This document contains questions and answers from an advertisement for the CA FLAP INY CR2022(2) - South Lake Road project. The project involves rehabilitating and widening 6.9 miles of South Lake Road in Inyo County, California to accommodate pedestrian, bicycle, and vehicular traffic. Specific work includes pulverizing and repaving the road, minor widening, grading, drainage improvements including replacing two large culverts, improvements to pullouts and parking areas maintained by Inyo County and the U.S. Forest Service, and improvements to four campgrounds. The estimated quantities of work include 15 acres of clearing, 8,100 cubic yards of excavation, 725 cubic yards of subexcavation, 4,650 tons of aggregate, 7 miles of reclamation, 17,625 tons of asphalt pavement, 2,000 linear feet of pipe culvert, 4,000 linear feet of underdrain, 13,000 linear feet of curb, 40 hours of slope scaling, and 23,375 square yards of topsoil. The project is scheduled for advertisement in October 2019, award in December 2019, and construction from January 2020 to October 2020. No changes will be made to the specification requirements as written in the request for clarification.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
CA FLAP INY CR2022(2) – SOUTH LAKE ROAD
November 21, 2019
Questions Answers
1 In the project special provisions, Section 401 requires the asphalt a minimum of one percent Type 3 (lime) in the asphalt concrete mixture. Lime treatment is not required by our local state DOT in the proximity of the project. Can the requirement for antistrip additive type be opened to allow all types of antistrip additive types as designated according Subsection 702.05 with the dosage rate to be determined such that the minimum Tensile Strength
Ratio of 0.8 is met?
No, we will not change the spec as written.
2 The bid schedule of the project special provisions requires the development of the asphalt concrete for the pavement by gyratory mix design method; however, the modifications to Section 401 in the project special provisions requires the Hveem stabilometer to be verified with a Hveem stabilometer value on page E-41. Can the Hveem requirement in the modifications of Section 401 within the special provisions be removed since Hveem stabilometer is not used in the development of an asphalt concrete mixture by gyratory mix design?
No, we will not change the spec as written.
3 When a current state DOT JMF is submitted which has been developed with different aggregate and volumetric criteria for acceptance than that of the project special provisions, is the state
DOT asphalt mixture tested according to the requirements of the state DOT or that of the project special provisions?
JMF will be evaluated per Subsection 401.03(e). Material submitted in accordance with SCR 401.03(e)(7), will be used to determine the AASHTO
T 308 correction factor for the Government’s furnace. Asphalt will be accepted per Subsection 401.17