Amendment 0010 - Boston XYZ - Avg File.zip

ZIP file 13 MB Posted

Attached to
Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Solicitation number
W912WJ21B0001
Issued by

About this file

This federal contract opportunity solicitation seeks removal of remaining material from the Boston Harbor Navigation Improvement Project to achieve authorized project depths. The third phase of the improvement project requires contractors to remove material from the Main Ship Channel to the Conley Terminal including the turning basin, from the Reserved Channel, and from the President Roads Anchorage to depths of -49 feet mean lower low water with an allowable 2-foot overdepth in most areas and -42 feet mean lower low water with an allowable 2-foot overdepth in one limited area of the Main Ship Channel. The material to be removed primarily consists of rock with some ordinary and hard materials as overburden. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District New England.

Other files

File Type Posted
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Amendment 0013 Attachment 01 - RFI Letter.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
AMendment 0010 - Boston XYZ - Min File.zip ZIP file
Amendment 0009.pdf PDF
Amendment 0008_BOS XYZ.zip ZIP file
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Specs - Boston Harbor Phase 3 Rock Removal.pdf PDF
Drawings - Boston Harbor Phase 3 Rock Removal.pdf PDF
W912WJ21B0001_Solicitation.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .