This federal contract opportunity solicitation seeks removal of remaining material from the Boston Harbor Navigation Improvement Project to achieve authorized project depths. The third phase of the improvement project requires contractors to remove material from the Main Ship Channel to the Conley Terminal including the turning basin, from the Reserved Channel, and from the President Roads Anchorage to depths of -49 feet mean lower low water with an allowable 2-foot overdepth in most areas and -42 feet mean lower low water with an allowable 2-foot overdepth in one limited area of the Main Ship Channel. The material to be removed primarily consists of rock with some ordinary and hard materials as overburden. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District New England.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0014.pdf | ||
| Amendment 0013.pdf | ||
| Amendment 0013 Attachment 01 - RFI Letter.pdf | ||
| Amendment 0012.pdf | ||
| Amendment 0011.pdf | ||
| Amendment 0010.pdf | ||
| AMendment 0010 - Boston XYZ - Min File.zip | ZIP file | |
| Amendment 0009.pdf | ||
| Amendment 0008_BOS XYZ.zip | ZIP file | |
| Amendment 0008.pdf | ||
| Amendment 0007.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Specs - Boston Harbor Phase 3 Rock Removal.pdf | ||
| Drawings - Boston Harbor Phase 3 Rock Removal.pdf | ||
| W912WJ21B0001_Solicitation.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .