This document is a Request for Information (RFI) for the Antelope Fire Road Reconditioning project (Solicitation Number 127EAW25R0010) issued by the U.S. Forest Service. The RFI contains nine official responses to potential contractors' questions about the project, covering topics such as road conditions, gate access, construction specifications, and roadway reconditioning details. Key responses include contact information for Tyson Curran (Civil Engineer & COR) for road accessibility, clarification on gate operations, specifications for construction slash scattering, and standard height clearing limits of 14 feet. The project is located in the Shasta-Trinity National Forest, with an estimated project value between $500,000 and $1,000,000, and is set aside as a total small business opportunity. RFI responses will be posted as amendments on beta.SAM.gov, and all RFI submissions were required by 1:00 PM PST on April 17th, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4. Forest Service Supplemental Specifications - VERSION 2.pdf | ||
| A00001 - RFI Official Responses - 1.pdf | ||
| 3. Project Map.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 4. Forest Service Supplemental Specifications.pdf | ||
| 5. Fire Plan.pdf | ||
| 1. Statement of Work.pdf | ||
| 6. Davis-Bacon Act WD # CA20250007.pdf | ||
| 127EAW25R0010 - Antelope Fire Road Reconditioning.pdf | ||
| 2. Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW25R0010 - Antelope Fire Road Reconditioning
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – who would I contact to make sure roads are drivable due to snow
USFS Response – Tyson Curran, Civil Engineer & COR, 530-227-9871 or
Tyson.Curran@usda.gov
RFI #2 – are gates opened
USFS Response – I am unaware of gates in the project area. However, under normal operations most gates are opened annually in May. If requester knows of a partically gate that is close please responded back with a road number and location of the gate and further information can be provided.
RFI #3 – Item 20103- Method F, Please provide spec.
USFS Response – see updated FSSS - (f) Scattering. Scatter construction slash in designated areas without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practicable on the completed slope.
RFI #4 – Item 30112- Grading R5, Please provide spec.
USFS Response – See FSSS.V2
RFI #5 – Item 30315, supplemental section 30307- Does the limits for the cattle guard extend the full length of 30315 in Schedules B.1 & B.2?
USFS Response – FSSS applies whenever cattleguards are present. All standards and Specs are the same unless stated otherwise in plans or SOW Statement of Work.
RFI #6 – Where are the disposal sites for the spoils from 30307 Cattle guard cleaning?
USFS Response – Determined after award.
RFI #7 – 20104 (d) Supplemental – What are the height clearing limits?
FOR OFFICIAL USE ONLY
USFS Response – Standard 14 feet
RFI #8 – 30103 Supplemental- Are there government furnished sources for untreated aggregate? If so please provide source locations.
USFS Response – None is provided.
RFI #9 – 30103 Supplemental- Are there government furnished sources for untreated aggregate? If so please provide source locations.
USFS Response – None is provided.