STATEMENT OF WORK (SOW)

FOR

HERBERT R. TEMPLE JR. ARMY NATIONAL GUARD READINESS CENTER GW

AND 1W RENOVATION

1. Period of Performance (PoP): The Period of Performance shall be 450 Calendar Days from the issuance of the Notice to Proceed.

1.1 All work under the Contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The Contractor shall consult with the Contracting Officer as to methods or sequence of carrying on the work. A definite program of work shall be arranged before starting. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”.

1.2 Activities in the vicinity of this project will be kept in full operation during construction. The Contractor shall coordinate with the Contracting Officer’s Representative and schedule construction activities. Reference Contract Clause FAR 52.236-8, “Other Contracts”.

2. INSTALLATION: The project shall be accomplished in 5 phases. Refer to the attached project drawings for phasing. The total duration of this project, including phased construction, shall not exceed 450 days. The construction work is followed by furniture installation performed by another contractor. There shall be a 30-day gap between the end of construction on one phase and beginning of construction/demo of the next phase. Phase 2 and Hallway phase may happen during the same time frame, however the hallway phase work shall be performed after hours (6pm-4am) or over the weekends. The hallway phase shall be planned such that the space shall be clear of dust and debris and be available for traffic starting at 4am the next workday. Phases 1, 2, 3, 4, and 5 shall be performed during regular work hours of 7am-5pm. Certain work items may need to be done after hours; these include any shut offs to electricity or water (plumbing, fire sprinkler) that may disrupt the occupants of the building.

Contractor shall coordinate with the COR.

2.1 Architectural.

2.1.1. Contractor shall demolish and dispose existing workstations. For suite WGS100 – GW, there is no demo, carpet, paint or ceiling tile work.

2.1.2. All the furniture within the project space shall be tagged by the government as “TRASH” or “DRMO”. Contractor shall move the furniture marked as “TRASH” to their dumpster. For furniture marked as “DRMO” the contractor shall move it to a location within the facility as directed by the COR (Penthouse D or loading dock hallway).

2.1.3. Contractor shall demo drywall and framing as required to accommodate the new layout indicated in the drawings.

2.1.4. Contractor shall demolish existing base, ceiling tiles, chair rail, and wall paper, if any, within the project space. The elevator lobby area is not part of the project. Contractor shall plan to remove and recycle the carpet. Contractor shall provide documentation / recycling reports to the COR. In the hallway phase (1 West), the existing carpet shall be protected during construction as it will remain.

2.1.5. Contractor shall safely remove the wood doors and frames with side lights as required and save them for re-use during the project.

2.1.6. Contractor shall demo the blinds at the private office doors located in all phases except the hallway phase, as applicable.

2.1.7. Contractor shall furnish and install new carpet tile CPT 1: 24”x24”

TANDUS CENTIVA; STYLE: ALL STAR 02931; COLOR:

SKYSCRAPER 17301 WITH FLEXAIRE CUSHION; ASHLAR; OR

APPROVED EQUAL. Contractor shall prepare the floor and install the carpet according to the manufacturer’s standards.

2.1.7.1. Contractor shall submit product data for carpet, glue and all other components of the carpet install to the COR for approval before ordering.

2.1.7.2. Contractor shall submit a sample to the COR for

approval before ordering.

2.1.7.3. Contractor shall lay carpet in the Ashlar pattern

(rather than monolithic). Contractor shall review carpet pattern/layout with the COR before install.

2.1.7.4. Contractor shall provide 2% attic stock.

2.1.7.5. At a minimum, an approved equal shall match

the specification in tile size, padding, durability, T.A.R.R. rating, pile height, installation method, ASTM resistance tests, color, and pattern.

2.1.8. Contractor shall furnish and install new wall base WB1: ROPPE

RUBBER WALL BASE PINNACLE TYPE – TS; COLOR# 177 STEEL

BLUE; OR APPROVED EQUAL. Preparation and installation shall be in accordance with the manufacturer’s specifications.

2.1.8.1. Contractor shall submit product data for the wall

base, glue and all other components of the wall base install to the COR for approval before ordering.

2.1.8.2. Contractor shall submit a sample to the COR for

approval before ordering.

2.1.8.3. At a minimum, an approved equal shall match

the specification in color, height, material, ASTM resistance tests, and type (cove base).

2.1.9. Contractor shall furnish and install carpet CPT 3 in the conference rooms: 24” x 24” SHAW PRISMA CARPET #59463 COLOR: #63500

OPAQUE BLACK MONOLITHIC; OR APPROVED EQUAL.

Contractor shall prepare the floor and install the carpet according to the manufacturer’s standards.

2.1.9.1. Contractor shall submit product data for carpet, glue and all other components of the carpet install to the COR for approval before ordering.

2.1.9.2. Contractor shall submit a carpet sample to the

COR for approval before ordering.

2.1.9.3. Contractor shall review carpet pattern/layout

with the COR before install.

