018113 sustainable design requirements.pdf

PDF 27 KB Posted

Attached to
CONSTRUCT CSMS PHASE II Federal contract opportunity
Solicitation number
W91364-09-B-0002
Issued by
Department of the Army Ohio Army National Guard

About this file

09B000218113 sustainable design requirements.pdf

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT CSMS PHASE II, newest first.
File Type Posted
CSMM315aW.pdf PDF
CSMS271 Layout1 —
E-602.pdf PDF
CSM-Q503W.pdf PDF
CSM-A423W .pdf PDF
CSMM315cW.pdf PDF
CSM-A723W .pdf PDF
CSMS265 Layout1 —
CSM-A519W .pdf PDF
CSMM319bW.pdf PDF
CSMM318bW.pdf PDF
CSM-A807W .pdf PDF
CSM-A100W .pdf PDF
CSM-Q504W.pdf PDF
E-501.pdf PDF
CSMF314W.pdf PDF
CSM-A200W .pdf PDF
CSM-A303W .pdf PDF
CSM-A410W .pdf PDF
C201.pdf PDF
CSMM407W.pdf PDF
E-802.pdf PDF
CSM-A817W .pdf PDF
CSMM409W.pdf PDF
CSMS507W Layout1 —
L501.pdf PDF
CSMFA601W.pdf PDF
C500.pdf PDF
CSMM317aW.pdf PDF
L101.pdf PDF
CSM-A212bW .pdf PDF
CSMS266 Layout1 —
CSM-A411W .pdf PDF
CSM-A403W .pdf PDF
CSMS212W Layout1 —
CSM-A267W .pdf PDF
220529 hangers and supports for plumbing piping and equipment.pdf PDF
015000 temporary facilities and controls.pdf PDF
412213.19 jib cranes.pdf PDF
013300d submittal register.pdf PDF
133423 fabricated structure.pdf PDF
017839 project record documents.pdf PDF
224500 emergency plumbing fixtures.pdf PDF
260523 control-voltage electrical power cables.pdf PDF
055000 metal fabrications.pdf PDF
271100 communications equipment room fittings.pdf PDF
221123 domestic water pumps.pdf PDF
019313 operation and maintenance manuals.pdf PDF
230523 general-duty valves for hvac piping.pdf PDF
085124 steel acoustical windows.pdf PDF
Show all 50

CONSTRUCT CSMS PHASE II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F5W61607 Combined Support Maintenance Shop - Phase II Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 1

SECTION 018113 - SUSTAINABLE DESIGN REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general requirements and procedures for compliance with certain USGBC LEED prerequisites and credits needed for Project to obtain LEED Silver certification based on LEED-NC, Version 2.2.

B. Related Sections:

1. Divisions 01 through 34 Sections for LEED requirements specific to the work of each of these Sections. Requirements may or may not include reference to

LEED.

1.2 DEFINITIONS

A. Chain-of-Custody Certificates: Certificates signed by manufacturers certifying that wood used to make products was obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship." Certificates shall include evidence that manufacturer is certified for chain of custody by an FSC-accredited certification body.

B. LEED: Leadership in Energy & Environmental Design.

C. Rapidly Renewable Materials: Materials made from plants that are typically harvested within a 10-year or shorter cycle. Rapidly renewable materials include products made from bamboo, cotton, flax, jute, straw, sunflower seed hulls, vegetable oils, or wool.

D. Regional Materials: Materials that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles of Project site. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.

E. Regionally Manufactured Materials: Materials that are manufactured within a radius of 500 miles from Project site. Manufacturing refers to the final assembly of components into the building product that is installed at Project site.

F. Regionally Extracted and Manufactured Materials: Regionally manufactured materials made from raw materials that are extracted, harvested, or recovered within a radius of 500 miles from Project site.

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 2

G. Recycled Content: The recycled content value of a material assembly shall be determined by weight.

1. "Post-consumer" material is defined as waste material generated by households or by commercial, industrial, and institutional facilities in their role as end users of the product, which can no longer be used for its intended purpose.

2. "Pre-consumer" material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind, or scrap generated in a process and capable of being reclaimed within the same process that generated it.

H. Recycled Content: The percentage by weight of constituents that have been recovered or otherwise diverted from the solid waste stream, either during the manufacturing process (pre-consumer), or after consumer use (post-consumer).

1. Spills and scraps from the original manufacturing process that are combined with other constituents after a minimal amount of reprocessing for use in further production of the same product are not recycled materials.

2. Discarded materials from one manufacturing process that are used as constituents in another manufacturing process are pre-consumer recycled materials.

