Bldg_1011_Information_Slides.pdf

PDF 208 KB Posted

Attached to
Medium Altitude Manned ISR Beddown
Solicitation number
W912L6-16-R-0007
Issued by

About this file

Bldg 1011 Information Slides

View the file

Other files

File Type Posted
W912L6-16-R-0007-0005.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_12-19-161.pdf PDF
W912L6-16-R-0007-0004.pdf PDF
Amendment_LEED_and_Commissioning_Deducts.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_12-01-16.pdf PDF
H-131.pdf PDF
Requested_photos_30_Nov_2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-30-16.pdf PDF
H-121.pdf PDF
RFI_78_Attachment.pdf PDF
H-122.pdf PDF
W912L6-16-R-0007-0003.pdf PDF
H-132.pdf PDF
RFI_52_attachment_Specification_Section_01000.pdf PDF
si_schedule_5-25-2016.pdf PDF
ED201.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-21-16.pdf PDF
STATEMENT_OF_SPECIAL_INSPECTIONS_5-25-2016.pdf PDF
00_22_13.00_20_R2.pdf PDF
W912L6-16-R-0007-0002.pdf PDF
ANGETL_15-01-03_Fire_Protection_Design_Guidance.pdf PDF
Requested_photos_21_Nov_2016.pdf PDF
Criteria_Changes.docx DOCX document
Hangar_Foam_Fire_Suppression_System_Inadvertent_Activations_Final.pdf PDF
CS101_-_Revised.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-21-16.pdf PDF
ANG_hangar_study_recommended_changes_.docx DOCX document
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-17-16.pdf PDF
Appendix_F9_Hazardous_Material_Report.pdf PDF
00_22_13.00_20_R1.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_11-14-2016__Answered.pdf PDF
EXHIBIT_B.doc DOC document
Attendance_Sheet_Bldg._1011_9_Nov_16_W912L6-16-R-0007.pdf PDF
EXHIBIT_F.DOC DOC document
EXHIBIT_A.doc DOC document
EXHIBIT_C.doc DOC document
W912L6-16-R-0007-0001.pdf PDF
00_22_13.00_20.pdf PDF
OK_ANG_Bldg_1011_Specs_Vol_1_07152016.pdf PDF
General_Requirements.pdf PDF
W912L6-16-R-0007.pdf PDF
B_Final_Design_OK_ANG.pdf PDF
OK_ANG_Bldg_1011_Specs_Vol_2_07152016.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9912L6-16-R-0007 Medium Altitude Manned ISR

Beddown Project # YZEU139006

PRE-PROPOSAL CONFERENCE

DATE: 9 November 2016

Location of Project:

Will Rogers Air National

Guard Base

INTRODUCTION

• Contracting Officer (KO) Daniel Tatro

• Contracting Specialist SSgt Mitchell Spaulding

• Contracting Officer Representative (COR) Lt Col Michael Spaulding

INTRODUCTION

• Sign in sheet is going around. Make sure that you are on the sign in sheet.

SOLICITATION, PLANS

& SPECIFICATIONS

• On The Web - https://www.fbo.gov •Solicitation

•Exhibits •Questions & Answers Document •Amendments

•Check Regularly & Refresh Web Page

• Plans & Specifications- must be registered and have password on FBO https://www.fbo.gov/

SOLICITATION, PLANS

& SPECIFICATIONS

•Export Controlled Material

• Company must be certified (via an approved DD

Form 2345 by the Joint Certification Program (JCP) administered by the Defense Logistics Information Service (DLIS)

•Questions about this program or DDForm 2345 should be addressed to:

U.S./Canada Joint Certification Office DLA Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, MI USA 49037-3084

Phone: (800) 352-3572 Email: jcp-admin@dla.mil

Period of Performance

Construction Period Is 365 Calendar Days After Receiving The Notice To

Proceed

DISCLAIMER

The following is a brief overview of the proposal requirements

Offerors Are Strongly Cautioned To Carefully Read The Requirements Of The

Solicitation And Comply Accordingly

Important Reminder

The Government Intends To Award Without Discussion And There May Not

Be A Chance For Discussions, Corrections, Or Revised Proposals

WHAT YOU MUST SUBMIT

•Section 00110 Of The RFP Details The Required Information And Format For The Proposal

•2 Volumes Are Required •VOL 1 – Price/Cost

• Pro forma documents •VOL 2 – Technical and Past Performance

Volume 1- Price/Cost

•Offeror portion of SF1442 •Section 00010 – Pricing Info •Section 00600 – Representations and Certifications (R&C) •Complete R&Cs in SAM on the web •Complete and Return DoD R&Cs in Section

•Complete & Include Supplemental Information-Section 00100 Paragraph 3.4.1.2

Volume 2 Technical Capability – Part 1

•Part 2 – Technical Capability •Comprised of three (3) subfactors:

•1. Experience & Capability •2. Construction Schedule & Commissioning

•3. LEED

Volume 2 Past Performance – Part 2

NO PRICES/COST IN THIS VOLUME

•Exhibit A- Part 1- Performance Relevancy Questionnaires – Use Exhibit Format!

