Amendment_Details_3_20May2016.pdf

PDF 27 KB Posted

Attached to
AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
Solicitation number
W91236-16-R-0010
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Amendment 0003 Details

View the file

Other files for this federal contract opportunity

Other files attached to AIT Barracks- Phase III, Ft. Lee, Virginia, newest first.
File Type Posted
W91236-16-R-0010-0006.pdf PDF
VOL_2_A-601_3JUN2016.pdf PDF
VOL_2_EL701_3JUN2016.pdf PDF
VOL_3_M-602_3JUN2016.pdf PDF
VOL_2_EP702_3JUN2016.pdf PDF
VOL_3_EP702_3JUN2016.pdf PDF
VOL_3_M-601_3JUN2016.pdf PDF
VOL_4_M-601_3JUN2016.pdf PDF
VOL_4_P-502_3JUN2016.pdf PDF
VOL_3_EP703_3JUN2016.pdf PDF
VOL_2_EP104_3JUN2016.pdf PDF
VOL_2_EP601_3JUN2016.pdf PDF
VOL_2_EP703_3JUN2016.pdf PDF
VOL_3_EP701_3JUN2016.pdf PDF
VOL_2_M-001_3JUN2016.pdf PDF
VOL_3_EL502_3JUN2016.pdf PDF
VOL_3_EP601_3JUN2016.pdf PDF
VOL_2_E-001_3JUN2016.pdf PDF
Am_4_-_Attach_10_VOL_3_A-101_26MAY2016.pdf PDF
Am_4_-_Attach_08_VOL_2_S-003_26MAY2016.pdf PDF
Am_4_-_Attach_23_VOL_4_A-101_26MAY2016.pdf PDF
Am_4_-_Attach_07_VOL_2_G-002_26MAY2016.pdf PDF
Am_4_-_Attach_03_VOL_2_A-101_26MAY2016.pdf PDF
Amendment_4_Breakout.pdf PDF
Am_4_-_Attach_15_VOL_3_G-002_26MAY2016.pdf PDF
Am_4_-_Attach_04_VOL_2_A-112_26MAY2016.pdf PDF
Am_4_-_Attach_20_VOL_3_S-105B_26MAY2016.pdf PDF
Am_4_-_Attach_17_VOL_3_S-102_26MAY2016.pdf PDF
Am_4_-_Attach_12_VOL_3_A-318_26MAY2016.pdf PDF
W91236-16-R-0010-0004.pdf PDF
25May2016_Site_Visit_Roster.pdf PDF
Am_4_-_Attach_01_VOL_1__CS101-103_26MAY2016.pdf PDF
Am_4_-_Attach_02_VOL_2_A-002_26MAY2016.pdf PDF
Am_4_-_Attach_22_VOL_3_S-501_26MAY2016.pdf PDF
synthetic_turf_spec.pdf PDF
VOL_3_EP601_20May2016.pdf PDF
DAYS_BASE_ACCESS_Template_.xlsx XLSX spreadsheet
VOL_3_P-001_20May2016.pdf PDF
W91236-16-R-0010-0003.pdf PDF
DFAC_SPECS_VOL2_16May2016.pdf PDF
BARRACKS_SPECS_VOL2_16May2016.pdf PDF
DFAC_SPECS_VOL1_16May2016.zip ZIP file
W91236-16-R-0010-00001.pdf PDF
VOL 2_LEE_BCOF_600_16May2016.pdf PDF
VOL 4_LEE_DFAC_16May2016.pdf PDF
H.01.04_LEE_VOLUME_4_DFAC_(ProgressSubmission).zip ZIP file
H.01.04_DFAC_Specifications_21April2016.zip ZIP file
H.01.04__Drainage_Report_21April2016.zip ZIP file
H.01.04_Volume2600PersonBarracks_21April2016.zip ZIP file
H.01.04_Volume4DFACPlans_21April2016.zip ZIP file
Show all 50

AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT #3:

The solicitation is amended as follows:

The following items represent changes to the contract scope. These changes apply across the entire solicitation.

REQUEST FOR PROPOSAL IS AMENDED AS FOLLOWS:

1. SPECIFICATION SECTION 02 65 00 (Barracks and DFAC specifications):

REPLACE statement from para.1.1 that reads as follows:

“Compensation for removal of contaminated soil and pumpable liquids will be paid as a unit cost.”

WITH:

"Compensation for removal of contaminated soil and pumpable liquids will be determined by modification to the contract in accordance with the Changes clause in the contract."

2. SPECIFICATION SECTION 02 61 13 (Barracks and DFAC specifications):

REPLACE statement from para.1.1.2.1 that reads as follows:

"Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost."

WITH:

"Compensation for excavation and onsite transportation of contaminated material will be determined by modification to the contract in accordance with the Changes clause in the contract."

3. SPECIFICATION SECTION 31 05 19 (Barracks specifications):

REPLACE statement from para.1.2 that reads as follows:

..."Geotextile installed and accepted will be paid for at the respective contract unit price in the bidding schedule."

WITH:

"Geotextile installed and accepted will be compensated as determined by modification to the contract in accordance with the Changes clause in the contract."

4. DRAWING EP-601, VOLUME 2:

ADD note at bottom left of page, as follows (refer to included “VOL 2_EP601_20May2016.pdf”):

“ROUTE (15) 4” DIRECT BURRIED EMPTY CONDUITS FROM THE SWITCHBOARD TO 5

FEET FROM THE BUILDING EDGE, IN TH DIRECTION OF THE UTILITY TRANSFORMER,

AND PROVIDE CAPS ON CONDUITS. COORDINATE WITH THE UTILITY COMPANY FOR

THE NUMBER AND SIZE OF CONDUITS.”