2.1.9.4. Contractor shall provide 10% attic stock.

2.1.9.5. At a minimum, an approved equal shall match

the specification in tile size, padding, durability, ASTM resistance tests, T.A.R.R. rating, pile height, installation method, color, and pattern.

2.1.10. Contractor shall furnish and install luxury vinyl tile in the break rooms LVT2: 36”x36” MOHAWK GROUP BOLDER, COLOR: 825 PEBBLE;

OR APPROVED EQUAL. Contractor shall prepare the floor and install the vinyl according to the manufacturer’s standards. Contractor shall ensure that the installation is “floating” type. This allows the building maintenance team to access the raised floors.

2.1.10.1. Contractor shall submit product data for vinyl, glue and all other components of the vinyl install to the COR for approval before ordering.

2.1.10.2. Contractor submit a sample to the COR for

approval prior to ordering.

2.1.10.3. Contractor shall provide 5% attic stock.

2.1.10.4. At a minimum, an approved equal shall match

the specification in tile size, type (floating), thickness, ASTM resistance tests, durability, installation method, color, and pattern.

2.1.11. Contractor shall perform framing and drywall work to create break rooms and any other walls required to accommodate the new layouts.

Removal of wall paper from the drywall might also entail repairing the drywall. Contractor shall plan accordingly. Drywall shall be level 4 in accordance with ASTM C840-04. Contractor shall include batt insulation for new walls.

2.1.11.1. Contractor shall provide product data for the

drywall, mud, all components of drywall install and batt insulation to the COR for approval before install.

2.1.12. For GW (phase 5 between grid lines 23-26 and J-K) contractor shall demo the drywall ceiling housing the can lights. Contractor shall replace the drywall ceiling with grid and ceiling tiles to match the rest of the new work. The drywall transition strip between the old and new ceiling grid shall remain. Refer to 5.2.1.22 for ceiling tile specifications.

2.1.13. The storage rooms and closets within the project space shall receive the new finishes. This shall exclude the mechanical, electrical, IT and phone closets.

2.1.14. All walls within the project area, unless otherwise specified, shall be primed and painted. Some walls may have wall paper, which shall be removed completely before the wall is painted. Any holes or wall damage shall be repaired prior to priming and painting. Paint spec PTD1: Sherwin Williams, Interior Architectural, Ultra Deluxe Acrylic Latex, EGGSHELL COMP (DRN) #5480 Winter Wind Custom Sher- Color Match, or approved equal.

2.1.14.1. Contractor shall submit product data, sample

and all other components of the wall paint install to the COR for approval before install.

2.1.14.2. At a minimum, an approved equal shall match

the specification in color, texture, finish, ASTM resistance tests, and VOC content.

2.1.15. Contractor shall remove and replace the crash rail, corner guards, and wall protection in the hallway.

2.1.15.1. Wall protection shall be installed underneath the

chair rail and shall be Koroseal Wall Protection Systems, Traffic Patterns Decorative Wall Protection Montage Type II, 0.040 finished thickness, color: Ash #8721-26 or equivalent. Wall protection shall be installed per manufacturer’s recommendation. Wall protection shall have aluminum molding options for all ends, inside and outside corners, and divider pieces.

2.1.15.2. At a minimum, an approved wall protection

equal shall match the specification in material, fire retardant properties, impact and chemical resistivity, UL rating, and class 1/A rating per ASTM E84.

2.1.15.3. Crash rail shall be installed immediately above

the wall protection at 34” above finished floor. Crash rail shall be 6” high and shall include all necessary angles and trim pieces to match. Crash rail shall be vinyl protective. Crash rail shall be Koroseal Wall Protection Systems Korogard C-630, Charcoal, or approved equal.

2.1.15.4. At a minimum, an approved crash rail equal

shall match the specification in material, fire retardant properties, impact and chemical resistivity, UL rating, and class 1/A rating per ASTM E84.

2.1.16. Contractor shall remove signs in the hallway prior to painting.

Contractor shall coordinate with the COR on which signs shall be rehung.

2.1.17. Contractor shall relocate the fire extinguishers and exit lights as indicated in the architect’s stamped design drawings. Contractor shall plan for drywall and framing as required to accommodate the recessed fire extinguisher cabinets. Designer shall ensure that all fire extinguisher and exit light locations are compliant with applicable codes.

2.1.18. For 1W, the Contractor shall furnish and install clerestory windows as indicated in the drawings. The governments intent is to have brushed stainless steel finish for the clerestory window components, however, the contractor shall provide a finish chart to the COR for selection/approval.

2.1.18.1. Contractor shall provide shop drawings for the

clerestory windows to include (a)Layout, elevation and installation details (b)Detail sections of fittings (c)Anchorage and reinforcement

2.1.18.2. Contractor shall provide samples for approval to

the COR prior to order. (a) Sample of metal color to match COR selection (b) Sample of glass approximately 6 inches square showing edge details.

2.1.18.3. Contractor shall obtain the clerestory system

from a single manufacturer to ensure full compatibility and warranty of parts.

2.1.19. Contractor shall furnish and install wood doors and hollow metal frames as indicated in the door schedule below:

2.1.19.1. At a minimum, an approved equal(s) for the

finishes, shall match the specification(s) in color, texture, finish, ASTM resistance tests and VOC content

2.1.19.2. Contractor shall submit product data and

samples for paint and stain to the COR for approval before ordering.

2.1.19.3. Contractor shall submit product data for the new

doors and frames to the COR for approval before ordering.

2.1.19.4. Contractor shall furnish and install new

hardware for all doors within the project area. Door hardware is either Arrow RL LEVERS FOR PASSAGE DOORS, or equivalent, or Arrow RL CLASSROOM FUNCTION LEVERS, or equivalent; utilize chart below for designation for each door.

2.1.19.4.1. At a minimum, an approved

equivalent shall match the hardware in color, locking mechanism, lever type handle, and ability to house the Assa-Abloy core.

2.1.19.5.

Door Type Hardware Wood stain Door frame

Door frame finish

Comments

1W

W1SX101-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

LEVERS FOR

PASSAGE

DOORS.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused – door + frame + sidelight.

Provide new finishes and hardware as indicated.

W1SX101-B Wood Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal Sherwin Williams Web Gray

SW7075

Existing door and frame to be painted as indicated.

W1S157-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

W1S158-A Wood door

Existing.

Contractor shall replace the locking hardware with

WS-2 :

Sherwin Williams

Metal frame with

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and

Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

SW3124-O

Pecan side light hardware as indicated.

W1S159-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

W1S141-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

W1SX150-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

LEVERS FOR

PASSAGE

DOORS

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

W1SX201-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

W1SX211-A Metal Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

W1SX212-A Metal Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

W1S341-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

FUNCTION

LEVERS

WITH 59A1

KEYWAY

hardware as indicated.

W1S342-A Wood door

New.

Contractor shall provide locking hardware Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

New wood door + metal frame + side light to match existing.

Hardware and finishes as indicated.

W1S343-A Wood door

New.

Contractor shall provide locking hardware Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

New wood door + metal frame + side light to match existing.

Hardware and finishes as indicated.

W1S253-A Wood door

New.

Contractor shall provide locking hardware Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused door.

Provide new finishes and

W1SX103-A Metal Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

W1SX104-A Wood door

Keep Existing hardware.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal Sherwin Williams Web Gray

SW7075

Existing door and frame to be painted as indicated

W1SX105-A Wood door

Keep Existing hardware.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal Sherwin Williams Web Gray

SW7075

Existing door and frame to be painted as indicated

W1S100-A Metal double doors

Keep existing hardware.

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

Suite door Glazed wood double doors

Keep existing hardware.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal Sherwin Williams Web Gray

SW7075

Existing door and frame to be painted as indicated

W1SX399-A Metal Existing. Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as

W1S380-A Wood

Keep Existing hardware.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Existing door.

Provide new finishes and hardware as indicated.

W1S370-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Existing door.

Provide new finishes and hardware as indicated.

W1S374-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Existing door.

Provide new finishes and hardware as indicated.

W1S360-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused door.

Provide new finishes and

W1S350-A Wood

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused door.

Provide new finishes and

GW

WGN405-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY.

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGN410-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and

WGN420-A Wood

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGN430-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGNX006 Metal Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Reused door.

Provide new finishes and hardware as indicated.

WGNX007-A Metal Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to

WITH 59A1

KEYWAY

WGSX391-A Metal Existing. Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

WGS525-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused door.

Provide new finishes and hardware as indicated.

WGS520-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS515-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and

WITH 59A1

KEYWAY

WGSX505-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

LEVERS FOR

PASSAGE

DOORS

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGSX510-A Wood door

Existing.

Contractor shall provide locking hardware Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame

Sherwin Williams Web Gray

SW7075

Reuse door and frame.

Hardware and finishes as indicated.

WGS100-A Wood double doors with glazing

Existing.

Contractor shall provide locking hardware Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame

Sherwin Williams Web Gray

SW7075

Reused door.

Provide new finishes and hardware as indicated.

WGSX551-A Metal door

Existing.

Contractor shall replace the locking hardware with

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to

Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WGSX103 Wood door

New hardware.

Locking hardware shall be Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

New door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS105-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS110-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and

WGS115-A Wood

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS120-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS125-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS201-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

WITH 59A1

KEYWAY

hardware as indicated.

WGS245-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGSX211 Metal door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

WGSX212 Metal double doors

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing doors and frame to

WGS200-A Metal

Keep existing hardware.

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

WGS300-A Metal door

Keep existing hardware.

Sherwin Williams 7065 Argos

Metal Sherwin Williams Argos

Existing door and frame to be painted as indicated.

WGS301-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS315-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS320-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and

WITH 59A1

KEYWAY

WGS325-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS330-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and hardware as indicated.

WGS335-A Wood door

Existing.

Contractor shall replace the locking hardware with Arrow RL

CLASSROOM

FUNCTION

LEVERS

WITH 59A1

KEYWAY

WS-2 :

Sherwin Williams

SW3124-O

Pecan

Metal frame with side light

Sherwin Williams Web Gray

SW7075

Reused - door + frame + sidelight.

Provide new finishes and

2.1.20. Contractor shall furnish and install CORBIN RUSSWIN Assa-Abloy cores for the locking hardware. Refer to the table below.

2.1.20.1. The private offices and storage closets shall be

keyed differently but shall be under the building master.

Contractor shall coordinate with the COR regarding pinning and provide a bitting list at the end of the project as part of closeout.

2.1.20.2. The phone closets, mechanical rooms, fire

sprinkler rooms shall be keyed alike and shall not be under the building master. The keys shall be keyed (bitted) to match the existing M1 keys for TARC#1.

Contractor shall coordinate with the COR for the M1 key as required.

2.1.20.3. Contractor shall sign a non-disclosure

agreement and shall not share any keying information with outside parties.

Sr.

No.

Qty of keys

Keyway Stamping Room Number Comments

1W

1 3 59A1 M1 Storage room inside

W1SX101

Change key. Not under master

2 3 59A1 1W08 W1S157 Change key, under the TARC#1 master.

3 3 59A1 1W07 W1S158 Change key, under the TARC#1 master.

4 3 59A1 1W06 W1S159 Change key, under the TARC#1 master.

5 3 59A1 1W12 W1S201 Change key, under the TARC#1 master.

6 3 59A1 1W04 W1S141 Change key, under

7 3 59A1 1W05 W1S150 Change key, under the TARC#1 master.

8 3 59A1 1W01 W1S341 Change key, under the TARC#1 master

9 3 59A1 1W02 W1S342 Change key, under the TARC#1 master

10 3 59A1 1W03 W1S343 Change key, under the TARC#1 master

11 3 59A1 1W13 W1S253 Change key, under the TARC#1 master

12 3 59A1 1W09 W1S380 Change key, under the TARC#1 master

13 3 59A1 1W14 W1S370 No stamp. No change key. Keyed directly under the TARC#1 master.

14 3 59A1 1W10 W1S374 Change key, under the TARC#1 master

15 3 59A1 1W15 W1S360 No stamp. No change key. Keyed directly under the TARC#1 master

16 3 59A1 1W11 W1S350 Change key, under the TARC#1 master

17 3 59A1 M1 W1SX211 Change key. Not under TARC#1 master.

18 3 59A1 M1 W1SX212 Change key. Not under TARC#1 master.

19 3 59A1 M1 W1SX104 Change key. Not under TARC#1 master.

20 3 59A1 M1 W1SX105 Change key. Not under TARC#1 master.

21 3 59A1 M1 W1SX103 Change key. Not master.

GW

1 3 59A1 GW20 WGN405 Change key, under the TARC#1 master.

2 3 59A1 GW19 WGN410 Change key, under the TARC#1 master.

3 3 59A1 GW18 WGN420 Change key, under the TARC#1 master.

4 3 59A1 GW17 WGN430 Change key, under

5 1 59A1 M1 WGNX006 Change key. Not master.

6 1 59A1 M1 WGNX007 Change key. Not under TARC#1 master.

7 3 59A1 GW16 WGS520 Change key, under the TARC#1 master.

8 3 59A1 GW15 WGS515 Change key, under the TARC#1 master.

9 3 59A1 GW21 WGS510 Change key, under the TARC#1 master.

10 3 59A1 GW22 WGS525 Change key, under the TARC#1 master.

11 3 59A1 GW01 WGS100 Change key, under the TARC#1 master.

12 3 59A1 GW02 WGS105 Change key, under the TARC#1 master.

13 3 59A1 GW03 WGS110 Change key, under the TARC#1 master.

14 3 59A1 GW04 WGS115 Change key, under the TARC#1 master.

15 3 59A1 GW05 WGS120 Change key, under

16 3 59A1 GW06 WGS125 Change key, under

17 3 59A1 GW07 WGS201 Change key, under the TARC#1 master.

18 3 59A1 GW08 WGS245 Change key, under the TARC#1 master.

19 1 59A1 M1 WGSX211 Change key. Not under TARC#1 master

20 1 59A1 M1 WGSX212 Change key. Not under TARC#1 master

21 3 59A1 GW14 WGS301 Change key, under the TARC#1 master.

22 3 59A1 GW13 WGS315 Change key, under the TARC#1 master.

23 3 59A1 GW12 WGS320 Change key, under the TARC#1 master.

24 3 59A1 GW11 WGS325 Change key, under the TARC#1 master.

25 3 59A1 GW10 WGS330 Change key, under the TARC#1 master.

