232123 SF - HYDRONIC PUMPS.doc

DOC document 38 KB Posted

Attached to
Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) Federal contract opportunity
Solicitation number
W91364-12-R-0005
Issued by
Department of the Army Ohio Army National Guard

About this file

232123

View the file

Other files for this federal contract opportunity

Other files attached to Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC), newest first.
File Type Posted
323113 - CHAIN LINK FENCES AND GATES.DOC DOC document
321373 - CONCRETE PAVING JOINT SEALANTS.DOC DOC document
412213 BRIDGE CRANES.doc DOC document
321313 - CONCRETE PAVING.DOC DOC document
proposal questions and answers MATOC.pdf PDF
site visit information.pdf PDF
329200 - TURF AND GRASSES.DOC DOC document
334100 - STORM UTILITY DRAINAGE PIPING.DOC DOC document
262416 - PANELBOARDS.DOC DOC document
262913 - ENCLOSED CONTROLLERS.DOC DOC document
220500_FL - COMMON WORK RESULTS FOR PLUMBING.DOC DOC document
018100 - GENERAL COMMISSIONING REQUIREMENTS.DOC DOC document
E-108.pdf PDF
099113 - EXTERIOR PAINTING.DOC DOC document
081113 - HOLLOW METAL DOORS AND FRAMES.DOC DOC document
260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.DOC DOC document
230513 SF - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT.DOC DOC document
260923 - LIGHTING CONTROL DEVICES.DOC DOC document
017823 - OPERATION AND MAINTENANCE DATA.DOC DOC document
230593 SF - TESTING ADJUSTING AND BALANCING FOR HVAC.DOC DOC document
079200 - JOINT SEALANTS.DOC DOC document
E-104.pdf PDF
018150 - COMMISSIONING OF HVAC.DOC DOC document
S-100.PDF PDF
M-100.PDF PDF
A301.pdf PDF
221113 - FACILITY WATER DISTRIBUTION PIPING.DOC DOC document
A600.pdf PDF
017700 - CLOSEOUT PROCEDURES.DOC DOC document
233113 FL - METAL DUCTS.DOC DOC document
A302.pdf PDF
223400 SF - FUEL-FIRED DOMESTIC-WATER HEATERS.DOC DOC document
A201.pdf PDF
P-102.PDF PDF
E-102.pdf PDF
013200 - CONSTRUCTION PROGRESS DOCUMENTATION.DOC DOC document
S-104.PDF PDF
A303.pdf PDF
015000 - TEMPORARY FACILITIES AND CONTROLS.DOC DOC document
221119 SF - DOMESTIC WATER PIPING SPECIALTIES.DOC DOC document
E-109.pdf PDF
E-107.pdf PDF
cr_recyclables_tracking_report_form_9feb2011.xlsx XLSX spreadsheet
265100 - INTERIOR LIGHTING.DOC DOC document
237339 SF - INDOOR DIRECT-FIRED HEATING AND VENTILATING UNITS.DOC DOC document
012500 - SUBSTITUTION PROCEDURES.DOC DOC document
104416 - FIRE EXTINGUISHERS.DOC DOC document
016000 - PRODUCT REQUIREMENTS.DOC DOC document
101400 - SIGNAGE.DOC DOC document
013100 - PROJECT MANAGEMENT AND COORDINATION.DOC DOC document
Show all 50

Construction Indefinite Delivery-Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT TRAININGEQUIPMENT SITE ADD/ALT

SECTION 232123 – HYDRONIC PUMPS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Circulating pumps.

B. Miscellaneous pump equipment.

1.2 RELATED SECTIONS

A. All drawings and specification sections apply to work in this section. Furnish all items, articles, materials, equipment, operations or methods that are mentioned, listed or scheduled on drawings or are in this specification including all labor, equipment, materials and miscellaneous incidentals necessary and/or required for the completion of this project. The work covered under this section of the specifications is in no way completion within itself but is supplementary to the entire specification and drawings.

1.3 REFERENCES

A. UL 778 - Motor Operated Water Pumps.

B. NFPA 70 - National Electrical Code.

1.4 PERFORMANCE REQUIREMENTS

A. Ensure pumps operate at specified system fluid temperatures without vapor binding and cavitation, are non-overloading in parallel or individual operation, and operate within 25 percent of midpoint of published maximum efficiency curve.

1.5 REGULATORY REQUIREMENTS

A. Products Requiring Electrical Connection: Listed and classified by UL as suitable for the purpose specified and indicated.

1.6 SCOPE

A. The work covered by this specification consists of furnishing all labor, equipment, materials and performing all operations required, for the correct and complete fabrication and installation of HVAC pumps in accordance with the applicable project specifications, drawings, codes, regulations and standards.

PART 2 - PRODUCTS

1.1 2.1

CLOSE-COUPLED, IN-LINE CENTRIFUGAL PUMPS

Retain "Manufacturers" Paragraph and list of manufacturers below to require products from manufacturers listed or a comparable product from other manufacturers.

A. Manufacturers: Subject to compliance with requirements, provide products by the following:

Retain "Basis-of-Design Product" Paragraph and list of manufacturers below to identify a specific product or a comparable product from manufacturers listed. Retain option and delete insert note if manufacturer's name and model number are indicated on Drawings.

1. ITT Corporation; Bell & Gossett.

B. Description: Factory-assembled and -tested, centrifugal, close-coupled, in-line pump; designed for installation with pump and motor shafts mounted horizontally.

C. Pump Construction:

1. Body: Cast Iron or Bronze

2. Face Plate: Stainless Steel

3. Impeller: Glass Filled PPS

4. Shaft: None

5. Seal: Mechanical, Carbon or Silicon Carbide

6. Motor Bearings: Sealed Precision Steel Ball Bearing Permanently Lubricated

7. Motor Type: ODP

8. Elastomers: EPDM

D. Motor: Single speed and rigidly mounted to pump casing.

E. Maximum Working Pressure: 150 psi

F. Maximum Operating Temperature: 225°F

If Project has more than one type or configuration of close-coupled, in-line centrifugal pump, delete "Capacities and Characteristics" Paragraph below and schedule pumps on Drawings.

G. Capacities and Characteristics:

1. See Drawings.

PART 3 EXECUTION

3.1 PREPARATION

A. Verify that electric power is available and of the correct characteristics.

3.2 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Provide access space around pumps for service. Provide no less than minimum as recommended by manufacturer.

C. Decrease from line size with long radius reducing elbows or reducing couplings. Support piping adjacent to pump such that no weight is carried on pump casings.

D. Provide line sized shut-off valve and pump suction fitting on pump suction, and line sized combination pump discharge valve on pump discharge.

E. Prior to initial start-up the pump representative shall be notified that all pumps are wired, lubricated, system filled, and ready for check test and alignment. A complete report shall be submitted to the Engineer covering the following:

1. Rotation Check

2. Base Grouted

3. Approved Piping

4. Voltage Check ______ Volts

5. Suction Pressure _____ psig

6. Discharge Pressure _____ psig

7. Actual Pump gpm _____ head_____ ft.

8. Amps L1____ L2____ L3____

9. Motor Hp _____

10. Any difficulties of operation.

K.

Complete instructions/training on operation and maintenance of the circulating pump system shall be provided to the Owner by the circulating pump representative to the satisfaction of the Owner/Engineer prior to project close-out and final payment.

END OF SECTION 232123