Criteria_Changes.docx

DOCX document 300 KB Posted

Attached to
Medium Altitude Manned ISR Beddown
Solicitation number
W912L6-16-R-0007
Issued by

About this file

Criteria Changes

View the file

Other files

File Type Posted
W912L6-16-R-0007-0005.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_12-19-161.pdf PDF
Amendment_LEED_and_Commissioning_Deducts.pdf PDF
W912L6-16-R-0007-0004.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_12-01-16.pdf PDF
W912L6-16-R-0007-0003.pdf PDF
H-132.pdf PDF
H-122.pdf PDF
H-131.pdf PDF
Requested_photos_30_Nov_2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-30-16.pdf PDF
H-121.pdf PDF
RFI_78_Attachment.pdf PDF
ED201.pdf PDF
RFI_52_attachment_Specification_Section_01000.pdf PDF
si_schedule_5-25-2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-21-16.pdf PDF
STATEMENT_OF_SPECIAL_INSPECTIONS_5-25-2016.pdf PDF
00_22_13.00_20_R2.pdf PDF
W912L6-16-R-0007-0002.pdf PDF
Hangar_Foam_Fire_Suppression_System_Inadvertent_Activations_Final.pdf PDF
CS101_-_Revised.pdf PDF
ANGETL_15-01-03_Fire_Protection_Design_Guidance.pdf PDF
Requested_photos_21_Nov_2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-21-16.pdf PDF
ANG_hangar_study_recommended_changes_.docx DOCX document
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-17-16.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_11-14-2016__Answered.pdf PDF
00_22_13.00_20_R1.pdf PDF
Appendix_F9_Hazardous_Material_Report.pdf PDF
EXHIBIT_A.doc DOC document
EXHIBIT_C.doc DOC document
EXHIBIT_B.doc DOC document
Attendance_Sheet_Bldg._1011_9_Nov_16_W912L6-16-R-0007.pdf PDF
EXHIBIT_F.DOC DOC document
Bldg_1011_Information_Slides.pdf PDF
W912L6-16-R-0007-0001.pdf PDF
W912L6-16-R-0007.pdf PDF
00_22_13.00_20.pdf PDF
OK_ANG_Bldg_1011_Specs_Vol_1_07152016.pdf PDF
General_Requirements.pdf PDF
B_Final_Design_OK_ANG.pdf PDF
OK_ANG_Bldg_1011_Specs_Vol_2_07152016.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This document reflects the biggest changes to ETL 02-15 and are incorporated to add fidelity to the system based on inadvertent foam activations and their associated safety investigations.

1. Delete Bladder tank-Provide: Foam Concentrate Storage Tank must be a vertical, double-walled, high density cross-linked polyethylene storage tank compatible with the required concentrate. Tank capacity must be the volume required to fully submerge the inductor dip tube plus the design volume to operate the foam generators for not less than 15 minutes plus 60 gallons. The inductor dip tube must enter through the top of the tank, and no taps are permitted in the bottom or sides of the tank. Provide a closeable fill opening and vent assembly. Provide either a translucent shell or clear vertical window to indicate fill level with permanent capacity markings at least every 50 gallons. The capacity markings will not include the unsuckable amount of concentration at the bottom of the tank. Mount concentrate tank on a 2 inch concrete housekeeping pad. The double wall tank does not require spill or secondary containment. A second foam concentrate tank or reserve concentrate supply is not required.

2. The maximum rated fire pump size will not exceed 2,500 gpm (9,463 lpm).

3. Foam proportioning must be by a single foam inductor for each foam-water riser. Inductor must, through a venturi, take concentrate and proportion such concentrate into the flow steam reliably at the designed system flow rate. Inductor must be specifically tuned for the system required flow rate, inlet pressure, back pressure, concentrate type, proportioning ratio, and lift height (at the near empty tank level). The inductor must be equipped with the exact orifice at the entry of the foam pipe. Off the shelf pre-tuned generic model inductors are not permitted. Shop drawings must be accompanied with an inductor datasheet fully annotated with the flow rate, inlet pressure, back pressure, and concentrate lift height (at the near empty tank level). Inductor will be fitted with a low loss bronze or brass check valve assembly by the manufacturer that is included in the device's hydraulic design. Known manufacturers of such products include Fomtec (distributed by Viking in US), Matre Maskin, Wilson Foam, and Delta Fire.

