This document contains a Quality Assurance Surveillance Plan (QASP) for base operations support services at Luis Gomez Nino Air Base in Colombia. The contractor will provide non-personal services including facility and equipment maintenance, grounds maintenance, housekeeping, administrative support, property accountability, cargo movement, and billeting facility management. Performance standards address requirements for personnel qualifications, preventative maintenance, emergency work orders, grounds maintenance, cleaning schedules, laundry services, translation assistance, transportation coordination, reporting, utilities management, and inspections. Surveillance methods include 100% inspections, random sampling, and periodic sampling. Performance ratings and deductions are defined for 16 performance objectives. The contractor must also submit Contractor Manpower Reporting data annually.

View the file

Other files for this federal contract opportunity

Other files attached to Apiay Base Operations Support Services, newest first.
File Type Posted
W912CL20R0003 Amendment 0006.pdf PDF
W912CL20R0003 Amendment 0005.pdf PDF
W912CL20R0003 Amendment 0004.pdf PDF
W912CL20R0003 Conformed thru Amendment 0003.pdf PDF
W912CL20R0003 Amendment 0003.pdf PDF
W912CL20R0003 Amendment 0002.pdf PDF
Site Visit Registration.xlsx XLSX spreadsheet
W912CL20R0003 Amendment 0001.pdf PDF
W912CL20R0003.pdf PDF
W912CL20R0003 Att. 3 PP Questionnaire.docx DOCX document
W912CL20R0003 Att. 2 Apiay footprint.pdf PDF
W912CL20R0003 Att. 5 GFP.XLSX XLSX spreadsheet
W912CL20R0003 Att. 4 DD254.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Operations Support Services Forward Operating Site Apiay

Luis Gomez Niño Air Base Apiay, Colombia

Quality Assurance Surveillance Plan

W912CL-20-R-0003

NOTE: THIS QASP IS PROVIDED AS AN ATTACHMENT TO THE SOLICITATION

FOR INFORMATIONAL PURPOSES ONLY. IT WILL NOT BECOME PART

OF THIS CONTRACT.

TABLE OF CONTENTS

Subject

1. Overview

2. Description of Services

3. Roles and Responsibilities

4. Contract Quality Requirements

5. Government Surveillance

6. Non-Conforming Performance

7. Data Analysis

8. Acceptance of Services

9. Monthly COR Activity Report

10. Contractor Manpower Reporting (CMR)

11. Quality Assurance Surveillance File

12. Contractor Performance Assessment Reporting System (CPARS)

13. Record Retention

14. Combating Trafficking in Persons (CTIP)

15. QASP Changes

1. OVERVIEW

1.1 Purpose. The purpose of this plan is to identify the methods and procedures the Government will use to ensure it receives the services/products under this contract as identified in the Performance Work Statement (PWS).

1.2 Intent. The intent of this plan is to hold the Contractor accountable for quality control and to encourage the contractor to take appropriate steps to control and improve quality. Contractor is responsible to develop an efficient methodology to ensure they meet and/or exceed the required thresholds of service as outlined in this acquisition. The Government intends to perform surveillance on this contract in accordance with this Quality Assurance Surveillance Plan (QASP), but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government reserves the right to perform quality assurance at the subcontract level and perform quality assurance at the contractor's place of business, if applicable. Non-conforming services discovered with subcontractors will be addressed with the prime contractor for resolution.

2. DESCRIPTION OF SERVICES

2.1 Scope of Work. This is a non-personal services contract to provide Base Operations Support Services (BOSS) at the US Army South (ARSOUTH) forward operating site (FOS) at Luis Gomez Niño Air Base, Apiay, Colombia. The Contractor shall provide personnel possessing the skills, knowledge, experience, proficiency, and training to satisfactorily perform the BOSS tasks, to include maintenance of facilities and equipment, grounds maintenance, housekeeping/janitorial services, administrative support, property, cargo movement, and management of billeting facility. In addition, the contractor will directly acquire utility services.

2.2 Contract. The contract type will be a Firm-Fixed Price, however, with reimbursement of Travel and Other Direct Costs under Not-To-Exceed CLINs.

3. ROLES AND RESPONSIBILITIES.

Contracting Officer (KO) - A person duly appointed with the authority to enter into, administer and terminate contracts on behalf of the Government. The KO is the only person who can legally commit the Government and only the KO, as the Government’s agent, can modify the contract/order. The KO is the final authority for determining the adequacy of the Contractor’s performance. KO decisions arising under or relating to the contact are final.

Contracting Officer’s Representative (COR) – An individual designated in writing by the KO to perform specific technical and administrative functions within the scope and limitations of their written appointment (e.g., surveillance of Contractor’s performance, accept services). The COR is not empowered to make any contractual commitments or authorize any changes to the order/contract or in any way obligate additional funds by the Government; such authority rests solely with the KO.

Property Administrator – Property Book Officer (PBO). The U.S. Military Group (MILGRP), Bogota, Colombia has assigned a PBO with the responsibility of managing and overseeing the accountability of U.S. Government property in Colombia. As one of its tasks in the PWS, the Apiay Contractor will assist the PBO in the accountability of property at Apiay in accordance with the MILGRP Standard Operating Procedures.

4. CONTRACT QUALITY REQUIREMENTS

4.1. Quality Control Program. The Contractor's Quality Control Program requirements are defined in Paragraph 1.6 of the PWS. The Contractor shall develop, maintain, enforce and document a Quality Control Plan (QCP) which complies with the requirements of this contract and outlines how they will ensure the Government will receive all the services required by the contract at the specified quality level.

4.2. Government Quality Assurance. The Government will perform Quality Assurance oversight of the Contractor and Contractor’s QCP IAW with this QASP to ensure acceptable levels of contract performance are achieved and that the contractor is performing acceptable levels of Quality Control to ensure fully acceptable services are provided.

5. GOVERNMENT SURVEILLANCE

5.1. Methods of Surveillance include but are not limited to:

• 100% Inspection - Reserved for the highest risk areas where consequence of failure is high (i.e. life or limb are threatened) or there is likelihood of mission failure.

• Random Sampling - When a service is performed relatively frequently and a statistically valid sample can be selected for audit. The most appropriate method for frequently recurring tasks.

• Periodic Sampling - Planned sampling of a service at specific predetermined dates and times. May be appropriate for tasks that occur infrequently.

• Customer Feedback – Not necessarily a valid method of surveillance but a good indicator for areas surveillance should be conducted or intensified.

5.2. Monthly Surveillance Schedule. The COR will develop a monthly schedule of surveillance activities based on the Performance Standards as outlined in the Performance Requirements Summary (PRS)(PRS will be an attachment to this QASP) as well as any other critical contractual requirements determined to be higher risk requiring oversight. The surveillance outlined in the monthly schedule will be as detailed and in-depth as necessary to provide the Government with the objective quality evidence required to support acceptance of the services provided by the Contractor. The schedule will provide planned periodic surveillance during all required hours of the Contractor’s operation. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. The schedule will identify the method of surveillance, the date of inspection, place of inspection, activity to be monitored, and who will conduct the surveillance (dates and times can be altered without a formal change to the schedule as long as all inspections are performed). The 410th CSB surveillance schedule shall be used to plan and scheduled monthly surveillance. The monthly schedule will be completed no later than seven calendar days prior to the beginning of the period it covers and a copy uploaded into the Procurement Integrated Enterprise Environment (PIEE)- Surveillance and Performance Monitoring (SPM) module.

5.3. Inspection instructions/checklists. The COR will develop inspection instructions/checklists for all planned inspections which may require special instructions on how to perform the inspection, what observations should be made with specific details of what to look for acceptable performance. The 410th Surveillance Checklist shall be used for the above purpose.

5.4. Documentation of Inspections. All inspections/observations will be documented and will include as a minimum date and time, who performed the inspection, what was inspected, to what standard and the results. Successful or exceptional performance will be documented as well as deficiencies in Contractor performance. Documentation will be maintained for future reference, audit, proof of inspection and past performance documentation. The 410th Surveillance Checklist shall be used for the above purpose.

6. Non-Conforming Performance. The COR will notify the Contractor, in person, each time an unacceptable observation has been recorded and ask the Contractor to correct the problem or re-accomplish the service. All valid non-conformances observed by the Government will be documented! The COR will record the contract requirement, the specific deficiency to the requirement, the date and time it was discovered, and have the Contractor initial the entry. The Contractor will be given a time line after notification to correct the deficiency in accordance with requirements of the contract. Deficiencies that cannot be corrected within the indentified time line will be reported to the KO. The approved 410th CSB nonconformance report (NCR) form shall be used to document all contractual nonconformance’ to include issues. All NCRs shall be logged into the NCR Log. Only KOs shall issue NCRs to the contractor.

6.1. Customer Feedback. Customer feedback can be in any form, verbal or written but no matter the format the COR will maintain a record of the feedback positive or negative. All negative feedback must be verified/validated by the COR.

a. If immediate response to a complaint is required, the COR will provide the response to the requester as soon as practical.

b. The COR will conduct an investigation to determine the validity of any negative comments received.

c. If the negative comment is determined not to be valid, if possible, the COR will inform customer of the reason(s) as soon as practical.

d. For validated negative comments that are true contractual non-conformances see paragraph 6.

If this non-conformance is a more serious (systemic in nature) deficiency or recurring deficiency that could indicate a trend the COR should see paragraph 6.2.

e. The COR will follow up with the customer of the corrective action taken by the contractor, if applicable.

6.2. Non-Conformance Reports (NCR). The COR will report more serious (systemic in nature) deficiencies or recurring deficiencies that could indicate a trend by using the 410th CSB non-conformance report. The Non-Conformance Report will state the Contract Requirement, the specific contract reference and the specific violation (s) to the requirement. The COR will forward copies of Non-Conformance Report to the KO within one working day. The KO will notify the Contractor and request corrective action to the specific non-conformance, identification of the root cause and corrective action for the root cause with a required suspense date. The KO may require the Contractor to re-perform any services that do not meet contract requirements at no additional cost to the Government. The Contractor will return a copy of the completed and signed Non-Conformance Report along with their Corrective Action Plan (CAP) to the KO for review, approval and inclusion in the contract/order file. The KO should include the COR in the review of the CAP and re-inspection of services that were found deficient to ensure the CAP included adequate root cause analysis, corrective action for the root cause and that it was accomplished in the timeframe agreed upon. The KO and COR will not consider the NCR closed until all deficiencies have been corrected and all agreed upon actions of the CAP have been completed. Contractor’s failure to follow through and complete corrective actions will be reported immediately to the KO for further action. (Note: if the COR has to repeatedly perform re-inspection there could be a Government re-inspection cost which could be recovered from the Contractor). The COR will also follow-up after the Contractor has completed the corrective action to ensure that the Contractor’s corrective action was sufficient to preclude recurrence.

7. Data Analysis. COR shall perform and document analysis of available data monthly and make adjustments to surveillance schedule as required based on results of analysis. Analysis shall be used to look for and document trends in performance which may indicate shifts in performance risk that could result in increased or reduced surveillance. Data can be based on Government observations or Contractor observations. Negative trends noted using Government observations could result in the KO issuing the Contractor a Cure Notice. Trends noted using Contractor data should never result in a Cure Notice unless the Contractor is not addressing the negative trend. Documentation of data analysis will be in the COR Status Report.

8. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment upon satisfactory completion of the work. This is done by approving the Contractor’s invoice in PIEE-Wide Area Workflow https://wawf.eb.mil/ or DD250 (if applicable).

9. COR Monthly Status Report. By the last working day of the month, the COR will complete the PIEE-SPM Online Monthly Report for KO review and acceptance or rejection. The COR will use the criteria listed below when rating the Contactor’s Quality of Work. In the Contactor’s Quality of Work comment box the COR will include a summary of inspections performed, summary of customer complaints, summary of contract discrepancies, recommended adjustments to surveillance and any other pertinent contract activities. In the individual question comments box, the COR will include a detailed summary of observations as it pertains to the individual question.

Contractors Quality Of Work Contractor quality of work ratings and criteria are described below:

Performance Rating

Criteria

Exceptional Performance meets contractual requirements and exceeds many of the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some of the government benefits. The contractual performance element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were highly effective.

Satisfactory Performance meets all minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

10. Contractor Manpower Reporting. Per Department of Defense Contractor Manpower Reporting Initiative MEMO dated Oct 16 2019, contractors will begin reporting manpower data relating to the performance of services contracts in the System for Award Management (www.sam.gov). A Defense FAR Supplement rule that will include a contract clause to implement the change from use of ECMRA to SAM is pending.

11. Quality Assurance Surveillance File: The official COR Quality Assurance Surveillance File will be maintained in the on-line PIEE-SPM module via https://wawf.eb.mil/ per ACC PAM 70-1. The Quality Assurance/COR Surveillance file shall contain the following as applicable:

a. Copy of the COR designation letter from the KO, any changes to that letter, and any termination letters.

b. Training Certifications for COR and refresher training.

c. Copy of the applicable Quality Assurance Surveillance Plan (QASP).

d. Copy of the contractor’s Quality Control Plan (QCP)

e. All correspondence initiated by authorized representatives (Contractor or Government) concerning performance of the contract.

f. Names, position titles and contact information of all key personnel assigned to this contract both Government and Contractor.

g. Monthly surveillance schedules.

h. Surveillance Checklists

i. Records of all inspections performed and the results.

j. Customer Feedback.

k. Memoranda for record of minutes of any meeting, telephone conversations and discussions with the contractor or others pertaining to the contract or contract performance.

l. Documentation pertaining to acceptance of services, reports or data.

12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data IAW this QASP will be used as objective data to support CPARS ratings. The inclusion of detailed documented inspection results provides objectivity to CPARS reporting.

CPARS will be accomplished annually or at the end of a Task Order whichever occurs first.

13. Record Retention. All records will be retained for the life of this contract. The COR/QAE shall ensure all record are uploaded into PIEE-SPM and all hard copies shall be forward to the KO upon completion of the contract/order.

14. Combating Trafficking in Persons (CTIP). See US Department of State website, http://www.state.gov/j/tip/rls/tiprpt/2012/192363.htm for Tier location requirements. The COR shall ensure that contractors are in compliance with FAR 52.222-50 at CTIP Tier 1 locations. For Tier 2, Tier 2 Watch List (WL), and Tier 3 locations, CORs shall ensure that contractors are in compliance with Tier 1 requirements in addition to performing spot checks, reviews, and assessments of contractor and subcontractor employees to identify indicators of CTIP. In the event indicators are identified, the COR shall notify the KO immediately.

The COR shall use the 410th CSB checklist when conducting CTIP surveillance. CTIP surveillance reporting will be completed biannually and submitted to the KO NLT the last working day of the months of June and November.

15. QASP Changes. The QASP is a living document and, as such, may be changed as needed.

However, the KO must approve changes. The COR will submit recommended changes to the KO for approval. Once approved, the COR will upload the newest version into PIEE-SPM.

Requirements Table

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective Standard Performance

Threshold Method of Surveillance

% Deduction from monthly invoice for not meeting Performance

Standards

Combating Trafficking in Persons FAR 52.222-50 c

PWS 5.13

(c) Contractor requirements. The Contractor shall-

(1) Notify its employees and agents of-

(i) The United States Government's policy prohibiting trafficking in persons, described in paragraph

(b) of this clause; and

(ii) The actions that will be taken against employees or agents for violations of this policy.

Such actions for employees may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment

100% Compliance

100% Inspection, COR

Validation

Past performance annotated, 0-30%

PRS 1.

Contractor/subcontractor personnel shall possess the qualifications identified in PWS sections 1.6.7, 1.6.10, 1.6.19,

1.6.20 and 1.6.21

See PWS sections 1.6.7, 1.6.10, 1.6.19, 1.6.20 and 1.6.21

100% Compliance Annual

Inspection

Past performance annotated, 0-30%

PRS 2. Contractor shall perform preventive maintenance.

PWS 5.2.1.

As prescribed by manufacturer or warranty recommendations / requirements.

90% on-time Random Sampling

Past performance annotated, 0-30%

PRS 3. Emergency work orders shall be immediately acted upon and corrected within eight (8) hours.

PWS 5.2.2.1

Any work order that impacts the immediate health and safety of equipment or personnel, or must be completed within eight (8) hours, is considered an Emergency work order.

95% on-time Random Sampling

Past performance annotated, 0-30%

PRS 4. The Contractor shall perform Grounds Maintenance services, to include mowing grass and weeds.

PWS 5.3

The approximate area to be mowed/trimmed is four acres and shall be serviced when grass reaches a height not to exceed four (4) inches.

This is estimated weekly, but may be required more or less frequently.

PWS 5.3.1.

95% of the time Random

Sampling

Past performance annotated, 0-30%

PRS 5. Contractor shall wash and clean the exterior walls of approx. 60 trailers.

PWS 5.3.4

Every six (6) months.