1.3 SUBMITTALS

A. Project Materials Cost Data: Provide statement indicating total cost for materials used for Project. Costs exclude labor, overhead, and profit. Include breakout of costs for the following categories of items:

1. Furniture.

2. Plumbing.

3. Mechanical.

4. Electrical.

5. Specialty items such as elevators and equipment.

6. Wood-based construction materials.

B. LEED Action Plans: Provide preliminary submittals within seven days of date established for commencement of the Work indicating how the following requirements will be met:

1. Credit MR 4.1 and Credit MR 4.2: List of proposed materials with recycled content. Indicate cost, post-consumer recycled content, and pre-consumer recycled content for each product having recycled content.

2. Credit MR 5.1 and Credit MR 5.2: List of proposed regional materials.

Identify each regional material, including its source, cost, and the fraction by weight that is considered regional.

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 3

C. LEED Progress Reports: Concurrent with each Application for Payment, submit reports comparing actual construction and purchasing activities with LEED action plans.

D. LEED Documentation Submittals:

1. Credit EA 5: Product data and wiring diagrams for sensors and data collection system used to provide continuous metering of building energy-consumption performance over time.

2. Credit MR 4.1 and Credit MR 4.2: Product data and certification letter indicating percentages by weight of post-consumer and pre-consumer recycled content for products having recycled content. Include statement indicating costs for each product having recycled content.

3. Credit MR 5.1 and Credit MR 5.2: Product data for regional materials indicating location and distance from Project of material manufacturer and point of extraction, harvest, or recovery for each raw material. Include statement indicating cost for each regional material and the fraction by weight that is considered regional.

4. Credit MR 7: Product data and chain-of-custody certificates for products containing certified wood. Include statement indicating cost for each certified wood product.

5. Credit EQ 3:

a. Construction indoor-air-quality management plan.

b. Product data for temporary filtration media.

c. Product data for filtration media used during occupancy.

d. Construction Documentation: Six photographs at three different times during the construction period, along with a brief description of the SMACNA approach employed, documenting implementation of the indoor-air-quality management measures, such as protection of ducts and on-site stored or installed absorptive materials.

6. Credit EQ 3.2:

a. Signed statement describing the building air flush-out procedures including the dates when flush-out was begun and completed and statement that filtration media was replaced after flush-out.

b. Product data for filtration media used during flush-out and during occupancy.

c. Report from testing and inspecting agency indicating results of indoor-air-quality testing and documentation showing compliance with indoor-air-quality testing procedures and requirements.

7. Credit EQ 4.1: Product data for adhesives and sealants used inside the weatherproofing system indicating VOC content of each product used.

Indicate VOC content in g/L calculated according to 40 CFR 59, Subpart D.

8. Credit EQ 4.2: Product data for paints and coatings used inside the weatherproofing system indicating chemical composition and VOC content of

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 4

each product used. Indicate VOC content in g/L calculated according to 40 CFR 59, Subpart D.

9. Credit EQ 4.4: Product data for products containing composite wood or agrifiber products or wood glues indicating that they do not contain urea-formaldehyde resin.

PART 2 - PRODUCTS

2.1 RECYCLED CONTENT OF MATERIALS

A. Credit MR 4.1 and Credit MR 4.2: Provide building materials with recycled content such that post-consumer recycled content plus one-half of pre-consumer recycled content constitutes a minimum of 10 percent of cost of materials used for Project.

1. Cost of post-consumer recycled content of an item shall be determined by dividing weight of post-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.

2. Cost of pre-consumer recycled content of an item shall be determined by dividing weight of pre-consumer recycled content in the item by total weight of the item and multiplying by cost of the item.

3. Do not include mechanical and electrical components, and specialty items such as elevators and equipment in the calculation.

2.2 REGIONAL MATERIALS

A. Credit MR 5.1 and Credit MR 5.2: Provide a minimum of 10 percent of building materials (by cost) that are regional materials.

B. Credit MR 5.2: Provide a minimum of 10 percent of materials (by cost) that are regionally extracted and manufactured materials.

2.3 LOW-EMITTING MATERIALS

A. Credit EQ 4.1: For field applications that are inside the weatherproofing system, use adhesives and sealants that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D:

1. Wood Glues: 30 g/L.

2. Metal to Metal Adhesives: 30 g/L.

3. Adhesives for Porous Materials (Except Wood): 50 g/L.

4. Subfloor Adhesives: 50 g/L.

5. Plastic Foam Adhesives: 50 g/L.

6. Carpet Adhesives: 50 g/L.

7. Carpet Pad Adhesives: 50 g/L.

8. VCT and Asphalt Tile Adhesives: 50 g/L.

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 5

9. Cove Base Adhesives: 50 g/L.

10. Gypsum Board and Panel Adhesives: 50 g/L.

11. Rubber Floor Adhesives: 60 g/L.

12. Ceramic Tile Adhesives: 65 g/L.

13. Multipurpose Construction Adhesives: 70 g/L.

14. Fiberglass Adhesives: 80 g/L.

15. Contact Adhesive: 80 g/L.

16. Structural Glazing Adhesives: 100 g/L.

17. Wood Flooring Adhesive: 100 g/L.

18. Structural Wood Member Adhesive: 140 g/L.

19. Special Purpose Contact Adhesive (contact adhesive that is used to bond melamine covered board, metal, unsupported vinyl, Teflon, ultra-high molecular weight polyethylene, rubber or wood veneer 1/16 inch or less in thickness to any surface): 250 g/L.

20. Top and Trim Adhesive: 250 g/L.

21. Plastic Cement Welding Compounds: 250 g/L.

22. ABS Welding Compounds: 325 g/L.

23. CPVC Welding Compounds: 490 g/L.

24. PVC Welding Compounds: 510 g/L.

25. Adhesive Primer for Plastic: 550 g/L.

26. Plastic Cement Welding Compounds: 350 g/L.

27. ABS Welding Compounds: 400 g/L.

28. CPVC Welding Compounds: 490 g/L.

29. PVC Welding Compounds: 510 g/L.

30. Adhesive Primer for Plastic: 650 g/L.

31. Sheet Applied Rubber Lining Adhesive: 850 g/L.

32. Aerosol Adhesive, General Purpose Mist Spray: 65 percent by weight.

33. Aerosol Adhesive, General Purpose Web Spray: 55 percent by weight.

34. Special Purpose Aerosol Adhesive (All Types): 70 percent by weight.

35. Other Adhesives: 250 g/L.

36. Architectural Sealants: 250 g/L.

37. Nonmembrane Roof Sealants: 300 g/L.

38. Single-Ply Roof Membrane Sealants: 450 g/L.

39. Other Sealants: 420 g/L.

40. Sealant Primers for Nonporous Substrates: 250 g/L.

41. Sealant Primers for Porous Substrates: 775 g/L.

42. Modified Bituminous Sealant Primers: 500 g/L.

43. Other Sealant Primers: 750 g/L.

B. Credit EQ 4.2: For field applications that are inside the weatherproofing system, use paints and coatings that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D and the following chemical restrictions:

1. Flat Paints, Coatings, and Primers: VOC not more than 50 g/L.

2. Nonflat Paints, Coatings, and Primers: VOC not more than 150 g/L.

3. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.

4. Clear Wood Finishes, Varnishes: VOC not more than 350 g/L.

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 6

5. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L.

6. Floor Coatings: VOC not more than 100 g/L.

7. Shellacs, Clear: VOC not more than 730 g/L.

8. Shellacs, Pigmented: VOC not more than 550 g/L.

9. Stains: VOC not more than 250 g/L.

10. Flat Interior Topcoat Paints: VOC not more than 50 g/L.

11. Nonflat Interior Topcoat Paints: VOC not more than 150 g/L.

12. Anticorrosive and Antirust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.

13. Clear Wood Finishes, Varnishes and Sanding Sealers: VOC not more than

350 g/L.

14. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L.

15. Floor Coatings: VOC not more than 100 g/L.

16. Shellacs, Clear: VOC not more than 730 g/L.

17. Shellacs, Pigmented: VOC not more than 550 g/L.

18. Stains: VOC not more than 250 g/L.

19. Primers, Sealers, and Undercoaters: VOC not more than 200 g/L.

20. Dry-Fog Coatings: VOC not more than 400 g/L.

21. Zinc-Rich Industrial Maintenance Primers: VOC not more than 340 g/L.

22. Pretreatment Wash Primers: VOC not more than 420 g/L.

23. Aromatic Compounds: Paints and coatings shall not contain more than 1.0 percent by weight total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).

24. Restricted Components: Paints and coatings shall not contain acrolein, acrylonitrile, antimony, benzene, butyl benzyl phthalate, cadmium, di (2-ethylhexyl) phthalate, di-n-butyl phthalate, di-n-octyl phthalate, 1,2-dichlorobenzene, diethyl phthalate, diethyl phthalate, dimethyl phthalate, ethylbenzene, formaldehyde, hexavalent chromium, isophorone, lead, mercury, methyl ethyl ketone, methyl isobutyl ketone, methylene chloride, naphthalene, toluene (methylbenzene), 1,1,1-trichloroethane, or vinyl chloride.

