Drawings - Boston Harbor Phase 3 Rock Removal.pdf

PDF 21 MB Posted

Attached to
Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Solicitation number
W912WJ21B0001
Issued by

About this file

This document outlines a federal contract opportunity for the Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal. The U.S. Army Corps of Engineers is soliciting bids to remove rock and other materials from the Main Ship Channel, Reserved Channel, and President Roads Anchorage in Boston Harbor to achieve authorized project depths of -49 feet in most areas and -42 feet in one limited area of the Main Ship Channel, with allowable 2-foot overdepths. The material to be removed consists primarily of rock with some ordinary and hard materials serving as overburden. Bidders must be able to completely remove all material within the -49 foot contour limits provided by the Corps to the specified depths. The government will pay for side slopes cut at a 1 foot vertical to 1 foot horizontal ratio.

View the file

Other files

File Type Posted
Amendment 0014.pdf PDF
Amendment 0013.pdf PDF
Amendment 0013 Attachment 01 - RFI Letter.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
Amendment 0010 - Boston XYZ - Avg File.zip ZIP file
AMendment 0010 - Boston XYZ - Min File.zip ZIP file
Amendment 0009.pdf PDF
Amendment 0008_BOS XYZ.zip ZIP file
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Specs - Boston Harbor Phase 3 Rock Removal.pdf PDF
W912WJ21B0001_Solicitation.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E6EPDLPT

Typewritten Text

LPT

E6EPDLPT

Typewritten Text 8/17/20 e6eddkhc Text Box

17AUG2020

e6eddkhc Text Box

17AUG2020

8/17/20

E6EPDLPT

LPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

8/17/20

E6EPDLPT

BOS_SP_2019_040_G-001
BOS_SP_2019_040_G-002
BOS_SP_2019_040_G-003
BOS_SP_2019_040_C-101
BOS_SP_2019_040_C-102
BOS_SP_2019_040_C-103
BOS_SP_2019_040_C-104
BOS_SP_2019_040_C-105
BOS_SP_2019_040_C-301
BOS_SP_2019_040_C-302
2020-08-17T10:51:07-0400
JACOBS.LAUREN.ASHLEY.1137790927
2020-08-17T11:22:53-0400
CHIBBARO.KATHERINE.HELEN.1410564455
2020-08-17T14:36:02-0400
TESSIER.MATTHEW.E.1377053253
2020-08-18T09:11:28-0400
IORIO.MARYELLEN.1228893800
2020-08-24T15:45:20-0400
MARGOLIS.DAVID.I.1228573805

File details come from the government source that posted it. Updated .