This document outlines a proposed federal highway project to improve 6.9 miles of South Lake Road and adjacent facilities in Inyo County, California. The project includes pulverizing and paving the existing roadway, minor widening, grading, drainage improvements, improvements to four Forest Service campgrounds and parking areas, slope scaling, upgraded signage and guardrails. Major work items include roadway excavation, subexcavation, aggregate, full depth reclamation, asphalt concrete paving, pipe culverts, geocomposite underdrains, asphalt curb and slope scaling. The estimated value is between $7-10 million. The solicitation is anticipated to be advertised in October 2019 with award in December 2019 and construction from January 2020 to October 2020. The work will be solicited as a full and open competition.
Pavements Report
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTH LAKE ROAD
INYO COUNTY, CALIFORNIA
CA FLAP INY CR2022(1)
PAVEMENT AND MATERIALS REPORT
AUGUST 2017
Report prepared by:
U.S. Department of Transportation Federal Highway Administration
Central Federal Lands Highway Division Lakewood, Colorado http://www.google.com/imgres?sa=X&biw=1280&bih=819&tbm=isch&tbnid=gtpyJEKxSQX6SM:&imgrefurl=http://portal.hud.gov/hudportal/HUD?src=/press/press_releases_media_advisories/2010/HUDNo.10-242&docid=0hzyuk4oobnONM&imgurl=http://portal.hud.gov/hudportal/images/hudimg?id=dot_logo_41193.jpg&w=520&h=528&ei=uGw7Uoy6Ksjk4AOC_IDQBw&zoom=1&iact=hc&vpx=567&vpy=131&dur=635&hovh=226&hovw=223&tx=151&ty=150&page=1&tbnh=154&tbnw=162&start=0&ndsp=30&ved=1t:429,r:26,s:0,i:171
CA FLAP INY CR2022(1) South Lake Road ii
Written by: ________________________________________________________ Robert Norick, Staff Pavements & Materials Engineer
Reviewed by: ________________________________________________________ Mike Voth, Pavements & Materials Team Lead
Approved for distribution by:
Mike Voth, Pavements & Materials Team Lead Date
Electronic Distribution:
Construction Project Development Project Management Technical Services iii
TABLE OF CONTENTS
I. INTRODUCTION
II. CLIMATE
III. EXPLORATION
IV. EXISTING PAVEMENT & SOILS
V. PAVEMENT DESIGN INPUTS
VI. PAVEMENT RECOMMENDATIONS & DISCUSSION
VII. MATERIALS RECOMMENDATIONS
APPENDICES
A – Location Maps and Climate Data B – Laboratory Reports and Boring Log C – Photographs D –Traffic Counts and Loads E – Pavement Design Calculations F – LTPPBind and CALTRANS Binder Data G – Memorandums and Pipe Selection Criteria
I. INTRODUCTION
This report is written to document the existing road conditions and provide pavement recommendations for the planned CA FLAP INY CR2022(1) South Lake Road project.
The project is located approximately 15 miles southwest of the Town of Bishop in Inyo County, California. South Lake Road begins at the intersection with State Route 168 and continues approximately 6.9 miles south to South Lake. Location maps for the project are provided in Appendix A.
II. CLIMATE
Climate data was obtained from RAWS USA Climate Archive for the South Lake, CA weather station. The data is summarized in Table 1 below and provided in Appendix A.
The average precipitation for this area is approximately 18.45 inches. The project is located at an elevation that receives both snow and rain, dependent upon the time of year.
The project ranges in elevation from ≈7,900 feet to ≈9,800 feet.
Table 1. Weather Data
Month Average
HIGH
Record
HIGH
Average
LOW
Record
LOW
Average
PRECIP.
January 38.7 68 12.5 -19 2.63”
February 38.0 65 11.8 -18 3.39”
March 42.0 67 15.0 -14 2.41”
April 47.0 65 21.9 -11 1.51”
May 52.6 69 30.0 4 0.74”
June 61.5 78 38.4 18 0.55”
July 69.3 82 45.3 30 0.61”
August 68.3 90 44.1 28 0.73”
September 62.1 84 37.8 14 0.85”
October 52.7 70 29.8 0 0.95” November 45.2 63 23.2 -10 1.58” December 39.5 62 16.3 -22 2.49”
Temperatures are in °F and precipitations are in inches.
III. EXPLORATION
On July 6-7, 2016, a pavement and subgrade investigation was conducted for the project, including 28 shallow borings. The road was drilled at approximately ¼ mile increments, with boring locations alternating between lanes. Borings were also drilled at the Forks, Four Jeffrey, and Willow campgrounds. CFL personnel logged the findings including depth of boring, visual soil classification, pavement thickness, areas of distress, and road width. During the site visit, fifteen samples were collected. These samples were submitted to the CFLHD laboratory for testing to determine engineering properties. The laboratory results and boring logs are provided in Appendix B.
IV. EXISTING PAVEMENT & SOILS
The existing roadway was found to be in fair condition. The existing pavement exhibits transverse, longitudinal, block, edge, and alligator cracking that comes with an old age hardened road. The pavement thickness along South Lake Road ranged between 2 and
8.5 inches, while the pavement thickness within the campgrounds ranged between 1.5 and 2.5 inches. The depth of the borings and the observed pavement thicknesses are shown in Table 2 below. In general, the borings were drilled to 5 foot depth. Boring depths less than or greater than 5 feet reflect borings that encountered refusal (boulders or bedrock). Table 3 below summarizes the soil classifications for the various borings.
Table 2. Asphalt Thicknesses (inches) and Boring Depths (feet) Boring B-1 B-1A B-2 B-3 B-4 B-4A B-5 B-6 B-7 B-8 B-9 B-10 B-11 B-12
Milepost 0.3 CG 0.5 0.8 1.0 CG 1.2 1.5 1.7 2.0 2.3 2.5 2.7 3.0 Thickness 5” 2” 6” 5.5” 6” 2.5” 6.5” 7” 8.5” 6” 7” 7.5” 5.5” 6”
Depth 5’ 4’ 3.5’ 1.2’ 3’ 5’ 5’ 2.5’ 2.5’ 5’ 1.5’ 5’ 2.5’ 5’ Boring B-13 B-14 B-15 B-16 B-16A B-17 B-18 B-19 B-20 B-20A B-21 B-22 B-23 B-24
Milepost 3.2 3.4 3.7 3.9 3.9 4.3 4.5 4.8 5.0 CG 5.2 5.7 6.2 6.8 Thickness 6” 5” 6.5” 8” 8” 5.5” 7.5” 5” 6.5” 1.5” 6.5” 6” 2” 2”
Depth 3’ 3.5’ 5’ 13.5’ 13.5’ 5’ 1.5’ 7’ 5’ 2.5’ 5’ 3.5’ 1.5’ 5’
Table 3. Subgrade Soil Classifications Soil Boring Designation B-1 B-1A B-2 B-4A B-5
Location / Milepost 0.3 Forks CG 0.5 Four
Jeffrey 1.2
Soil Classification
AASHTO
M 145 A-1-b (0) A-1-b (0) A-1-b (0) A-1-b (0) A-1-b (0)
ASTM D
2487 SM SM SM SM GC-GM
Location B-8 B-10 B-12 B-16 B-16A
Location / Milepost 2.0 2.5 3.0 3.9 3.9
Soil Classification
AASHTO
M 145 A-2-4 (0) A-2-4 (0) A-1-b (0) A-2-4 (0) A-4 (0)
ASTM D
2487 SC SC-SM SM SM SC-SM
Location B-18 B-19 B-20A B-22 B-24
Location / Milepost 4.5 4.8 Willows
CG 5.7 6.8
Soil Classification
AASHTO
M 145 A-1-b (0) A-1-b (0) A-2-4 (0) A-1-b (0) A-1-b (0)
ASTM D
2487 SM SM SM SM SM
In general, the underlying soils through the project limits were fairly consistent; silty sands with and without gravel. Silty and clayey sands and gravels were encountered at four locations.
V. PAVEMENT DESIGN INPUTS
The pavement design for the South Lake Road project utilized design criteria established in the Federal Lands Highway (FLH) Project Development Design Manual (PDDM). The criteria shown in Table 4 below were selected based on the project’s scope and traffic levels.
Table 4. Design Criteria Design Performance Period (3R) 20 years Initial Serviceability 4.2 Terminal Serviceability for South Lake Road 2.5 Terminal Serviceability for Campgrounds/Parking 2.0 Design Reliability Level 75% Overall Standard Deviation 0.49 Directional Distribution 50%
Traffic
South Lake Road is used primarily for recreational purposes. The vast majority of vehicles that use this route are passenger vehicles, pickups, SUVs and recreational vehicles. There are occasional delivery trucks or freight trucks that service the campgrounds along this route. The majority of the campgrounds and resorts along South Lake Road operate for less than 6 months per year (including Four Jeffrey Campground and Creekside RV Park). Further, the roadway is subject to road closure during inclement weather in the winter months. As such, traffic counts are subdivided into two six month seasons; peak season (May-October) and off-season (November-April).
Inyo County provided CFLHD roadway traffic counts from two peak season time periods; July 1999 and August 2016. Both sets of traffic counts were measured just west of the intersection with State Route 168. The seven day time period between July 14-20, 1999 had a two way traffic count of 5,149 vehicles or 735 ADT. The six day time period between August 18-23, 2016 had a two way traffic count of 4,082 vehicles or 680 ADT.
Based upon these traffic counts, the peak season, two way traffic ADT is assumed to be 700 vehicles per day. With the closure of the campgrounds and resorts, the off-season ADT is assumed to be less than 100 vehicles per day. Based upon the peak season and off-season ADTs, the average annual ADT for the South Lake Road pavement design is 400 vehicles per day with a 2% growth factor.
In 2011, South Lake Road peak season traffic data was collected for the Inyo National Forest Alternative Transportation Study. The 2011 traffic counts were measured 2 miles south of the intersection with State Route 168 with an ADT of 180 vehicles per day. The vast majority of the RV spaces along South Lake Road are in the northern 2 miles (including the Four Jeffrey Campground and Creekside RV Park). The Four Jeffrey
Campground (with nearly 100 spaces) accounts for nearly half of the total RV spaces along South Lake Road. As such, the peak season ADT for the Four Jeffrey Campground is estimated to be half of the difference in the South Lake Road ADTs at State Route 168 (700 vehicles per day) and Milepost 2 (180 vehicles per day) or 260 vehicles per day. The Four Jeffrey Campground is only open during the peak season, and therefore, the average annual ADT is half of the peak season ADT or 130 vehicles per day. This ADT is conservatively used for the pavement design for all campgrounds and parking areas.
Based upon CFLHD’s field observations during the pavement and subgrade investigations, the following vehicle classifications and distributions are assumed for the project’s pavement designs: 66% Class 2-3 cars/pickups, 33% Class 5 motor homes, and 1% Class 9 tractor trailer trucks. Vehicle classifications and truck factors used in the ESALs calculations are taken from Exhibit 11.2-A in Chapter 11 of the PDDM.
Based on the design criteria and assumptions shown above and the 1993 AASHTO pavement design procedure, the 20-year-18-kip equivalent single axle loads (ESAL) are calculated to be 332,819 for South Lake Road and 108,166 for the campgrounds and parking areas.
Subgrade Soil Resilient Modulus
Eleven subgrade soil samples were submitted for testing to determine their respective R-Values (AASHTO T 190). These test results and their calculated Resilient Modulus values are summarized in Tables 5 below. The design R-Value and respective Resilient Modulus values are also shown in the table. The subgrade Resilient Modulus is calculated from the R-Value (AASHTO T 190) using the following correlation equation:
Resilient Modulus, MR (psi) = 10[ ( S
+ 18.72 ) / 6.24 ] where S1 = [(R-Value – 5) / 11.29] + 3
Table 5. South Lake Road Resilient Modulus Values
Sample Number Location R-Value Resilient Modulus
B-1 South Lake Rd MP 0.3 77 31,826 psi B-1A South Lake Rd MP 0.3 73 27,925 psi B-2 South Lake Rd MP 0.5 72 27,027 psi
B-4A Four Jeffrey Campground 71 26,158 psi B-8 South Lake Rd MP 2.0 56 16,021 psi B-12 South Lake Rd MP 3.0 75 29,812 psi B-16 South Lake Rd MP 3.9 58 17,103 psi
B-16A South Lake Rd MP 3.9 49 12,745 psi B-20A Willow Campground 65 21,500 psi B-22 South Lake Rd MP 5.7 75 29,812psi B-24 South Lake Rd MP 6.8 73 27,925 psi
Design Value Used 58 17,000 psi
Structural Layer Coefficients
Standard CFLHD structural layer coefficients were selected for asphalt concrete pavement (0.44), aggregate base course (0.12), and full depth reclamation (0.10) in accordance with Exhibit 11.2-C of the PDDM. A drainage coefficient of 1.0 was utilized for all proposed layers.
Structural Number Calculations
The Pavement Interactive App for the 1993 AASHTO pavement design procedure is used to determine the required pavement structural numbers (SN) for South Lake Road and the campground and parking areas. Based upon the ESALs, the subgrade Resilient Modulus, and the aforementioned design criteria, the following required pavement design structural numbers are calculated.
South Lake Road SN = 1.95 inches
Campground/Parking SN = 1.60 inches
VI. PAVEMENT RECOMMENDATIONS & DISCUSSION
Project Recommendations
In accordance with the 1993 AASHTO pavement design procedure and the required pavement structural numbers, the following pavement structural sections are proposed:
SOUTH LAKE ROAD PAVEMENT SECTIONS
3 inches Asphalt Pavement (SN = 3” x 0.44 = 1.32”) 8 inches FDR - Pulverize (SN = 8” x 0.10 = 0.80”)
TOTAL SN = 2.12 inches
6 inches Aggregate Base (SN = 6” x 0.12 = 0.72”)
TOTAL SN = 2.04 inches
CAMPGROUNDS/PARKING AREA PAVEMENT SECTION
6 inches FDR – Pulverize (SN = 6” x 0.10 = 0.60”) TOTAL SN = 1.92 inches
Pulverization should be from edge of pavement to edge of pavement. No existing pavement should remain after the road is pulverized. The hot mix asphalt (HACP) shall be in accordance with FP-14 Section 401. The full depth reclamation shall be in accordance with FP-14 Section 304.
More specific recommendations for the individual campgrounds are described below and shown on the following exhibits.
Forks Campground: For the “L” shape road to the picnic area, we recommend a 6” deep full depth reclamation with a 3” deep HACP.
