01_33_29_20May2016.pdf
PDF 240 KB Posted
- Attached to
- AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
- Solicitation number
- W91236-16-R-0010
About this file
01 33 29_20May2016
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ft. Lee AIT Barracks Phase III FY15 041449FTLEE
SECTION 01 33 29
SUSTAINABILITY REPORTING
02/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 189.1 (2011; Errata 1-2 2012; INT 1 2013; Errata 3-8 2013) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition
U.S. DEPARTMENT OF ENERGY (DOE)
ISWG Guiding Principles (2008) High Performance and Sustainable Buildings Guidance
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED GBDC Ref Guide (2009; R 2010) LEED Reference Guide for Green Building Design, Construction and Major Renovations of Commercial and Institutional Buildings including Core & Shell and K-12 Projects
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.2 SUMMARY
This specification includes general requirements and procedures for this project to be constructed and documented per the federally mandated "Guiding Principles" (GP), Third Party Certification (TPC) requirements, UFC 1-200-02, High Performance and Sustainable Building Requirements, and other requirements identified in this specification.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
Submittals with an "S" are for inclusion in the Sustainability Notebook, in
SECTION 01 33 29 Page 1 conformance to this section. Submit the following in accordance with Section 01 33 00.00 50 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Preliminary Sustainability Notebook; G
Preliminary LEED Building Checklist
Indoor Air Quality Plan
SD-07 Certificates
SD-11 Closeout Submittals
Final Sustainability Notebook; G
Final LEED Building Checklist; G
Amended Final Sustainability Notebook; G
Third Party Certification Plaque and Certificates; G
1.4 GUIDING PRINCIPLES VALIDATION (GPV)
Provide construction related sustainability documentation to verify achievement of ISWG Guiding Principles Validation (GPV). Provide the following for GPV:
a. Refer to LEED Building Checklist at the end of this specification section.
b. Obtain approval of any changes to the LEED Building Checklist from the Contracting Officer at the Preconstruction Conference. Contracting Officer's approval establishes identified ISWG Guiding Principles Requirements as the project's sustainability goals.
No variations or substitutions to the LEED Building Checklist are allowed without written consent from the Contracting Officer.
Immediately bring to the attention of the Contracting Officer any changes that impact meeting the approved ISWG Guiding Principles Requirements for this project and demonstrate that change will not incur additional construction cost or increase the life cycle cost.
c. Include all work required to incorporate the applicable ISWG Guiding Principles Requirements indicated on the LEED Building Checklist and in this contract.
d. Include construction related documentation to maintain an up-to-date Sustainability Notebook. Supplement construction related documentation containing the following components;
(1) LEED Building Checklist
(2) Sustainability Action Plan
(4) Commissioning Plan and Reports
SECTION 01 33 29 Page 2
1.4.1 Sustainability Action Plan
Include the following information in the Sustainability Action Plan:
a. Contractor's planned method to achieve each construction related GP requirement.
b. For each designated construction related ISWG Guiding Principles Requirements that is not achieved, provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.
c. Name and contact information for: Contractor's POC responsible for ensuring sustainability goals are accomplished and documentation is assembled.
1.4.2 Costs
Contractor is responsible for all costs associated with constructing and demonstrating that project complies with approved ISWG Guiding Principles Requirements.
1.4.3 Third Party Certification (TPC) Documentation
U. S. Green Building Council (USGBC) is the TPC organization. This project has been designed for, and must be constructed to attain a sustainability rating of LEED GBDC Ref Guide Silver . Project is already registered with USGBC. The contractor is responsible for paying for the design review 14 days after recieving the notice to proceed, the construction review, and any appeals associated with the construction review. The design information has been provided by the goverment. Provide construction related sustainability documentation, in the format required by the TPC Organization, to the Contracting Officer for approval, and for final approval by the TPC organization. Third Party Certification is met when Government receives TPC organization Silver level certificate and plaque.
