Drawing E-601 requires the electrical contractor to remove include cost for utility fees & charges. This is a fluctuating cost & usually we would exclude this from our bid. Who is the BGE Designer Representative for this project? If we are required to carry these cost it is crucial that we get an estimate from the utility company. If this is a cost that we must carry, can we provide an allowance in our bid?
ELIMINATE REFERENCE TO KEYED NOTE 6, CONTRACTOR TO DISREGARD NOTE. GOVERNMENT WILL
CONTRACT OUT WORK WITH BG&E.
Please specify whether keyed LC fiber connectors are required at both the work area outlet and telecom room termination points or just the work area outlet.
KEYED LC FIBER CONNECTORS ARE REQUIRED AT WORK AREA OUTLETS OR TELECOMM ROOM
TERMINATION POINTS. SUGGESTED VENDOR IS CORNING OR EQUAL PRODUCT.