j8 Quality Control Report.xls

XLS spreadsheet 45 KB Posted

Attached to
Competitive 8(a) SATOC JOC Federal contract opportunity
Solicitation number
W9124P-19-R-A029
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document contains a quality control report template and details of a federal contract opportunity. The quality control report template outlines requirements for daily reporting on weather conditions, work performed, inspections, test results, instructions received, remarks, safety issues, and contractor certification.

The federal contract opportunity is a five-year, firm-fixed-price Indefinite Delivery Indefinite Quantity single award task order contract to perform unspecified minor military construction projects, lab revitalization, and sustainment, restoration, and modernization projects for the US Army Garrison - Redstone Department of Public Works. Questions regarding the opportunity must be submitted by email to the listed points of contact by February 22, 2019, with an anticipated award date of December 16, 2019. The contracting agency is the Department of the Army Materiel Command Contracting Command Redstone Arsenal.

j8 Quality Control Report

View the file

Other files for this federal contract opportunity

Other files attached to Competitive 8(a) SATOC JOC, newest first.
File Type Posted
Amendment_0002_.pdf PDF
Amendment_0001_.pdf PDF
j17 Storm Water Runoff Permit Terminaiton Request.pdf PDF
j19 Past Perfomance Record.doc DOC document
j24 Background Checks for Installation Access.xlsx XLSX spreadsheet
Section_J_-_Attachments_.zip ZIP file
j28 Trial Proposal Site Visit Memo Attachment.pdf PDF
j15 ADEM Form 24- NOI.pdf PDF
j15 ADEM Form 24- NOI.pdf PDF
j14 septic.pdf PDF
j9 Site Visit Memo.doc DOC document
j16 ADEM Form 23 BMP Inspection Report.pdf PDF
j20 Past Performance Survey.docx DOCX document
j5 Manifest of Material Delivered to SWMA.xls XLS spreadsheet
j7 Manifest of Material Delivered to the City Incenerator.doc DOC document
j25 CDRLs.docx DOCX document
j4 Equipment Data Sheet.xls XLS spreadsheet
j18 Spill Plan.pdf PDF
j11 Equipment Warranty List.doc DOC document
j23 Company Specialized Experience.docx DOCX document
j6 Manifest of Material Delivered to the City Landfill.doc DOC document
j10 Progress Chart.xls XLS spreadsheet
j21 Key Personnel Resume.docx DOCX document
j12 JOC Evaluation Form.xls XLS spreadsheet
j24 Background Checks for Installation Access.xlsx XLSX spreadsheet
j25 CDRLs.docx DOCX document
j22 Letter of Commitment.docx DOCX document
Construction_Task_Catalog_-_April_2019.pdf PDF
j14 septic.pdf PDF
j6 Manifest of Material Delivered to the City Landfill.doc DOC document
J1 DD Form 1348-1 Turn-in Slip.xls XLS spreadsheet
Technical_Specifications_-_April_2019.pdf PDF
j3 Environmental Laws.doc DOC document
j7 Manifest of Material Delivered to the City Incenerator.doc DOC document
j2 RSA 200-6 Hazmat Management Plan.pdf PDF
j9 Site Visit Memo.doc DOC document
j27 Seed Project.pdf PDF
j20 Past Performance Survey.docx DOCX document
j13__Small_Projects_order_form.xlsx XLSX spreadsheet
j22 Letter of Commitment.docx DOCX document
j18 Spill Plan.pdf PDF
W9124P-19-R-A029_JOC_KO_Signed.pdf PDF
j5 Manifest of Material Delivered to SWMA.xls XLS spreadsheet
j21 Key Personnel Resume.docx DOCX document
j11 Equipment Warranty List.doc DOC document
j26 Trial Proposal Drawing Set.pdf PDF
J1 DD Form 1348-1 Turn-in Slip.xls XLS spreadsheet
j4 Equipment Data Sheet.xls XLS spreadsheet
BLDG_3434_Photo_Studio_Equipmnt_Listing.xlsx XLSX spreadsheet
DRAFT_RFP_W9124P-19-R-A029.pdf PDF
Show all 50

Competitive 8(a) SATOC JOC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QCR (1)

CONTRACTOR'S QUALITY CONTROL REPORT (QCR)DATE:REPORT NO:
CONTRACT NUMBER AND NAME OF CONTRACTOR:DESCRIPTION AND LOCATION OF THE WORK:
WEATHER CLASSIFICATION:CLASSIFICATION:
CLASS ANo interruptions of any kind from weather conditions occurring on this or previous
shifts.
CLASS BWeather occurred during this shift that caused a complete stoppage of all work.CLASS _______________
CLASS CWeather occurred during this shift that caused a partial stoppage of work.TEMPERATURE:
CLASS DWeather overhead excellent or suitable during shift. Work completely stopped
due to results of previous adverse weather.
CLASS EWeather overhead excellent or suitable during shift but work partially stoppedMAX ______ MIN ______
due to previous adverse manner.PRECIPITATION:
OTHERExplain
INCHES _____________
CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY: (Attach list of
items of equipment either idle or working as appropriate.)
a.
b.
c.
d.
e.
f.
g.
1. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime
and/or subcontractors by letter in Table above. Indicate any delays in work.)
2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P - Preparatory, I - Initial, or F - Follow-up and include
satisfactory work completed or deficiencies with action to be taken.)
3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:

&CATTACHMENT J8

Page &P

QCR (2)

4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies
retesting required, etc., with action to be taken. List the names of the Government personnel who gave verbal
instruction)
5. REMARKS: (Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials; offsite
surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.)
Include any telephone conversations/instructions with the Contracting Officer, COR or other representative.
Indication of delays to be in accordance with para 2 of Part B of FAR 52.249-10.
6. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel.
Specify corrective action taken.)
INSPECTOR
CONTRACTOR'S CERTIFICATION: I certify that the above report is complete and correct and that all material
and equipment used, work performed and tests conducted during this reporting period were in strict compliance
with the contract plans and specifications except as noted above.
CONTRACTOR'S APPROVED AUTHORIZED REPRESENTATIVE
SAM FORM 696, 1 SEP 79

&CATTACHMENT J8

&CPage 2

File details come from the government source that posted it. Updated .