Amendment_LEED_and_Commissioning_Deducts.pdf

PDF 7 KB Posted

Attached to
Medium Altitude Manned ISR Beddown
Solicitation number
W912L6-16-R-0007
Issued by

About this file

Amendment LEED and Commissioning Deducts

View the file

Other files

File Type Posted
W912L6-16-R-0007-0005.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_12-19-161.pdf PDF
W912L6-16-R-0007-0004.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_12-01-16.pdf PDF
W912L6-16-R-0007-0003.pdf PDF
H-132.pdf PDF
H-122.pdf PDF
H-131.pdf PDF
Requested_photos_30_Nov_2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-30-16.pdf PDF
H-121.pdf PDF
RFI_78_Attachment.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-21-16.pdf PDF
STATEMENT_OF_SPECIAL_INSPECTIONS_5-25-2016.pdf PDF
00_22_13.00_20_R2.pdf PDF
W912L6-16-R-0007-0002.pdf PDF
ED201.pdf PDF
RFI_52_attachment_Specification_Section_01000.pdf PDF
si_schedule_5-25-2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-21-16.pdf PDF
ANG_hangar_study_recommended_changes_.docx DOCX document
Hangar_Foam_Fire_Suppression_System_Inadvertent_Activations_Final.pdf PDF
CS101_-_Revised.pdf PDF
Criteria_Changes.docx DOCX document
ANGETL_15-01-03_Fire_Protection_Design_Guidance.pdf PDF
Requested_photos_21_Nov_2016.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_Log_11-17-16.pdf PDF
Pre-Bid_RFI_W912L6-16-R-0007_11-14-2016__Answered.pdf PDF
00_22_13.00_20_R1.pdf PDF
Appendix_F9_Hazardous_Material_Report.pdf PDF
W912L6-16-R-0007-0001.pdf PDF
EXHIBIT_A.doc DOC document
EXHIBIT_C.doc DOC document
EXHIBIT_B.doc DOC document
Attendance_Sheet_Bldg._1011_9_Nov_16_W912L6-16-R-0007.pdf PDF
EXHIBIT_F.DOC DOC document
Bldg_1011_Information_Slides.pdf PDF
B_Final_Design_OK_ANG.pdf PDF
OK_ANG_Bldg_1011_Specs_Vol_2_07152016.pdf PDF
W912L6-16-R-0007.pdf PDF
00_22_13.00_20.pdf PDF
OK_ANG_Bldg_1011_Specs_Vol_1_07152016.pdf PDF
General_Requirements.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 1, December 15, 2016 TO: Prospective Bidders

CHANGES TO PRIOR AMENDMENT:

1. NONE

CHANGES TO BIDDING REQUIREMENTS:

2.

a. ADD CLIN: 0005

DEDUCT LEED REPORTING AND PLUMBING/HVAC/ELECTRICAL COMMISSIONING

b. ADD CLIN: 0006

DEDUCT HANGAR DOOR REPAIRS

CHANGES TO CONDITIONS OF THE CONTRACT:

3. NONE

CHANGES TO DEMOLITION PHASE:

4. NONE

CHANGES TO CONSTRUCTION PHASE:

CHANGES TO DRAWINGS:

5. CLIN 0005: Deduct all work shown in A-200 except the pocket door and fire proofing shown in detail

3.

CHANGES TO SPECS:

6.

a. CLIN 0005: Delete LEED reporting and documentation requirements (Section 013329) and all reporting and documentation requirements throughout the remaining spec sections. Delete the Plumbing, HVAC and Electrical Commissioning requirement (Sections 019100, 220800, 230800 and 260800). Fire Protection Commissioning is still required.

b. CLIN 0006: Spec Section 083417 “Only the 4 pocket personnel doors shall be replaced to include Electrical interlocks and hardware.” Delete all other items not related to the 4 pocket doors.

End of Amendment

File details come from the government source that posted it. Updated .