238126 split-system air-conditioners.pdf
View the file
Other files for this federal contract opportunity
Show all 50
CONSTRUCT CSMS PHASE II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F5W61607 Combined Support Maintenance Shop - Phase II Ohio Army National Guard Rev. 0 Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SPLIT-SYSTEM AIR-CONDITIONERS 238126 - 1
SECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes split-system air-conditioning and heat-pump units consisting of separate evaporator-fan and compressor-condenser components.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, and furnished specialties and accessories. Include performance data in terms of capacities, outlet velocities, static pressures, sound power characteristics, motor requirements, and electrical characteristics.
B. LEED Submittals:
1. Product Data for Credit EA 4: For refrigerants, documentation including printed statement that refrigerants are free of HCFCs.
C. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Wiring Diagrams: For power, signal, and control wiring.
D. Operation and Maintenance Data: For split-system air-conditioning units to include in emergency, operation, and maintenance manuals.
E. Warranty: Sample of special warranty.
1.4 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SPLIT-SYSTEM AIR-CONDITIONERS 238126 - 2
B. ASHRAE Compliance:
1. Fabricate and label refrigeration system to comply with ASHRAE 15, "Safety Standard for Refrigeration Systems."
2. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1-2004, Section 4 - "Outdoor Air Quality," Section 5 - "Systems and Equipment," Section 6 - " Procedures," and Section 7 - "Construction and System Start-Up."
C. ASHRAE/IESNA Compliance: Applicable requirements in ASHRAE/IESNA 90.1- 2004.
1.5 COORDINATION
A. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual equipment provided.
1.6 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of split-system air-conditioning units that fail in materials or workmanship within specified warranty period.
1. Warranty Period:
a. For Compressor: Five year(s) from date of Substantial Completion.
b. For Parts: One year(s) from date of Substantial Completion.
c. For Labor: One year(s) from date of Substantial Completion.
1.7 EXTRA MATERIALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Filters: One set(s) for each air-handling unit.
2. Gaskets: One set(s) for each access door.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Carrier Corporation; Home Comfort and HVAC Building & Industrial Systems.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SPLIT-SYSTEM AIR-CONDITIONERS 238126 - 3
2. Coleman Company Inc. (The).
3. First Operations LP.
4. Friedrich Air Conditioning Company.
5. Koldwave, Inc.; a Mestek company.
6. Lennox International Inc.
7. Mitsubishi Electric & Electronics USA, Inc.; HVAC Advanced Products Division.
8. Mitsubishi Electric Sales Canada Inc.
9. Mitsubishi Heavy Industries America, Inc.
10. SANYO North America Corporation; SANYO Fisher Company.
11. Trane; a business of American Standard companies.
12. YORK; a Johnson Controls company.
2.2 INDOOR UNITS 5 TONS OR LESS
A. Floor-mounted, Evaporator-Fan Components:
1. Cabinet: Enameled steel with removable panels on front and ends and discharge drain pans with drain connection.
a. Discharge Grille: Steel with surface-mounted frame
2. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins and thermal-expansion valve. Comply with ARI 210/240.
3. Heat-Pump Components: Reversing valve and low-temperature-air cutoff thermostat.
4. Fan: Direct drive, centrifugal.
5. Fan Motors:
a. Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements specified in Division 23 Section "Common Motor Requirements for HVAC Equipment."
b. Multitapped, multispeed with internal thermal protection and permanent lubrication.
c. Enclosure Type: Totally enclosed, fan cooled.
d. NEMA Premium (TM) efficient motors as defined in NEMA MG 1.
e. Controllers, Electrical Devices, and Wiring: Comply with requirements for electrical devices and connections specified in Division 26 Sections.
6. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1-2004.
7. Air Filtration Section:
a. General Requirements for Air Filtration Section:
1) Comply with NFPA 90A.
2) Minimum Arrestance: According to ASHRAE 52.1 and MERV according to ASHRAE 52.2.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SPLIT-SYSTEM AIR-CONDITIONERS 238126 - 4
3) Filter-Holding Frames: Arranged for flat or angular orientation, with access doors on both sides of unit. Filters shall be removable from one side or lifted out from access plenum.
2.3 OUTDOOR UNITS (5 TONS OR LESS)
A. Air-Cooled, Compressor-Condenser Components:
1. Casing: Steel, finished with baked enamel with removable panels for access to controls, weep holes for water drainage, and mounting holes in base. Provide brass service valves, fittings, and gage ports on exterior of casing.
2. Compressor: Hermetically sealed with crankcase heater and mounted on vibration isolation device. Compressor motor shall have thermal- and current-sensitive overload devices, start capacitor, relay, and contactor.
a. Compressor Type: Scroll.
b. Refrigerant Charge: R-407C or R-410A.
c. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins and liquid subcooler. Comply with ARI 210/240.
3. Fan: Aluminum-propeller type, directly connected to motor.
4. Motor: Permanently lubricated, with integral thermal-overload protection.
5. Low Ambient Kit: Permits operation down to 0 deg F.
6. Mounting Base: Polyethylene.
2.4 ACCESSORIES
A. Control equipment and sequence of operation are specified in Division 23 Sections "Instrumentation and Control for HVAC" and "Sequence of Operations for HVAC Controls."
B. Thermostat: Low voltage with subbase to control compressor and evaporator fan.
C. Thermostat: Wireless infrared functioning to remotely control compressor and evaporator fan, with the following features:
1. Compressor time delay.
2. 24-hour time control of system stop and start.
3. Liquid-crystal display indicating temperature, set-point temperature, time setting, operating mode, and fan speed.
4. Fan-speed selection including auto setting.
D. Automatic-reset timer to prevent rapid cycling of compressor.
E. Refrigerant Line Kits: Soft-annealed copper suction and liquid lines factory cleaned, dried, pressurized, and sealed; factory-insulated suction line with flared fittings at both ends.
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SPLIT-SYSTEM AIR-CONDITIONERS 238126 - 5
F. Drain Hose: For condensate.
2.5 CAPACITIES AND CHARACTERISTICS
a. Reference schedules on the drawings.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install units level and plumb.
B. Install evaporator-fan components using manufacturer's standard mounting devices securely fastened to building structure.
C. Install ground-mounted, compressor-condenser components on 6-inch-thick, reinforced concrete base that is 4 inches larger, on each side, than unit. Reference Structural for exterior equipment pad details. Concrete, reinforcement, and formwork are specified in Division 03 Section "Cast-in-Place Concrete." Coordinate anchor installation with concrete base.
D. Install roof-mounted, compressor-condenser components on equipment supports specified in Division 07 Section "Roof Accessories." Anchor units to supports with removable, cadmium-plated fasteners.
E. Install seismic restraints.
F. Install compressor-condenser components per Division 23 Section "Vibration and Seismic Controls for HVAC Piping and Equipment."
G. Install and connect precharged refrigerant tubing to component's quick-connect fittings. Install tubing to allow access to unit.
3.2 CONNECTIONS
A. Piping installation requirements are specified in other Division 23 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Where piping is installed adjacent to unit, allow space for service and maintenance of unit per manufacturer’s recommendations..
Defense Supply Center Columbus, Ohio 30 January 2009 Bid Final
SPLIT-SYSTEM AIR-CONDITIONERS 238126 - 6
3.3 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections.
B. Perform tests and inspections.
1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.
C. Tests and Inspections:
1. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.
2. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.
3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
D. Remove and replace malfunctioning units and retest as specified above.
E. Prepare test and inspection reports.
3.4 STARTUP SERVICE
A. Performstartup service.
1. Complete installation and startup checks according to manufacturer's written instructions.
3.5 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain units.
END OF SECTION 238126