AMendment 0010 - Boston XYZ - Min File.zip
ZIP file 12 MB Posted
- Solicitation number
- W912WJ21B0001
About this file
This document outlines a federal contract opportunity for the Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal. The U.S. Army Corps of Engineers seeks to remove remaining material in the Boston Harbor Federal Navigation Project to achieve authorized project depths of -49 feet in the Main Ship Channel, Reserved Channel, and President Roads Anchorage. One limited area within the Main Ship Channel will be dredged to -42 feet. Contractors will be required to remove all material within the -49 foot contour limit and are allowed a 2-foot overdepth. The government will pay for side slopes at a 1 vertical foot to 1 horizontal foot ratio. The material to be removed primarily consists of rock with some ordinary and hard materials as overburden.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0014.pdf | ||
| Amendment 0013.pdf | ||
| Amendment 0013 Attachment 01 - RFI Letter.pdf | ||
| Amendment 0012.pdf | ||
| Amendment 0011.pdf | ||
| Amendment 0010.pdf | ||
| Amendment 0010 - Boston XYZ - Avg File.zip | ZIP file | |
| Amendment 0009.pdf | ||
| Amendment 0008_BOS XYZ.zip | ZIP file | |
| Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Specs - Boston Harbor Phase 3 Rock Removal.pdf | ||
| Drawings - Boston Harbor Phase 3 Rock Removal.pdf | ||
| W912WJ21B0001_Solicitation.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .