Amendment 0003 Details
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT #3:
The solicitation is amended as follows:
The following items represent changes to the contract scope. These changes apply across the entire solicitation.
REQUEST FOR PROPOSAL IS AMENDED AS FOLLOWS:
1. SPECIFICATION SECTION 02 65 00 (Barracks and DFAC specifications):
REPLACE statement from para.1.1 that reads as follows:
“Compensation for removal of contaminated soil and pumpable liquids will be paid as a unit cost.”
WITH:
"Compensation for removal of contaminated soil and pumpable liquids will be determined by modification to the contract in accordance with the Changes clause in the contract."
2. SPECIFICATION SECTION 02 61 13 (Barracks and DFAC specifications):
REPLACE statement from para.1.1.2.1 that reads as follows:
"Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost."
WITH:
"Compensation for excavation and onsite transportation of contaminated material will be determined by modification to the contract in accordance with the Changes clause in the contract."
3. SPECIFICATION SECTION 31 05 19 (Barracks specifications):
REPLACE statement from para.1.2 that reads as follows:
..."Geotextile installed and accepted will be paid for at the respective contract unit price in the bidding schedule."
WITH:
"Geotextile installed and accepted will be compensated as determined by modification to the contract in accordance with the Changes clause in the contract."
4. DRAWING EP-601, VOLUME 2:
ADD note at bottom left of page, as follows (refer to included “VOL 2_EP601_20May2016.pdf”):
“ROUTE (15) 4” DIRECT BURRIED EMPTY CONDUITS FROM THE SWITCHBOARD TO 5
FEET FROM THE BUILDING EDGE, IN TH DIRECTION OF THE UTILITY TRANSFORMER,
AND PROVIDE CAPS ON CONDUITS. COORDINATE WITH THE UTILITY COMPANY FOR
THE NUMBER AND SIZE OF CONDUITS.”
5. DRAWING EP-601, VOLUME 3:
ADD note at bottom left of page, as follows (refer to included “VOL 3_EP601_20May2016.pdf”):
“ROUTE (10) 4” DIRECT BURRIED ROUTE EMPTY CONDUITS FROM THE SWITCHBOARD
TO 5 FEET FROM THE BUILDING EDGE, IN TH DIRECTION OF THE UTILITY
TRANSFORMER, AND PROVIDE CAPS ON CONDUITS. COORDINATE WITH THE UTILITY
COMPANY FOR THE NUMBER AND SIZE OF CONDUITS.”
6. SPECIFICATION SECTION 01 33 29 (Barracks and DFAC specifications):
REPLACE entire specification (refer to included “01 33 29_20May2016.pdf”)
7. DRAWING GC001 VOLUME 1:
Added HDPE and PERF. To the Abbreviations follows (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
8. DRAWING V-001 VOLUME 1:
Added Note 6 to Survey Notes (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
9. DRAWING V-101 VOLUME 1:
Added Sheet Note 3 (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
10. DRAWING V-102 VOLUME 1:
Added Sheet Note 3. Added underground storm modifications from Phase 2. (refer to included
11. DRAWING V-103 VOLUME 1:
Added Sheet Note 3. Removed curb from Adams Avenue. Added sidewalk along south side of Adams Avenue. Added existing fire lane. Relocated existing 8-inch water main. Adjusted location of underground electrical ductbank. Added stormwater structure near power pole #MO335VM84 from Phase 2. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
12. DRAWING V-104 VOLUME 1:
Added Sheet Note 3. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
13. DRAWING V-105 VOLUME 1:
Added Sheet Note 3. Added underground storm modifications and sidewalk from Phase 2. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
14. DRAWING CD103 VOLUME 1:
Demolition of added sidewalk along south side of Adams Avenue. Demolition of 8-inch watermain. Demolition of fire lane on west side of the site. Adjusted demolition by DVP of electrical duct bank. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
15. DRAWING CS101 VOLUME 1:
Added transformer pad and Keynote 18. Removed one parking space near the ADA parking to accommodate an existing storm manhole to remain. (refer to included
16. DRAWING CS102 VOLUME 1:
Added removable bollards along 12th Street. Added transformer pad and Keynote 19. Moved sidewalk connections along new fire road per Phase 2 Modifications. (refer to included
17. DRAWING CS103 VOLUME 1:
Removed pavement patch and curb and gutter along south side of Adams Avenue. Added valves at fire line connection. Added transformer pad and keynote 10. (refer to included
18. DRAWING CS104 VOLUME 1:
Adjusted coordinate table. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
19. DRAWING CS105 VOLUME 1:
Adjusted new sidewalk to match Phase 2 Modifications. (refer to included
20. DRAWING CP101 VOLUME 1:
Adjusted limits of paving due to the loss of one parking space near the ADA parking. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
21. DRAWING CP102 VOLUME 1:
Adjusted sidewalk and fireline tie-ins due to Phase 2 Modification. (refer to included
22. DRAWING CP103 VOLUME 1:
Removed pavement patch and curb and gutter along south side of Adams Avenue. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
23. DRAWING CP105 VOLUME 1:
24. DRAWING CG100 VOLUME 1:
25. DRAWING CG101 VOLUME 1:
Added keynotes and alignments for storm drain profiles. (refer to included
26. DRAWING CG102 VOLUME 1:
Added keynotes and alignments for storm drain profiles. (refer to included
27. DRAWING CG103 VOLUME 1:
Added keynotes and alignments for storm drain profiles. Adjusted location of Structure D11. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
28. DRAWING CG104 VOLUME 1:
Added keynnotes and alignments for storm drain profiles. Modified connection from Structure G2 to G4, and G4 to G6. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
29. DRAWING CG105 VOLUME 1:
Added Phase 2 Modification for underground stormwater BMP and associated structures.
Eliminated pipe run from Structure E8 to E9. Adjusted location of Structures F1 through F5.
Added keynote and alignment for storm drain profiles. (refer to included
30. DRAWING CG203 VOLUME 1:
Added storm drain profiles. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
31. DRAWING CG204 VOLUME 1:
32. DRAWING CG205 VOLUME 1:
33. DRAWING CG206 VOLUME 1:
34. DRAWING CU101 VOLUME 1:
Added Sheet Note 9 for electrical coordination at the building. Moved Natural Gas line 2-feet off existing electrical ductbank. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
35. DRAWING CU102 VOLUME 1:
Added Sheet Note 8 for electrical coordination at the building. Added water valves for fire service connection at 300 PN Barracks. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
36. DRAWING CU103 VOLUME 1:
Added Sheet Note 9 for electrical coordination at the building. New waterline offset shown on west side of building. Added valves for fire service connection. (refer to included
37. DRAWING C-509 VOLUME 1:
Updated Structure #'s for Outfall Controls. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)
38. DRAWING P-001 VOLUME 3:
Increased the capacity of the lint interceptor. (refer to included “VOL3_P-001_20May2016.pdf”)
39. UTILITY COORDINATION DRAWINGS:
Site utility drawings referencing work performed by others provided for information only.(refer to included “Utility Coordination_20May2016.pdf”)