4. Provide flow control valve must be [4-inch (100mm)][6-inch (150mm)][8-inch (200mm)] with trim package for electric releasing, remote re-setting, and opening/closing speed control. Use of any other flow control valve requires approval from the service criteria office. If flow control valve of a size greater than or less than the risers, provide smoothly tapered inlet and outlet connections. In addition to automatic operation, arrange each valve for manual release at the valve. Provide pressure gages and other appurtenances at the flow control valves as required by NFPA 13. All trim piping must be brass with compatible fittings. Trim piping must be factory configured and installed. The manual release for the flow control valve will be installed no higher than 5 ft. (1.5 m) above finished floor. Hydraulic calculations must include a minimum pressure drop across flow control valves of 20 psi (138 kPa), or the listed pressure drop, whichever is greater.

5. Prepriming of any foam solution piping is NOT acceptable. All solution piping must be slopped to be self-draining back to the riser. During commissioning, the responsible FPE must seal or otherwise install tamper proof guards on the pressure regulator adjusting stem and the two small globe valves on the speed control assembly. It is crucial these settings not be changed after commission; least the system may be impaired. Safety-wire these devices in those positions and label them "DO NOT ADJUST". Any other trim valves which must be open or closed for the FCV to function also must be safety wired in position.

6. Provide foam stop stations of the "dead-man" type. The stop stations must be used in conjunction with valves and equipment that will prohibit or stop the discharge of foam/water from the foam suppression system. The stations must have distinctive signage at each device. Provide a red mushroom type push button and include the word “PUSH”. Colored portions of tamper cover must be blue and lettering on the cover must be “STOP”; the words “FIRE”, “ALARM”, or “AGENT” must not appear on the cover. A manual foam stop station will be provided at each manual foam releasing station. Once depressed, and so long as the button is held down, the stop station will prevent/stop discharge from the foam system regardless of whether or not the foam system was activated automatically or manually and whether or not the activation occurs prior to or after the stop station is pressed and held. Unless the FSCP has been reset and all activation alarms (manual and automatic) have been cleared; when the foam stop station button is released, the FSCP will instantaneously restore system operation and foam discharge. When the foam stop station button is depressed under full flow, the time to fully close the flow control valve will not exceed 15 seconds. The time for the flow control valve to fully open upon release of the foam stop station button will not exceed 5 seconds. Manual foam stop stations will be protected from mechanical damage and water infiltration (minimum NEMA 4). Manual foam stop stations will be provided with a clear plastic tamper cover that must be lifted prior to actuating the station. Conduits will enter the station back box from the bottom. Back box and conduits will not be placed in front of signage, and a breather and drain (at the low point in the conduit) will be provided. Where manual stop stations and foam releasing stations are provided at an exit door, they will be located on opposite sides of doorway from fire alarm manual pull station. Where not located at an exit door opening, the manual stop stations and foam releasing stations will be located at least 5 feet apart from the manual fire alarm pull station.

7. Provide two separate but adjacent 24 inch (610 mm) high by 18 inch (457 mm) wide metal signs. There will be no more than 12 inches of separation between the two signs. The words “FIRE”, “ALARM”, or “AGENT” will not appear on these signs. The sign for the manual releasing station will have a yellow or lime-yellow background with “START FOAM SYSTEM” in red lettering not less than 3 inches (76 millimeters) high. The manual release station with tamper cover will be located on the lower center portion of the sign. The word “START” will be written in minimum 1 inch (25.4 mm) high green lettering placed directly above the activation station. The sign for the manual stop station will have a white background with a minimum 1/2 inch wide blue boarder with “STOP FOAM SYSTEM” in blue lettering not less than 3 inches (76 millimeters) high. The manual stop station with tamper cover will be located on the lower center portion of the sign. The word “STOP” will be written in minimum 1 inch (25.4 mm) high red lettering placed directly above the manual stop station.

8. FSCP must be Det-Tronics Eagle Quantum Premier Fire Detection/ Releasing System, must be furnished complete with Safety Systems Software (S3) configuration/logic programming/diagnostic tools software package including USB dongle key and RS232 cable. FSCP alarm, supervisory, and trouble signal reporting to the Fire Alarm Control Panel must be via discrete dry contact output points. Modular type panel installed in a surface mounted NEMA Type 4 painted steel cabinet with hinged door and cylinder lock. All detectors must be listed for use with that panel. IR detectors must be networked with the panel so that during commission IR detectors can be calibrated from the releasing panel. The FSCP must provide a real time display of current IR levels at any detector, have the ability to set the detector sensitivity for each detector from the panel, be able to download detector level log history, have remote test and diagnostics capability (manual self-test, lens dirty, sensor failure, power out of tolerance, device non-responsive), and remote setup and programing of detector options (lens heater power level, detector alarm LED function, alarm latching or non-latching, device address, sensitivity level, timing and gate count for alarm). FSCP must be electro-magnetic interference/radio frequency interference (EMI)/(RFI) tolerant and rated to SIL level 2 capability (IEC 61508), a safety assessment evaluation which evaluates critical fault paths, redundancies, and statistical measurement/prediction to ensure a specific level of long term reliable performance and stability to co-exist with aircraft radar systems. In certain situations a redundant foam suppression control panel may be need, verify redundancy requirements with agency and mission.