Four Jeffery Campground: The campground entrance road and two of the four campground loops were recently patched and overlaid (2” depth). Our recommendation is to reconstruct the two campground loops that were not previously overlaid, as well as, the connector road between loops 1 and 4, and the dump station road. We recommend a 6” deep full depth reclamation with a 3” deep HACP. Additionally, we recommend a fog seal for the two campground loops and the entrance road that were previously overlaid.
Willow Campground: Not much is left of the Willow’s road pavement. The subgrade soils are a silty sand with some organics. We recommend roadbed reconditioning (6” depth) topped with a 6” depth of surface course aggregate. We also recommend a paved apron off of South Lake Road consisting of a 6” deep full depth reclamation with a 3” depth of HACP.
Mountain Glen: Reconstruct and widen the paved apron off of South Lake Road. We recommend a 6” deep full depth reclamation with a 3” deep HACP.
South Lake Trailhead and Parking Areas: The South Lake parking areas were reconstructed with a new asphalt pavement, asphalt curbs, and micro surfacing in the Fall 2015. The earthwork for the project was acceptable, but there were problems with the asphalt pavement. Based upon the construction photos, the new asphalt pavement was plagued by coarse aggregate segregation on the pavement surface. Micro surfacing was placed to seal voids on the pavement surface. The micro surfacing was placed in October 2015 and may not have fully cured. The micro surfacing is “shedding” some aggregate particles which is normal. Our recommendation is to reconstruct the entrance road with small parking area, as well as, the boat trailer parking area. We recommend a 6” deep full depth reclamation with a 3” deep HACP for this reconstruction. Additionally, we recommend a 1.5” HACP overlay for the South Lake parking lots.
VII. MATERIALS RECOMMENDATIONS, SCRs, AND
CONSTRUCTION CONSIDERATIONS
Selection of Asphalt Binder
LTPPBind On-line, the PDDM standards, and the CALTRANS’ binder selection criteria were utilized for the selection of the asphalt binder for the project (See Appendix F). The CALTRANS’ binder selection criteria identifies this project as located in the High Desert region of the state of California. Based on these considerations, a PG 64-28 M binder should be used. This binder grade is used by CALTRANS and appears to be available at several refineries in the area.
Pavement Roughness
It is recommended that pavement roughness be evaluated as Type III-B in accordance with FP-14 Section 401.16(d) and Table 401-5.
Prime and Tack Coats, Fog Seal and Blotter
For this project, a Prime Coat and Blotter applied to the base prior to asphalt placement, a Tack Coat applied between asphalt lifts, and a Fog Seal applied to the final pavement surface are recommended.
Drainage
During the pavement and subgrade investigation, water seepage was observed. There is some potential for water under the road in some areas. Ditch maintenance and underdrains may be needed to prevent water from saturating the roadbed.
Materials for Culvert Pipe / Cement
The pH and resistivity of the project soils do not show a need to specify special culvert materials in accordance with the pipe selection criteria in Appendix G. Based upon this information, the project soils are considered non-corrosive.
SCRs and Construction Concerns
CFLHD standard SCRs related to pavements and materials are expected to be used with the exception of the SCR for FP-14 Section 702 which must be tailored for the CALTRANS PG 64-28M binder. Any additional SCRs may be developed as needed.
Bid Items
Suggested FP-14 pay items for the proposed structural section are shown in Table 6.
Table 6: Recommended Pay Items Item
Number Item Description Unit Remarks.
30202-2000 Roadway Aggregate, Method 2 TON 30303-1000 Roadbed Reconditioning SQYD 30401-5500 Full Depth Reclamation, Method 2, 8-Inch Depth MILE 30402-5300 Full Depth Reclamation, Method 2, 6-Inch Depth SQYD
40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2- Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL
TON
40105-3000 Antistrip Additive, Type 3 TON 40601-0000 Fog Seal TON 41102-1000 Prime Coat, Method 1 SQYD 41105-0000 Blotter TON 41201-0000 Tack Coat TON
AC section of road:
FHWA recommendation:
- 6” deep full depth reclamation with 3” deep HACP
Loop 1 (north) FHWA recommendation:
- Fog Seal Only
Loop 2 (mid-north) FHWA recommendation:
- 6” deep full depth reclamation with 3” deep HACP
Loop 3 (mid-south) FHWA recommendation:
- 6” deep full depth reclamation with 3” deep HACP
Loop 4 (south)
- Fog Seal Only
Entrance Road
- Fog Seal Only
Dump Station Road FHWA recommendation:
- 6” deep full depth reclamation with 3” deep HACP
Connector Roads FHWA recommendation:
- 6” deep full depth
Reclamation with 3” deep HACP
Connector Roads FHWA recommendation:
- 6” deep full depth
Reclamation with 3” deep HACP
Paved Apron – for 30’ min
- Reconstruct and widen with 6” deep full depth reclamation
Willow CG
- 30’ long paved apron with 6” deep full depth reclamation with 3” deep HACP
- 6” deep roadbed reconditioning with
6” deep aggregate surface course for remainder of campground road
South Lake TH Parking 2015 new AC pavement with micro seal FHWA recommendation:
1.5” HACP overlay
South Lake TH Parking 2015 crack & slurry seal FHWA recommendation:
6” deep full depth reclamation with 3” deep HACP
South Lake TH Parking 2015 new AC pavement with micro seal FHWA recommendation:
6” deep full depth reclamation with 3” deep HACP for roadway & parking
South Lake TH Parking 2015 crack and slurry seal FHWA recommendation:
6” deep full depth reclamation
APPENDICES
A – Location Maps and Climate Data
B – Laboratory Reports and Boring Log
C – Photographs
D – Traffic Counts and Loads
E – Pavement Design Calculations
F – LTPPBind and CALTRANS Binder Data
G – Memorandums and Pipe Selection Criteria
APPENDIX A – Location Maps and Climate Data
South Lake Road Reconstruction Project
Regional Map
Green Area = National Forest or National Park land
End Point
Start Point
So ut h La ke R d
Hi gh wa y
North Lake Rd
Sa br in a
R d
C ar di na l R d
C at ar ac t R d
Sage R d
Federal Lands Access Program South Lake Road
Reconstruction Project
Project Start Point
Project End Point
APPENDIX B – Laboratory Reports and Boring Log
Resilient Modulus Calculation
Project: CA FLAP INY CR2022(1) - South Lake Road
Location: Inyo National Forest, Inyo County, California
Date: 9/16/2016
Resilient
Boring # R-Value S1 Modulus
B-1 77 9.4 31,826
B-1A 73 9.0 27,925
B-2 72 8.9 27,027
B-4A 71 8.8 26,158
B-8 56 7.5 16,021
B-12 75 9.2 29,812
B-16 58 7.7 17,103
B-16A 49 6.9 12,745
B-20A 65 8.3 21,500
B-22 75 9.2 29,812
B-24 73 9.0 27,925
Mean 68 8.5 23,435
Design Value 58 17,000 mailto:=@sum(h7:h24)
Project:
Sample
Number
Station or
Location
Offset
(from c/l)
Date
Sampled
Depth of
Bore
Container
Type
0 to 5"
5" to 1.5'
1.5' to 5'
0 to 2"
2" to 3'
3' to 4'
4'
0 to 6"
6" to 1.5'
1.5' to 3.5'
3.5'
0 to 5.5"
5.5" to 14"
14"
0 to 6"
6" to 3'
3'
0 to 2.5"
2.5" to 3.5'
3.5' to 5'
0 to 6.5"
6.5" to 2'
2' to 5'
0 to 7"
7" to 2.5'
2.5'
0 to 8.5"
8.5" to 1'
1' to 2.5'
2.5' asphalt
No Sample Tough drillingbrown sandy silt with gravel
Refusal
In through cut leveling material cobbles
Refusal asphalt
No Sample Cut on rightbrown sandy silt with gravel
Refusal
B-6 MP 1.5 5.5'RT 7/6/2016 2.5' N/A
asphalt
No Sample In through fillbrown sandy silt with gravel
Refusal asphalt
7/6/2016 5' 5-gal bucket
5-gal bucket
B-5 MP 1.2 7/6/2016
CA FLAP INY CR2022(1) South Lake Road Account Number:
Submitted By: Date Submitted:Sampled By:Mike Voth Mike Voth
7/6/20166'RTMP 0.3B-1 5'
5-gal bucket
15A6062022001 M10.PE.15G0.06 160600000
12-Jul-16
Pavement Investigation - Shallow Borings
Comments brown silty sand
1,2,3 asphalt
No Sample asphalt
N/A
5-gal bucket
3.5'7/6/20167'LTMP 0.5B-2
B-4A Four
Jeffrey CG n/a
B-3 MP 0.8 5'RT 7/6/2016 14" N/A
6'LT 5'
B-4 MP 1.0 6'RT 7/6/2016 3' N/A
B-7 MP 1.7 6' LT 7/6/2016 2.5'
Pavement Investigation Boring Log
Tough drilling
Easy drilling
In through cut asphalt brown silty sand brown silty sand with gravel asphalt brown sand-silt mix, some PI
Refusal
1,2,3,16,17,AASHTO T
290 & T 291
Boring Observations (grey = sample depth )
1,2,3,4, Testing Requested brown silty sand with gravel yellow-brown silty sand w/gravel
1,2,3,4 brown sand-silt mix brown silty, clayey gravel w/ sand brown gravelly sand-silt asphalt brown silty sand with gravel
Refusal
1,2,3,4B-1A Forks CG n/a 7/6/2016 4' 5-gal bucket
0 to 6"
6" to 2'
2' to 5'
0 to 7"
7" to 1.5'
1.5'
0 to 7.5"
7.5" to 5'
0 to 5.5"
5.5" to 2.5'
2.5'
0 to 6"
6" to 5'
0 to 6"
6" to 18"
18" to 3'
3'
0 to 5"
5" to 3.5'
3.5'
0 to 6.5"
6.5" to 5'
0 to 8"
8" to 7.5'
7.5' to 11.5'
11.5' to 13.5'
13.5'
0 to 8"
8" to 7.5'
7.5' to 11.5'
11.5' to 13.5'
13.5'
0 to 5.5"
5.5" to 3'
3' to 5'
Sample
Number
Station or
Location
Offset
(from c/l)
Date
Sampled
Depth of
Bore
Container
Type Boring Observations (grey = sample depth) Testing Requested Comments
5-gal bucket asphalt 1,2,3 In through cut brown silty, clayey sand w/ gravel brown silty sand with gravel
Cut on right
B-9 MP 2.3 4.5'LT 7/6/2016 1.5' N/A
asphalt
No Sample In through cut, tough drilling brown sandy silt with gravel
Refusal asphalt
1,2,3,4 on bulk bucket sample
AASHTO T 265 on baggy sample asphalt dark brown clayey sand
Refusal brown silty sand
7'LT
B-12 MP 3.0 6'RT 7/6/2016 5'
B-10 MP 2.5 6'RT 7/6/2016 5'
7/6/2016 2.5'
B-8 MP 2.0 5'RT 7/6/2016 5'
MP 3.9 6.5'RT 7/7/2016
13.5' (SPT
location)
5-gal bucket + baggy asphalt brown silty sand
Refusal
B-16
B-16A MP 3.9 7/7/2016
13.5' (SPT
location)
5-gal bucket + baggy
5-gal bucket
N/A
5-gal bucket
1,2,3,4 on bulk bucket sample
AASHTO T 265 on baggy sample
1,2,3,4,5
1,2,3,4 asphalt brown sandy fill material
Cut on right, fill on left
In through cut
Baggy sample - 5' SPT
In through cut
Baggy sample - 10' SPT
Refusal
No Sample asphalt
B-11 MP 2.7
brown silty sand with gravel
B-14
Cut on right, fill on left, tough drilling at 18" moist, lt brown clayey sand-silt moist, brown silty sand w/gravel moist, lt brown silty, clayey sand moist, brown silty sand w/gravel
MP 3.4 5'RT 7/6/2016 3.5' N/A
asphalt
No Sample In through fill, tough drillingbrown silty sand with gravel
Refusal
B-13 MP 3.2 7'LT 7/6/2016 3' N/A
asphalt
No Sample In through cut, tough drilling brown silty sand with gravel
Refusal brown silty sand with cobbles
B-15 MP 3.7 7'LT 7/6/2016 5' N/A
asphalt
No Sample Cut on right, easy drilling brown silty sand
B-17 MP 4.3 4.5'LT 7/6/2016 5' N/A
asphalt
No Sample Cut on leftbrown silty sand brown silty sand with gravel
0 to 3"
3" to 18"
18"
0 to 5"
5" to 7'
7'
0 to 1.5"
1.5" to 5'
0 to 6.5"
6.5" to 2.5' brown silty sand with gravel
2.5' Refusal
0 to 6.5"
6.5" to 3.5'
3.5' to 5'
0 to 6"
6" to 3.5'
3.5'
0 to 2"
2" to 18"
18"
0 to 2"
2" to 18"
18" to 5'
No Sample
Boring Observations (grey = sample depth) Testing Requested
Note: Grey background indicates sample location.
B-20 MP 5.0 6'RT 7/7/2016 2.5' N/A Tough drilling at 2'
B-19 MP 4.8 5.5'RT 7/7/2016
7' (SPT
location)
5-gal bucket + baggy asphalt 1,2,3 on bulk bucket sample
AASHTO T 265 on baggy sample
Cut on left, fill on right
Baggy sample - 4' SPT brown silty sand
Refusal
B-18 MP 4.5 5.5'LT 7/7/2016 18" baggy asphalt wet, silty sand
Refusal
1,2,3 (if enough material available) and AASHTO T
Note: Baggy was placed in
B-22, 5-gal bucket sample.
Cut on left, fill on right
B-24 MP 6.8 4.5'RT 7/7/2016 5'
5-gal bucket asphalt
B-22 MP 5.7 6'RT 7/7/2016 3.5'
5-gal bucket
B-23 MP 6.2 6'LT
1,2,3,4 Cut on left, fill on right brown silty sand with gravel dark brown silty sand
1,2,3,4,5
Note: Baggy in bucket is from B-18 location.
