127EAW25R0010 - Antelope Fire Road Reconditioning
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW25R0010
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- McCloud, California 96057, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Department of Agriculture Forest Service is seeking a small business contractor to perform road reconditioning services in the Shasta-Trinity National Forest following the Antelope Fire. The project involves comprehensive road rehabilitation on Forest Road 43N15 Harris Spring, including tasks such as clearing and grubbing, road surface restoration, drainage feature rehabilitation, and asphalt repair across approximately 54.26 miles. Contractors must provide all necessary labor, materials, and equipment to complete the work within 60 calendar days after receiving the Notice to Proceed. The solicitation will use a tradeoff source selection method, with evaluation factors including past performance, work plan, key personnel, performance schedule, and price, with technical factors being approximately equal to price in importance. All requests for information must be submitted to Contracting Officer Greg Cunningham by 1:00 PM PST on April 17th, 2025, with final proposals due by 1:00 PM PST on May 2nd, 2025.
The contract is designated as a total small business set-aside with an estimated project value between $500,000 and $1,000,000, located in McCloud, California 96057. The scope includes base construction work covering 28.63 miles of roadway, with two optional sections for aggregate surface course work and asphalt concrete pavement patching. The project is categorized under NAICS code 237310 for Highway, Street, and Bridge Construction, and requires adherence to Davis-Bacon wage determination standards. Contractors will need to comply with specific forest service supplemental specifications, including precise aggregate and compaction requirements, and follow a comprehensive fire prevention plan with Project Activity Level (PAL) restrictions. The work area encompasses regions near Hemlock Lake, Rainbow Mountain, Stephens Butte, and Antelope Creek, representing a significant road maintenance effort in the fire-affected national forest region.
Notice text
2 versions
Update #2 · Latest ·
127EAW25R0010 - Antelope Fire Road Reconditioning - A00001
Shasta-Trinity National Forest
The purpose of this amendment is to post RFI round 1 responses and revised specifications.
Attached are "RFI Official Responses - 1" and "4. Forest Service Supplemental Specifications - VERSION 2" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
//////////////////////////////////////////////////////////////////////////////////////////////////////////
127EAW25R0010 - Antelope Fire Road Reconditioning
Shasta-Trinity National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal
All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, April 17th, 2025.
A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Update #1 ·
127EAW25R0010 - Antelope Fire Road Reconditioning
Shasta-Trinity National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal
All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, April 17th, 2025.
A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses - 1.pdf | ||
| A00001 - RFI Official Responses - 1.pdf | ||
| 4. Forest Service Supplemental Specifications - VERSION 2.pdf | ||
| 6. Davis-Bacon Act WD # CA20250007.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 4. Forest Service Supplemental Specifications.pdf | ||
| 5. Fire Plan.pdf | ||
| 1. Statement of Work.pdf | ||
| 3. Project Map.pdf | ||
| 127EAW25R0010 - Antelope Fire Road Reconditioning.pdf | ||
| 2. Schedule.docx | DOCX document |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| 127EAW25R0010 - Antelope Fire Road Reconditioning | Award Notice | |
| This notice | Solicitation | |
| 127EAW25R0010 - Antelope Fire Road Reconditioning | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management Unit | Forest Service | Total Small Business | |
| Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon | Forest Service | Total Small Business | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business |