012300 optional bid items.pdf

PDF 8 KB Posted

Attached to
CONSTRUCT USPFO WAREHOUSE
Solicitation number
W91364-09-B-0003
Issued by

About this file

012300 optional bid items.pdf

View the file

Other files

File Type Posted
USPFO_P602W.pdf PDF
USPFO_P304W.pdf PDF
USPFO_P701W.pdf PDF
USPFO_F401W.pdf PDF
262923 variable frequency controllers.pdf PDF
224700 drinking fountains and water coolers.pdf PDF
E703.pdf PDF
072100 thermal insulation.pdf PDF
230500 common work results for hvac.pdf PDF
OHARNG_USPFO_Q202W.pdf PDF
USPFO_P303W.pdf PDF
224000 plumbing fixtures.pdf PDF
221123 domestic water pumps.pdf PDF
E504.pdf PDF
074213 metal wall panels.pdf PDF
271300 communications backbone cabling.pdf PDF
OHARNG-USPFO-A-211aW .pdf PDF
096519 resilient tile flooring.pdf PDF
L502.pdf PDF
C000.pdf PDF
223400 fuel-fired domestic water heaters.pdf PDF
USPFO_P301W.pdf PDF
USPFO_S501W.pdf PDF
USPFO_S502W.pdf PDF
260526 grounding and bonding for electrical systems.pdf PDF
OHARNG-USPFO-I-101W .pdf PDF
003 Fly Page.pdf PDF
G140.pdf PDF
061600 sheathing.pdf PDF
271100 communications equipment room fittings.pdf PDF
USPFO_P001W.pdf PDF
OHARNG-USPFO-A-401W .pdf PDF
E304.pdf PDF
012900 payment procedures.pdf PDF
055300 metal gratings.pdf PDF
017900 operational and maintenance training.pdf PDF
OHARNG-USPFO-A-821W .pdf PDF
064023 interior architectural woodwork.pdf PDF
E201.pdf PDF
E301.pdf PDF
033000 cast-in-place concrete.pdf PDF
C501.pdf PDF
OHARNG-USPFO-A-701W .pdf PDF
USPFO_F301W.pdf PDF
USPFO_M502W.pdf PDF
C600.pdf PDF
329200 lawns.pdf PDF
OHARNG-USPFO-A-807W .pdf PDF
096813 tile carpeting.pdf PDF
099123 interior painting.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

OPTIONAL BID ITEMS 012300 - 1

SECTION 012300 – OPTIONAL BID ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for Optional Bid Items.

1.2 DEFINITIONS

A. Optional Bid Items (OBI’s): An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if Government decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. The cost or credit for each optional line item is the net addition to or deduction from the Contract Sum to incorporate Optional Bid Item alternate into the Work.

No other adjustments are made to the Contract Sum.

1.3 PROCEDURES

A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if OBI’s have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates.

C. Execute accepted OBI’s under the same conditions as other work of the Contract.

D. Schedule: A Schedule of OBI’s is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each OBI.

F5W61608 USPFO Warehouse Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

OPTIONAL BID ITEMS 012300 - 2

PART 2 - PRODUCTS

(Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF OBI’S

A. USPFO Warehouse Optional Bid Item 1: Provide and install dock levelers and dock leveler concrete construction at doors 125C, 125D, 125E, and 125F. OBI includes painted safety line around the dock leveler.

B. USPFO Warehouse Optional Bid Item 2: Add (landscaping plantings and mulch) at USPFO Warehouse. Grass is Base Bid.

C. USPFO Warehouse Optional Bid Item 3: Add compacted gravel paving east of USPFO Warehouse.

D. USPFO Warehouse Optional Bid Item 4: Add asphalt paving east of USPFO Warehouse.

E. USPFO Warehouse Optional Bid Item 5: Add concrete paving east of USPFO Warehouse.

F. USPFO Warehouse Optional Bid Item 6: Repave 8th Boulevard west of USPFO Warehouse from Pershing Avenue to northern fence-line of CSMS.

G. USPFO Warehouse Optional Bid Item 7: Add mobile aisle shelf system (Item CI4 from the Equipment List).

H. USPFO Warehouse Optional Bid Item 8: Use asphalt paving in lieu of gravel at the

POV.

I. USPFO Warehouse Optional Bid Item 9: Provide CENTRIA Architectural Systems SRS 3 in lieu of SRS 2 specified in Division 7 Section “Sheet Metal Roofing”.

END OF SECTION 012300