Cut on right, fill on left asphalt
1,2,3,4,16,17, AASHTO T
290 & T 291 Cut on right, fill on leftdark brown silty sand with gravel
Refusal dark brown silty sand with organics
& peat asphalt asphalt asphalt
No Sample Cut on left, fill on right dark brown silty sand with gravel
Refusal asphalt
No Sample In through fillbrown silty sand with gravel gray moist silty sand with gravel
Sample
Number
Station or
Location
Offset
(from c/l)
Date
Sampled
Depth of
Bore
Container
Type Comments
5-gal bucket 5'7/7/2016n/aWillow CGB-20A
7/7/2016 18" N/A
B-21 MP 5.2 6'LT 7/7/2016 5' N/A
APPENDIX C – Photographs
Typical Road Conditions at MP 0, Looking Ahead
Typical Road Conditions at MP 0.5, BH-2, Looking Back
Typical Road Conditions at MP 1.2, BH-5, Looking Back
Subgrade Material at MP 1.2, BH-5, Silty Clayey Gravel with Sand
Pavement Damage and Wet Area at MP 1.7, BH-7, Looking Ahead
Cobble Subgrade Material at MP 1.7, BH-7, Looking Ahead
Typical Road Conditions at MP 2.5, BH-10, Looking Back
Subgrade Material at MP 3.0, BH-12, Silty Sand with Gravel
Typical Road Conditions at MP 3.3, BH-12, Looking Back
Road Damage at MP 3.9, BH-16, Looking Ahead
Pavement Edge Cracking at MP 4.5, BH-18, Looking Ahead
Subgrade Material at MP 4.8, BH-19, Silty Sand
Typical Road Conditions at MP 5.0, BH-20, Looking Ahead
Typical Road Conditions at MP 5.7, BH-22, Looking Ahead
Traverse and Alligator Cracking at MP 6.2, BH-23
Cut Slope Seepage and Pavement Damage at MP 6.4
Road Damage at MP 6.8, BH-24, Looking Ahead
Left Cut Slope Water Seepage and Ponding at MP 6.8, BH 24
Typical Road Conditions at Forks Campground, Looking Back
Subgrade Material at Forks Campground, BH-1A, Silty Sand with Gravel
APPENDIX D – Traffic Counts and Loads
SOUTH LAKE ROAD TRAFFIC SUMMARY
South Lake Road is used primarily for recreational purposes. The vast majority of vehicles that use this route are passenger vehicles, pickups, SUVs and recreational vehicles. There are occasional delivery trucks or freight trucks that service the campgrounds along this route. The majority of the campgrounds and resorts along South
Lake Road operate for less than 6 months per year (including Four Jeffrey Campground and Creekside RV Park). Further, the roadway is subject to road closure during inclement weather in the winter months. As such, traffic counts are subdivided into two six month seasons; peak season (May-October) and off-season (November-April).
Inyo County provided CFLHD roadway traffic counts from two peak season time periods; July 1999 and August 2016. Both sets of traffic counts were measured just west of the intersection with State Route 168. The seven day time period between July 14-20, 1999 had a two way traffic count of 5,149 vehicles or 735 ADT. The six day time period between August 18-23, 2016 had a two way traffic count of 4,082 vehicles or 680 ADT.
Based upon these traffic counts, the peak season, two way traffic ADT is assumed to be
700 vehicles per day. With the closure of the campgrounds and resorts, the off-season
ADT is assumed to be less than 100 vehicles per day. Based upon the peak season and off-season ADTs, the average annual ADT for the South Lake Road pavement design is
400 vehicles per day with a 2% growth factor.
In 2011, South Lake Road peak season traffic data was collected for the Inyo National
Forest Alternative Transportation Study. The 2011 traffic counts were measured 2 miles south of the intersection with State Route 168 with an ADT of 180 vehicles per day. The vast majority of the RV spaces along South Lake Road are in the northern 2 miles
(including the Four Jeffrey Campground and Creekside RV Park). The Four Jeffrey
Campground (with nearly 100 spaces) accounts for nearly half of the total RV spaces along South Lake Road. As such, the peak season ADT for the Four Jeffrey Campground is estimated to be half of the difference in the South Lake Road ADTs at State Route 168
(700 vehicles per day) and Milepost 2 (180 vehicles per day) or 260 vehicles per day. The
Four Jeffrey Campground is only open during the peak season, and therefore, the average annual ADT is half of the peak season ADT or 130 vehicles per day. This ADT is conservatively used for the pavement design for all campgrounds and parking areas.
Based upon CFLHD’s field observations during the pavement and subgrade investigations, the following vehicle classifications and distributions are assumed for the project’s pavement designs: 66% Class 2-3 cars/pickups, 33% Class 5 motor homes, and
1% Class 9 tractor trailer trucks. Vehicle classifications and truck factors used in the
ESALs calculations are taken from Exhibit 11.2-A in Chapter 11 of the PDDM.
Based on the design criteria and the assumptions shown above, the 20-year-18-kip equivalent single axle loads (ESAL) are calculated to be 332,819 for South Lake Road and 108,166 for the campgrounds and parking areas.
The ESAL calculations and traffic count data are provided on the following pages.
Rigorous ESAL Calculations
Project: CA FLAP INY CR2022(1) - South Lake Road Date: 9/15/2016
Location: Inyo National Forest, Inyo County, California
South Lake Road ESAL Calculation
Performance Period (years) 20
Two-Way Traffic (ADT) 400
Number of Lanes in Design Direction 1
Percent of Trucks in Design Lane 100%
Percent of Trucks in Design Direction 50%
Accumulated
Average Initial 18-kip ESALs for
Vehicle Percent Annual % Growth Truck Factor Performance
Class of ADT Growth Factor (ESALs/Truck) Period
2-3 66% 2% 24.30 0.004 4,683
5 33% 2% 24.30 0.5 292,662
9 1% 2% 24.30 2 35,474
Total 332,819
Campground and Parking Area ESAL Calculation
Performance Period (years) 20
Two-Way Traffic (ADT) 130
Number of Lanes in Design Direction 1
Percent of Trucks in Design Lane 100%
Percent of Trucks in Design Direction 50%
Accumulated
Average Initial 18-kip ESALs for
Vehicle Percent Annual % Growth Truck Factor Performance
Class of ADT Growth Factor (ESALs/Truck) Period
2-3 66% 2% 24.30 0.004 1,522
5 33% 2% 24.30 0.5 95,115
9 1% 2% 24.30 2 11,529
Total 108,166
PTNUM
FROM TO DIR COUNT AVG SPEED PERCENT TRUCKSAVERAGE COUNT
NAME RD NUMBER LOCATIONDIST
5/5/1999 5/11/1999 W 998 0 0142
5/5/1999 5/11/1999 E 1168 0 0166
1 97 FIVE BRIDGES RD. 1036 .1 MILES N OF HWY 6
5/5/1999 5/11/1999 N 1139 0 0162
5/5/1999 5/11/1999 S 1259 0 0179
5/14/1999 5/20/1999 N 1598 49 30228
5/23/1999 5/29/1999 S 1115 39 12159
1 98 SANIGER LN. 1106 .5 MILES N OF HWY 395
5/6/1999 5/12/1999 S 9408 26 21344
5/6/1999 5/12/1999 N 8918 22 41274
1 99 HORTEN CREEK 1089 .1 MILES S OF S. ROUND VALLEY
5/6/1999 5/12/1999 S 427 0 061
2 106 PLANT FIVE RD. 1019 .1 MILES S OF BISHOP CR.
6/3/1999 6/9/1999 S 737 0 0105
6/18/1999 6/24/1999 N 484 0 069
2 107 BISHOP CREEK RD. 2085 1.4 MILES S OF HWY 168
6/3/1999 6/9/1999 N 1004 0 0143
6/18/1999 6/24/1999 S 874 0 0124
2 115 NORTH LAKE 2025 100' W. OF HWY 168
6/30/1999 7/6/1999 S 2639 0 0377
6/30/1999 7/6/1999 N 2493 0 0356
2 118 SOUTH LAKE RD 2022 .1 MILES E OF HWY 168
Tuesday, September 09, 2014 Page 15 of 48 csmith Highlight csmith Highlight csmith Highlight
PTNUM
FROM TO DIR COUNT AVG SPEED PERCENT TRUCKSAVERAGE COUNT
NAME RD NUMBER LOCATIONDIST
7/14/1999 7/20/1999 E 2538 0 0362
7/14/1999 7/20/1999 W 2611 0 0373
2 119 GLACIER LODGE RD. 3002 .4 MILES W.OF CONE RD.
7/14/1999 7/20/1999 E 1082 0 4154
7/14/1999 7/20/1999 W 1314 0 0187
2 120 CARDINAL RD 2090 50' W OF HWY 168
7/22/1999 7/28/1999 E 317 0 045
7/22/1999 7/28/1999 W 328 0 046
2 121 COLUMBINE DR. 2023 200' W. OF HWY 168
7/22/1999 7/28/1999 W 1255 0 0179
7/22/1999 7/28/1999 E 1010 0 0144
2 122 ALPINE DRIVE 2081 50' E OF HWY 168
7/22/1999 7/28/1999 W 264 0 037
7/22/1999 7/28/1999 E 294 0 042
2 124 CATARACT RD 2088 100' W OF COLUMBINE DR
7/30/1999 8/5/1999 W 391 0 055
7/30/1999 8/5/1999 E 400 0 057
2 125 WHITE PINE RD 2086 75' S OF CATARACT
7/30/1999 8/5/1999 S 120 0 017
7/30/1999 8/5/1999 N 114 0 016
2 126 CATARACT RD 2088 .1 MILES W OF COLUMBINE DR
7/30/1999 8/5/1999 N 233 0 033
Tuesday, September 09, 2014 Page 16 of 48 csmith Highlight
12.5 Data Collection & Analysis 417
12.0 BISHOP CREEK INYO NATIONAL FOREST
2013 Forestwide Alternative Transportation Study
No overnight parking is permitted in the Lake Sabrina core recreation area parking lots.
Overnight parking for the trailheads in the Lake Sabrina area is available along Bishop Creek Road (State Route 168) and at the Hiker Overnight dirt parking area located at the North Lake Road intersection with Bishop Creek Road. The average number of vehicles parked along Bishop Creek Road in the area where overnight parking is permitted was 12 for the peak month of August. This segment of Bishop Creek Road acts as overnight parking for the Sabrina and George Lakes trails located in the Lake Sabrina area. (See Figure: Bishop Creek – Lake Sabrina roadside parking average number of vehicles by month graph).
The parking lot occupancy for the North Lake area was calculated by average number of vehicles. The designated overnight parking lots (Trailhead Lot 1 and 2) and day-use lot (Day-use) are unpaved and unmarked. Given the large size of the parking areas and an often organic parking pattern, the average number of vehicles was used as a gauge of usage.
Parking demand in the North Lake recreation area peaked in the month of August. Average number of parked vehicles in the Trailhead Lot 1 and 2 parking areas was 57 vehicles.
Demand stayed high during the month of September with an average of 41 vehicles parked in the trailhead lots. Parking demand dropped precipitously in the month of October. Utilization of the Day-use parking lot was de minimus for the entire study period.
(See Figure: Bishop Creek – North Lake area parking lots average number of vehicles by month graph).
Figure: Bishop Creek Canyon traffic data collection dates
12.5.2.3 TRAFFIC SURVEY METHODOLOGY
Traffic data was collected using MetroCount 5600 vehicle classification equipment during the study period of May 1st through October 31st, 2011. The vehicle classifier collects rich data that can be mined to produce custom analyses. The firmware associated with the equipment can distill traffic volume, speed, gap between vehicles, type of vehicle, direction and time and date easily from the data collected. Data may be analyzed using any of these characteristics. The traffic graphs presented in this report were developed by combining the data collected over the 6 time periods into 1 data set.
418 12.5 Data Collection & Analysis
INYO NATIONAL FOREST 12.0 BISHOP CREEK
Forestwide Alternative Transportation Study 2013
ÆQ
ÆQ
ÆQ
ÆQ Forks Campground
To N or th
L ak e/ Sa br in a L ak e
ÆQ
4 Jeffrey Campground
Big Trees Campground
Aspendell
To S ou th
L ak e
Habeggers
Intake 2 Campground and Intake 2 Walk-In
Campground
Bishop Park Campground
Mt. Glen Campground
ÆQ
Lee Vining
Traffic Counter Locations - Bishop Creek
0 0.2 0.4 0.6
Miles
BishopCreek_traffic_Final Figure: Bishop Creek Canyon Inyo National Forest traffic counter locations map
12.5 Data Collection & Analysis 419
12.0 BISHOP CREEK INYO NATIONAL FOREST
2013 Forestwide Alternative Transportation Study
Figure: Bishop Creek – South Lake virtual day distribution by time of day graph
Traffic data was collected at 2 locations in Bishop Creek Canyon. On South Lake Road the traffic count equipment was installed at the road closure gate after the Habeggers community. Traffic data for the combined Lake Sabrina and North Lake areas was collected at the road closure gate after the Aspendell community on Bishop Creek Road (State Route 168). (See Figure: Bishop Creek Canyon Inyo National Forest traffic counter locations map). The data includes all vehicles entering (inbound) and exiting (outbound) the South Lake and combined Lake Sabrina/ North Lake areas. This includes local and seasonal residents, area business employees and recreational visitors. The traffic counters were located after the major community centers as to minimize the collection of residential area related traffic.
12.5.2.4 TRAFFIC DATA ANALYSIS
Temporal distributions of traffic data were analyzed by virtual day and week to determine periods and levels of demand. The traffic data is presented separately by South Lake Road and Bishop Creek Road traffic count stations.
About 30,600 vehicles were counted for both directions at the South Lake count station during the study period. The calculated average daily traffic (ADT) was 179 vehicles.
The daily distribution of vehicles for a typical day at South Lake Road is shown in the graph below. The inbound peak traffic hour was between 10:30am and 11:30am with an average of 16 vehicles. The outbound peak hour was between 1:45pm and 2:45pm with an average of 17 vehicles leaving the South Lake recreation area during that hour.
APPENDIX E – Pavement Design Calculations
South Lake Road, Inyo County, California
Pavement Design Structural Number (SN) Calculation
South Lake Campgrounds & Parking Areas, Inyo County, CA
Pavement Design Structural Number (SN) Calculation
APPENDIX F – LTPPBind & CALTRANS Binder Data
South Lake Road at South Lake, CA - LTPPBind On-line Data
South Lake Road at CA-168, CA - LTPPBind On-line Data
Bishop, CA - LTPPBind On-line Data
Note: Markers indicate County/Route/Post Mile of State Hwys. at region boundaries. When there is no marker, the region follows a county boundary.
<------------- SITE
Table 2.0 – ASPHALT BINDER GRADE
Binder
Climatic Region
Conventional Asphalt Rubberized Asphalt
Dense Graded Open Graded Gap
Graded Open
GradedTypical Special
PG PG
PG
Polymer Modified
PG
PG
Polymer Modified2
PG PG
South Coast Central Coast Inland Valleys
64-10 70-10 64-28PM 64-10 58-34PM 64-16 64-16
North Coast 64-16 N/A 64-28PM 64-16 58-34PM 64-16 64-16
Low Mountain South Mountain 64-16 N/A 64-28PM 64-16 58-34PM 64-16 64-16
High Mountain High Desert 64-28 N/A 58-34PM 64-28 58-34PM 58-22 58-22
Desert 70-10 N/A 64-28PM 70-10 58-34PM 64-16 64-16
Notes:
1. For asphalt concrete dikes use PG 70-10. For tack coats use either 64-10 or 64-16.
| 2. | For low temperature placement. |
| 3. | At DME discretion, PG 76-22PM may be specified for dense graded asphalt concrete for |
special location identified by DME.
For conventional Dense Graded Asphalt concrete, values are given for typical and special conditions. Special conditions are defined as those roadways or portion of roadways which meet any of the following criteria:
| • | Truck/bus traffic (over 10 million ESALs for 20 years) |
| • | Truck/bus stopping areas (parking area, rest area, loading area, etc.) |
| • | Truck/bus stop and go areas (intersections, metered ramps, ramps to and from Truck |
Scales etc.)
It should be noted that special binder grades may help to meet the requirements for the above criteria. However, there are other provisions that may also be necessary to address the above special conditions. The District Materials Engineer should be consulted for additional recommendations for these locations. Final decision as to whether a roadway meets the criteria for special conditions rests with the District.
For more detailed information on PG binder selection, refer to technical guides available on pavement web site at http://www.dot.ca.gov/hq/oppd/pavement/guidance.htm.
3.0 COST ESTIMATING
The use of PG binder should not affect the unit price for asphalt concrete for projects that have not been advertised. Asphalt concrete binders that use PBA binders are typically 20 to 30% more expensive than conventional binders like PG or AR.
http://www.dot.ca.gov/hq/oppd/pavement/guidance.htm
SECTION 92 ASPHALT BINDERS
PG Asphalt Binders
Quality characteristic Test method
Requirement
PG
58-22a
PG
64-10
PG
64-16
PG
64-28
PG
70-10 Original Binder
Flash point (min, °C) AASHTO T 48
230 230 230 230 230
Solubilityb (min, %) AASHTO T 44
99 99 99 99 99
Viscosity at 135 °Cc
(max, Pa•s)
AASHTO
T 316 3.0 3.0 3.0 3.0 3.0 Dynamic shear
Test temperature at 10 rad/s (°C) G*/sin(delta) (min, kPa) G*/sin(delta) (max, kPa)
AASHTO
T 315 58
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 2.00
RTFOf teste mass loss (max, %)
AASHTO
T 240 1.00 1.00 1.00 1.00 1.00
RTFOf Test Aged Binder Dynamic shear
Test temperature at 10 rad/s (°C) G*/sin(delta) (min, kPa)
AASHTO
T 315 58
2.20
2.20
2.20
2.20
2.20 Ductility at 25 °C (min, cm) AASHTO
T 51 75 75 75 75 75 PAVg
Test temperature (°C)
AASHTO
R 28 100 100 100 100 110 RTFOf Test and PAVg Aged Binder
Dynamic shear, Test temperature at 10 rad/s (°C) G*sin(delta) (max, kPa)
AASHTO
T 315 22d
31d
28d
22d
34d
Creep stiffness, Test temperature, °C S-value (max, MPa) M-value (min)
AASHTO
T 313
-12
0.300
0.300
-6
0.300
-18
0.300
0.300 aUse as asphalt rubber base stock for high mountain and high desert area.
bThe Engineer waives solubility requirements if the supplier is an authorized material source as defined by the Department's Certification Program for Suppliers of Asphalt.
cThe Engineer waives this specification if the supplier provides written certification the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.
dTest the sample at 3 °C higher if it fails at the specified test temperature. G*sin(delta) remains 5000 kPa maximum.
eThe residue from mass change determination may be used for other tests.
fRTFO means rolling thin film oven.
gPAV means Pressure Aging Vessel.
PG modified asphalt binder must comply with the requirements shown in the following table:
California Trans. 9/22/16
SECTION 92 ASPHALT BINDERS
PG Modified Asphalt Binders
Quality characteristic Test method Requirement
PG
58-34 M
PG
64-28 M
PG
76-22 M
Original Binder Flash point (min, °C) AASHTO T 48 230 230 230 Solubility (min, %) AASHTO T 44a 97.5 97.5 97.5b
Viscosity at 135 °Cc
(max, Pa•s) AASHTO T 316 3.0 3.0 3.0 Dynamic shear, Test temperature at 10 rad/s (°C) G*/sin(delta) (min, kPa)
AASHTO T 315 58
1.00
1.00
1.00
RTFOg testd, Mass loss (max, %) AASHTO T 240 1.00 1.00 1.00
RTFOg Test Aged Binder Dynamic shear, Test temperature at 10 rad/s (°C) G*/sin(delta) (min, kPa)
AASHTO T 315 58
2.20
2.20
2.20
Dynamic shear, Test temperature at 10 rad/s, °C Delta (max, degree)
AASHTO T 315
80e 80e 80e
Elastic recoveryf, Test temperature (°C) Recovery (min, %)
AASHTO T 301 25
PAVh, Temperature (°C) AASHTO R 28 100 100 110
RTFOg Test and PAVh Aged Binder Dynamic shear, Test temperature at 10 rad/s (°C) G*sin(delta) (max, kPa)
AASHTO T 315 16
Creep stiffness, Test temperature (°C) S-value (max, Mpa) M-value (min)
AASHTO T 313 -24
0.300
-18
0.300
-12
0.300 aThe Department allows ASTM D5546 or ASTM D7553 instead of AASHTO T 44. Particles recovered from ASTM D5546 or ASTM D7553 or AASHTO T 44 must be less than 250 m.
bReport only for spray application.
cThe Engineer waives the viscosity requirements if the supplier provides written certification the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.
dThe residue from mass change determination may be used for other tests.
eTest temperature is the temperature at which G*/sin(delta) is 2.2 kPa. A graph of log G*/sin(delta) plotted against temperature may be used to determine the test temperature when G*/sin(delta) is 2.2 kPa. A graph of (delta) versus temperature may be used to determine delta at the temperature when G*/sin(delta) is 2.2 kPa. The graph must have at least 2 points that envelope G*/sin(delta) of 2.2 kPa, and the test temperature must not be more than 6 degree C apart. The Engineer also accepts direct measurement of delta at the temperature when G*/sin(delta) is 2.2 kPa.
fTests without a force ductility clamp may be performed.
gRTFO means rolling thin film oven.
hPAV means Pressure Aging Vessel.
Do not modify PG modified asphalt binder using polyphosphoric acid.
California Trans. 9/22/16
Caltrans Home > hq > esc > Translab > ormt > fpmcoc
Materials Engineering and Testing Services
Office of Roadway Materials Testing
ASPHALT BINDER & HOT MIX ASPHALT LABORATORY
5900 FOLSOM BOULEVARD
SACRAMENTO, CA 95819
APPROVED SUPPLIERS
(Updated: 06/22/2015 Caltrans Contact: Albert Vasquez (916) 227-7322)
Caltrans Performance-Graded (PG) Asphalt Binder Types are:
Non-Modified: PG58-22, PG64-10, PG64-16, PG64-28, and PG70-10 Modified: PG58-34 M, PG64-28 M, and PG76-22 M
Asphalt Supplier - Location Binder Type
Approval Status
Non-Modified Modified (M)
Albina Asphalt - Klamath Falls, OR Keven Heitschmidt - (360) 816-8560 keven.heitschmidt@albina.com
PG64-10, PG64-16,
PG64-28, & PG70-
PG58-34M,
PG64-28M
Current
Albina Asphalt - Madras, OR Keven Heitschmidt - (360) 816-8560 keven.heitschmidt@albina.com
PG64-10, PG64-16,
PG64-28, & PG70-
PG58-34M,
PG64-28M
Pending
Alon Asphalt Co. - Bakersfield, CA Brian Orr - (661) 340-6408 borr@ppcla.com
PG58-22, PG64-10,
PG64-16, PG64-28,
& PG70-10
PG58-34M,
PG64-28M,
PG76-22M
Current
Alon Asphalt Co. - Elk Grove, CA Brian Orr - (661) 340-6408 borr@ppcla.com
PG58-22, PG64-10,
PG64-16, PG64-28,
& PG70-10
PG58-34M,
PG64-28M,
PG76-22M
Current
Alon Asphalt Co. - Mojave, CA Brian Orr - (661) 340-6408 borr@ppcla.com
PG64-10, PG64-16,
& PG70-10
None Current
Current
Page 1 of 3Division of Engineering Services :: ... :: index.htm
7/29/2016http://www.dot.ca.gov/hq/esc/Translab/ormt/fpmcoc.htm
Alon Asphalt Co. - Phoenix, AZ Mohammad Rahman - (602) 794-2528 mrahman@ppcla.com
PG58-22, PG64-10,
PG64-16, PG64-28,
& PG70-10
PG58-34M,
PG64-28M,
PG76-22M
Alon Asphalt Co. - Fernley, NV Kevin McKinney - (775) 835-6366 kmckinney@ppcla.com
PG58-22, PG64-16,
& PG64-28
PG64-28M Current
Chowchilla Asphalt - Chowchilla, CA Akira Hasegawa - (559) 223-6284 ahasegawa@jaxonaggregates.com
PG64-10, & PG64-
None Current
Delta Trading LP - Bakersfield, CA Rob McElroy - (661) 834-5560 rmcelroy@deltatradinglp.com
PG64-10, & PG64-
None Current
Ergon Asphalt & Emulsions, Inc. - Las Vegas, NV Michael Holst - (702) 736-2059 michael.holst@ergon.com
PG64-10, PG64-16,
& PG70-10
PG64-28M,
PG76-22M
Current
Ergon Asphalt & Emulsions, Inc. - Pittsburg, CA
Daniel Thomas - (925) 427-6880 daniel.thomas@nustarenergy.com
PG58-22, PG64-10,
PG64-16, PG64-28,
& PG70-10
PG64-28M,
PG76-22M
Current
Lunday Thagard Refinery - South Gate, CA Gustavo Moreno - (562) 928-7000, Ext. 239 gmoreno@worldoil.net
PG58-22, PG64-10,
PG64-16, & PG70-
PG64-28M Current
Pacific Northwest Oil - Stockton, CA Patrick Sendegeya - (209) 463-4762 patrick.sendegeya@pacificnorthwestoil.com
PG58-22, PG64-10,
PG64-16, PG64-28,
& PG70-10
PG64-28M,
PG76-22M
Current
San Joaquin Refining Co. - Bakersfield, CA Don Powell - (661) 327-8248 donp@sjr.com
PG64-10, PG 64-
16, & PG70-10
PG58-34M,
PG64-28M,
PG76-22M
Current
Santa Maria Refining Co. - Santa Maria, CA Edgar Cifuentes - (805) 357-2995 edc@greka.com
PG64-10, PG64-16,
& PG70-10
None Current
SWT Group - Bakersfield, CA Jonathan Dietzel - (519) 967-1523 jdietzel@swtgroup.com
PG64-10, & PG64-
None Inactive
Syar Industries - Pittsburg, CA Michael Herlax - (707) 259-5705 mherlax@syar.com
PG64-10, & PG64-
None Inactive
Valero Marketing & Supply - Benicia, CA Brenda Mooney - (707) 745-7089 brenda.mooney@valero.com
PG58-22, PG64-10,
PG64-16, PG64-28,
& PG70-10
PG58-34M,
PG64-28M,
PG76-22M
Current
Page 2 of 3Division of Engineering Services :: ... :: index.htm
Valero Marketing & Supply - Wilmington, CA Eric Gauss - (310) 518-4000 eric.gauss@valero.com
PG58-22, PG64-10,
PG64-16, & PG70-
None Current
VSS Emultech - West Sacramento, CA Sallie Houston - (916) 397-8623 sallie.houston@slurry.com
PG64-10, & PG64-
None Current
Western Refining Co. - Phoenix, AZ Sam Huddleston - (602) 286-1982 sam.huddleston@wnr.com
PG58-22, PG64-10,
& PG64-16
None Current
The files below are being made available to asphalt suppliers who are participating in the Caltrans Certification Program for Suppliers of Asphalt. The files below describe the certification program, and acceptance testing criteria are listed in Section 92 of the Caltrans Standard Specifications. If you have any questions about the information in these files, please call Albert Vasquez at (916) 227-7322. Please note that Caltrans projects may require additional acceptance criteria or modifications to asphalt binder specifications for project acceptance testing.
1. Caltrans Certification Program for Suppliers of Asphalt: Program Guidelines Document
2. Caltrans Certification Program for Suppliers of Asphalt: Test Data Format for Submittal to Caltrans (Please submit data using a MS-Excel 2003 spread sheet, i.e., a “.xls” file format.)
3. Caltrans Certification Program for Suppliers of Asphalt: Test ID Numbers for PG Asphalt Binders
4. Caltrans Certification Program for Suppliers of Asphalt: Test ID Numbers for PG-M Asphalt Binders
5. Caltrans Price List for Asphalt Testing
[Note: Some of the Caltrans Test ID Numbers capture two test results rather than just one. For those cases, the Test Data Format file now includes columns for “Test Result 1” and “Test Result 2.”]
Conditions of Use | Privacy Policy Copyright © 2016 State of California
Page 3 of 3Division of Engineering Services :: ... :: index.htm
APPENDIX G – Memorandums & Pipe Selection Criteria
Memorandum
Subject: CA FLAP INY CR2022(1)
South Lake Road Pavement Recommendations
Date: September 14, 2016
From: Robert Norick
Staff Pavements/IA/Materials Engineer
To: Wendy Longley, PM/COE Sebastian Guzman, Lead Designer
Background:
This memorandum provides the pavement structural section recommendation for the CA FLAP INY CR2022(1) South Lake Road Project. The project is located approximately 15 miles southwest of the Town of Bishop in Inyo County, California. The route begins at the intersection with State Route 168 and continues approximately 6.9 miles south to South Lake. South Lake Road is used primarily for recreational purposes with the vast majority of the vehicles being passenger cars, pickups, SUVs, and recreational vehicles.
The majority of the campgrounds and resorts along the route operate for less than 6 months per year (including the Four Jeffrey Campground). Further, the roadway is subject to road closures during snow events in the winter months.
Recommendations:
South Lake Road, as well as, the adjacent campground and parking area roads are currently paved with varying depths of asphalt concrete pavement. The project proposes a full depth reclamation (pulverizing) of the existing asphalt pavements and the placement of hot asphalt concrete pavement (HACP). A pavement investigation was conducted by CFLHD’s senior pavement and materials engineer, Mike Voth, on July 6-7, 2016. The existing pavement was drilled at approximately ¼ mile increments, with boring locations alternating between lanes. Borings were also drilled at the Forks, Four Jeffrey, and Willow campgrounds. In general, the underlying soils through the project limits were fairly consistent; silty sands with and without gravel.
This is the start of the file's text. The full file is on GovTribe.