C. Credit EQ 4.4: Do not use composite wood or agrifiber products or adhesives that contain urea-formaldehyde resin.

PART 3 - EXECUTION

3.1 REFRIGERANT AND CLEAN-AGENT FIRE-EXTINGUISHING-AGENT REMOVAL

A. Prerequisite EA 3: Remove CFC-based refrigerants from existing HVAC&R equipment indicated to remain and replace with refrigerants that are not CFC based.

Replace or adjust existing equipment to accommodate new refrigerant.

B. Credit EA 4: Remove clean-agent fire-extinguishing agents that contain HCFCs or halons and replace with agent that does not contain HCFCs or halons.

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 7

3.2 MEASUREMENT AND VERIFICATION

A. Credit EA 5: Implement measurement and verification plan consistent with Option B: Energy Conservation Measure Isolation or Option D: Calibrated Simulation, Savings Estimation Method 2 in the EVO's "International Performance Measurement and Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction," and as further defined by the following:

B. If not already in place, install metering equipment to measure energy usage.

Monitor, record, and trend log measurements.

C. Evaluate energy performance and efficiency by comparing actual to predicted performance.

D. Measurement and verification period shall cover at least one year of postconstruction occupancy.

3.3 CONSTRUCTION INDOOR-AIR-QUALITY MANAGEMENT

A. Credit EQ 3: Comply with SMACNA's "SMACNA IAQ Guideline for Occupied Buildings under Construction."

1. If Owner authorizes use of permanent heating, cooling, and ventilating systems during construction period as specified in Division 01 Section "Temporary Facilities and Controls," install filter media having a MERV 8 according to ASHRAE 52.2 at each return-air inlet for the air-handling system used during construction.

2. Replace all air filters immediately prior to occupancy.

B. Credit EQ 3.2: Comply with one of the following requirements:

1. After construction ends, prior to occupancy and with all interior finishes installed, perform a building flush-out by supplying a total volume of 14000 cu.

ft. of outdoor air per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and a relative humidity no higher than 60 percent.

2. If occupancy is desired prior to flush-out completion, the space may be occupied following delivery of a minimum of 3500 cu. ft. of outdoor air per sq.

ft. of floor area to the space. Once a space is occupied, it shall be ventilated at a minimum rate of 0.30 cfm per sq. ft. of outside air or the design minimum outside air rate determined in EQ Prerequisite 1, whichever is greater. During each day of the flush-out period, ventilation shall begin a minimum of three hours prior to occupancy and continue during occupancy. These conditions shall be maintained until a total of 14000 cu. ft./sq. ft. of outside air has been delivered to the space.

3. Air-Quality Testing:

SUSTAINABLE DESIGN REQUIREMENTS 018113 - 8

a. Conduct baseline indoor-air-quality testing, after construction ends and prior to occupancy, using testing protocols consistent with the EPA's "Compendium of Methods for the Determination of Air Pollutants in Indoor Air," and as additionally detailed in the USGBC's "LEED-NC:

Reference Guide."

b. Demonstrate that the contaminant maximum concentrations listed below are not exceeded:

1) Formaldehyde: 50 ppb.

2) Particulates (PM10): 50 micrograms/cu. m.

3) Total Volatile Organic Compounds (TVOC): 500 micrograms/cu. m.

4) 4-Phenylcyclohexene (4-PH): 6.5 micrograms/cu. m.

5) Carbon Monoxide: 9 ppm and no greater than 2 ppm above outdoor levels.

c. For each sampling point where the maximum concentration limits are exceeded, conduct additional flush-out with outside air and retest the specific parameter(s) exceeded to indicate the requirements are achieved. Repeat procedure until all requirements have been met.

When retesting noncomplying building areas, take samples from same locations as in the first test.

d. Air-sample testing shall be conducted as follows:

1) All measurements shall be conducted prior to occupancy but during normal occupied hours, and with building ventilation system starting at the normal daily start time and operated at the minimum outside air flow rate for the occupied mode throughout the duration of the air testing.

2) Building shall have all interior finishes installed including, but not limited to, millwork, doors, paint, carpet, and acoustic tiles.

Nonfixed furnishings such as workstations and partitions are encouraged, but not required, to be in place for the testing.

3) Number of sampling locations will vary depending on the size of building and number of ventilation systems. For each portion of building served by a separate ventilation system, the number of sampling points shall not be less than one per 25,000 sq. ft. or for each contiguous floor area, whichever is larger, and shall include areas with the least ventilation and greatest presumed source strength.

4) Air samples shall be collected between 3 and 6 feet from the floor to represent the breathing zone of occupants, and over a minimum four-hour period.

END OF SECTION 018113