• Complete not more than 5 forms for Relevant

Contracts Completed Or Substantially Completed (70%) In The Last Five Years

•Exhibit A-Part 2 – Complete One (1) •Send Questionnaires For The Exhibit A Projects to references

• Do This Early – Must Be to KO NLT Closing Date

Volume 2 – Part 2 Past Performance Continued

•If You Do Not Have Relevant Past Performance And Are Using Experience Of Key Personnel, Predecessor Companies Or Subcontractors To Obtain This Ensure You Clearly State This In The Proposal

•To Be Considered Subcontractor Must Complete A Consent Form - Exhibit B

Past Performance References Exhibit C

•Reference Questionnaires Are Also Due By This Time And Date •Send Reference Questionnaires Out As Soon As Possible

•Return to KO E-mail

Exhibits

•Exhibit A = Relevancy Questionnaire

• PART 1 (NTE 5) PART 2 (1)

•Exhibit B = Subcontractor Consent Form- if applicable

•Exhibit C = Past Performance Letter and Questionnaire (Send out to References)

Proposal Due Dates

• Proposal Due: 5 December 2016 by 2:00 PM CST

• Proposal Must Be Signed By Officer Of Your Company

• No Facsimile

• Electronic Offers (Email) Authorized

• Send or deliver to: (follow instructions in Section

00100 for base access) Will Rogers Air National Guard Base Attention: Daniel Tatro 5624 Air Guard Dr Building 1007 Oklahoma City, OK 73179

Proposal Evaluation

•Process Is Detailed In RFP Section 00120 •Carefully Review Section 00120 When Preparing Proposal

•Comply With Section 00100 And 00110 Requirements

•Failure To Furnish A Complete Proposal May Result In Elimination From Consideration

Proposal Evaluation

• The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration give the to the three (3) evaluation factors: Technical, Past Performance and Price.

• The Technical Factor is somewhat more important than Present/Past Performance and when combined however, the non-cost factors are approximately equal to the Price Factor.

• The firm that represents the Best Value to the Government will be selected for an award IAW FAR 15.1 Source Selection Processes and Techniques

Award

The Contractor Whose Proposal Provides:

• The Best Value To The Government- Read carefully Section 00120

• Non–cost factors (Technical + PP) are approximately Equal To Price

• The Best Value May Not Be The Lowest Price

Important Reminders

• Submit a Complete Proposal In Accordance With Instructions – Use Formats Provided

• Award Without Discussions Is Intended, You May Not Have An Opportunity To Correct Or Revise Proposal

• 52.219-14 Limitations on Subcontracting Apply- Small Business must perform 25% of cost of contract, not including the cost of materials with it’s own employees

Important Reminders

• When Using A Subcontractor To Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, Or The Information Will Not Be Considered

• Lowest Price may not necessarily win the award

How Questions Will Be Handled

• Questions Must Be Submitted in the format shown in Exhibit F Via Email To: daniel.r.tatro.civ@mail.mil, mitchell.w.spaulding.mil@mail.mil, or kurt.a.ennis.mil@mail.mil

• Submit Questions NLT COB 17 November 2016

• Questions Received After 17 November 2016 May Be

Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary

• Do Not Call Technical Personnel Or A&E- This Will Delay Getting An Answer mailto:daniel.r.tatro.civ@mail.mil mailto:mitchell.w.spaulding.mil@mail.mil

Answers To Questions

•All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.fbo.gov/

•If Necessary Addendums, Issued By An Amendment, Will Also Be Posted

•Check Web Site Regularly And Don’t Forget To Refresh Web Page

Websites

•www.fbo.gov (to download RFP, plans and specs)

•www.sam.gov (be sure you are registered) http://www.fbo.gov/ http://www.sam.gov/

Questions

W9912L6-16-R-0007�Medium Altitude Manned ISR Beddown Project # YZEU139006
INTRODUCTION
INTRODUCTION
SOLICITATION, PLANS�& SPECIFICATIONS
SOLICITATION, PLANS�& SPECIFICATIONS
Period of Performance
DISCLAIMER � The following is a brief overview of the proposal requirements
� Important Reminder
WHAT YOU MUST SUBMIT
Volume 1- Price/Cost
Volume 2 Technical Capability – Part 1
Volume 2 Past Performance – Part 2�NO PRICES/COST IN THIS VOLUME
Volume 2 – Part 2� Past Performance Continued
Past Performance References�Exhibit C
Exhibits
Proposal Due Dates
Proposal Evaluation
Proposal Evaluation
Award
Important Reminders
Important Reminders
How Questions Will Be Handled
Answers To Questions
Websites
Questions

File details come from the government source that posted it. Updated .