5. DRAWING EP-601, VOLUME 3:

ADD note at bottom left of page, as follows (refer to included “VOL 3_EP601_20May2016.pdf”):

“ROUTE (10) 4” DIRECT BURRIED ROUTE EMPTY CONDUITS FROM THE SWITCHBOARD

TO 5 FEET FROM THE BUILDING EDGE, IN TH DIRECTION OF THE UTILITY

TRANSFORMER, AND PROVIDE CAPS ON CONDUITS. COORDINATE WITH THE UTILITY

COMPANY FOR THE NUMBER AND SIZE OF CONDUITS.”

6. SPECIFICATION SECTION 01 33 29 (Barracks and DFAC specifications):

REPLACE entire specification (refer to included “01 33 29_20May2016.pdf”)

7. DRAWING GC001 VOLUME 1:

Added HDPE and PERF. To the Abbreviations follows (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

8. DRAWING V-001 VOLUME 1:

Added Note 6 to Survey Notes (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

9. DRAWING V-101 VOLUME 1:

Added Sheet Note 3 (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

10. DRAWING V-102 VOLUME 1:

Added Sheet Note 3. Added underground storm modifications from Phase 2. (refer to included

11. DRAWING V-103 VOLUME 1:

Added Sheet Note 3. Removed curb from Adams Avenue. Added sidewalk along south side of Adams Avenue. Added existing fire lane. Relocated existing 8-inch water main. Adjusted location of underground electrical ductbank. Added stormwater structure near power pole #MO335VM84 from Phase 2. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

12. DRAWING V-104 VOLUME 1:

Added Sheet Note 3. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

13. DRAWING V-105 VOLUME 1:

Added Sheet Note 3. Added underground storm modifications and sidewalk from Phase 2. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

14. DRAWING CD103 VOLUME 1:

Demolition of added sidewalk along south side of Adams Avenue. Demolition of 8-inch watermain. Demolition of fire lane on west side of the site. Adjusted demolition by DVP of electrical duct bank. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

15. DRAWING CS101 VOLUME 1:

Added transformer pad and Keynote 18. Removed one parking space near the ADA parking to accommodate an existing storm manhole to remain. (refer to included

16. DRAWING CS102 VOLUME 1:

Added removable bollards along 12th Street. Added transformer pad and Keynote 19. Moved sidewalk connections along new fire road per Phase 2 Modifications. (refer to included

17. DRAWING CS103 VOLUME 1:

Removed pavement patch and curb and gutter along south side of Adams Avenue. Added valves at fire line connection. Added transformer pad and keynote 10. (refer to included

18. DRAWING CS104 VOLUME 1:

Adjusted coordinate table. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

19. DRAWING CS105 VOLUME 1:

Adjusted new sidewalk to match Phase 2 Modifications. (refer to included

20. DRAWING CP101 VOLUME 1:

Adjusted limits of paving due to the loss of one parking space near the ADA parking. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

21. DRAWING CP102 VOLUME 1:

Adjusted sidewalk and fireline tie-ins due to Phase 2 Modification. (refer to included

22. DRAWING CP103 VOLUME 1:

Removed pavement patch and curb and gutter along south side of Adams Avenue. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

23. DRAWING CP105 VOLUME 1:

24. DRAWING CG100 VOLUME 1:

25. DRAWING CG101 VOLUME 1:

Added keynotes and alignments for storm drain profiles. (refer to included

26. DRAWING CG102 VOLUME 1:

Added keynotes and alignments for storm drain profiles. (refer to included

27. DRAWING CG103 VOLUME 1:

Added keynotes and alignments for storm drain profiles. Adjusted location of Structure D11. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

28. DRAWING CG104 VOLUME 1:

Added keynnotes and alignments for storm drain profiles. Modified connection from Structure G2 to G4, and G4 to G6. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

29. DRAWING CG105 VOLUME 1:

Added Phase 2 Modification for underground stormwater BMP and associated structures.

Eliminated pipe run from Structure E8 to E9. Adjusted location of Structures F1 through F5.

Added keynote and alignment for storm drain profiles. (refer to included

30. DRAWING CG203 VOLUME 1:

Added storm drain profiles. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

31. DRAWING CG204 VOLUME 1:

32. DRAWING CG205 VOLUME 1:

33. DRAWING CG206 VOLUME 1:

34. DRAWING CU101 VOLUME 1:

Added Sheet Note 9 for electrical coordination at the building. Moved Natural Gas line 2-feet off existing electrical ductbank. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

35. DRAWING CU102 VOLUME 1:

Added Sheet Note 8 for electrical coordination at the building. Added water valves for fire service connection at 300 PN Barracks. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

36. DRAWING CU103 VOLUME 1:

Added Sheet Note 9 for electrical coordination at the building. New waterline offset shown on west side of building. Added valves for fire service connection. (refer to included

37. DRAWING C-509 VOLUME 1:

Updated Structure #'s for Outfall Controls. (refer to included “VOL1_LEE_SITE_20May2016.pdf”)

38. DRAWING P-001 VOLUME 3:

Increased the capacity of the lint interceptor. (refer to included “VOL3_P-001_20May2016.pdf”)

39. UTILITY COORDINATION DRAWINGS:

Site utility drawings referencing work performed by others provided for information only.(refer to included “Utility Coordination_20May2016.pdf”)