26 3 59A1 GW09 WGS335 Change key, under

2.1.21. Contractor shall furnish and install new ceiling tiles. SPEC:

ARMSTRONG CORTEGA TEGULAR 15/16” ANGLED TEGULAR

OR APPROVED EQUAL.

2.1.21.1. Contractor shall submit product data for the

ceiling tiles and all other components of the ceiling tile install to the COR for approval before ordering.

2.1.21.2. At a minimum, an approved equal shall match

the specification in tile size, type, thickness, ASTM resistance tests, texture, acoustical qualities, installation method, and color.

2.1.22. Contractor shall furnish and install Solid surface (quartz) countertop in the break room. Countertop shall be 1 ¼” thick or 3cm with a quarter round or eased edge. Spec: FORMICA CLASSICS SOLID

SURFACE COLOR: #656 RIVER ROCK MOSAIC OR APPROVED

EQUAL.

2.1.22.1. Contractor shall provide product data for the

surface, caulk, glue and all the components that are part of the countertop install to the COR for approval before ordering.

2.1.22.2. Contractor shall submit shop drawings to the

COR for approval before ordering.

2.1.22.3. Contractor shall submit a countertop sample to

the COR for approval before purchase.

2.1.22.4. At a minimum, an approved equal shall match

the specification in type, thickness, ASTM resistance tests, finish, edge, installation method, and color.

2.1.23. Contractor shall furnish and install millwork in the break rooms as indicated in the drawings which shall comply with Architectural Woodwork Institute (AWI) quality standards per American Institute of Architects (AIA) for custom grade. Millwork SPEC: WILSONART

7971-K-12 UPTOWN WALNUT LAMINATE CABINETS.

2.1.23.1. Contractor and their design team shall submit

millwork shop drawings (which shall also indicate hardware) for COR approval prior to ordering.

2.1.23.2. Contractor shall submit millwork hardware

product data, cut sheets and laminate finish sample to the COR for approval before purchase.

2.1.23.3. At a minimum, an approved equal shall match

the specification in color, texture, finish, ASTM resistance tests and VOC content.

2.1.24. Contractor shall furnish and install new paper towel and soap dispensers in the break rooms. Accessories shall match existing.

2.1.25. Contractor shall furnish and install window frosting on all sidelights, glazed double doors, atrium windows and areas indicated on the plans within the project area. Window frosting shall be applied as shown in the drawings. The doors with glass side lights located in the hallway phase (1W) shall not receive the window frosting, with the exception of W1SX150, which shall receive frosting. The E-1 pattern shall be utilized in all areas except for private office sidelights (which shall be full frost), as indicated in the drawings. SPEC: 3M FASARA

GLASS FINISHES; FINISH: OPAQUE GLASS FILM; COLOR:

SH2MAML MILKY WHITE MILANO OR APPROVED EQUAL.

2.1.25.1. Contractor shall submit product data for COR

approval.

2.1.25.2. Contractor shall do frosting on one panel per the

drawings as a mock-up for COR approval. Contractor shall proceed with frosting after approval of mock-up.

2.1.25.3. At a minimum, an approved equal shall match

the specification in color, texture, finish, thickness, ASTM resistance tests, and VOC content.

2.1.26. Contractor shall furnish and install wood chair rails at conference rooms W1SX150, W1SX101, WGSX101, and WGSX505. Spec:

KOROSEAL WOOD CHAIR RAIL #BW20 Stained to match SW

PECAN #324.0 WITH CHARCOAL RUBBER INSERT OR AN

APPROVED EQUAL. The chair rail shall be installed at 34” from the finished floor to the bottom of the chair rail.

2.1.26.1. Contractor shall submit sample to the COR for

approval prior to install.

2.1.26.2. At a minimum, an approved equal shall match

the specification in color, texture, finish, ASTM resistance tests, and VOC content for the stain.

2.1.27. Contractor shall update the as-builts and provide AutoCAD 2017 files as well as pdf files (includes the finish schedule) to the COR.

2.2 Mechanical

2.2.1. Contractor shall furnish and install all equipment, grilles, diffusers, registers, ducts, Variable Air Volume (VAV)’s, thermostats etc. as indicated on the design documents. The intent of this contract is to be all-inclusive for any and all work described herein, on the drawings and in the Specifications. This shall include items that may not be shown or specified, but that good practice dictates.

2.2.2. Contractor shall include all the Direct Digital Control (DDC) work associated with the new equipment & shall ensure that the new equipment (if any; to be determined by designer) communicates with the Building Automation System (BAS) and is visible on the front end.

Contractor shall also ensure that any changes to the location of diffusers, modification of ductwork, new or relocated VAV boxes etc.

is captured in the BAS graphics. The BAS graphics shall also indicate the walls per the new layouts. The controls contractor for TARC#1 is Siemens.

2.2.3. Contractor shall furnish and install return grills as required to match existing.

2.2.4. Contractor shall protect all stored or installed materials in such a manner that no foreign debris can enter piping and/or ductwork.

2.2.5. All testing required by code shall be witnessed and test sheets shall be turned in as part of close-out.

2.2.6. All new return and supply diffusers and grills shall match existing.

Existing diffusers and grilles can be reused; they can be left in the grid during the renovation as long as they are free of construction debris at the completion of the project.

2.2.7. Contractor shall clean all the existing supply and return grills.

Contractor shall paint the supply and return grills PTD-1.

2.2.8. Contractor shall relocate the thermostats as required to accommodate the new layout. All the thermostats shall be moved 68” above finished floor (to the bottom of the thermostat) to accommodate the office furniture and workstation layouts.

2.2.9. Contractor shall update the as-builts and provide AutoCAD 2017 files as well as pdf files (includes the equipment schedule) to the COR.

2.3 Electrical

2.3.1. Contractor shall include all components (material and labor) such as floor boxes, extender cables, wires etc. as indicated in the design documents and required for a complete and usable space. This project shall be all-inclusive for any and all work described herein, on the drawings and in the Specifications, to create a complete and usable space. This shall include items that may not be shown or specified, but that good practice dictates.

2.3.2. Contractor shall relocate / add light fixtures as required to accommodate the new office and furniture layout. Contractor shall match the existing light fixtures.

2.3.3. Contractor shall relocate / furnish and install ceiling and wall sensors as required to accommodate the layout. In the existing setup, the private offices have wall sensors and the open areas housing workstations have ceiling sensors. Contractors shall rewire the sensors as required to ensure the relevant lighting fixtures are controlled by a sensor. In case of new sensors the contractor shall match existing.

2.3.4. Contractor shall disconnect and remove the old low voltage quad switches. The government intent is to have the sensors control the lighting and not the wall mounted quad switches. Contractor shall patch and paint the walls in their place. Contractor shall ensure all lights are still functional from their alternate switches.

2.3.5. Each workstation shall have one floor box with power. There may be areas where floor boxes with power are required, contractor shall refer to the drawings. Conference rooms shall have power and (1) data. Refer to IT section for data requirements. Damaged or cut or modified floor tiles shall be replaced with new ones.

2.3.6. Each multi-functional device (large copiers/printers) shall have one floor box with dedicated power (20 amp, 120 volt) and data.

2.3.7. Contractor shall trace the circuits to the floor boxes, locate the power distribution units and create as-built power drawings pertaining to the floor boxes. The circuits and panel numbers shall be identified along with the location of floor boxes and power distribution units on the as-builts. The contractor shall also trace the circuits for the wall outlets and label at the outlet the panel and circuit number (with a label maker).

2.3.8. For 1W and GW breakrooms; The Contractor shall pull power to support the refrigerators, microwaves, coffee maker and the insta-hot at the break rooms. Individual wall outlets with dedicated circuits shall be provided for a) Each microwave b) Coffee maker c) Each refrigerator. For the insta-hot, the contractor may pull the existing wiring, if possible, that currently powers the device. Contractor shall also provide power for the garbage disposal units at the sinks.

2.3.9. For 1W and GW breakrooms the contractor shall furnish and install insta-hots.

2.3.9.1. Contractor shall submit product data to the COR

for approval prior to purchase.

2.3.10. For GW (phase 5) the contractor shall relocate the mass notification device affected by the layout Contractor shall coordinate with the

COR.

2.3.11. Contractor shall adjust or install light fixture wiring and sensors at the break rooms as required.

2.3.12. Contractor shall coordinate with the COR to relocate floor boxes as required to work with the office and workstation layouts.

2.3.13. Contractor shall demo old exit signs, furnish and install new exit signs at locations indicated in the approved design drawings. The exit signs shall be Edge lit, Red LED – brushed aluminum housing. New signs shall meet all applicable codes.

2.3.13.1. Contractor shall provide product data and cut

sheets to the COR for selection and approval prior to purchase.

2.3.14. Contractor shall demo existing can lights and furnish and install new LED can lights for the hallway phase.

2.3.14.1. Contractor shall provide product data and cut

sheets to the COR for selection and approval prior to purchase.

2.3.15. For GW (phase 5), the contractor shall demo existing can lights.

Contractor shall install 2x2 light fixtures in the space as indicated in the approved design drawings. The 2x2 light fixtures shall match the existing.

2.3.16. Contractor shall demolish the old speakers from the ceiling and completely remove the wiring. Wires shall not be abandoned above the ceiling.

2.3.17. All junction boxes utilized in completion of the project shall be labelled indicating which electrical panel they service.

2.3.18. Any penetrations in the electrical room associated with this work shall be fire caulked per applicable codes.

2.3.19. Contractor shall relocate/ furnish install fire alarm strobes as required / indicated in the design drawings. All fire alarm strobes shall meet applicable codes.

2.3.19.1. Contractor shall provide product data and cut

sheets to the COR for approval prior to purchase.

2.3.20. The contractor shall provide red line drawings indicating the path of the wiring/conduit. Contractor shall also include information that is considered necessary for updating as-builts such as identifying electrical room, panel, conductor size etc.

2.3.21. The contractor shall update the electrical panel schedule in the electrical room for any panels affected by this work. Contractor shall provide a copy of the updated panel schedule to the Government.

2.3.22. Contractor shall provide the as-builts and provide AutoCAD 2017 dwg files as well as pdf files (includes the equipment schedule) / provide red line drawings.

2.4 Plumbing

2.4.1. Contractor shall include all components (material and labor) plumbing lines, shut-off / isolation valves, traps etc., as indicated in the design documents and required for a complete install. This project shall be all-inclusive for any and all work described herein, on the drawings and in the Specifications, to create a complete and usable breakroom.

This shall include items that may not be shown or specified, but that good practice dictates.

2.4.2. Contractor shall furnish and install metal under mount sinks at the breakroom.

2.4.2.1. Contractor shall provide product data and cut

sheets to the COR for selection and approval.

2.4.3. Contractor shall provide submittal for all the plumbing components that shall be utilized in the project for example, plumbing lines, valves, traps etc. to the COR for approval prior to ordering.

2.4.4. Contractor shall furnish and install new faucets at the break room sinks. Flow shall be 1GPM.

2.4.4.1. Contractor shall provide product data and cut

sheets to the COR for selection and approval prior to ordering. Government intent is to have brushed stainless steel finish.

2.4.5. Contractor shall furnish and install garbage disposals in the break room sinks. Garbage disposals shall be commercial grade.

2.4.5.1. Contractor shall provide a submittal to the COR

for approval prior to order.

2.4.6. Contractor shall test the new lines for leaks and provide documentation to the COR.

2.4.7. Contractor shall provide as-builts in AutoCAD 2017 files as well as pdf. The drawings should indicate the path of the water lines.

2.5 Fire Protection

2.5.1. Contractor shall install per the design drawings.

2.5.2. Contractor shall coordinate all drain downs (if required) with the Government.

2.5.3. Contractor shall provide all necessary testing and inspection required by code and submit the reports.

2.5.4. Contractor shall update as-builts and provide AutoCAD 2017 files, pdf files and red line drawings.

2.6 IT

2.6.1. Contractor shall coordinate with the COR and Government IT team before the start of floor box work as it pertains to IT.

2.6.2. While moving existing floor boxes to accommodate the new furniture layouts, the contractor shall drop the floor boxes (along with all the cabling) in the access floor and relocate the floor boxes. Contractor shall not cut any data or phone lines from the boxes. Consider the following for clarification:

2.6.2.1. An existing workstation has a floor box that has

1 data and 1 phone line. Workstation in the new layout is in the same vicinity; the contractor can relocate and utilize the same floor box with 1 phone and 1 data to meet the requirements.

2.6.2.2. In case the data cabling and phone line is short

for a particular floor box move, the contractor shall remove the phone line, drop it under the access floor, mark it on the as-builts, furnish and install two CAT 6 lines (per box) from the patch panel to the floor box.

Contractor may utilize data from a floor box that is close by which has extra data lines (using jumper cables).

2.6.3. Work shall include termination at the floor box and the patch panel.

2.6.4. In case of a new floor box the contractor shall furnish and install two new CAT 6 cables from the patch panel to the floor box. Work shall include termination at the floor box and the patch panel.

2.6.5. Contractor shall furnish and install face plates as required.

2.6.6. Government intent is to have 1 data line per seat at a minimum and 1 phone line per seat; 1 data line per conference room.

2.6.7. Once cabling is completely re-aligned, Contractor shall test each cable for meeting operational standards.

2.6.8. All necessary electrical cables, materials, grommets, and tools necessary to accomplish the above requirements shall be supplied by the Contractor.

2.6.9. Contractor shall test and label the lines, patch panels and cover plates (inside the floor boxes). Contractor shall provide test reports to the COR.

2.7 Audio Visual

2.7.1. Contractor shall remove all the co-ax connections /face plates within the project space.

2.7.2. Contractor shall roll the co-ax wires and leave them above the ceiling tiles. Contractor shall indicate the locations of the co-ax rolls in the as-builts.

2.8 SIGNAGE

2.8.1. Contractor shall demo existing room number signs for the rooms indicated in the table shown below.

2.8.2. Contractor shall furnish and install ADA compliant signs for all signs except workstation signs. The specifications are included in Attachment 2. Contractor shall submit shop drawings and one (1) sample of each type of sign for approval to the COR prior to order.

2.8.3. For the signs that are installed on a glass panel the contractor shall provide vinyl backers. The vinyl shall be installed on the glass and the sign would be installed on the vinyl to hide the sticky tape / adhesive (same side of glass).

2.8.4. Contactor shall furnish and install workstations signs (Type T-14a).

The signs shall have slots to allow for name inserts. The specifications are attached. Contractor shall submit a shop drawing and a sample (complete T-14a sign) to the COR for review.

Sr. No Mounting condition

Sign type

Room # Notes

1W 1 Glass T-7 W1SX101 Text to read

“CONFERENCE ROOM”

2 Wall mount T-7 W1SX101B Text to read “STORAGE

ROOM”

3 Glass T-6 W1S157 New sign. Follow specs indicated in the attachments.

4 Glass T-6 W1S158 New sign. Follow specs indicated in the attachments.

5 Glass T-6 W1S159 New sign. Follow specs indicated in the attachments.

6 Glass T-6 W1S201 New sign. Follow specs indicated in the attachments.

7 Glass T-6 W1S140 New sign. Follow specs indicated in the attachments.

8 Glass T-7 W1SX150 Text to read

“CONFERENCE ROOM”

9 Wall mount

T-7 W1SX211 Text to read “ELECTRIC

ROOM”

10 Wall mount

T-7 W1SX212 Text to read “PHONE

CLOSET”

11 Wall mount

T-7 W1SX220 Text to read “BREAK

ROOM”

12 Glass T-6 W1S341 New sign. Follow specs indicated in the attachments.

13 Glass T-6 W1S342 New sign. Follow specs indicated in the attachments.

14 Glass T-6 W1S343 New sign. Follow specs attachments.

15 Glass T-6 W1S253 New sign. Follow specs indicated in the attachments.

16 Door mount

T-7 W1SX103 Text to read

“MECHANICAL CLOSET”

17 Door mount

T-7 W1SX104 Text to read “STORAGE

ROOM”

18 Door mount

T-9b W1S100 New sign. Follow specs indicated in the attachments.

19 Door mount

T-7 W1SX105 Text to read “STORAGE

ROOM”

20 Wall Mount

T-7 W1SX399 Text to Read “DPR”

21 Glass Mount

T-6 W1S374 New sign. Follow specs indicated in the attachments.

22 Glass Mount

T-9b W1S360 New sign. Follow specs indicated in the attachments.

23 Glass Mount

T-9b W1S350 New sign. Follow specs indicated in the attachments.

24 Wall mount

T-8a STAIRWELL F

No room number. Text to read “STAIRWELL F” at top and “No Roof Access” at bottom.

25 Wall mount

T-15 Floor 1 No room number. Text to read “FLOOR 1 WEST WING” at top and “Exit Level – Floor G or 1” at bottom

26 Glass mount

T-9b W1S380 New sign. Follow specs indicated in the attachments.

27 Glass mount

T-9b W1S370 New sign. Follow specs indicated in the attachments.

28 Wall Mount

T-8a STAIRWELL E

No room number. Text to read “STAIRWELL E” at top and “Roof Access” at bottom.

29 Wall Mount

T-15 STAIRWELL

E

No room number. Text to read “FLOOR 1 WEST WING” at top and “Exit Level – Floor G or 1”

GW

1 Glass mount T-6 WGN405 New sign. Follow specs indicated in the attachments.

2 Glass mount

T-6 WGN410 New sign. Follow specs indicated in the attachments.

3 Glass mount

T-6 WGN420 New sign. Follow specs indicated in the attachments.

4 Glass mount

T-6 WGN430 New sign. Follow specs indicated in the attachments.

5 Door mount

T-7 WGNX006 Text to read “STORAGE

ROOM”

6 Door mount

T-7 WGNX007 Text to read “PHONE

CLOSET”

7 Wall mount

T-7 WGSX391 Text to read “DPR”

8 Glass mount

T-6 WGS525 New sign. Follow specs indicated in the attachments.

9 Glass mount

T-7 WGSX505 Text to read

“CONFERENCE ROOM”

10 Wall mount

T-6 WGS510 New sign. Follow specs indicated in the attachments.

11 Glass mount

T-6 WGS515 New sign. Follow specs indicated in the attachments.

12 Glass mount

T-6 WGS520 New sign. Follow specs indicated in the attachments.

13 Wall mount

T-9b WGS100 New sign. Follow specs indicated in the attachments.

14 Glass mount

T-6 WGS105 New sign. Follow specs indicated in the attachments.

15 Glass mount

T-6 WGS110 New sign. Follow specs attachments.

16 Glass mount

T-6 WGS115 New sign. Follow specs indicated in the attachments.

17 Glass mount

T-6 WGS120 New sign. Follow specs indicated in the attachments.

18 Glass mount

T-6 WGS125 New sign. Follow specs indicated in the attachments.

19 Glass mount

T-6 WGS201 New sign. Follow specs indicated in the attachments.

20 Glass mount

T-6 WGS245 New sign. Follow specs indicated in the attachments.

21 Wall mount

T-7 WGSX211 Text to read “ELECTRIC

ROOM”

22 Door mount

T-7 WGSX212 Text to read “PHONE

CLOSET”

23 Wall mount

T-7 WGSX225 Text to read “BREAK

ROOM”

24 Glass mount

T-6 WGS301 New sign. Follow specs indicated in the attachments.

25 Glass mount

T-6 WGS315 New…