RFI #2 1 Mar 2016

On drawing M-503, detail A3 depicts 2 of the 2" CWS and 2of the 2" CWR lines per unit. However, the floor plan drawing MP-101 only indicates 1 of 2" CWS and 1of 2" CWR line per unit. Please clarify.

The detail is incorrect. Only (1) 2" CHWS and (1) 2" CHWR are required per the floor plan.

There is no detail indicated on the drawings for the Heating Water coils at the air handling units. There is a detail for the Chilled Water Coil shown on drawing M - 501. Are we to use the same detail for the Heating Water?

Yes, the chilled water coil piping detail can also be applied to the hot water coil at the air handling units.

Drawing S404 & S405 is depicting rebar on CMU walls called out with a reference "See wall Schedule on S-601 for Reinforcement", however drawing S-601 shows no schedule or details for masonry walls, please provide additional details for CMU wall reinforcement.

"Typical wall reinforcing schedule was removed. See note #11/S101 and #7/S201 for typical wall reinforcing not adjacent to openings, UNO."

Specification section 01 50 00 para 3.2.2 indicate that “The Government will make reasonably required utilities available to the Contractor from existing outlets and supplies” please advise locations/distances of the temporary utilities proposed outlets.

THE ONLY TEMPORARY UTILITY IS WATER, A FIRE HYDRANT 100 YARDS FROM THE SITE. ELECTRICITY

IS NOT AVAILABLE NEAR THE PROJECT SITE.

Solicitation stipulates that GC to self perform 15% of the project with his own force, please advise if the GC site personnel would account toward this percentage?

THE GC SITE PERSONNEL WOULD ACCOUNT TOWARD THE 15%.

Please advise what is the design basis for windows, storefronts & curtain walls.

it’sYKK Protek Blast Mitigation Products or approved equal

I think the question is, why aren't they mentioned? Also, is there any additional information available about these pipes?

"Insulation specification 23 07 00 sections 2.3.1 cold pipe line and 2.3.2 hot pipe line. These two systems are not listed on the table 1 and table 2 under section 3.2.1.6 pipe insulation material and thickness."

See attached image for the Chilled and Hot Water Insulation Material and Thickness tables

Drawing E-100 requires the electrical contractor to remove and replace the existingmanhole "CMH-108" What Size manhole is existing? What size manhole should we propose to provide?

Refer to A4/E-508

Drawing E-401 & E605 Shows PHWP-1A & PHWP-2A starters, but the equipment that it is serving are not shown.

Where are the water pumps that they are feeding?

PHWP-1A is in the same location as PHWP-1B but they stack vertically so it doesn't show up on the floor plan. They both serve boiler B-1 with one of the pumps serving as a backup pump on stand-by. It is the same for PHWP-2A & PHWP-2B except that they serve boiler B-2

Please specify whether keyed LC fiber connectors are required at both the work area outlet and telecom room termination points or just the work area outlet.

The B3 design documents and specification do not require the telecom fiber optic patch panels to be keyed, however this requirement should be verified by the base Communications Flight personnel.

Please confirm that all CATV equipment is by others and that this scope only includes the horizontal RG6 cabling from the Comm Room to the monitor outlets.

Refer to Specification 27 05 14.00 10 Cable Television Premises Distribution System.

Please confirm that a reference to “4 – Duplex LC” in detail A3 on drawing T-502 indicates 4 keyed duplex LC ports in a faceplate – a total of 8 strands.

Refer to T-503.

Please advise what is the design basis for windows, storefronts & curtain walls.

Basis of design is YKK Protek Blast Mitigation Products or approved equal

In reference to the Buy American Act and it’s applicability –

Vendors should look through the provisions and read each one. The provisions can be viewed at https://farsite.hill.af.mil