This document is an invitation for bid for roadway construction services. The solicitation is for rehabilitation and improvements to 6.9 miles of South Lake Road and adjacent facilities located in Inyo County, California. Work includes pulverizing and paving existing road sections, minor widening, grading, drainage improvements, slope scaling, signage upgrades, and improvements to four campgrounds and parking areas. Estimated quantities include 8,100 cubic yards of excavation and 17,625 tons of asphalt pavement. Bids are due on December 10, 2019 and contract award will occur in December 2019, with construction to begin in January 2020 and be complete by October 2020. The estimated value of the project is between $7-10 million. The solicitation is issued by the U.S. Department of Transportation Federal Highway Administration Central Federal Lands Division.
Invitation for Bid
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: 6982AF19B000010
SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED)
PROJECT NUMBER: CA FLAP INY CR2022(1)
PROJECT NAME: SOUTH LAKE ROAD
BID OPENING DATE:
See Page A-1, Item 13A
This solicitation cites Standard Specifications for
Construction of Roads and Bridges on
Federal Highway Projects, FP-14 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: http://www.fbo.gov
E-mail: CFLContracts@dot.gov mailto:CFLContracts@dot.gov
PROJECT CA FLAP INY CR2022(1)
LOCATION INYO NATIONAL FOREST
COUNTY INYO
STATE CALIFORNIA
LENGTH SCHEDULE A: 6.90 MILES
OPTION X: 1.21 MILES
OPTION Y: 0.17 MILES
OPTION Z: 0.30 MILES
TYPE OF IMPROVEMENT ROAD REHABILITATION, ASPHALT
SURFACING, PARKING AREAS, AND
DRAINAGE
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-4
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Construction Wage Rate Requirement............................................................................ D-1
Division 100 ..................................................................................................................... E-1
Division 150 ................................................................................................................... E-17
Division 200 ................................................................................................................... E-32
Division 300 ................................................................................................................... E-39
Division 400 ................................................................................................................... E-40
Division 500 ................................................................................................................... E-55
Division 600 ................................................................................................................... E-57
Division 700 ................................................................................................................... E-72
APPENDICES
Appendix A ............................................................................................................. Fire Plan
Appendix B ................................................................................................. 401/404 Permits
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard
Specification for Construction of Roads and Bridges on Federal Highway Projects
Appendix C ..........................................................................................Encroachment Permit
Appendix D .................................................................. Small Business Subcontracting Plan
NOTICE TO BIDDERS
A-i
PROJECT OVERVIEW
The existing South Lake Road is a two-lane paved roadway with varying widths and variable width unpaved shoulders, as well as multiple paved and unpaved pull-offs and intersecting roadways. The proposed road improvements include pulverizing and paving, minor widening, grading, and drainage improvements to 6.9 miles of South Lake Road and adjacent campgrounds and parking facilities.
I. PRE-BID INFORMATION
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Submit the following documents with your
Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2
• Indication of interest in formal Partnering, Page A-6
• Bid Schedule including Buy American Act & Hazardous Materials, Pages A-12 through
A-30
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
• Completed the VETS-4212 declaration, Page A-ii; Bidders’ Information, Pages B-3 through
B-6.
• Annual Representations and Certifications (FAR Provision 52.204-8) and Certification Regarding Responsibility Matters (FAR Provision 52.209-5).
• HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.
• Completed an applicable Authority to Bind certificate, pages A-7 through A-11
Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations
(FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads http://www.fbo.gov/
A-ii and Bridges on Federal Highway Projects, FP-14.
The FP-14 was utilized for the design of this project. Paper copies of the FP-14 will not be provided to bidders or the awarded Prime Contractor. The FP-14 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ and a copy is uploaded with this solicitation. A single paper copy can be obtained from the Research & Technology Distribution Center (RTPDC) by email report.center@dot.gov .
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at http://farsite.hill.af.mil/vffara.htm.
Notice of SAM Registration – you must be registered in the System for Award Management
(SAM) prior to submission of a bid in response to this solicitation. Failure to register prior to submission of a bid may require award to the next successful registered offeror. See FAR Subpart
4.1102. Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 –
Highway, Street & Bridge Construction with a small business size standard of $39.5 million. If your average annual gross receipts for the past 3 years are above $39.5 million, you are a large business for this solicitation. If they are below $39.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and
Certifications. The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. Please include NAICS
237310 in SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
My firm had a qualifying Federal Contract in 2019 and has complied with the reporting requirements.
My firm did not have a qualifying Federal Contract in 2019 and is therefore exempt from the reporting requirements
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of
10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern (SBC). The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.
https://flh.fhwa.dot.gov/resources/specs/ mailto:report.center@dot.gov http://farsite.hill.af.mil/vffara.htm http://www.sam.gov/ http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm
A-iii
A qualified HUBZone SBC receiving a contract under this solicitation for general construction must:
(i) At least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the prime contractor’s employees;
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-14. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The
Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON DECEMBER 3, 2019
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce
(email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The
Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision
52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov http://osdbuweb.dot.gov/
A-iv
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded
Prime Contractor.
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime
Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1.5 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the
Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of
Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.sam.gov.
See Appendix D for Sample Small Business Subcontracting Plan.
NOTE:
Consider the following FHWA small business goals in development of Subcontracting plans and efforts:
FHWA Small Business Subcontracting Goals (As of FY 2019)
Business Size Goal (%)
SB 48.5%
SDB 5.0%
HUBZone 3.0%
WOSB 5.0%
http://web.sba.gov/subnet/ http://www.sam.gov/
A-v
SDVOSB 3.0%
Insurance requirements - See Subsection 107.05 of the FP-14.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction
Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the
CO. The Contractor shall be responsible for training additional staff.
The Contractor shall be required to submit a user account form to gain access to the EEBACS system. See
Subsection 108.01.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF19B000010
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
11/04/2019
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
HFLCEO190236PR
6. PROJECT NO.
CA FLAP INY CR2022(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Ryan Phillips, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 12/10/19 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA
FAR (48 CFR) 53.236-1(d)
X
X
X
X
X
A-1
STANDARD FORM 1442 (REV. 8/2014) BACK
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 10 U.S.C. 2304(c)( ) □ 41 U.S.C. 3304(a)( )
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
A-2
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.
Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov .
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-
14. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE
DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY
RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-14.
ESTIMATED
PRICE: The price range of the project work is between $7 and $10 million.
A-3
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule and three options.
Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the
Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Pay Item 15401-0000, Contractor testing
Bidders must provide prices on alternative Contractor Testing pay items for EACH SCHEDULE.
Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for each schedule. The price for this item will be included in the Construction Cost Total for each schedule and all totals on the Bid Summary, page A-30, therefore, included in the evaluation for award.
Bidders must also provide a stand alone price on the last page of each schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory, at the end of each bid schedule. This price will not be factored into the evaluation for award.
The Government retains the discretion to award a contract which includes either of the alternative
Contractor Testing items at the respective bid price.
Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A, Option X, Option Y and Option Z. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.
Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A.
Evaluation of options will not obligate the Government to exercise the option(s). If the determination
A-4 is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 60 days after contract award, per FAR clause 52.217-7, Option for
Increased Quantity- Separately Priced Line Item (MAR 1989).
A-5
Partnering
A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.
CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.
A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.
Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the
FP-14. Costs of partnering would be in addition to the contract award amount.
Please indicate your desire to participate in a formal partnering meeting on this project.
(___) We would like to participate in a formal partnering meeting.
(___) We do not want to participate in a formal partnering meeting.
A-6
INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.
certification with your offer/bid.
Corporate Certificate
I, (name), certify that I am the
(title), of the corporation named as the
Offeror/Principal herein;
that (name), who signed this offer and/or bid bond on behalf of (company name) is
(title) of this corporation;
that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.
(signature) Affix Corporate Seal
(title)
A-7
INSTRUCTIONS: When the offeror/principal is a limited liability corporation, include this certification with your offer/bid.
Limited Liability Certificate
I, (name), certify that I am the
(title), of the limited liability company named as the Offeror/Principal herein;
that (name), who signed this offer and/or bid bond on behalf of (company name) is
(title) of this company;
that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.
(signature) Affix Company Seal
(as applicable) (title)
A-8
INSTRUCTIONS: When the offeror/principal is a partnership, include this certification with your offer/bid.
Authority to Bind Partnership
This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting
Officer.
(Include names and signatures of all partners)
A-9
INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification
Authority to Bind Joint Venture
This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting
Officer.
(Include names and signatures of all applicable individuals)
A-10
INSTRUCTIONS: When the offeror/principal is a sole proprietorship, include this
Sole Proprietorship Requirement
An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor. If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.
A-11
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225- 12 Paragraph (b).
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-12
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and
Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the
Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products
Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
A-13
A - 14
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CA FLAP INY CR2022(1)
Project Name:South Lake Road
A - 15
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0020 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
2.300 MILE $____________ $____________
A0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING
5.000 MILE $____________ $____________
A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
40 EACH $____________ $____________
A0050 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
2.300 MILE $____________ $____________
A0060 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0070 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0090 15705-0100 SOIL EROSION CONTROL, SILT FENCE
960 LNFT $____________ $____________
A0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
1,100 LNFT $____________ $____________
A0110 15706-0200 SOIL EROSION CONTROL, CHECK DAM
65 EACH $____________ $____________
A0120 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
40 EACH $____________ $____________
A0130 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
2 EACH $____________ $____________
A0140 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP INY CR2022(1)
(Contractor-furnished Lab)
A - 16
A0150 20101-0000 CLEARING AND GRUBBING
15.5 ACRE $____________ $____________
A0160 20201-0000 SELECTIVE CLEARING
1.0 ACRE $____________ $____________
A0170 20301-0700 REMOVAL OF DELINEATOR (SNOW POLE)
200 EACH $____________ $____________
A0180 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A0190 20301-1900 REMOVAL OF PIPE CULVERT
40 EACH $____________ $____________
A0200 20301-2400 REMOVAL OF SIGN
30 EACH $____________ $____________
A0210 20301-3400 REMOVAL OF WHEELSTOP
31 EACH $____________ $____________
A0220 20401-0000 ROADWAY EXCAVATION
8,100 CUYD $____________ $____________
A0230 20402-0000 SUBEXCAVATION
725 CUYD $____________ $____________
A0240 20441-0000 WASTE
950 CUYD $____________ $____________
A0250 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
A0260 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
95 CUYD $____________ $____________
A0270 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
50 CUYD $____________ $____________
A0280 25110-0400 GROUTED RIPRAP, METHOD A, CLASS 4
52 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 17
A0290 25125-0000 BOULDER
8 EACH $____________ $____________
A0300 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
125 CUYD $____________ $____________
A0310 30202-2000 ROADWAY AGGREGATE, METHOD 2
4,650 TON $____________ $____________
A0320 30302-1000 DITCH RECONDITIONING
7,625 LNFT $____________ $____________
A0330 30302-2000 SHOULDER RECONDITIONING
1,525 LNFT $____________ $____________
A0340 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
7.000 MILE $____________ $____________
A0350 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
2,625 SQYD $____________ $____________
A0360 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
17,625 TON $____________ $____________
A0380 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
176 TON $____________ $____________
A0400 40601-0000 FOG SEAL
47 TON $____________ $____________
A0410 41102-1000 PRIME COAT, METHOD 1
108,300 SQYD $____________ $____________
A0420 41105-0000 BLOTTER
150 TON $____________ $____________
A0430 41201-0000 TACK COAT
45 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 18
A0440 60103-0000 CONCRETE, HEADWALL
3 EACH $____________ $____________
A0450 60201-0600 18-INCH PIPE CULVERT
600 LNFT $____________ $____________
A0460 60201-0800 24-INCH PIPE CULVERT
1,300 LNFT $____________ $____________
A0470 60202-1500 90-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
52 LNFT $____________ $____________
A0480 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
10 EACH $____________ $____________
A0490 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
27 EACH $____________ $____________
A0500 60403-0000 INLET
24 EACH $____________ $____________
A0510 60405-0000 MANHOLE ADJUSTMENT
9 EACH $____________ $____________
A0520 60409-0000 INLET TOP, METAL FRAME AND GRATE
24 EACH $____________ $____________
A0530 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM
4,000 LNFT $____________ $____________
A0540 60601-0000 SPILLWAY ASSEMBLY
1 EACH $____________ $____________
A0550 60705-0000 REPAIRING DRAINAGE STRUCTURE
1 EACH $____________ $____________
A0560 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
13,000 LNFT $____________ $____________
A0570 60901-8000 CURB, TIMBER
20 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 19
A0580 60907-1000 PAVED DITCH, ASPHALT
1,400 LNFT $____________ $____________
A0590 60915-1000 WHEELSTOP, CONCRETE
40 EACH $____________ $____________
A0600 61504-1000 ACCESSIBILITY RAMP, CONCRETE
3 SQYD $____________ $____________
A0610 61701-5100 GUARDRAIL SYSTEM MGS, TYPE 4, CLASS B STEEL POSTS
275 LNFT $____________ $____________
A0620 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
7 EACH $____________ $____________
A0630 61702-1700 TERMINAL SECTION, TYPE MGS-BAT
1 EACH $____________ $____________
A0640 61902-1400 GATE, METAL, 16 FEET WIDTH
1 EACH $____________ $____________
A0650 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A0660 62201-0350 BACKHOE
80 HOUR $____________ $____________
A0670 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A0680 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
A0690 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0700 62301-0000 GENERAL LABOR
100 HOUR $____________ $____________
A0710 62302-0100 SPECIAL LABOR, SLOPE SCALING
40 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 20
A0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
A0730 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A0740 62401-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
23,375 SQYD $____________ $____________
A0750 62510-2000 SEEDING, HYDRAULIC METHOD
5.0 ACRE $____________ $____________
A0760 62515-2000 MULCHING, HYDRAULIC METHOD
5.0 ACRE $____________ $____________
A0770 63301-0000 SIGN SYSTEM
70 EACH $____________ $____________
A0780 63308-4000 OBJECT MARKER, TYPE CALTRANS TYPE L
8 EACH $____________ $____________
A0790 63309-1000 DELINEATOR, TYPE SNOW POLE (OBJECT MARKER)
300 EACH $____________ $____________
A0800 63309-1000 DELINEATOR, TYPE SNOW POLE
320 EACH $____________ $____________
A0810 63316-1000 REMOVE AND RESET SIGN
3 EACH $____________ $____________
A0820 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
4,200 LNFT $____________ $____________
A0830 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
45.0 MILE $____________ $____________
A0840 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
2.0 MILE $____________ $____________
A0850 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 21
A0860 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
3 EACH $____________ $____________
A0870 63405-0700 PAVEMENT MARKINGS, TYPE B, "STOP" WORD MESSAGE
2 EACH $____________ $____________
A0880 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
A0890 63502-0500 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2
50 EACH $____________ $____________
A0900 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
8 EACH $____________ $____________
A0910 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
50 EACH $____________ $____________
A0920 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
A0930 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A0940 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
300 LNFT $____________ $____________
A0950 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
650 LNFT $____________ $____________
A0960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
222 SQFT $____________ $____________
A0970 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
20.7 MILE $____________ $____________
A0980 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
6,000 HOUR $____________ $____________
A0990 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
2,000 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 22
A1000 64620-0400 REMOVE AND RESET MAILBOX
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CA FLAP INY CR2022(1)
Project Name:South Lake Road
A0080 15401-0000 CONTRACTOR TESTING (Bid Item Alternative: Government Furnished Lab)
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $___LPSM_____ $____________
A - 23
X0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
1.300 MILE $____________ $____________
X0030 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0050 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X0060 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X0070 20101-0000 CLEARING AND GRUBBING
0.3 ACRE $____________ $____________
X0080 20301-1100 REMOVAL OF GATE
6 EACH $____________ $____________
X0090 30202-2000 ROADWAY AGGREGATE, METHOD 2
155 TON $____________ $____________
X0100 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
5,550 SQYD $____________ $____________
X0110 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
900 TON $____________ $____________
X0120 40601-0000 FOG SEAL
5 TON $____________ $____________
X0130 40605-0000 BLOTTER
1 TON $____________ $____________
X0140 41102-1000 PRIME COAT, METHOD 1
5,550 SQYD $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FLAP INY CR2022(1)
A - 24
X0150 41201-0000 TACK COAT
3 TON $____________ $____________
X0160 61902-2100 GATE, METAL, 30 FEET WIDTH
1 EACH $____________ $____________
X0170 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
X0180 62201-0350 BACKHOE
20 HOUR $____________ $____________
X0190 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
20 HOUR $____________ $____________
X0200 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