9. Optical flame detection will be the X3301 Multispectrum IR Flame Detector manufactured by Det-Tronics. Optical flame detection system will use triple infrared (IR) flame detectors listed/approved for the expected fuel hazards in the hangar bay. The detectors will be immune to radar and radio frequency emissions. Provide shielding for the detectors and their circuits from radio frequency interference. All circuiting from the FACP or FSCP to the detectors will be shielded, and shielding will be grounded at one end. Optical flame detector alarm signals to the FACP or FSCP will be latching. Detectors must be mounted in accordance with their listing at approximately 8 ft. (2.4 m) above the finished floor of the hangar. The specifics for each design must take into account facility construction, type of aircraft, aircraft configuration and positioning, fixed and mobile equipment within the aircraft servicing area, and all other relevant factors. Do not mount optical detectors in inaccessible locations. The detectors will be angled and blinds will be provided such that the cone-of-vision does not extend more than 5 ft. (1.5 m) outside the hangar bay. The horizontal and vertical axis of the detector determined during commissioning will be permanently marked on each detector. The optical flame detectors will be installed with 5 ft. (1.5 m) of flexible conduit to allow for any minor adjustments during testing or changes in mission of the hangar. Provide a sufficient number of optical flame detectors such that a fire at any position within the hangar bay will be within the range and cone-of vision of at least two detectors. With the exception of a manual foam release station, the cross-zoning of two optical flame detectors in the hangar bay is required to release the foam suppression system.

10. Provide blue beacons not less than 400 cd (208/120VAC) powered from a dedicated emergency panel provided in accordance with UFC 3-520-01. This requirement does not justify an emergency generator for the facility. The FSCP will control beacon initiation. A backup power supply or supervision of the power supply feeding the beacons is not required when fed from the dedicated emergency panel. Beacons will be mounted 20 – 30 ft. (3 – 9.1 m) above the floor of the hangar bay. For single door hangars, provide one beacon centered on each of the three walls. For drive through hangars, provide one beacon 10-25 ft. (3-7.6 m) from each corner of the hangar bay. Provide additional beacons where at least one beacon is not viewable from normally occupied areas of the hangar bay. Design will take into account facility construction, type of aircraft, aircraft configuration and positioning, fixed and mobile equipment within the aircraft servicing area.

11. For all fire alarm circuiting in the hangar bay, provide watertight conduit/connections and NEMA 4 junction boxes, back boxes, and enclosures. Initiating devices such as Start Stations, Stop Stations, and Flame Detectors require conduit to enter the bottom of the back box, and the low point of the conduit will be provided with a drain. Where the conduit is in a hazardously classified area, additionally provide breathers in isolated portions of the conduit (e.g. sealed off from the remaining conduit system). Drains and breathers shall be rated for the hazardous classification in which they are installed, but shall not be less than NEMA 4. Install releasing modules and monitor modules integral to the release of the foam system in a normally occupied conditioned space within the building. The location selected must be maintained between 60-80ºF (15-27ºC) and does not exceed 85% relative humidity at 80ºF.

12. Provide SPD to protect all power supply circuits to FACP and FSCP panels, including any subpanels (e.g. Mass Notification Panels, Amplifier Panels, NAC Booster Panels). Provide SPD to protect all fire alarm circuits leaving or entering the building. Devices mounted on an exterior wall do not require an SPD when lighting protection is provided on the building (e.g. wall mounted exterior speaker.) SPDs will be in accordance with UFC 3-520-01 and will be mounted in a separate enclosure, unless listed and installed by the factory (e.g. Installing the SPD in the FACP or FSCP is not permitted).

13. Where a Mass Notification System (MNS) is provided, delete amber strobes. Use one clear strobe marked with the word “Alert” and also shall provide text signs. Text signs are required over the door to each egress stairwell and over (or adjacent to) the required means of egress from the level of discharge. Exterior exit doors from a single room (e.g., mechanical or electrical rooms) do not require a text sign.

14. Where wet-pipe sprinkler systems are provided, install automatic air vents at all high points in the system. Where a pre-action valve is used it will be an externally resettable (without opening the valve assembly and without use of special tools) automatic water control (deluge) valve for pre-action systems. Pre-action sprinkler systems protecting hangar bays will be single interlock as defined by NFPA 13.