyo
Federal Land: Inyo National Forest Opened at: Lakewood, CO
Opened by: Ryan Phillips
Date: 12/10/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Granite Construction Company $258,850.00 3005 James Road Bakersfield, CA 93308
Herback General Engineering, LLC $323,662.00 2531 Nowlin Road Minden, NV 89423
Qualcon Contractors, Inc. $415,585.00 1645 Esmeralda Ave Minden, NV 89423
Hat Creek Construction & Materials, Inc. $461,083.00 24339 Highway 89 N Burney, CA 96013
Engineer's Estimate $290,000.00
29 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0010 15101-0000 MOBILIZATION
Granite Construction Company Lump Sum $25,000.00 Herback General Engineering, LLC Lump Sum $42,769.00 Qualcon Contractors, Inc. Lump Sum $40,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $46,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,570.00
Y0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Granite Construction Company $4,000.00 $800.00 Herback General Engineering, LLC $9,260.00 $1,852.00 Qualcon Contractors, Inc. $40,000.00 $8,000.00 Hat Creek Construction & Materials, Inc. $5,280.00 $1,056.00 Engineer's Estimate 0.200 MILE $8,000.00 $1,600.00
Y0030 15301-0000 CONTRACTOR QUALITY CONTROL
Granite Construction Company Lump Sum $15,000.00 Herback General Engineering, LLC Lump Sum $10,300.00 Qualcon Contractors, Inc. Lump Sum $15,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
Y0040 15401-0000 CONTRACTOR TESTING
Granite Construction Company Lump Sum $2,000.00 Herback General Engineering, LLC Lump Sum $11,340.00 Qualcon Contractors, Inc. Lump Sum $5,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $31,382.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
Y0050 15501-0000 CONSTRUCTION SCHEDULE
Granite Construction Company Lump Sum $100.00 Herback General Engineering, LLC Lump Sum $2,061.00 Qualcon Contractors, Inc. Lump Sum $1,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
Y0060 15802-0000 WATERING FOR DUST CONTROL
Granite Construction Company Lump Sum $1,000.00 Herback General Engineering, LLC Lump Sum $18,098.00 Qualcon Contractors, Inc. Lump Sum $20,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
30 out of 39
Project No: CA FLAP INY CR2022(1)
Project Name: South Lake Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0070 20301-3400 REMOVAL OF WHEELSTOP
Granite Construction Company $125.00 $3,375.00 Herback General Engineering, LLC $55.00 $1,485.00 Qualcon Contractors, Inc. $100.00 $2,700.00 Hat Creek Construction & Materials, Inc. $80.00 $2,160.00 Engineer's Estimate 27 EACH $50.00 $1,350.00
Y0080 30202-2000 ROADWAY AGGREGATE, METHOD 2
Granite Construction Company $100.00 $700.00 Herback General Engineering, LLC $97.00 $679.00 Qualcon Contractors, Inc. $120.00 $840.00 Hat Creek Construction & Materials, Inc. $60.00 $420.00 Engineer's Estimate 7 TON $50.00 $350.00
Y0090 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
Granite Construction Company $8.00 $23,280.00 Herback General Engineering, LLC $4.80 $13,968.00 Qualcon Contractors, Inc. $15.00 $43,650.00 Hat Creek Construction & Materials, Inc. $15.00 $43,650.00 Engineer's Estimate 2,910 SQYD $6.00 $17,460.00
Y0100 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Granite Construction Company $150.00 $120,000.00 Herback General Engineering, LLC $155.00 $124,000.00 Qualcon Contractors, Inc. $230.00 $184,000.00 Hat Creek Construction & Materials, Inc. $210.00 $168,000.00 Engineer's Estimate 800 TON $200.00 $160,000.00
Y0110 40601-0000 FOG SEAL
Granite Construction Company $700.00 $2,800.00 Herback General Engineering, LLC $1,970.00 $7,880.00 Qualcon Contractors, Inc. $1,000.00 $4,000.00 Hat Creek Construction & Materials, Inc. $900.00 $3,600.00 Engineer's Estimate 4 TON $1,000.00 $4,000.00
Y0120 40605-0000 BLOTTER
Granite…
This is the start of the file's text. The full file is on GovTribe.