X0210 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
X0220 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
X0230 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
10 HOUR $____________ $____________
X0240 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
10 HOUR $____________ $____________
X0250 63308-5000 OBJECT MARKER, TYPE CALTRANS TYPE P
4 EACH $____________ $____________
X0260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CA FLAP INY CR2022(1)
Project Name:South Lake Road
X0080 15401-0000 CONTRACTOR TESTING (Bid Item Alternative: Government Furnished Lab)
A - 25
Y0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Y0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.200 MILE $____________ $____________
Y0030 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y0050 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Y0060 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Y0070 20301-3400 REMOVAL OF WHEELSTOP
27 EACH $____________ $____________
Y0080 30202-2000 ROADWAY AGGREGATE, METHOD 2
7 TON $____________ $____________
Y0090 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
2,910 SQYD $____________ $____________
Y0100 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
800 TON $____________ $____________
Y0110 40601-0000 FOG SEAL
4 TON $____________ $____________
Y0120 40605-0000 BLOTTER
1 TON $____________ $____________
Y0130 41102-1000 PRIME COAT, METHOD 1
6,850 SQYD $____________ $____________
Y0140 41201-0000 TACK COAT
4 TON $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CA FLAP INY CR2022(1)
A - 26
Y0150 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
740 LNFT $____________ $____________
Y0160 60915-1000 WHEELSTOP, CONCRETE
50 EACH $____________ $____________
Y0170 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
Y0180 62201-0350 BACKHOE
20 HOUR $____________ $____________
Y0190 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
20 HOUR $____________ $____________
Y0200 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
Y0210 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
Y0220 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
Y0230 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
10 HOUR $____________ $____________
Y0240 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
10 HOUR $____________ $____________
Y0250 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
6,800 LNFT $____________ $____________
Y0260 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
4 EACH $____________ $____________
Y0270 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:Y Schedule Type:Options
A - 27
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CA FLAP INY CR2022(1)
Project Name:South Lake Road
Y0080 15401-0000 CONTRACTOR TESTING (Bid Item Alternative: Government Furnished Lab)
A - 28
Z0010 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
Z0020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.300 MILE $____________ $____________
Z0030 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Z0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Z0050 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Z0060 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Z0070 20101-0000 CLEARING AND GRUBBING
0.1 ACRE $____________ $____________
Z0080 20301-1100 REMOVAL OF GATE
2 EACH $____________ $____________
Z0090 30202-2000 ROADWAY AGGREGATE, METHOD 2
470 TON $____________ $____________
Z0100 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
2,275 SQYD $____________ $____________
Z0110 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
120 TON $____________ $____________
Z0120 40601-0000 FOG SEAL
0.5 TON $____________ $____________
Z0130 40605-0000 BLOTTER
1 TON $____________ $____________
Z0140 41102-1000 PRIME COAT, METHOD 1
740 SQYD $____________ $____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CA FLAP INY CR2022(1)
A - 29
Z0150 41201-0000 TACK COAT
0.5 TON $____________ $____________
Z0160 61902-1400 GATE, METAL, 16 FEET WIDTH
2 EACH $____________ $____________
Z0170 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
Z0180 62201-0350 BACKHOE
20 HOUR $____________ $____________
Z0190 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
20 HOUR $____________ $____________
Z0200 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
Z0210 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
Z0220 62301-0000 GENERAL LABOR
20 HOUR $____________ $____________
Z0230 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
10 HOUR $____________ $____________
Z0240 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
10 HOUR $____________ $____________
Z0250 63309-1000 DELINEATOR, TYPE SNOW POLE
6 EACH $____________ $____________
Z0260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CA FLAP INY CR2022(1)
Project Name:South Lake Road
Z0140 15401-0000 CONTRACTOR TESTING (Bid Item Alternative: Government Furnished Lab)
ALL LPSM $___LPSM_____ $____________BID ALTERNATE ITEM - SEE PAGE A-4
A - 30
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 15)
Schedule X - Option(A - 23)
Schedule Y - Option(A - 25)
Schedule Z - Option(A - 28)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (REV. 8/2016)
Previous edition is NOT usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
BID BOND
(See…