Include the following:
a. Not Used
b. Not Used
c. Complete all work required to incorporate the applicable TPC Requirements.
d. Maintain the construction related information, and provide replacement pages, in the Sustainability Notebook pertaining to additions and changes to the approved sustainability requirements. The Sustainability Notebook is in electronic format and is explained in the paragraph entitled "SUSTAINABILITY NOTEBOOK". The Sustainability Notebook contains the following components in addition to the GPV components above:
(1) Not Used
(2) Sustainability Action Plan
(3) Completed TPC documentation for each identified prerequisite and
SECTION 01 33 29 Page 3 credit. Upload onto the TPC Online documentation website.
(4) Copy of all correspondence with the TPC organization.
e. Include the following information in the Sustainability Action Plan.
Provide this TPC information in addition to the GPV Action Plan items above:
(1) Contractor's planned method to achieve each TPC requirement.
(2) For each required TPC credit that is attempted but not achieved, provide narrative explaining how mission or activity precludes achieving specific sustainability requirement or goal. Provide analysis of particular requirement and level to which project is able to comply.
(3) Provide the commissioning plan and schedule for performance testing, and data collection to take place during first year of facility usage.
(4) Name and contact information for: Contractor's Sustainability POC and other names of sustainability professionals on the Contractor's Staff responsible for ensuring TPC sustainability goals are accomplished and documentation is assembled.The contractor shall have a LEED accredited professional assigned to each construction credit being pursued. Contractor's Sustainability POCs are also responsible for ensuring GPV required in paragraph GUIDING PRINCIPLES VALIDATION (GPV) above.
f. Contractor is responsible for all costs associated with constructing and demonstrating that project complies with approved TPC requirements, including but not limited to:
(1) TPC coordination, TPC website requirements, and management for construction related documentation.
(2) Construction work required to incorporate TPC prerequisites and credits.
(3) Submittals required to demonstrating compliance with Government approved TPC checklists.
g. Provide all calculations, product data, and certifications required in this contract to demonstrate compliance with the TPC Requirements of this section.
1.5 SUSTAINABILITY SUBMITTALS
Provide documentation in the Sustainability Notebook and the LEED Building Checklist to indicate compliance with the sustainability requirements of the project.
1.5.1 "S" Submittals for Sustainability Documentation
Submit the GPV and TPC sustainability documentation required in this specification as "S" submittals. Highlight GPV and TPC compliance data in "S" submittal.
SECTION 01 33 29 Page 4
1.5.2 SUSTAINABILITY NOTEBOOK
Provide and maintain a comprehensive Sustainability Notebook to document compliance with the sustainability requirements identified in the approved LEED Building Checklist. Sustainability Notebook must contain all required data to support full compliance with the ISWG Guiding Principles Requirements . Sustainability Notebook is in the form of an Adobe PDF file; bookmarked at each ISWG Guiding Principles Requirement , TPC requirement,and sub-bookmarked at each document. Match format to ISWG Guiding Principles numbering system indicated herein. Maintain up to date information, spreadsheets, templates, and other required documentation with each current submittal. For TPC projects, provide a second Table of contents using TPC numbering system. Locate documentation unique to TPC here. Where TPC documentation would repeat GP documentation, insert note referring reviewer to GP documentation.
Contracting Officer may deduct from the monthly progress payment accordingly if Sustainability Notebook information is not current, until information is updated and on track per project goals.
1.5.2.1 Sustainability Notebook Submittal Schedule
Provide Sustainability Notebook Submittals at the following milestones of the project:
a. Preliminary Sustainability Notebook
Submit preliminary Sustainability Notebook for approval at the Pre-construction conference. Include Preliminary LEED Building Checklist.
b. Construction Progress Meetings. Update GP and TPC documentation in the Sustainability Notebook and TPC Online tool for each meeting.
c. Final Sustainability Notebook
Submit updated Sustainability Notebook within 60 days after the Beneficial Occupancy Date (BOD). Final progress payment retainage may be held by Contracting Officer until final sustainability documentation is complete. Submit three (3) electronic copies of the Final Sustainability Notebook on DVDs to the Government. Include Final LEED Building Checklist.
d. Amended Final Sustainability Notebook
Amend and resubmit the Final Sustainability Notebook to include commissioning, testing and balancing, and collection of performance requirements. Submit three (3) final electronic copies of the Amended Final Sustainability Notebook Submittal on DVDs to the Government no longer than 30 days after the GP, TPC, and Cx designated data collection period.
1.5.3 LEED Building CHECKLIST
Provide construction documentation that provides proof of and supports compliance with the completed LEED Building Checklist.
SECTION 01 33 29 Page 5
1.5.3.1 LEED Building Checklist Submittals
Submit an updated copy of the LEED Building Checklist with each Sustainability Notebook submittal. Attach LEED Building Checklist to DD1354 Real Property Record Submittal.
1.6 DOCUMENTATION REQUIREMENTS
Third Party Certification requirements or credits are mandatory when they have requirements that match a Guiding Principle Requirement.
Documentation used to demonstrate TPC compliance may be used to demonstrate GP compliance.
Incorporate each of the following ISWG Guiding Principles Requirements into project construction; and provide documentation that proves compliance with each listed requirement. Items below are organized according to the ISWG Guiding Principles. Refer to Third Party Certifier's reference manuals for TPC requirements.
1.6.1 Commissioning
Work with the Commissioning Authority (CxA) to achieve requirements of the Commissioning plan and other contract document requirements at each stage of commissioning. Maintain up-to-date records of commissioning activities in the Sustainability Notebook, to include commissioning plan and summary commissioning report.
1.6.2 Energy Efficient Equipment
Provide only energy-using equipment that is Energy Star rated, or has the Federal Energy Management Program (FEMP) recommended efficiency. Where Energy Star or FEMP recommendations have not been established, provide equipment with efficiency in the top 25 percent for the type of equipment procured. Provide only energy using equipment that meets FEMP requirements for low standby power consumption. Energy efficient equipment can be found at: http://www1.eere.energy.gov/femp/ and http://www.energystar.gov/.
Provide the following documentation:
Proof that equipment is energy efficient and complies with the cited requirements.
1.6.3 Benchmarking
Provide report of initial actual energy performance with the energy design targets. Provide the following documentation:
Prefinal Performance Report with data collected from the first 60 days of operation of the facility after Beneficial Occupancy Date (BOD). Submit this information with the Final Sustainability Notebook Submittal.
1.6.4 Reduce Volatile Organic Compounds (VOC)
Provide materials and products with low pollutant emissions, including composite wood products, adhesives, sealants, interior paints and finishes, carpet systems, and furnishings. Meeting the requirements of ASHRAE 189.1 Sections 8.4.2 (Prescriptive Option: Materials) or Section 8.5.2 (Performance Option: Materials) demonstrates compliance. Provide the
SECTION 01 33 29 Page 6 following documentation:
a. Demonstrate that materials do not exceed maximum VOC emissions of cited standards. VOC averaging is allowed where coatings are subject to human contact or harsh environmental conditions.
b. Demonstrate that flooring materials comply with VOC emissions of cited standards.
c. Demonstrate that composite wood and agrifiber products and associated laminating adhesives contain no added urea-formaldehyde.
d. Demonstrate that furniture and seating complies with low emissions requirements.
e. Create and maintain a list of above listed products used on the project within the building vapor barrier. Demonstrate how product meets cited standards.
1.6.5 Indoor Air Quality During Construction
Prior to construction, create indoor air quality plan. Implement IAQ plan during construction and flush building air before occupancy.
a. Construction submittal documentation required:
(1) For new construction and for renovation of unoccupied existing buildings, comply with ASHRAE 189.1 Section 10.3.1.4. (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60 percent. For renovation of occupied existing buildings, comply with ANSI/SMACNA 008 IAQ Guidelines for Occupied Buildings Under Construction.
(2) Provide required documentation showing that after construction ends and prior to occupancy, new HVAC filters were installed, and building air was flushed out in accordance with UFC 1-200-02.
1.6.6 Recycled Content
Provide materials on this project with aggregated total recycled content greater than 10 percent. In addition, comply with 40 CFR 247. Refer to http://www.epa.gov/cpg/products.htm for assistance identifying products cited in 40 CFR 247. Provide the following documentation:
a. Total amount of recycled content contained in building materials as a percentage of total cost of all building materials on the project (mechanical, electrical, and plumbing components, fire protection equipment and transportation are excluded).
b. Substitutions: Contractor may submit for Government approval, proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.
SECTION 01 33 29 Page 7
1.6.7 Bio-Based Products
Utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.
Biobased products that are designated for preferred procurement under the USDA BioPreferred Program must meet the required minimum biobased content.
Refer to http://www.biopreferred.gov for the product categories and BioPreferred Catalog. Provide the following documentation:
a. For biobased products used on this project, provide biobased content and biobased source of material. Indicate name of the manufacturer, cost of each product and the use of each product on this project.
1.6.8 Landfill Disposal
Divert construction debris from landfill disposal in accordance with Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. Provide the following documentation:
a. Documentation showing total amount of construction debris diverted from landfill as a percentage of all construction debris on the project.
b. Include project's Construction Waste Management Plan and all dumpster haul tickets.
1.6.9 Ozone Depleting Substances
Eliminate the use of ozone depleting substances during and after construction where alternative environmentally preferable products are available. Meet the requirements of ASHRAE 189.1 Section 9.3.3 Refrigerants for no CFC-based refrigerants in heating ventilation, air conditioning and refrigeration systems (except for fire suppression system requirements, covered elsewhere in this specification). Provide the following documentation:
a. MSDS sheets for all refrigerants provided
b. Products that meet the criteria of U.S. EPA Significant New Alternatives Policy, available at http://www.epa.gov/ozone/snap/index.html.
1.6.10 Validation and Certification Restrictions
The Contractor's purchase of renewable energy certificates (RECs) specifically to meet project sustainability goals is prohibited.
PART 2 PRODUCTS
Not used.
SECTION 01 33 29 Page 8
PART 3 EXECUTION
3.1 SUSTAINABILITY COORDINATION
3.1.1 Coordinating Sustainability Documentation Progress
Provide sustainability focus and coordination at the following meetings to achieve sustainability goals. Contractor's designated TPC accredited sustainability professional responsible for GP and TPC documentation must participate in the following meetings to coordinate documentation completion.
a. Pre-Construction Conference: Discuss the following: TPC and LEED Building Checklist, Sustainability Action Plan, Construction submittal requirements and schedule, individuals responsible for achieving each Guiding Principle Requirement and TPC prerequisite and credit.
b. Construction Progress Meetings: Review GP and TPC sustainability requirements with project team including contractor and sub-contractor representatives. Demonstrate GP and TPC documentation is being collected and updated to the Sustainability Notebook and TPC Online tool.
(1) Facility Turnover Meetings: Review Sustainability Notebook, and TPC Online submission for completeness and identify any outstanding issues relating to final documentation requirements.
(2) Final Sustainability Notebook Review
3.2 SUSTAINABILITY AWARD
Finalize the sustainability certification process and obtain the TPC Certification Silver level Plaque and Certificates, indicating completion of the projects sustainability goals.
3.2.1 Third Party Certification Plaque and Certificates
Obtain and install plaque and provide one original framed copy of the certificate. Plaque shall be a 16" round engraved brass plaque.Mount certificates in 1 inch deep metal frames, with double matt, and wire hangers. Hang the Plaque in a prominent interior location approved by the Contracting Officer.
-- End of Section --
SECTION 01 33 29 Page 9
LEED 2009 for New Construction and Major Renovations 600 & 300 Man Barracks
Project Checklist
14 Possible Points: 26 Y ? N Y ? N
Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2
Credit 2 5 Credit 6 Rapidly Renewable Materials 1 Credit 3 Brownfield Redevelopment 1 Credit 7 1
6 Credit 4.1 6 Credit 4.2 1 12 Possible Points: 15
3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1
Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2
Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 Credit 2 1
Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1
1 Credit 7.2 1 1 Credit 4.1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1
1 Credit 4.3 1 8 Possible Points: 10 1 Credit 4.4 1
1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1
Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 4 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1
Credit 8.1 1 10 Possible Points: 35 Credit 8.2 1
Y Prereq 1 3 Possible Points: 6 Y Prereq 2
Y Prereq 3 1 Credit 1.1 1 6 Credit 1 1 to 19 1 Credit 1.2 1
Credit 2 1 to 7 Credit 1.3 1 2 Credit 3 2 Credit 1.4 1 2 Credit 4 2 Credit 1.5 1
Credit 5 3 1 Credit 2 1 Credit 6 2
3 Possible Points: 4 6 Possible Points: 14
1 Credit 1.1 1 Y Prereq 1 1 Credit 1.2 1
Credit 1.1 1 to 3 1 Credit 1.3 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 Credit 1.4 1
2 Credit 2 1 to 2 Credit 3 1 to 2 56 Possible Points: 110
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Construction IAQ Management Plan—During Construction
Outdoor Air Delivery Monitoring
Indoor Environmental Quality
Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control
Increased Ventilation
Regional Priority Credits
Innovation and Design Process
Water Use Reduction
Minimum Energy Performance Fundamental Refrigerant Management
Daylight and Views—Views
LEED Accredited Professional
Daylight and Views—Daylight
Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings
Optimize Energy Performance
Energy and Atmosphere
Water Use Reduction—20% Reduction
Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems
Indoor Chemical and Pollutant Source Control
Thermal Comfort—Design Controllability of Systems—Thermal Comfort
Sustainable Sites
Alternative Transportation—Public Transportation Access
Site Selection Development Density and Community Connectivity
Construction Activity Pollution Prevention
Construction IAQ Management Plan—Before Occupancy
Materials and Resources, Continued
Water Efficiency
Building Reuse—Maintain Existing Walls, Floors, and Roof
Alternative Transportation—Parking Capacity
Heat Island Effect—Roof
Recycled Content Regional Materials
Certified Wood
Alternative Transportation—Bicycle Storage and Changing Rooms
Materials Reuse
Storage and Collection of Recyclables
Materials and Resources
Fundamental Commissioning of Building Energy Systems
Total Construction Waste Management
Enhanced Commissioning On-Site Renewable Energy
Enhanced Refrigerant Management
MRc2 Construction Waste Management SSc6.1 Stormwater Design - quantity control WEc3 Water Use Reduction
Measurement and Verification
Exemplary Performance: WEc3 Innovation in Design: Low Mercury Lighting Exemplary Performance: SSc7.1
Green Power
LEED 2009 for New Construction and Major Renovations DFAC
Project Checklist
14 Possible Points: 26 Y ? N Y ? N
Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2
Credit 2 5 Credit 6 Rapidly Renewable Materials 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1
6 Credit 4.1 6 Credit 4.2 1 12 Possible Points: 15
3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1
Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2
Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 Credit 2 1
Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1
1 Credit 7.2 1 1 Credit 4.1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1
1 Credit 4.3 1 7 Possible Points: 10 1 Credit 4.4 1
1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1
Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 3 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1
Credit 8.1 1 9 Possible Points: 35 Credit 8.2 1
Y Prereq 1 3 Possible Points: 6 Y Prereq 2
Y Prereq 3 1 Credit 1.1 1 5 Credit 1 1 to 19 1 Credit 1.2 1
Credit 2 1 to 7 Credit 1.3 1 2 Credit 3 2 Credit 1.4 1 2 Credit 4 2 Credit 1.5 1
Credit 5 3 1 Credit 2 1 Credit 6 2
3 Possible Points: 4 7 Possible Points: 14
1 Credit 1.1 1 Y Prereq 1 1 Credit 1.2 1
Credit 1.1 1 to 3 1 Credit 1.3 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 Credit 1.4 1
2 Credit 2 1 to 2 Credit 3 1 to 2 55 Possible Points: 110
Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110
Construction IAQ Management Plan—During Construction
Outdoor Air Delivery Monitoring
Indoor Environmental Quality
Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control
Increased Ventilation
Regional Priority Credits
Innovation and Design Process
Water Use Reduction
Minimum Energy Performance Fundamental Refrigerant Management
Daylight and Views—Views
LEED Accredited Professional
Daylight and Views—Daylight
Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings
Optimize Energy Performance
Energy and Atmosphere
Water Use Reduction—20% Reduction
Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems
Indoor Chemical and Pollutant Source Control
Thermal Comfort—Design Controllability of Systems—Thermal Comfort
Sustainable Sites
Alternative Transportation—Public Transportation Access
Site Selection Development Density and Community Connectivity
Construction Activity Pollution Prevention
Construction IAQ Management Plan—Before Occupancy
Materials and Resources, Continued
Water Efficiency
Building Reuse—Maintain Existing Walls, Floors, and Roof
Alternative Transportation—Parking Capacity
Heat Island Effect—Roof
Recycled Content Regional Materials
Certified Wood
Alternative Transportation—Bicycle Storage and Changing Rooms
Materials Reuse
Storage and Collection of Recyclables
Materials and Resources
Fundamental Commissioning of Building Energy Systems
Total Construction Waste Management
Enhanced Commissioning On-Site Renewable Energy
Enhanced Refrigerant Management
MRc2 Construction Waste Management SSc6.1 Stormwater Design - quantity control WEc3 Water Use Reduction
Measurement and Verification
Exemplary Performance: WEc3 Innovation in Design: Low Mercury Lighting Exemplary Performance: SSc7.1
Green Power
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 33 29 - SUSTAINABILITY REPORTING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUMMARY |
| 1.3 SUBMITTALS |
| 1.4 GUIDING PRINCIPLES VALIDATION GPV |
| 1.4.1 Sustainability Action Plan |
| 1.4.2 Costs |
| 1.4.3 Third Party Certification TPC Documentation |
| 1.5 SUSTAINABILITY SUBMITTALS |
| 1.5.1 "S" Submittals for Sustainability Documentation |
| 1.5.2 SUSTAINABILITY NOTEBOOK |
| 1.5.2.1 Sustainability Notebook Submittal Schedule |
| 1.5.3 LEED Building CHECKLIST |
| 1.5.3.1 LEED Building Checklist Submittals |
| 1.6 DOCUMENTATION REQUIREMENTS |
| 1.6.1 Commissioning |
| 1.6.2 Energy Efficient Equipment |
| 1.6.3 Benchmarking |
| 1.6.4 Reduce Volatile Organic Compounds VOC |
| 1.6.5 Indoor Air Quality During Construction |
| 1.6.6 Recycled Content |
| 1.6.7 Bio-Based Products |
| 1.6.8 Landfill Disposal |
| 1.6.9 Ozone Depleting Substances |
| 1.6.10 Validation and Certification Restrictions |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 SUSTAINABILITY COORDINATION |
| 3.1.1 Coordinating Sustainability Documentation Progress |
| 3.2 SUSTAINABILITY AWARD |
| 3.2.1 Third Party Certification Plaque and Certificates |
| 600&300 Man Barracks.pdf |
| One Page |
| DFAC.pdf |
| One Page |
File details come from the government source that posted it. Updated .