100% of the time Random Sampling

Past performance annotated, 0-30% PRS 6. Contractor shall perform Daily cleaning of billeting facilities of 94 rooms, six (6) offices, and 1,500 square feet of common areas (bathrooms, gyms, kitchens, etc.). PWS 5.4.1.1

Floors shall be free of dirt; bathrooms and showers shall be cleaned and disinfected; surfaces shall be free of dust; trash containers shall be emptied; toilet paper and soap shall be stocked sufficiently to meet the needs of a 24 hour period.

98% of the time Random

Sampling

Past performance annotated, 0-30%

PRS 7. Contractor shall collect and replace one bath towel and one hand towel in each occupied or vacated room.

Exchange of towels in two (2) kitchen facilities (2-3 towels each), two (2) physical fitness centers (one towel per machine), and three (3) restrooms when billeting rooms are occupied by U.S.

Daily. PWS 5.4.1.2.2.

Replacement towels and bed linens shall be unsoiled. PWS 5.4.1.2

100% of the time Random

Sampling

Past performance

Government personnel. PWS 5.4.1.2.2

PRS 8. Contractor shall wash, dry, fold, and store hand towels, towels, pillow cases, comforters, rugs and sheets daily when Billeted Facilities are occupied.

PWS 5.4.2

Laundering shall be done to acceptable commercial practices and standards.

100% of the time Random

Sampling

Past performance annotated, 0-30%

PRS 9. Contractor shall translate correspondence for the preparation and distribution of OFICIOs to the host nation command staff.

PWS 5.5.1

Documents shall be free of typing and translation errors.

95% of the time Random

Sampling

Past performance annotated, 0-30%

PRS 10. Contractor shall assist U.S. personnel and VIPs with entry into the air base. Includes meeting, escorting / transporting personnel to and from base entry points to various locations on Apiay. PWS 5.5.2

Coordination with CACOM 2 Security shall be initiated at least 48 hours in advance of arrival of U.S. personnel and VIPs.

95% of the time Random

Sampling

Past performance annotated, 0-30%

PRS 11. The Contractor shall submit SITREP daily to ARSOUTH COIC and COR.

PWS 5.5.3

No later than 1700 local (Apiay).

95% of the time Random

Sampling

Past performance annotated, 0-30% PRS 12. Contractor shall provide property accountability support for Logistics Missions to ensure the proper inventorying and safeguarding of all Government property.

PWS 5.6

100% inventories of MILGP Property Book / Government Property (not furnished/GFP) will be conducted as determined by the Property Book Officer (PBO). Historically, this is performed every six (6) months.

98% of the time Random

Sampling

Past performance annotated, 0-30%

PRS 13. Contractor shall perform routine cargo movement and storage of U.S.

Government assets. PWS 5.8

Three hours prior to the arrival/departure of aircraft or ground transportation, the Contractor shall have personnel and all equipment ready and operational to receive or ship cargo. Contractor shall be responsible for accident or incident free operations when operating cargo movement equipment.

Contractor shall safely operate cargo movement equipment to include

100% Damage Free 100%

Inspection

Past performance forklifts, trucks, tugs, pallet trailers and other associated equipment.

PRS 14. Contractor shall establish, monitor and pay utilities for all areas and shall restore any disruption of service within 24 hours. PWS 5.9

Contractor shall arrange for the establishment, monitoring and payment of utilities (water, sewage, trash-pick up and electricity, internet, Direct TV) Disruptions of service shall be immediately reported and service restored within 24 hours.

90% disruptions of service repaired and restored on time

Random Sampling

Past performance annotated, 0-30%

PRS 15. Contractor shall perform billeting and facility management and oversight.

PWS 5.9

Verify that rooms are clean, supplied, and equipment are fully operational. Inspections of living and common use areas shall be conducted.

All other facilities shall be checked weekly.

Contractor shall also provide for arrangement, installation, monitoring, and payment of utility services including: Cable TV, Internet, water, sewage, trash disposal, telephone service, and electricity.

90% Accuracy Random

Sampling

Past performance annotated, 0-30%

PRS 16. Contractor shall submit Contractor Manpower Reporting (CMR) data.

The Contractor shall completely fill in all the information in the format using the following web address https://ecmra.army.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 01 through September

30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. PWS 5.12.1

100% Compliance

100% Inspection

COR

Validation

Past performance