123210 canvas table.pdf

PDF 11 KB Posted

Attached to
CONSTRUCT CSMS PHASE II Federal contract opportunity
Solicitation number
W91364-09-B-0002
Issued by
Department of the Army Ohio Army National Guard

About this file

123210 canvas table.pdf

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT CSMS PHASE II, newest first.
File Type Posted
e1w13300.PDF PDF
CSM-A705W .pdf PDF
L100.pdf PDF
CSM-A415W .pdf PDF
CSMM366W.pdf PDF
CSMM316aW.pdf PDF
CSMFA318W.pdf PDF
CSMM317bW.pdf PDF
CSMS203W Layout1 —
CSMFA501W.pdf PDF
CSM-G140W .pdf PDF
CSMM406W.pdf PDF
C000.pdf PDF
CSMS304W Layout1 —
E-103.pdf PDF
CSMM101W.pdf PDF
E-102.pdf PDF
CSM-A405W .pdf PDF
CSM-A218bW .pdf PDF
CSMM006W.pdf PDF
CSM-A324W .pdf PDF
ED-101.pdf PDF
CSMM410W.pdf PDF
CSM-A816W .pdf PDF
CSMM401W.pdf PDF
CSMS305W Layout1 —
CSMM319aW.pdf PDF
CSM-G129W .pdf PDF
CSM-A804W .pdf PDF
042000 unit masonry.pdf PDF
223300 electric domestic water heaters.pdf PDF
092216 non-structural metal framing.pdf PDF
230553 identification for hvac piping and equipment.pdf PDF
235100 breechings chimneys and stacks.pdf PDF
232100 glycol makeup system.pdf PDF
260923 lighting control devices.pdf PDF
238126 split-system air-conditioners.pdf PDF
079200 joint sealants.pdf PDF
233300 air duct accessories.pdf PDF
102800 toilet bath and laundry accessories.pdf PDF
323113 chain link fences and gates —
055300 metal gratings.pdf PDF
099113 exterior painting.pdf PDF
083113 access doors and frames.pdf PDF
018113 sustainable design requirements.pdf PDF
271500 communications horizontal cabling.pdf PDF
260533 raceway and boxes for electrical systems.pdf PDF
010001 affirmative procurement.pdf PDF
232113 hydronic piping.pdf PDF
260526 grounding and bonding for electrical systems.pdf PDF
Show all 50

CONSTRUCT CSMS PHASE II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5W61607 Combined Support Maintenance Shop - Phase II Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

CANVAS TABLE 123210 - 1

SECTION 123210 – CANVAS TABLE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Wood-surfaced steel work tables (Canvas Table)

1.2 DEFINITIONS

A. MDF: Medium-density fiberboard.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. LEED Submittals:

1. Certificates for Credit MR 7: Chain-of-custody certificates certifying that wood used to produce work table top complies with forest certification requirements.

Include evidence that manufacturer is certified for chain of custody by an FSC-accredited certification body.

a. Include statement indicating costs for each certified wood product.

2. Product Data for Credit EQ 4.4: For adhesives and composite wood products, documentation indicating that product contains no urea formaldehyde.

C. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

D. Samples: For cabinet finishes and for each type of top material indicated.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.

B. Forest Certification: Fabricate table top with wood and wood-based products produced from wood obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship."

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

CANVAS TABLE 123210 - 2

C. Quality Standard: Unless otherwise indicated, comply with requirements for modular cabinets in AWI's "Architectural Woodwork Quality Standards."

1. Provide AWI Quality Certification Program certificate indicating that manufactured wood casework complies with requirements.

D. Product Designations: Drawings indicate sizes, configurations, and finish material of manufactured wood casework by referencing designated manufacturer's catalog numbers. Other manufacturers' casework of similar sizes and door and drawer configurations, of same finish material, and complying with the Specifications may be considered.

1.5 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of manufactured wood casework that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Delamination of components or other failures of glue bond.

b. Warping of components.

2. Warranty Period: Ten years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis-of-Design Product: Subject to compliance with requirements, provide Bench Depot, H-Series (model HB4896) or comparable product by one of the following:

1. Wood-surfaced steel work tables:

a. A Plus Warehouse Equipment & Supply

b. Gaw Technology

c. Global; a Systemax Company.

2.2 MATERIALS, GENERAL

A. Low-Emitting Materials: Provide manufactured wood casework, including countertops, made with adhesives and composite wood products containing no urea formaldehyde.

B. Maximum Moisture Content for Lumber: 7 percent for hardwood

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

CANVAS TABLE 123210 - 3

2.3 DESIGN, COLOR, AND FINISH

A. Design: Provide manufactured wood-surfaced steel work tables of the following design:

1. Dimensions (D x L): 48” x 96”.

2. Table top height above floor: 33 ½”.

3. Combine twelve (12) tables to create a single canvas table 16’-0” x 24’-0” as indicated on the plans. Bolt table frames together per manufacturer’s recommendations. Bolt legs to concrete floor per manufacturer’s recommendations.

4. Load capacity per 48” x 96” work table: 12,000 pounds

5. Table top material: 1 ¾” Solid Maple Butcher Block.

6. Steel frame finish: Powder Coated, color RAL 7042 Gray, 80% gloss.

B. Wood Colors and Finishes: As selected by Architect from table manufacturer's full range.

PART 3 - EXECUTION

3.1 WOOD-SURFACED STEEL WORK TABLE INSTALLATION

A. Install level, plumb, and true; shim as required, using concealed shims. Where manufactured wood casework abuts other finished work, apply filler strips and scribe for accurate fit, with fasteners concealed where practical.

3.2 INSTALLATION OF TOPS

A. Field Jointing: Where possible make in the same manner as shop jointing, using demountable elements and fasteners recommended by manufacturer. Prepare edges to be joined in field to minimize size of joints between tables. Locate field joints where approved on Shop Drawings.

1. Secure with concealed clamping devices located within 6 inches of front and back edges and at intervals not exceeding 24 inches. Tighten according to manufacturer's written instructions to exert a constant, heavy-clamping pressure at joints to ensure that individual tables will act as one.

3.3 CLEANING AND PROTECTING

A. Clean finished surfaces, touch up as required, and remove or refinish damaged or soiled areas to match original factory finish, as approved by Architect.

Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

CANVAS TABLE 123210 - 4

B. Protection: Provide 6-mil plastic or other suitable water-resistant covering over wood-surfaced steel work tables surfaces. Tape to floor at a minimum of 48 inches o.c.

Remove protection at Substantial Completion.

END OF SECTION 123210

File details come from the government source that posted it. Updated .