AMendment 0010 - Boston XYZ - Min File.zip

ZIP file 12 MB Posted

Attached to
Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Solicitation number
W912WJ21B0001
Issued by

About this file

This document outlines a federal contract opportunity for the Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal. The U.S. Army Corps of Engineers seeks to remove remaining material in the Boston Harbor Federal Navigation Project to achieve authorized project depths of -49 feet in the Main Ship Channel, Reserved Channel, and President Roads Anchorage. One limited area within the Main Ship Channel will be dredged to -42 feet. Contractors will be required to remove all material within the -49 foot contour limit and are allowed a 2-foot overdepth. The government will pay for side slopes at a 1 vertical foot to 1 horizontal foot ratio. The material to be removed primarily consists of rock with some ordinary and hard materials as overburden.

Other files

File Type Posted
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Amendment 0013 Attachment 01 - RFI Letter.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
Amendment 0010 - Boston XYZ - Avg File.zip ZIP file
Amendment 0009.pdf PDF
Amendment 0008_BOS XYZ.zip ZIP file
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Specs - Boston Harbor Phase 3 Rock Removal.pdf PDF
Drawings - Boston Harbor Phase 3 Rock Removal.pdf PDF
W912WJ21B0001_Solicitation.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .